Public Act 096-0781 |
SB0052 Enrolled |
LRB096 02025 RCE 12038 b |
|
|
AN ACT concerning finance.
|
Be it enacted by the People of the State of Illinois,
|
represented in the General Assembly:
|
Section 5. If and only if Senate Bill 658 of the 96th |
General Assembly (as amended by House Amendment No. 3) becomes |
law, the Illinois Power Agency Act is amended by changing |
Section 1-56 as follows: |
(20 ILCS 3855/1-56 as added by 09600SB0658eng with ham003)
|
Sec. 1-56. Clean coal SNG facility construction. |
(a) It is the intention of the General Assembly to provide |
additional long-term natural gas price stability to the State |
and consumers by promoting the development of a clean coal SNG |
facility that would produce a minimum annual output of 30 Bcf |
of SNG and commence construction no later than June 1, 2013 on |
a brownfield site in a municipality with at least one million |
residents. The costs associated with preparing a facility cost |
report for such a facility, which contains all of the |
information required by subsection (b) of this Section, may be |
paid or reimbursed pursuant to subsection (c) of this Section. |
(b) The facility cost report for a facility that meets the |
criteria set forth in subsection (a) of this Section shall be |
prepared by a duly licensed engineering firm that details the |
estimated capital costs payable to one or more contractors or |
|
suppliers for the engineering, procurement, and construction |
of the components comprising the facility and the estimated |
costs of operation and maintenance of the facility. The report |
must be provided to the General Assembly and the Agency on or |
before April 30, 2010. The facility cost report shall include |
all off the following: |
(1) An estimate of the capital cost of the core plant |
based on a front-end engineering and design study. The core |
plant shall include all civil, structural, mechanical, |
electrical, control, and safety systems. The quoted |
construction costs shall be expressed in nominal dollars as |
of the date that the quote is prepared and shall include: |
(A) capitalized financing costs during |
construction; |
(B) taxes, insurance, and other owner's costs; and |
(C) any assumed escalation in materials and labor |
beyond the date as of which the construction cost quote |
is expressed; |
(2) An estimate of the capital cost of the balance of |
the plant, including any capital costs associated with site |
preparation and remediation, sequestration of carbon |
dioxide emissions, and all interconnects and interfaces |
required to operate the facility, such as construction or |
backfeed power supply, pipelines to transport substitute |
natural gas or carbon dioxide, potable water supply, |
natural gas supply, water supply, water discharge, |
|
landfill, access roads, and coal delivery. The front-end |
engineering and design study and the cost study for the |
balance of the plant shall include sufficient design work |
to permit quantification of major categories of materials, |
commodities and labor hours, and receipt of quotes from |
vendors of major equipment required to construct and |
operate the facility. |
(3) An operating and maintenance cost quote that will |
provide the estimated cost of delivered fuel, personnel, |
maintenance contracts, chemicals, catalysts, consumables, |
spares, and other fixed and variable operating and |
maintenance costs. This quote is subject to the following |
requirements: |
(A) The delivered fuel cost estimate shall be |
provided by a recognized third party expert or experts |
in the fuel and transportation industries. |
(B) The balance of the operating and maintenance |
cost quote, excluding delivered fuel costs shall be |
developed based on the inputs provided by a duly |
licensed engineering firm performing the construction |
cost quote, potential vendors under long-term service |
agreements and plant operating agreements, or |
recognized third-party plant operator or operators. |
The operating and maintenance cost quote shall be |
expressed in nominal dollars as of the date that the quote |
is prepared and shall include (i) taxes, insurance, and |
|
other owner's costs and (ii) any assumed escalation in |
materials and labor beyond the date as of which the |
operating and maintenance cost quote is expressed. |
(c) Reasonable amounts paid or due to be paid by the owner |
or owners of the clean coal SNG facility to third parties |
unrelated to the owner or owners to prepare the facility cost |
report will may be reimbursed or paid up to $10 million through |
Coal Development Bonds , through funding authorized pursuant to |
20 ILCS 3501/825-65 . |
(d) The Agency shall review the facility report and based |
on that report, consider whether to enter into long term |
contracts to purchase SNG from the facility pursuant to Section |
1-20 of this Act. To assist with its evaluation of the report, |
the Agency may hire one or more experts or consultants, the |
reasonable costs of which, not to exceed $250,000, shall be |
paid for by the owner or owners of the clean coal SNG facility |
submitting the facility cost report. The Agency may begin the |
process of selecting such experts or consultants prior to |
receipt of the facility cost report.
|
(Source: 09600SB0658eng with ham003.) |
Section 10. If and only if Senate Bill 658 of the 96th |
General Assembly (as amended by House Amendment No. 3) becomes |
law, the General Obligation Bond Act is amended by changing |
Section 7 as follows:
|
|
(30 ILCS 330/7) (from Ch. 127, par. 657)
|
Sec. 7. Coal and Energy Development. The amount of |
$698,200,000 is
authorized to be used by the Department of |
Commerce and Economic Opportunity (formerly Department of |
Commerce and Community Affairs) for
coal and energy development |
purposes, pursuant to Sections 2, 3 and 3.1 of the
Illinois |
Coal and Energy Development Bond Act, for the purposes
|
specified
in Section 8.1 of the Energy Conservation and Coal |
Development Act, for
the purposes specified in Section 605-332 |
of the Department of Commerce and
Economic Opportunity Law of |
the Civil Administrative Code of Illinois, and for the purpose |
of facility cost reports prepared pursuant to Sections 1-56 or |
Section 1-75(d)(4) of the Illinois Power Agency Act and for the |
purpose of development costs pursuant to Section 8.1 of the |
Energy Conservation and Coal Development Act . Of this
amount:
|
(a) $115,000,000 is
for the specific purposes of |
acquisition,
development, construction, reconstruction, |
improvement, financing,
architectural and technical planning |
and installation of capital facilities
consisting of |
buildings, structures, durable equipment, and land for the
|
purpose of capital development of coal resources within the |
State and for the
purposes specified in Section 8.1 of the |
Energy Conservation and Coal
Development Act;
|
(b) $35,000,000 is for the purposes specified in Section |
8.1 of the
Energy
Conservation and Coal Development Act and |
making a grant to the owner of a
generating station
located in |
|
Illinois and having at least three coal-fired generating units
|
with accredited summer capability greater than 500 megawatts |
each at such
generating station as provided in Section 6 of |
that Bond Act;
|
(c) $13,200,000 is for research, development and |
demonstration
of forms of energy
other than that derived from |
coal, either on or off State property;
|
(d) $500,000,000 is for the purpose of providing financial |
assistance to
new
electric generating facilities as provided in |
Section 605-332 of the Department
of Commerce and Economic |
Opportunity Law of the Civil Administrative Code of
Illinois; |
and
|
(e) $35,000,000 is for the purpose of facility cost reports |
prepared for not more than one facility pursuant to Section |
1-75(d)(4) of the Illinois Power Agency Act and not more than |
one facility pursuant to Section 1-56 of the Illinois Power |
Agency Act and for the purpose of up to $6,000,000 of |
development costs pursuant to Section 8.1 of the Energy |
Conservation and Coal Development Act . |
(Source: P.A. 94-793, eff. 5-19-06; 95-1026, eff. 1-12-09.)
|
Section 99. Effective date. This Act takes effect upon |
becoming law.
|