State of Illinois
91st General Assembly
Legislation

   [ Search ]   [ Legislation ]
[ Home ]   [ Back ]   [ Bottom ]


[ Introduced ][ Engrossed ][ House Amendment 001 ]
[ Senate Amendment 002 ]

91_SB1391sam001

 










                                           LRB9112340ACfgam01

 1                    AMENDMENT TO SENATE BILL 1391

 2        AMENDMENT NO. ____.  Amend Senate Bill 1391 by  replacing
 3    everything after the enacting clause with the following:

 4        "Section  5.  The Environmental Protection Act is amended
 5    by adding Section 10.1 as follows:

 6        (415 ILCS 5/10.1 new)
 7        Sec. 10.1.  Limestone  quarry  operation;  fugitive  dust
 8    control plan; rules.
 9        (a)  The  Agency  shall  publish  notice  of  and  hold a
10    hearing, pursuant to Section 252 of Title 35 of the  Illinois
11    Administrative  Code,  on an application for an air pollution
12    control permit for a  crushed  and  broken  limestone  quarry
13    operation  in  the  PM10  nonattainment  area,  as defined in
14    Section 212.324 of Title 35 of  the  Illinois  Administrative
15    Code.
16        The  Agency  shall also provide public notice of and make
17    available for public comment at the hearing a  fugitive  dust
18    control plan required pursuant to Section 212.309 of Title 35
19    of  the Illinois Administrative Code for any source for which
20    a hearing is required under this Section.   The  Agency  must
21    approve  or  deny  the  fugitive  dust  control plan based on
22    criteria established by Board rule.
 
                            -2-            LRB9112340ACfgam01
 1        (b)  Within 60 days after  the  effective  date  of  this
 2    Section,  the  Agency shall review existing rules relating to
 3    fugitive  dust  control  plans  and  propose  to  the   Board
 4    additional  rules  specifying in detail the required contents
 5    of those plans.  At a minimum, the rules  shall  (i)  require
 6    that   a   fugitive   dust  control  plan  provide  stringent
 7    safeguards to protect the life, health, safety,  and  comfort
 8    of  the  residents  of areas surrounding a crushed and broken
 9    limestone quarry operation and (ii) include a procedure under
10    which the permittee is required  to  accept  and  respond  to
11    public  comment  and  address  public  concerns  relating  to
12    fugitive dust control throughout the term of the permit.  The
13    Board   shall  consider  and  adopt  the  proposed  rules  as
14    expeditiously as may be practical.

15        Section 99.  Effective date.  This Act takes effect  upon
16    becoming law.".

[ Top ]