Public Act 90-0002 of the 90th General Assembly

State of Illinois
Public Acts
90th General Assembly

[ Home ] [ Public Acts ] [ ILCS ] [ Search ] [ Bottom ]


Public Act 90-0002

SB88 Enrolled                                  SRA90S0011MWcb

    AN ACT  making  appropriations  and  reappropriations  by
amending Public Act 89-0501.

    Be  it  enacted  by  the People of the State of Illinois,
represented in the General Assembly:

    Section   1.    "AN   ACT   making   appropriations   and
reappropriations," Public  Act  89-0501,  approved  June  28,
1996,  is  amended by adding new Sections 1A, 2A, 3B, 4B, 5A,
6B, 7A, 8A, 9A, 10B, 11A, 24A, 28A,  28B,  28C,  and  28D  to
Article 77 as follows:

    (P.A. 89-0501, Art. 77, Sec. 1A new)
    Sec. 1A.  The following named amounts, or so much thereof
as  may  be  necessary,  are  appropriated  from  the Capital
Development Fund to the Capital  Development  Board  for  the
Department   of  Agriculture  for  the  projects  hereinafter
enumerated:
            ANIMAL DISEASE LABORATORY - CENTRALIA
For upgrading the diagnostic laboratory
  facility, in addition to funds previously
  appropriated ................................. $    200,000
          ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
For replacing and/or repairing sidewalks,
  curbs, gutters and streets, in addition
  to funds previously appropriated .............    1,050,000
For completing the installation of fiber
  optics system, in addition to funds
  previously appropriated ......................       25,000
For upgrading the storm/sanitary and water
  systems, in addition to funds previously
  appropriated .................................    1,600,000
For renovation or replacement of
  comfort stations, in addition
  to funds previously appropriated .............    1,273,000
For upgrading Building 13, in addition to
  funds previously appropriated ................      733,000
    Total, Section 1A                              $4,881,000

    (P.A. 89-0501, Art. 77, Sec. 2A new)
    Sec. 2A.  The following named amounts, or so much thereof
as may  be  necessary,  are  appropriated  from  the  Capital
Development  Fund  to  the  Capital Development Board for the
Department of Central Management Services  for  the  projects
hereinafter enumerated:
                 ILLINOIS REHABILITATION AND
           EDUCATION CENTER (ROOSEVELT) - CHICAGO
For upgrading the HVAC system ..................    2,250,000
    SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES
For renovation of Suburban North Regional
  Office Building (formerly Maine Township
  North High School building), in addition
  to funds previously appropriated for such
  purpose, Phase III ...........................    5,400,000
For renovation and expansion of garage .........      375,000
               MARION REGIONAL OFFICE BUILDING
For construction of a Regional Office
  Building Addition ............................    2,000,000
               COMPUTER FACILITY - SPRINGFIELD
For replacement of the halon fire
  suppression system ...........................      875,000
    Total, Section 2A                             $10,900,000

    (P.A. 89-0501, Art. 77, Sec. 3B new)
    Sec  3B.  The following named amounts, or so much thereof
as may  be  necessary,  are  appropriated  from  the  Capital
Development  Fund  to  the  Capital Development Board for the
Department  of  Corrections  for  the  projects   hereinafter
enumerated:
                          STATEWIDE
For correction of deficiencies in
  water systems at three correctional
  facilities ................................... $    100,000
For replacement of locks, windows and
  doors at the following locations
  as set forth below: ..........................    4,000,000
   Dwight ...............................291,400
   IYC Harrisburg .......................943,000
   IYC Joliet ...........................367,500
   Menard .............................1,350,000
   Pontiac ...............................77,100
   IYC Valley View ......................500,000
   Vienna ...............................471,000
For planning, design, construction,
  equipment and other necessary costs
  for a Correctional Facility for
  juveniles ....................................   42,750,000
For planning, design, construction,
  equipment and other necessary costs
  for a Medium Security Correctional
  Facility .....................................   69,000,000
                DANVILLE CORRECTIONAL CENTER
For renovation of interior and
  exterior walls, in addition to
  funds previously appropriated ................    4,000,000
             DECATUR WOMEN'S CORRECTIONAL CENTER
For the planning and conversion of
  Meyer Mental Health Center into a
  correctional facility ........................   23,000,000
                  DIXON CORRECTIONAL CENTER
For renovation of the groundwater
  storage tank  and abatement of crawl-
  space pipes in Bldgs. 26, 27 and 29 ..........      700,000
                 DWIGHT CORRECTIONAL CENTER
For completion of medical unit,
  in addition to funds previously
  appropriated .................................    3,500,000
For expansion of the Education Building
  and Dietary and construction of
  a warehouse ..................................    4,700,000
               EAST MOLINE CORRECTIONAL CENTER
For upgrading locking system, in addition
  to funds previously appropriated .............      800,000
             ILLINOIS YOUTH CENTER - HARRISBURG
For upgrading the domestic water system ........      675,000
For upgrading the HVAC system ..................      532,000
               ILLINOIS YOUTH CENTER - JOLIET
For planning, site improvements,
  utility upgrade, equipment and all
  costs necessary to construct a
  housing unit and dietary facility.............    7,000,000
           ILLINOIS YOUTH CENTER - PERE MARQUETTE
For upgrading the electrical
  distribution system ..........................      215,000
             ILLINOIS YOUTH CENTER - VALLEY VIEW
For upgrading dormitory restrooms
  and fixtures, in addition to
  funds previously appropriated ................      550,000
                 JOLIET CORRECTIONAL CENTER
For upgrading the power house and
  installation of a generator ..................      407,000
           STATEVILLE CORRECTIONAL CENTER - JOLIET
For replacement of the MSU .....................    6,500,000
                 LINCOLN CORRECTIONAL CENTER
For upgrading the water softener system ........      150,000
            MENARD CORRECTIONAL CENTER - CHESTER
For upgrading roads and sidewalks ..............      310,000
For upgrading the plumbing systems in
  two buildings ................................      400,000
For upgrading the coal handling system
  and repair or replace boiler system ..........      950,000
For conversion of the Maintenance Building
  to an inmate dormitory .......................      250,000
For conversion of the Administration
  Building basement to a courtroom and
  attorney offices .............................      100,000
For upgrading the steam and water distribution
  systems, in addition to funds previously
  appropriated .................................    2,400,000
                 PONTIAC CORRECTIONAL CENTER
For renovation of main sally port ..............      300,000
                VANDALIA CORRECTIONAL CENTER
For renovation of dormitory shower rooms .......      450,000
                 VIENNA CORRECTIONAL CENTER
For upgrading the steam distribution system
  and renovation of Powerhouse, in addition
  to funds previously appropriated .............    4,000,000
For installation of security fencing ...........    1,000,000
For upgrading air conditioning system
  and replacement of cooling tower .............    1,100,000
For upgrading the electrical, plumbing and
  HVAC systems in four buildings ...............      850,000
    Total, Section 3B                            $180,689,000

    (P.A. 89-0501, Art. 77, Sec. 4B new)
    Sec. 4B.  The following named amounts, or so much thereof
as  may  be  necessary,  are  appropriated  from  the Capital
Development Fund to the Capital  Development  Board  for  the
Department  of  Mental  Health and Developmental Disabilities
for the projects hereinafter enumerated:
                          STATEWIDE
For replacement of roofing systems at the
  following locations at the approximate costs
  set forth below: ............................. $  2,333,900
    Alton Mental Health Center ..........217,000
    Choate Mental Health Center .........134,900
    Chester Mental Health Center ......1,350,000
    Fox Developmental Center ............101,000
    Howe Developmental Center ...........166,000
    Jacksonville Developmental Center ....21,000
    Lincoln Developmental Center ........344,000
         ALTON MENTAL HEALTH CENTER - MADISON COUNTY
For rehabilitation of the central dietary ......    1,950,000
For replacement of life/safety and
  security system in a residential
  building .....................................      246,000
           CHESTER MENTAL HEALTH CENTER - CHESTER
For installation of emergency generator
  and upgrading EMS system .....................      350,000
         CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
For renovating residential units, in
  addition to funds previously
  appropriated .................................    2,171,000
             CHOATE MENTAL HEALTH CENTER - ANNA
For upgrading mechanical equipment, in
  addition to funds previously
appropriated ...................................      837,000
For renovating a residential building,
  in addition to funds previously
  appropriated .................................    2,334,000
          ELGIN MENTAL HEALTH CENTER - KANE COUNTY
For construction of an Adult Psychiatric
  Building, in addition to funds previously
  appropriated .................................    3,681,000
For construction of roads, parking lots
  and street lights ............................    2,500,000
For upgrading and expanding the mechanical
  infrastructure, in addition to funds
  previously appropriated ......................    4,500,000
For construction of a forensic services complex
  at Elgin Mental Health Center, in addition
  to funds previously appropriated .............    4,815,500
             FOX DEVELOPMENTAL CENTER  - DWIGHT
For replacement of absorbers and
  upgrading HVAC system ........................      738,000
For renovation of dietary ......................      843,000
           HOWE DEVELOPMENTAL CENTER - TINLEY PARK
For renovation of residential buildings ........    2,561,000
      JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
For rehabilitation of bathrooms and
  replacing doors ..............................    1,575,000
For rehabilitation of the electrical
  distribution system, in addition to funds
  previously appropriated ......................    1,257,000
         LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
For installation of a rethermalization food
  service system, in addition to funds
  previously appropriated ......................      732,000
         LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
For renovation of residential buildings,
  in addition to funds previously
  appropriated .................................    1,888,500
For rehabilitation of the roads and parking
  areas and constructing walks .................      800,000
             MADDEN MENTAL HEALTH CENTER - HINES
For renovation of pavilions, in addition
  to funds previously appropriated .............      844,000
        MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
For replacement of the HVAC management
  control panel, in addition to funds
  previously appropriated ......................      150,000
For rehabilitation of the dietary facility .....      413,000
           MURRAY DEVELOPMENTAL CENTER - CENTRALIA
For replacement of the boiler
  shells and controls, in addition
  to funds previously appropriated .............      132,000
For rehabilitation of the hot water
  distribution system, in addition to
  funds previously appropriated ................      514,000
For replacement of cooling towers and
  support beams, in addition to funds
  previously appropriated ......................      335,000
           SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
For completion of the HVAC system, in
  addition to funds previously
  appropriated .................................      598,000
For replacement of boiler, in
  addition to funds previously
  appropriated .................................      765,000
For replacement of electrical feeder
  cable, in addition to the funds
  previously appropriated ......................      586,000
For rehabilitation of sewers and
  manholes, in addition to funds
  previously appropriated ......................      777,000
For replacement of water mains
  and valves ...................................    1,826,000
           SINGER MENTAL HEALTH CENTER - ROCKFORD
For replacement of absorbers ...................      746,000
       TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY
For replacement of the bar screen and
  renovating the sewer system, in
  addition to funds previously appropriated ....      655,000
For rehabilitation of the electrical
  distribution system, in addition to
  funds previously appropriated ................    2,250,000
            ZELLER MENTAL HEALTH CENTER - PEORIA
For renovation of the nurses' stations,
  in addition to funds previously
  appropriated .................................    1,720,000
    Total, Section 4B                             $48,423,900

    (P.A. 89-0501, Art. 77, Sec. 5A new)
    Sec. 5A.  The following named amounts, or so much thereof
as may  be  necessary,  are  appropriated  from  the  Capital
Development  Fund  to  the  Capital Development Board for the
Department of Military Affairs for the  projects  hereinafter
enumerated:
                 NORTHWEST ARMORY - CHICAGO
For renovation of interior and exterior,
  in addition to funds previously
  appropriated for such purposes ...............    1,200,000
                  DIXON ARMORY - LEE COUNTY
For construction of an addition,
  remodeling, extending utilities and
  installing a kitchen .........................      280,000
                SALEM ARMORY - MARION COUNTY
For replacement of the boiler and
  all domestic plumbing, piping and
  fixtures .....................................      800,000
              STREATOR ARMORY - LASALLE COUNTY
For renovation of the mechanical
  systems,  in addition to funds
  previously appropriated ......................      450,000
    Total, Section 5A                              $2,730,000

    (P.A. 89-0501, Art. 77, Sec. 6B new)
    Sec. 6B.  The following named amounts, or so much thereof
as  may  be  necessary,  are  appropriated  from  the Capital
Development Fund to the Capital  Development  Board  for  the
Department  of Natural Resources for the projects hereinafter
enumerated:
         CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
For construction of a concession building
  and upgrading the horse concession, in
  addition to funds previously appropriated ....      500,000
               CHAMPAIGN - STATE WATER SURVEY
For planning the renovation of the central
  utilities plant ..............................       30,000
For renovation of office and
  laboratory buildings .........................      793,000
For replacement and upgrade of the exterior
  lighting system ..............................      146,000
          CHAMPAIGN - STATE NATURAL HISTORY SURVEY
For renovation of Natural History
  Research Center (formerly Burnham
  Hospital) in Champaign .......................    6,000,000
            DELABAR STATE PARK - HENDERSON COUNTY
For replacement of waterlines and
  fountains ....................................      110,000
           EAGLE CREEK STATE PARK - SHELBY COUNTY
For rehabilitation of the sewage treatment
  system, in addition to funds previously
  appropriated .................................      312,000
      HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
For replacement and rehabilitation
  of arch culverts and canal ...................      600,000
        JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
For rehabilitation of the concession
  building, in addition to funds
  previously appropriated ......................      140,000
           KICKAPOO STATE PARK - VERMILION COUNTY
For construction of a sewage treatment
  plant, in addition to funds
  previously appropriated ......................    1,110,000
          MORAINE HILLS STATE PARK - MCHENRY COUNTY
For renovation of the trail ....................      345,000
           MORAINE VIEW STATE PARK - MCLEAN COUNTY
For construction of a sewage treatment
  system and plant .............................    1,625,000
          PERE MARQUETTE STATE PARK - JERSEY COUNTY
For renovation of two buildings and
  replacement of a storage building ............      180,000
          STARVED ROCK STATE PARK - LASALLE COUNTY
For construction of a visitors'
  center, in addition to funds
  previously appropriated ......................      365,000
For rehabilitation of trails, in addition
  to funds previously appropriated  ............    1,000,000
For reconstruction of the seawall, in
  addition to funds previously
  appropriated .................................      500,000
For rehabilitation of the sewer
  system - Phase I .............................      180,000
  STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
For the completion of site improvements ........      559,000
                 STATE MUSEUM - SPRINGFIELD
For planning and replacement of the main
  museum exhibits, in addition to funds
  previously appropriated ......................      700,000
    Total, Section 6B                             $15,195,000

    (P.A. 89-0501, Art. 77, Sec. 7A new)
    Sec. 7A.  The following named amounts, or so much thereof
as may  be  necessary,  are  appropriated  from  the  Capital
Development  Fund  to  the  Capital Development Board for the
Department  of  Rehabilitation  Services  for  the   projects
hereinafter enumerated:
  ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
For upgrading campus lighting ..................      150,000
For the renovation of Building No. 4 ...........      700,000
         ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
For replacement of roofing systems .............      535,000
For planning the upgrade of the heat
  and smoke detection system ...................      100,000
For the renovation of Cullom Hall ..............    2,100,000
    Total, Section 7A                              $3,585,000

    (P.A. 89-0501, Art. 77, Sec. 8A new)
    Sec. 8A.  The following named amounts, or so much thereof
as  may  be  necessary,  are  appropriated  from  the Capital
Development Fund to the Capital  Development  Board  for  the
Department of Revenue for the project hereinafter enumerated:
             WILLARD ICE BUILDING - SPRINGFIELD
For completion of the replacement of the
  fire alarm and security system ...............  $    70,000
For upgrade of the uninterruptible
  power system .................................    1,300,000
For completion of the renovation of
  the atrium landscaping .......................      100,000
    Total, Section 8A                              $1,470,000

    (P.A. 89-0501, Art. 77, Sec. 9A new)
    Sec. 9A.  The following named amounts, or so much thereof
as  may  be  necessary,  are  appropriated  from  the Capital
Development Fund to the Capital  Development  Board  for  the
Department  of  State  Police  for  the  projects hereinafter
enumerated:
For replacing radio communication
  towers, equipment, buildings and
  installing emergency power
  generators at various locations ..............    1,150,000
   District #22, Effingham (Mason site)
   District #10, Pesotum
   District #21, Askum
   District #6, Pontiac
            DISTRICT 18 HEADQUARTERS - LITCHFIELD
For rehabilitation of headquarters facilities ..      377,000
    Total, Section 9A                              $1,527,000

    (P.A. 89-0501, Art. 77, Sec. 10B new)
    Sec.  10B.  The  following  named  amounts,  or  so  much
thereof as  may  be  necessary,  are  appropriated  from  the
Capital Development Fund to the Capital Development Board for
the  Capital  Development  Board for the projects hereinafter
enumerated:
                          STATEWIDE
For renovation to meet the requirements
  of the Americans with Disabilities Act .......    3,000,000
                CAPITOL COMPLEX - SPRINGFIELD
For energy improvements and upgrading the
  HVAC, security and electrical systems,
  in addition to funds previously
  appropriated - Attorney General's
  Building .....................................      225,000
To renovate the interior, exterior and
  site improvements, in addition to
  funds previously appropriated -
  Executive Mansion ............................      190,000
For upgrading environmental equipment
  and HVAC, in addition to funds previously
  appropriated - Archives Building .............    2,150,000
For planning and beginning the rehabilitation
  of the Power Plant ...........................    3,805,000
For upgrading sewer system - Capitol Complex,
  in addition to funds previously
  appropriated .................................    2,100,000
For renovation of the lower level and
  ground floor, in addition to funds
  previously appropriated - Old Power Plant ....    2,180,000
    Total, Section 10B                            $13,650,000

    (P.A. 89-0501, Art. 77, Sec. 11A new)
    Sec.  11A.  The  following  named  amounts,  or  so  much
thereof as  may  be  necessary,  are  appropriated  from  the
Capital Development Fund to the Capital Development Board for
the Historic Preservation Agency for the projects hereinafter
enumerated:
                   STATEWIDE HISTORIC SITE
For matching ISTEA federal grant funds ......... $    500,000
              DAVID DAVIS MANSION - BLOOMINGTON
For renovation of the David Davis Mansion
  to eliminate basement leakage ................      231,000
         CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
For renovation of the Cahokia Courthouse
  and the Jarrot House .........................      387,000
         CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
For replacement of Monk's Mound stairs .........      465,000
For restoration of Monk's Mound ................    1,800,000
       LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY
For construction of a visitors' center .........    1,625,000
For replacement of bridges .....................      180,000
              LINCOLN'S NEW SALEM - PETERSBURG
For renovation of the River Ridge
  Restaurant and improvements to the
  domestic water system ........................      273,000
               OLD STATE CAPITOL - SPRINGFIELD
For renovation of the Old State
  Capitol to eliminate basement
  leakage ......................................      620,000
    Total, Section 11A                             $6,081,000

    (P.A. 89-0501, Art. 77, Sec. 24A new)
    Sec.  24A.  The  following  named  amounts,  or  so  much
thereof  as  may  be  necessary,  are  appropriated  from the
Capital Development Fund to the Capital Development Board for
the  Department  of  Veterans'  Affairs   for   the   project
hereinafter enumerated:
              ILLINOIS VETERANS' HOME - MANTENO
For construction of a special care facility ....   $5,550,000
              ILLINOIS VETERANS' HOME - QUINCY
For upgrading HVAC system ......................      254,000
For replacing steam lines ......................       83,000
For replacing the domestic hot water loop ......      305,000
For renovating the elevator ....................      197,000
    Total, Section 24A                             $6,389,000

    (P.A. 89-0501, Art. 77, Sec. 28A new)
    Sec.  28A.  The  following  named  amounts,  or  so  much
thereof  as  may  be  necessary,  are  appropriated  from the
Capital Development Fund to the Capital Development Board for
the  Illinois  Community  College  Board  for  the   projects
hereinafter enumerated:
                   BELLEVILLE AREA COLLEGE
For constructing a building, additions
  and site improvements at the
  Belleville and Red Bud campuses,
  in addition to funds previously
  appropriated ................................. $ 10,797,100
        DANVILLE COMMUNITY COLLEGE - VERMILION COUNTY
To rehabilitate infrastructure,
  construct a classroom facility
  and a day care center, in addition
  to funds previously appropriated .............    4,770,200
          HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
For planning buildings, parking areas,
  utilities, and site development and
  preliminary site preparation
  required to establish permanent
  campus facilities ............................    2,500,000
               JOHN A. LOGAN COMMUNITY COLLEGE
For constructing additions and site
  improvements, in addition to funds
  previously appropriated ......................   12,315,900
              SHAWNEE COMMUNITY COLLEGE - ULLIN
For planning additions to the main
  building, parking areas, site
  improvements and roofing
  replacements .................................      310,000
    Total, Section 28A                            $30,693,200

    (P.A. 89-0501, Art. 77, Sec. 28B new)
    Sec.  28B.  The  following  named  amounts,  or  so  much
thereof  as  may  be  necessary,  are  appropriated  from the
Capital Development Fund to the Capital Development Board for
the Board of Higher Education for  the  projects  hereinafter
enumerated:
                  MATH AND SCIENCE ACADEMY
For replacing air conditioning units,
  controls and upgrading the energy
  management system ............................ $  2,370,000
                  CHICAGO STATE UNIVERSITY
For renovating campus buildings and
  upgrading mechanical systems..................    2,432,200
          EASTERN ILLINOIS UNIVERSITY - CHARLESTON
For planning an addition and renovation
  of Booth Library .............................    1,000,000
                 GOVERNORS STATE UNIVERSITY
For upgrading and replacing cooling
  and refrigeration systems and
  equipment ....................................    2,299,400
         NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
For purchasing equipment
  for the Fine Arts Complex ....................    4,000,000
            WESTERN ILLINOIS UNIVERSITY - MACOMB
For converting Simpkins Hall
  gymnasium and adjacent areas into
  a performing arts facility ...................    2,309,300
             ILLINOIS STATE UNIVERSITY - NORMAL
For purchasing equipment for
  the Science Laboratory building ..............    4,000,000
          SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
For site improvements and purchasing
  equipment for the Engineering and
  Technology Building ..........................    1,259,000
For planning addition, remodeling and
upgrading the HVAC system in Altgeld Hall ......      574,000
         SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
For construction of the Engineering Facility
  building and related site improvements .......   21,256,200
            UNIVERSITY OF ILLINOIS - SPRINGFIELD
For upgrading and completing the south
  access roadway ...............................      451,600
              UNIVERSITY OF ILLINOIS - CHICAGO
For the renovation of the court area and
  Lecture Center, in addition to funds
  previously appropriated ......................    5,900,000
             UNIVERSITY OF ILLINOIS - CHAMPAIGN
For completion of campus flood control .........    6,000,000
    Total, Section 14                             $53,851,700

    (P.A. 89-0501, Art. 77, Sec. 28C new)
    Sec.  28C.  The  following  named  amounts,  or  so  much
thereof as may be necessary, is appropriated from the Capital
Development  Fund  to  the  Capital Development Board for the
Board  of  Higher   Education   for   miscellaneous   capital
improvements  including  construction,   capital  facilities,
cost  of  planning,  supplies, equipment, materials, services
and all other expenses required to complete the work  at  the
various  universities  set  forth  below.  This appropriation
shall be in addition to any other appropriated amounts  which
can be expended for these purposes.
  For Chicago State University ..........525,000
  For Eastern Illinois University .......980,000
  For Governors State University ........315,000
  For Illinois State University .......2,030,000
  For Northeastern Illinois University ..735,000
  For Northern Illinois University ....2,240,000
  For Southern Illinois University ....4,830,000
  For University of Illinois .........13,090,000
  For Western Illinois University .....1,505,000

    (P.A. 89-0501, Art. 77, Sec. 28D new)
    Sec.  28D.  The  sum of $8,750,000, or so much thereof as
may  be  necessary,  is   appropriated   from   the   Capital
Development  Fund  to  the  Capital Development Board for the
Illinois Community College Board  for  miscellaneous  capital
improvements    including    construction,    reconstruction,
remodeling,  improvement,  repair and installation of capital
facilities, cost of planning, supplies, equipment, materials,
services and all other expenses required to complete the work
at the various community colleges.  This appropriation  shall
be in addition to any other appropriated amounts which can be
expended for these purposes.

    Section  2.   "AN  ACT  making appropriations, Public Act
89-0501, approved June  28,  1996,  is  amended  by  changing
Sections 5, 9 and 21 of Article 78 as follows:

    (P.A. 89-0501, Art. 78, Sec. 5)
    Sec.  5.  The following named amounts, or so much thereof
as may be necessary and remain unexpended  at  the  close  of
business  on  June 30, 1996, from reappropriations heretofore
made for such purposes in Article 80, Section  5,  of  Public
Act  89-0022, are reappropriated from the Capital Development
Fund to the Capital Development Board for the  Department  of
Corrections for the projects hereinafter enumerated:
                CENTRALIA CORRECTIONAL CENTER
For renovation of the Dietary .................. $    576,008
                DANVILLE CORRECTIONAL CENTER
For installation of a water softener system  ...       80,000
For renovation of interior walls and
  exterior masonry walls .......................      743,387
For correction of construction defects .........      363,136
For planning, utilities, site improvements,
  and other expenses necessary for the
  construction of a correctional facility ......       32,511
                  DIXON CORRECTIONAL CENTER
For completing the upgrade of Sewage Treatment
  Plant, in addition to funds previously
  appropriated .................................      805,336
For renovation of the Dietary and
  replacement of the blast chillers ............      220,918
For replacement of the cooling tower in
  the medical unit .............................        7,030
For upgrading the steam distribution system
  and replacement of the boiler system
  including asbestos abatement .................      304,916
For replacement of the cooling tower ...........       14,864
                     DU QUOIN WORK CAMP
For construction of classroom space and
  maintenance building, and
  site improvement .............................       83,026
                 DWIGHT CORRECTIONAL CENTER
For renovation of buildings  ...................    1,255,872
For tuckpointing and renovation of walls for
  17 buildings .................................        5,223
For installation of handicapped lifts and
  construction of ramps ........................       58,899
For renovation of the basement walls and
  correction of water infiltration of
  eight housing units  .........................        6,552
For rehabilitation of the water and sewer
  systems ......................................       86,877
               EAST MOLINE CORRECTIONAL CENTER
For planning the upgrade of locking
  systems in nine buildings ....................       34,995
For stabilization of the slopes ................      150,121
For upgrading the steam distribution system
  and replacement of boilers, including
  asbestos abatement ...........................      264,888
           SOUTHWESTERN ILL. CORRECTIONAL FACILITY
For providing equipment and telecom,
  constructing a warehouse and upgrading
  a parking lot, in addition to funds
  previously appropriated ......................    1,278,823
For completing the conversion of existing
  buildings into a minimum security
  correctional facility, in addition to funds
  previously appropriated ......................       44,937
                    HANNA CITY WORK CAMP
For the purchase and upgrade of the
  water system .................................        5,051
             ILLINOIS YOUTH CENTER - HARRISBURG
For purchasing and installation of equipment
  to complete the dietary expansion  ...........       25,607
For replacement of absorption chiller units
  and boiler systems in three buildings ........      239,985
                 JOLIET CORRECTIONAL CENTER
For completing the west cellhouse renovation,
  including asbestos abatement, in addition
  to funds previously appropriated .............    8,503,812
For renovation of the west cellhouse, in
  addition to funds previously appropriated ....       45,445
For rehabilitation of the electrical
  distribution system and renovation
  of the sanitary system at the
  barscreen ....................................       12,041
For renovation of steam, water, sewage and
  electrical systems ...........................       11,048
For planning the rehabilitation of
  West Cellhouses ..............................      172,010
               ILLINOIS YOUTH CENTER - JOLIET
For completing the upgrade of electrical
  systems, in addition to funds
  previously appropriated ......................    2,090,299
For upgrading the fire alarm system ............      893,150
For upgrading the storm and sanitary sewers ....      965,000
For completing the upgrade of the utilities, in
  addition to funds previously appropriated ....       83,738
For completion of the steam system upgrade
  and initiation of the electrical
  system upgrade ...............................        6,239
                        KANKAKEE MSU
For providing equipment, telecom, lighting
  and freezer units, in addition to funds
  previously appropriated ......................       94,419
For planning, construction, utilities,
  renovation, site improvements, and
  other expenses necessary for a minimum
  security women's prison ......................        4,133
For rehabilitation of the heating and air
  handling system in the resident buildings ....        4,817
                 LINCOLN CORRECTIONAL CENTER
For upgrading the locking systems and doors  ...       77,700
For upgrading the water supply .................      356,077
For renovation of the Dietary, construction
  of a cooler addition and installation
  of blast chillers  ...........................      487,520
                  LOGAN CORRECTIONAL CENTER
For renovation of sewer system .................      881,858
For renovation of the water tower ..............      125,088
For rehabilitation of the roof ventilation
  systems ......................................       77,948
                 MENARD CORRECTIONAL CENTER
For planning, completion and rehabilitation
or replacement of the MSU "C" Building .........    2,525,680
For replacement of East and West
  Cellhouse windows and boilers.................      511,346
For improving the south yard for outdoor
  recreation ...................................       34,346
For repairs due to the Great Flood of
  1993 and projects to protect the facility
  from future floods ...........................      825,890
For upgrading the steam and water distribution
  systems and replacement of the MSU
  "C" Building .................................      576,422
For replacement of the chimney stack and
  boilers, in addition to funds previously
  appropriated .................................      400,000
For replacement of hot water heaters and
  deairing tanks ...............................      110,000
For planning the renovation of the old
  hospital building ............................      207,540
For renovation of the North Cellhouse II,
  Phase II .....................................        5,512
For renovation of elements of the power
  plant, including the main generator ..........       52,501
For planning for renovation of the
  Administration Building ......................       15,604
For completing the renovation of the
  Psychiatric Cellhouse ........................        5,247
           ILLINOIS YOUTH CENTER - PERE MARQUETTE
For completing the renovation of control
  center and construction of a confinement
  addition, in addition to funds previously
  appropriated .................................      250,279
For upgrading the dormitory restrooms  .........       65,380
                 PONTIAC CORRECTIONAL CENTER
For upgrading selected utilities and planning
  the rehabilitation and upgrade of the total
  system .......................................       31,129
For renovation of steam, water, sewage and
  electrical systems ...........................        5,875
                ROBINSON CORRECTIONAL CENTER
For Health and Life Safety improvements ........        8,875
                 SHAWNEE CORRECTIONAL CENTER
For upgrading the heating and hot
  water system .................................      581,309
                SHERIDAN CORRECTIONAL CENTER
For completion of water and sewer systems
  upgrade, in addition to funds previously
  appropriated .................................        2,699
For planning the upgrade of sewer and
  water utilities ..............................        6,954
               STATEVILLE CORRECTIONAL CENTER
For upgrading the the gatehouse ................      464,185
For completing the upgrade of the security
  system, in addition to funds previously
  appropriated .................................      200,000
For rehabilitation of plumbing in Dietary  .....       79,710
For upgrading the doors, locks and hardware
  in B Cellhouse ...............................       59,940
For rehabilitation of the intercom system  .....      380,924
For upgrading the water supply to B house  .....      187,633
For upgrade of the utility system ..............        7,177
             ILLINOIS YOUTH CENTER - ST. CHARLES
For completing the upgrade of the water distribution
  system, in addition to funds previously
  appropriated .................................      308,328
For replacement of Madison Cottage .............      504,802
For rehabilitation of the utilities ............       42,004
               TAYLORVILLE CORRECTIONAL CENTER
For Health and Life Safety improvements  .......        2,115
             ILLINOIS YOUTH CENTER - VALLEY VIEW
For planning the upgrade of dormitory restrooms
  and fixtures .................................       68,560
(From Article 80, Section 6 of Public Act 89-0022):
For upgrading locking systems and doors
  in J Hall ....................................       13,520
                VANDALIA CORRECTIONAL CENTER
For completing Dormitory G renovation and
  replacement of the cold storage facility, in
  addition to funds previously appropriated ....        3,230
For rehabilitation of the south wall of
  Dormitory G ..................................       35,833
                 VIENNA CORRECTIONAL CENTER
For completing the rehabilitation of duct
  system and walls, in addition to
  funds previously appropriated ................    2,909,382
For upgrading the electrical system ............      455,994
For planning the upgrade of the steam
  distribution system ..........................      200,471
For planning the replacement of the
  absorption chiller and cooling tower .........       42,625
For upgrading the library and school
  buildings ....................................      107,592
For planning the rehabilitation of the
  duct system and walls ........................      138,027
For upgrading the water and sewer
  utilities ....................................      396,000
             ILLINOIS YOUTH CENTER - WARRENVILLE
For installation of bathroom fixtures in
  cottages .....................................       11,523
                          STATEWIDE
For planning, design, construction,
  equipment and all other necessary
  costs for a youth boot camp at a
  site to be chosen from the list of
  finalists not selected for the
  super maximum security prison  ...............    5,198,856
For planning the construction of
  two work camps at sites to be
  chosen from the list of finalists not
  selected for the super maximum
  security prison ..............................      153,941
For completion of planning, site improvements,
  utility upgrade, equipment and construction of
  three housing units to add 672 cells
  to the adult correctional system .............      317,978
For planning, construction, utilities, site
  improvements, equipment and other expenses
  necessary for the construction of a close
  supervision super maximum security prison ....   43,312,099
For upgrading for fire safety at five
  locations and replacing boilers...............    3,799,775
For correcting defects in the food preparation
  areas, including roofs .......................      215,323
For planning, construction, utilities,
  site improvements, and other expenses
  necessary for the construction of two
  minimum and one medium security
  prisons ......................................      204,213
For utilities, construction, planning,
  design, site improvements, rehabilitation,
  equipment, or any other means of acquiring
  community correctional centers, adult work
  camps, and boot camps ........................       26,609
For replacement of boiler systems at the
  following locations at the approximate
  costs set forth below: .......................       17,704
    Illinois Youth Center -
      Joliet .............................17,704
For renovation and improvements at various
  correctional facilities at the approximate
  costs set forth below: .......................      117,693
    Roof Replacement .....................70,000
    Road Repavement ......................47,693
For replacement of cell doors and locks
  and rehabilitation of locking systems at
  the following locations at the approximate
  costs set forth below: .......................      118,902
    Kankakee MSU
      For rehabilitation of locking
      systems ...........................118,902
For renovation of roads and parking lots
  and replacement of boilers at the
  following locations at the approximate
  costs set forth below ........................      176,152
    Dixon Correctional Center
      For roads and parking ..............30,000
    Hanna City Work Camp
      For roads and parking ..............37,000
    Logan Correctional Center
      For roads and parking ..............10,000
    Menard Correctional Center
      For roads and parking and
       replacement of boilers............168,832
    Vienna Correctional Center
      For roads ..........................30,000
For replacement of roofs at various Department of
  Corrections locations ........................      500,000
For roof replacement at the following
  locations at the approximate costs
  set forth below: .............................    1,109,004
    Dixon Correctional Center
      Five Buildings .....................25,000
    Dwight Correctional Center
      Three buildings ...................122,000
    Dwight Correctional Center
      Multi-Purpose Building .............85,000
    Graham Correctional Center
      Five buildings ....................125,000
    Graham Correctional Center
      Thirty-two buildings ..............150,000
    Hanna City Work Camp
      13 buildings ........................7,000
    Joliet Correctional Center
      Five buildings ....................160,000
    Logan Correctional Center
      Two buildings .....................200,000
    Menard Psychiatric Center
      Six buildings .....................485,000
    Menard Correctional Center
      Warehouse Building .................70,000
    Menard Correctional Center
      Five buildings ....................700,000
    Pontiac Correctional Center
      Nine buildings .....................40,000
    Pontiac Correctional Center
      Eight buildings ....................75,000
    Illinois Youth Center-
      St. Charles
      three buildings ...................175,000
    Sheridan Correctional Ctr
      Six buildings ......................50,000
    Stateville Correctional Ctr
      16 buildings .......................50,000
    Stateville Correctional Ctr
      Seven buildings ...................135,000
    Ill Youth Center-
      Valley View
      Administration Building and
      Kitchen Addition ..................100,688
    Illinois Youth Center-
      Warrenville
      One residential building ..........150,000
    Total, Section 5                $89,691,716   $89,519,706

    (P.A. 89-0501, Art. 78, Sec. 9)
    Sec.  9.  The following named amounts, or so much thereof
as may be necessary and remain unexpended  at  the  close  of
business  on  June 30, 1996, from reappropriations heretofore
made for such purposes in  Article 80, Section  9  of  Public
Act  89-0022, as amended, are reappropriated from the Capital
Development Fund to the Capital  Development  Board  for  the
Department  of  Mental  Health and Developmental Disabilities
for the projects hereinafter enumerated:
                 ALTON MENTAL HEALTH CENTER
For rehabilitation of storm and sanitary sewers, in
  addition to funds previously appropriated .... $    528,468
For rehabilitation of storm and sanitary
  sewers, in addition to funds previously
  appropriated .................................       11,579
For installation of security screens ...........       75,000
For replacement of domestic hot water
  lines in seven buildings .....................       19,048
For upgrading fire safety systems in
  eight buildings   ............................       43,900
For renovation of ceilings in Holly, Maple,
  Locust and Elm ...............................       42,444
For replacement of the chiller and
  connection of the HVAC to the energy
  management system ............................      149,551
For replacement of two cooling towers in
  the Willow Building ..........................       68,639
For installation of emergency generators
  in four buildings ............................       14,137
For rehabilitation of bathrooms for
  handicapped accessibility ....................       25,847
For rehabilitation of the electrical
  distribution system ..........................      105,257
                CHESTER MENTAL HEALTH CENTER
For replacement of windows and door frames, in
  addition to funds previously appropriated  ...       34,509
For construction of a storage building  ........      803,585
For renovation of the HVAC system ..............      148,822
For upgrading the security system ..............      390,000
For planning the replacement of the
  security windows .............................       15,607
For construction of a Rehabilitative
  Services building ............................       79,400
For replacement of the emergency generator .....      167,651
                      CHICAGO METRO C&A
For renovation of ISPI building ................    4,500,000
For planning and renovation of residential
  and program units for children and
  adolescent services ..........................    1,039,329
              CHICAGO READ MENTAL HEALTH CENTER
For renovation of utility rooms and installation of
  drinking fountains ...........................      218,000
For renovation of the West Campus Nurses'
  Stations .....................................    1,304,000
For renovation of Henry Horner Children's Center
  and West Campus for fire and life safety
  codes ........................................    1,421,941
For renovation of the West Campus shower
  and toilet rooms .............................      685,520
For replacement of penthouse louvers at
  the West Campus ..............................       65,347
For installation of an emergency generator
  in Henry Horner Children's Center ............       15,158
For rehabilitation of the bathroom shower
  walls in ten buildings .......................       96,691
For improvement of the site drainage and
  for upgrading the fire lane ..................       62,698
        CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
For upgrading the mechanical
  equipment, in addition to funds
  previously appropriated ........      522,080        92,668
For planning and beginning the renovation of a
  residential building .........................       75,131
For renovation of the kitchen and residential
  units for rethermalization and air
  condition the kitchen, in addition to
  funds previously appropriated  ...............      101,678
For separating and upgrading of the combined
  sewer system, in addition to funds
  previously appropriated ......................      194,466
For rehabilitation of resident buildings
  and upgrading of temperature controls ........      793,150
For renovation of the kitchen for
  rethermalization and air conditioning ........      102,476
For planning the separation and beginning
  the renovation of the combined sewers  .......       35,634
For construction of a coal pile retaining
  wall .........................................       18,748
                 ELGIN MENTAL HEALTH CENTER
For upgrading and expanding the mechanical
  infrastructure, in addition to funds
  previously appropriated ......................    3,300,000
For renovation of the HVAC systems,
  replacement of windows and installation
  of security screens, in addition
  to funds previously appropriated .............    2,092,543
For construction of a Forensic Services
  Facility, in addition to funds
  previously appropriated  .....................   24,612,256
For upgrading and expanding mechanical
  infrastructure, in addition to funds
  previously appropriated ......................    1,350,571
For upgrading for fire and life safety .........      902,122
For planning the renovation of the Forensic
  Building and abating asbestos ................      251,946
For renovation of the Central Stores
  Building .....................................      181,034
For upgrading the Medical Building HVAC
  system and replacement of the cooling
  towers .......................................       21,336
For upgrading the security systems and
  constructing a multi-purpose building
  for the Forensic Complex .....................       64,550
For the demolition of the Old Main Building
  and construction of an Adult
  Psychiatric Center ...........................   14,751,842
                  FOX DEVELOPMENTAL CENTER
For renovation of Building #8, in addition
  to funds previously appropriated .............    1,619,590
For renovation of the exterior of Building #1,
  in addition to funds previously
  appropriated .................................      499,782
For planning the renovation of Building #8 .....       44,709
For installation of an elevator and
  rehabilitation of corridor exits .............       25,140
           HOWE DEVELOPMENTAL CENTER - TINLEY PARK
For renovation of residences ...................      797,135
For replacement of steam and
  condensate lines .............................      565,000
For renovation of homes and walkways ...........      581,784
For renovation of the boilers in the power
  plant ........................................      241,583
For renovation of bathrooms and utility rooms
  in ten residences ............................       11,904
     JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER
For replacement of code compliance
  generators ...................................      158,336
For providing storage space ....................      154,718
For planning and beginning electrical
  distribution renovation ......................       21,950
For replacement of piping and heating units ....      495,095
For rehabilitation of bathrooms and replacement
  of doors .....................................      595,847
For rehabilitation of the boilers, turbine
  generator and switchgear .....................       40,851
For installation of fire safety systems in
  four buildings and replacement of a
  code compliance generator ....................      545,074
For replacement of two water softeners and
  four heaters .................................       41,100
                 KILEY DEVELOPMENTAL CENTER
For renovation of homes ........................      630,000
For renovation of bathrooms in homes ...........      637,788
For installation of fire safety systems in
  six buildings ................................      187,025
                LINCOLN DEVELOPMENTAL CENTER
For replacement of an absorber, in addition to
  funds previously appropriated ................      120,000
For upgrading the architectural and mechanical
  systems, in addition to funds
  previously appropriated ......................    1,528,728
For installation of a code compliance generator   .   107,000
For rehabilitation of the coal bunker
  in the Powerhouse ............................      261,000
For installation of rethermalization food
  service system ...............................      707,034
For expansion of the sprinkler system in
  four buildings ...............................      185,081
For renovation of the boilers, replacement of
  controls and tuckpointing the exterior .......      194,718
For installation of air conditioning in
  Coty and Dietary Buildings ...................       49,508
For upgrading the HVAC systems, including
  chillers .....................................      104,852
                LUDEMAN DEVELOPMENTAL CENTER
For renovation of residences ...................      709,410
For renovation of residences ...................      783,000
For renovation of restrooms for accessibility
  in two buildings .............................      178,501
For renovation of bathrooms in 15 residences ...      157,589
For installation of automatic sprinkler
  and fire alarm system ........................        9,133
             MABLEY DEVELOPMENTAL CENTER - DIXON
For installation of a sewer screening system  ..       79,101
For construction of a dietary and stores
  building .....................................       19,002
             MADDEN MENTAL HEALTH CENTER - HINES
For renovation of pavilions ....................      370,000
For upgrading residences for safety and
  security .....................................      330,898
For replacing controls for sewage ejector ......       39,000
For replacement of a cooling tower and
  chiller ......................................      288,922
For installation of return air fan systems .....       42,195
For replacement of hot water heaters ...........      129,975
For upgrade of the central kitchen and
  renovation of eight pavilions ................        6,062
        MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
For renovation of a residential building .......      483,226
For replacement of the HVAC control panel ......      191,759
           MURRAY DEVELOPMENTAL CENTER - CENTRALIA
For replacement of cooling towers ..............      581,288
For installation of fire safety systems ........    1,366,824
For rehabilitation of the electrical
  distribution system ..........................      237,000
For replacement of the sewage ejector
  equipment and bar screen .....................       24,971
For replacement of the boiler shell and
  controls .....................................        5,747
For rehabilitation of the hot water
  distribution system ..........................       48,665
For renovation of Daisy Cottage ................      125,349
           SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
For replacement of the roof and masonry repair,
  in addition to funds previously
  appropriated .................................      128,000
For replacement of valves in the powerhouse ....      276,000
For replacement of electrical feeder cable .....      212,000
For planning and beginning sewer and
  manhole renovation ...........................       57,645
  as amended):
For rehabilitation of the boilers ..............      587,000
For planning and replacement of windows ........      234,721
For installation of an emergency generator .....      646,000
For upgrading fire safety systems in the
  support buildings ............................      677,677
For upgrading the HVAC system and installation
  air conditioning in the Dietary Building .....      225,383
For replacement of expansion joints in the
  utility tunnels ..............................      107,208
For installation of emergency generators in
  three residences .............................      330,000
For installation of air conditioning in
  Building #704, in addition to funds
  previously appropriated ......................      108,049
For replacement of hot water tanks in the
  Laundry Building .............................      191,431
For replacement of switches and switchgear,
  in addition to funds previously
  appropriated .................................      183,051
For replacement of the water softener
  system in the powerhouse .....................      107,000
For replacement of cooling towers in
  Buildings #100A and #100B ....................      132,813
For replacement of roofing systems and
  renovation of the exterior in two
  buildings ....................................       49,253
For replacement of the electrical switchgear
  in the Power Plant ...........................       29,421
For replacement of the heating system in
  the Work Activity Center .....................       37,210
For planning the installation of an air
  conditioning system for Building #704 ........       45,376
For upgrading the HVAC system in the
  Administration building and other
  buildings ....................................      233,321
For installation of air conditioning in
  Buildings #502 and #514 ......................      238,756
For upgrading the electrical system ............      124,571
For upgrade of the electrical distribution
  system .......................................       62,102
                 SINGER MENTAL HEALTH CENTER
For replacement of cooling tower, expansion
  tanks and test absorbers .....................      179,923
For replacement of the water main ..............      570,258
For replacement of HVAC pumps and valves .......      258,409
For replacement of mechanical equipment ........       34,638
              TINLEY PARK MENTAL HEALTH CENTER/
                  HOWE DEVELOPMENTAL CENTER
For renovating and making mechanical
  improvements to Spruce Hall ..................      302,823
For planning the rehabilitation of the
  electrical distribution system ...............      101,337
For installation of security screens, in
  addition to funds previously appropriated ....      142,161
For renovation for accessibility in four
  buildings ....................................      703,813
For planning the sewer system renovation and
  replacement of the rag catcher ...............      390,886
For renovation for fire and life safety in
  three residences .............................      625,000
For replacement of piping in Maple Hall ........      234,158
For renovation of nursing stations and
  medication rooms in three residences .........      591,298
For rehabilitation of the domestic hot water
  system for Willow and Pine Halls .............      108,263
For rehabilitation of the washrooms in
  Spruce Hall ..................................      108,000
For replacement of the windows in nine
  buildings ....................................       70,125
                 ZELLER MENTAL HEALTH CENTER
For renovation of Nurses' Stations and
  seclusion rooms ..............................    1,223,000
For replacement of the heating and cooling
  pumps ........................................       12,465
                          STATEWIDE
                         ALTON/ELGIN
For construction of a forensic services complex
  at Alton Mental Health Center and Elgin
  Mental Health Center, in addition to funds
  previously appropriated ......................    8,346,593
For conducting the preliminary design to
  construct, convert and/or rehabilitate
  a forensic facility ..........................      212,483
                          STATEWIDE
For replacement of the roofing systems,
  upgrading the ventilation systems, and
  enclosure of HVAC units at the following
  locations at the approximate costs set
  forth below: .................................        5,763
    Jacksonville Mental Health Ctr
      Gillespie and Drake buildings
      including the enclosure of the
      rooftop HVAC unit on Gillespie ......5,763
For upgrading and rehabilitation of roads,
  parking lots and drainage systems at the
  following locations at the approximate
  costs set forth below: .......................      105,769
    Chester Mental Health Center
      For rehabilitation of the
      drainage system and upgrading
      parking lots ......................113,986
For upgrading roads and parking lots at
  the following locations at the
  approximate costs set forth below: ...........       40,544
    McFarland Mental Health Ctr ...........5,544
    Shapiro Developmental Center .........35,000
For rehabilitation of water towers -
  Murray and Chester ...........................      500,000
For replacement of roofs at the following
  locations at the approximate costs set
  forth below: .................................    3,031,603
    Alton Mental Health Center -
      five buildings ....................342,687
    Choate Mental Health Center -
      three buildings ....................17,479
    Choate Mental Health and
      Developmental Center
      Five buildings .....................15,034
    Chester Mental Health Ctr
      21 buildings .......................49,555
    Elgin Mental Health Center -
      three buildings ....................52,000
    Elgin Mental Health Center
      Six Buildings .....................115,000
    Jacksonville Developmental Center -
      one building .......................53,750
    Lincoln Developmental Center -
      three buildings ...................413,510
    Lincoln Developmental Center
      four buildings ......................6,601
    Ludeman Developmental Center
      Support buildings ..................91,447
    Ludeman Developmental Center
      residences .........................22,158
    Mabley Developmental Center -
      one building ......................103,517
    Madden Mental Health Center -
      buildings and covered walkways .....72,822
    McFarland Mental Health Center -
      three buildings ...................144,240
    Meyer Mental Health Center -
      one building ......................315,514
    Shapiro Developmental Center -
      three buildings ...................187,000
    Shapiro Developmental Center
      two buildings ......................16,351
    Shapiro Developmental Center
      Five buildings .....................67,831
    Tinley Park Mental Health Center -
      one building .......................26,048
    Tinley Park Mental Health Ctr
      Oak Hall ..........................109,034
                   STATEWIDE - FIRE SAFETY
To renovate fire safety systems, including
  installation of sprinklers, at the following
  locations at the approximate costs set
  forth below: .................................      354,529
    Anna Mental Health and
      Developmental Center ...............12,318
    Singer Mental Health and
      Developmental Center ..............335,021
For fire safety and other work necessary to meet
  state and federal certification standards for
  the following projects:
For installation of sprinkler systems at
  Chicago-Read Mental Health Center ............      148,010
For installation of sprinkler systems at
  Murray Developmental Center ..................        2,000
For installation of sprinkler systems at
  Waukegan Developmental Center ................       18,547
    Total, Section 9               $102,309,844  $103,689,207

    (P.A. 89-0501, Art. 78, Sec. 21)
    Sec. 21.  The following named amounts, or so much thereof
as may be necessary and remain unexpended  at  the  close  of
business  on  June 30, 1996, from reappropriations heretofore
made for such purposes in  Article 80, Section 21  of  Public
Act  89-0022, are reappropriated from the Capital Development
Fund to  the  Capital  Development  Board  for  the  Illinois
Community   College   Board   for  the  projects  hereinafter
enumerated:
                  BELLEVILLE AREA COLLEGE
For planning buildings, additions and
  site improvements ............................ $ 1,746,900
               DANVILLE AREA COMMUNITY COLLEGE
For rehabilitation of infrastructure
  and beginning construction of a
  classroom facility ...........................    2,305,427
For rehabilitation of the infrastructure and
  planning campus buildings ....................    1,522,392
                      COLLEGE OF DUPAGE
For completing the addition to
  the Student Resource Center ..................    2,180,400
             ILLINOIS EASTERN COMMUNITY COLLEGE
For remodeling the Student Services Office
  facilities ...................................       26,557
For replacement of the roofing system ..........      104,172
                   ELGIN COMMUNITY COLLEGE
For construction of addition, site improvements,
  remodeling and purchasing equipment ..........    9,192,689
(From Article 80, Section 23 of Public Act 89-0022):
For planning, design, site improvements, utility
  adjustments, and any other costs associated
  with construction of a new Instructional
  Building at Elgin Community College ..........      428,894
               JOHN A. LOGAN COMMUNITY COLLEGE
For planning an addition and site improvements .      409,400
For construction of classroom additions
  and remodeling the existing facility,
  including utilities and site improvements ....       33,745
                 JOHN WOOD COMMUNITY COLLEGE
For construction of a science and technology
  center and access road .......................    1,697,465
                    JOLIET JUNIOR COLLEGE
For construction of a business and technology
  center and remodeling the main campus
  building .....................................    1,343,174
For planning, design and site preparation of
  a Business Technology Center .................       12,744
                KISHWAUKEE COMMUNITY COLLEGE
For construction and reconstruction at
  the library ..................................      100,055
                   COLLEGE OF LAKE COUNTY
For construction of a multi-use Instructional
  Center, including acquisition of equipment
  and remodeling of existing facilities ........    5,421,861
For initial costs associated with planning,
  design, construction, site improvements,
  utilities, remodeling and equipment for
  a multi-use instructional facility ...........      774,155
For planning a multi-use instructional
  building .....................................      159,865
                LAKE LAND COLLEGE - EFFINGHAM
For construction of an education and
  technology center ............................       29,622
             LEWIS AND CLARK COMMUNITY COLLEGE
For renovation of buildings, construction of an
  addition and site improvements ...............      815,800
For construction of health,
  mathematics and science
  laboratory facilities and
  remodeling Fobes Hall ..........    2,801,529       824,549
For renovation of the main complex .............      464,317
For planning, design, and site preparation,
  and construction of a multi-purpose
  building .....................................       24,932
                   MCHENRY COUNTY COLLEGE
For construction of an addition, including
  equipment, a parking area and
  site improvements ............................      291,590
For expansion of existing library facilities
  and construction of classrooms at McHenry
  County College ...............................       45,736
              MORAINE VALLEY COMMUNITY COLLEGE
For planning and constructing a new classroom
  facility .....................................      500,000
For providing for an architectural engineering
  study, renovations, construction,
  reconstruction and remodeling of Buildings
  A, B and L ...................................      483,482
           MORTON COMMUNITY COLLEGE - COOK COUNTY
For construction of an addition and
  site improvements ............................      272,000
                PARKLAND COLLEGE - CHAMPAIGN
For construction of a child care center
  and access drives ............................        9,820
               PRAIRIE STATE COMMUNITY COLLEGE
For construction of a Learning Resource
  Center addition ..............................      942,828
                      REND LAKE COLLEGE
For construction of an aquatic and
  rehabilitation center ........................    1,694,587
For replacement of the roof ....................       30,889
                SOUTHEASTERN ILLINOIS COLLEGE
For construction of humanities,
  administration, and child care facilities
  and remodeling campus buildings ..............    4,552,440
For the planning, design and site preparation
  of a Humanities/Administration Building ......       60,426
           TRITON COMMUNITY COLLEGE - RIVER GROVE
For planning, site improvements, construction
  and other expenses necessary for the
  construction of an addition to the Learning
  Resource Center ..............................      182,692
      WILLIAM RAINEY HARPER COMMUNITY COLLEGE -PALATINE
For planning, developing, and designing a multi-
  purpose telecommunications
  instructional delivery center ................      350,000
              STATEWIDE - CONSTRUCTION DEFECTS
For planning, construction and renovation
  to correct defectively designed or
  constructed community college facilities,
  provided that monies recovered based upon
  claims arising out of such defective design
  or construction shall be paid to the state
  as required by Section 105.12 of the Public
  Community College Act as reimbursement for
  monies expended pursuant to this
  appropriation ................................    5,300,930
    Total, Section 21               $46,313,515   $44,336,535

    Section 3.  "AN ACT making  appropriations,"  Public  Act
89-0501,  approved  June  28,  1996,  is  amended  by  adding
Sections 9A, 9B and 23A to Article 49 as follows:

    (P.A. 89-0501, Art. 49, Sec. 9A new)
    Sec. 9A.  The amount of $3,000,000,  is appropriated from
the  Capital  Development  Fund  to the Department of Natural
Resources for deposit into  the  Conservation  2000  Projects
Fund.

    (P.A. 89-0501, Art. 49, Sec. 9B new)
    Sec. 9B.  The amount of $3,000,000, or so much thereof as
may  be necessary, is appropriated from the Conservation 2000
Projects Fund to the Department of Natural Resources for  the
following projects as the approximate costs set forth below:
Site M planning and development ................ $  2,500,000
Acquisition of land and long-term
  easements for ecosystem-based
  management of Illinois'
  natural resources ............................      500,000
    Total                                          $3,000,000

    (P.A. 89-0501, Art. 49, Sec. 23A new)
    Sec.  23A.  The  amount of $5,000,000, or so much thereof
as  may  be  necessary,  is  appropriated  from  the  Capital
Development Fund to the Department of Natural  Resources  for
the  Office  of Water Resources for the following projects at
the approximate costs set forth below, in addition  to  funds
previously appropriated.
East Peoria
  East Peoria Levee construction
  cost share ..........................2,000,000
Loves Park
  Construction cost share ...............750,000
Metro East Sanitary District
  Cost share for two pump stations
  and closure structures ................850,000
Fox River
  Flood control at Algonquin
  and McHenry Dams ......................600,000
Granite City
  Reduce urban groundwater flooding .....300,000
Chicago Harbor/Lake Michigan
  Control leakage - mouth
  of Chicago River ......................500,000

    Section  4.  "AN  ACT  making  appropriations, Public Act
89-0501, approved June 28, 1996, is amended by adding Section
57A to Article 51 as follows:

    (P.A. 89-0501, Art. 51, Sec. 57A new)
    Sec. 57A.  The following named sums, or so  much  thereof
as may be necessary, are appropriated from the Transportation
Bond  Series  B  Fund to the Department of Transportation for
construction  costs,  making  grants  and  providing  project
assistance   to   municipalities,   special    transportation
districts,  private  non-profit carriers, mass transportation
carriers, and the Intercity Rail Program for the acquisition,
construction, extension, reconstruction  and  improvement  of
mass  transportation  facilities,  including  rapid  transit,
intercity  rail,  bus  and other equipment used in connection
therewith, as provided by law, as follows:
  Pursuant to Section 4(b)(1) of
   the General Obligation Bond Act,
   as amended................................... $ 35,000,000
  For the counties of the State
   outside of Cook, DuPage, Kane,
   McHenry, and Will pursuant to
   Section 4(b)(1) of the General
   Obligation Bond Act, as amended .............    3,000,000
  For the Department of Transportations's
   Operation Greenlight Program
   pursuant to Section 4(b)(1)
   of the General Obligation Bond
   Act, as amended .............................   10,000,000
    Total                                         $48,000,000
    Section   5.  "AN   ACT   making    appropriations    and
reappropriations,"  Public  Act  89-0501,  approved  June 28,
1996, is amended by adding Sections 10 and 11 to Article  67,
as follows:
    (P.A. 89-0501, Art. 67, Sec. 10 new)
    Sec.  10.  The  amount of $73,000,000, or so much thereof
as  may  be  necessary,  is  appropriated  from  the  Capital
Development Fund to  the  Department  of  Central  Management
Services  on  behalf of the Department of Corrections for the
payment on the contract for  purchase,  improvement  and  any
other   costs  associated  with  the  acquisition  of  a  new
correctional facility at Pinckneyville, Illinois.

    (P.A. 89-0501, Art. 67, Sec. 11 new)
    Sec. 11.  The amount of $16,800,000, or so  much  thereof
as  may  be  necessary,  is  appropriated  from  the  Capital
Development  Fund  to  the  Department  of Central Management
Services on behalf of the Department of Corrections  for  the
payment  on  the  contract  for purchase, improvement and any
other  costs  associated  with  the  acquisition  of  a   new
correctional   facility  at  Graham  and  Logan  Correctional
Centers.

    Section   6.  "AN   ACT   making    appropriations    and
reappropriations,"  Public  Act  89-0501,  approved  June 28,
1996, is amended by  adding  Section  56  to  Article  47  as
follows:

    (P.A. 89-0501, Art. 47, Sec. 56 new)
    Sec.  56.  The  amount of $50,000,000, or so much thereof
as  may  be  necessary,  is  appropriated  to  the   Illinois
Environmental  Protection Agency from the Anti-Pollution Bond
Fund  for  payment  of  claims  submitted,  including  claims
submitted in prior years,  to  the  State  and  approved  for
payment  under  the  Leaking Underground Storage Tank Program
established in Title XVI of the Environmental Protection Act.

    Section  7.  This  Act  takes  effect  immediately   upon
becoming law.

[ Top ]