[ Search ] [ Legislation ]
[ Home ] [ Back ] [ Bottom ]
[ Engrossed ] | [ House Amendment 001 ] | [ House Amendment 003 ] |
[ Senate Amendment 001 ] |
91_SB0598 BOB-CDBnew-re2000 1 AN ACT making appropriations and reappropriations. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 ARTICLE 1 5 Section 1. The following named amounts, or so much 6 thereof as may be necessary, are appropriated from the 7 Capital Development Fund to the Capital Development Board for 8 the Department of Agriculture for the projects hereinafter 9 enumerated: 10 DUQUOIN STATE FAIRGROUNDS 11 For renovating roundhouses ..................... $ 600,000 12 GALESBURG DIAGNOSTIC LABORATORY 13 For purchasing the facility .................... 3,200,000 14 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD 15 For completing the HVAC replacement 16 in the Administration Building, in 17 addition to funds previously appropriated .... 485,000 18 For replacing and repairing roofs, 19 Phase II ..................................... 810,000 20 For extending the fiber optics system .......... 250,000 21 For installing HVAC system and 22 restrooms in the Orr Building ................ 1,100,000 23 Total, Section 1 $6,445,000 24 Section 1a. The following named amount, or so much 25 thereof as may be necessary, is appropriated from the General 26 Revenue Fund to the Capital Development Board for the 27 Department of Agriculture for the project hereinafter 28 enumerated: 29 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD 30 For upgrading infield lighting on one mile -2- BOB-CDBnew-re2000 1 and one-half mile tracks .......................$ 335,000 2 Section 2. The following named amounts, or so much 3 thereof as may be necessary, are appropriated from the 4 Capital Development Fund to the Capital Development Board for 5 the Department of Central Management Services for the 6 projects hereinafter enumerated: 7 CENTRAL COMPUTER FACILITY 8 For installing a cooling tower and fire alarm 9 system and various other improvements ........ $ 581,000 10 OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER 11 For planning and beginning the renovation 12 of the facility .............................. 2,500,000 13 SPRINGFIELD REGIONAL OFFICE BUILDING 14 For replacing the potable water system ......... 825,000 15 For upgrading the parking lot .................. 175,000 16 Total, Section 2 $4,081,000 17 Section 2a. The following named amounts, or so much 18 thereof as may be necessary, are appropriated from the 19 General Revenue Fund to the Capital Development Board for the 20 Department of Central Management Services for the projects 21 hereinafter enumerated: 22 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION 23 (ROOSEVELT ROAD) - CHICAGO 24 For rehabilitating the pool area ............... $ 150,000 25 JAMES R. THOMPSON CENTER - CHICAGO 26 For investigating structural columns 27 deterioration ................................ 50,000 28 STATE OF ILLINOIS BUILDING - CHICAGO 29 For restoring exterior limestone and 30 masonry ...................................... 550,000 31 PARIS STATE GARAGE 32 For replacing overhead lighting and -3- BOB-CDBnew-re2000 1 pneumatic system ............................. 205,000 2 WATSEKA STATE GARAGE 3 For replacing lighting, windows and 4 overhead doors ............................... 110,000 5 Total, Section 2a $1,065,000 6 Section 3. The following named amounts, or so much 7 thereof as may be necessary, are appropriated from the 8 Capital Development Fund to the Capital Development Board for 9 the Department of Corrections for the projects hereinafter 10 enumerated: 11 DWIGHT CORRECTIONAL CENTER 12 For upgrading the water treatment plant ........ $ 1,000,000 13 EAST MOLINE CORRECTIONAL CENTER 14 For upgrading fire alarm and building 15 automation systems ........................... 900,000 16 ILLINOIS YOUTH CENTER - HARRISBURG 17 For upgrading mechanical control system ........ 515,000 18 ILLINOIS YOUTH CENTER - VALLEY VIEW 19 For replacing boilers, controls, hot 20 water heaters and softeners in 21 residential units and administration 22 building ..................................... 1,300,000 23 ILLINOIS YOUTH CENTER - WARRENVILLE 24 For rehabilitation of the administration 25 building ..................................... 791,000 26 LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE 27 For constructing two cellhouses, in 28 addition to funds previously appropriated .... 14,300,000 29 MENARD CORRECTIONAL CENTER - CHESTER 30 For improving ventilation and dehumidification 31 systems in the kitchen and dining rooms ...... 500,000 32 For replacing shower room and guard tower ...... 500,000 33 For upgrading mechanical bar screen and storm -4- BOB-CDBnew-re2000 1 and sanitary sewer system .................... 1,300,000 2 SHERIDAN CORRECTIONAL CENTER 3 For replacing doors and locks .................. 150,000 4 STATEVILLE CORRECTIONAL CENTER - JOLIET 5 For constructing a housing unit, cellhouse, 6 vehicle maintenance building and 7 warehouse for the reception and 8 classification center, in addition to 9 funds previously appropriated ................ 28,500,000 10 For replacing windows in B House ............... 3,000,000 11 For replacing cell fronts in F House ........... 1,000,000 12 For upgrading plumbing system in F House, 13 in addition to funds previously 14 appropriated ................................. 3,500,000 15 TAYLORVILLE CORRECTIONAL CENTER 16 For upgrading shower ventilation system ........ 250,000 17 THOMSON CORRECTIONAL CENTER 18 For constructing three cellhouses and 19 expanding educational and vocational 20 space, in addition to funds previously 21 appropriated ................................. 38,400,000 22 VANDALIA CORRECTIONAL CENTER 23 For planning and beginning construction 24 for a slaughter house and meat plant ......... 500,000 25 For repairing exterior masonry, in addition 26 to funds previously appropriated ............. 750,000 27 VIENNA CORRECTIONAL CENTER 28 For replacing windows, in addition to 29 funds previously appropriated ................ 800,000 30 STATEWIDE 31 For planning, design, construction, equipment 32 and all other necessary costs for a 33 female multi-security level 34 correctional center .......................... 80,000,000 -5- BOB-CDBnew-re2000 1 For replacing roofing systems at the 2 following locations at the approximate 3 cost set forth below ......................... 1,100,000 4 Vienna Correctional Center ..........500,000 5 Sheridan Correctional Center ........600,000 6 For replacing or installing mechanical bar 7 screens at the following locations at the 8 approximate cost set forth below ............. 840,000 9 Graham Correctional Center - 10 Hillsboro ..........................340,000 11 Western Illinois Correctional 12 Center - Mt. Sterling ..............350,000 13 Shawnee Correctional Center - 14 Vienna .............................150,000 15 For upgrading security control systems and 16 panels in housing units at the following 17 locations at the approximate cost set 18 forth below .................................. 4,850,000 19 Danville Correctional Center ........500,000 20 Hill Correctional Center - 21 Galesburg ........................1,500,000 22 Western Illinois Correctional 23 Center - Mt. Sterling ..............675,000 24 Illinois River Correctional 25 Center - Canton ....................675,000 26 Shawnee Correctional Center - 27 Vienna ...........................1,500,000 ____________ 28 Total, Section 3 $184,746,000 29 Section 3a. The following named amounts, or so much 30 thereof as may be necessary, are appropriated from the 31 General Revenue Fund to the Capital Development Board for the 32 Department of Corrections for the projects hereinafter 33 enumerated: -6- BOB-CDBnew-re2000 1 JACKSONVILLE CORRECTIONAL CENTER 2 For replacing inner perimeter sidewalk ......... $ 330,000 3 VANDALIA CORRECTIONAL CENTER 4 For replacing showers in six buildings, in 5 addition to funds previously appropriated .... 600,000 6 Total, Section 3a $930,000 7 Section 4. The following named amounts, or so much 8 thereof as may be necessary, are appropriated from the 9 Capital Development Fund to the Capital Development Board for 10 the Historic Preservation Agency for the projects hereinafter 11 enumerated: 12 FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY 13 For restoring the powder magazine .............. $ 305,000 14 LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD 15 For rehabilitating site and providing 16 irrigation system ............................ 445,000 17 LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD 18 For rehabilitating interior and exterior ....... 755,000 19 OLD STATE CAPITOL - SPRINGFIELD 20 For providing structural stabilization ......... 2,000,000 21 UNION STATION - SPRINGFIELD 22 For purchasing and rehabilitating .............. 2,810,000 23 Total, Section 4 $6,315,000 24 Section 4a. The following named amounts, or so much 25 thereof as may be necessary, are appropriated from the 26 General Revenue Fund to the Capital Development Board for 27 the Historic Preservation Agency for the projects hereinafter 28 enumerated: 29 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE 30 For replacing the Orientation 31 Theater screen ............................... $ 220,000 32 DANA THOMAS HOUSE - SPRINGFIELD -7- BOB-CDBnew-re2000 1 For restoring exterior and interior ............ 450,000 2 GALENA HISTORIC SITE 3 For rehabilitating Washburne House ............. 564,000 4 LINCOLN'S NEW SALEM HISTORIC SITE - PETERSBURG 5 For resurfacing village and service roads ...... 125,000 6 For rehabilitating lift stations ............... 395,000 7 OLD STATE CAPITOL - SPRINGFIELD 8 For replacing the bottom cylinder of 9 the hydraulic elevator ....................... 50,000 10 Total, Section 4a $1,804,000 11 Section 5. The following named amounts, or so much 12 thereof as may be necessary, are appropriated from the 13 Capital Development Fund to the Capital Development Board for 14 the Department of Human Services for the projects hereinafter 15 enumerated: 16 CHESTER MENTAL HEALTH CENTER 17 For upgrading access control/duress system ..... $ 1,500,000 18 FOX DEVELOPMENTAL CENTER - DWIGHT 19 For upgrading electrical system and installing 20 an emergency generator ....................... 842,000 21 HOWE DEVELOPMENTAL CENTER - TINLEY PARK 22 For renovating residences, in addition to 23 funds previously appropriated ................ 2,792,000 24 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 25 For renovating the fire alarm systems, in 26 addition to funds previously appropriated .... 500,000 27 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE 28 For completing the powerhouse rehabilitation, in 29 addition to funds previously appropriated .... 400,000 30 JACKSONVILLE DEVELOPMENTAL CENTER 31 For rehabilitating cooling towers at 32 the power plant .............................. 270,000 33 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST -8- BOB-CDBnew-re2000 1 For renovating residential and neighborhood 2 homes, in addition to funds previously 3 appropriated ................................. 1,850,000 4 MADDEN MENTAL HEALTH CENTER - HINES 5 For renovating pavilions for safety/security, 6 in addition to funds previously appropriated . 1,200,000 7 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD 8 For renovating Kennedy Hall .................... 2,500,000 9 MURRAY MENTAL HEALTH CENTER - CENTRALIA 10 For replacing energy management system ......... 815,000 11 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 12 For upgrading HVAC systems in four 13 residential buildings ........................ 1,210,000 14 ZELLER MENTAL HEALTH CENTER - PEORIA 15 For upgrading HVAC and mechanical systems ...... 685,000 16 STATEWIDE 17 For replacing and repairing roofing systems 18 at the following locations at the approximate 19 cost set forth below ......................... 2,310,000 20 Choate Developmental Center - 21 Anna ...............................300,000 22 Chicago-Read Mental Health Center ...100,000 23 Tinley Park Mental Health Center.....185,000 24 Illinois School for the Visually 25 Impaired - Jacksonville ............160,000 26 Shapiro Developmental Center - 27 Kankakee ...........................545,000 28 Kiley Developmental Center - 29 Waukegan ...........................300,000 30 Ludeman Developmental center - 31 Park Forest ........................720,000 32 For upgrading roads at the following 33 locations at the approximate 34 cost set forth below ......................... 1,000,000 -9- BOB-CDBnew-re2000 1 Howe Developmental Center - 2 Tinley Park ........................520,000 3 Shapiro Developmental center - 4 Kankakee ...........................480,000 ____________ 5 Total, Section 5 $17,874,000 6 Section 5a. The following named amounts, or so much 7 thereof as may be necessary, are appropriated from the 8 General Revenue Fund to the Capital Development Board for the 9 Department of Human Services for the projects hereinafter 10 enumerated: 11 CHOATE MENTAL HEALTH CENTER - ANNA 12 For life/safety improvements ................... $ 175,000 13 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 14 For upgrading kitchen equipment ................ 750,000 15 JACKSONVILLE DEVELOPMENTAL CENTER 16 For upgrading HVAC systems in the Drake and 17 Gillespie buildings .......................... 245,000 18 STATEWIDE 19 For resurfacing and repairing roads at the 20 following locations at the approximate cost 21 set forth below .............................. 1,000,000 22 Alton Mental Health Center ..........590,000 23 Choate Mental Health Center - 24 Anna ...............................210,000 25 Lincoln Developmental Center ........200,000 ____________ 26 Total, Section 5a $2,170,000 27 Section 6. The following named amounts, or so much 28 thereof as may be necessary, are appropriated from the 29 General Revenue Fund to the Capital Development Board for the 30 Medical District Commission for the projects hereinafter 31 enumerated: 32 CHICAGO TECHNOLOGY PARK RESEARCH CENTER -10- BOB-CDBnew-re2000 1 For renovating the Research Center ............. $ 770,000 2 For upgrading centrifugal chillers ............. 235,000 3 Total, Section 6 $1,005,000 4 Section 7. The following named amounts, or so much 5 thereof as may be necessary, are appropriated from the 6 Capital Development Fund to the Capital Development Board for 7 the Department of Military Affairs for the projects 8 hereinafter enumerated: 9 CHAMPAIGN ARMORY 10 For replacing roofing systems and 11 rehabilitating exterior walls ................ $ 300,000 12 DELAVAN ARMORY 13 For rehabilitating the exterior and 14 replacing roofing system ..................... 700,000 15 PONTIAC ARMORY 16 For rehabilitating the exterior and 17 replacing the roofing system ................. 600,000 18 STREATOR ARMORY 19 For replacing the roofing system and 20 tuckpointing walls ........................... 300,000 21 Total, Section 7 $1,900,000 22 Section 7a. The following named amounts, or so much 23 thereof as may be necessary, are appropriated from the 24 General Revenue Fund to the Capital Development Board for the 25 Department of Military Affairs for the projects hereinafter 26 enumerated: 27 CARBONDALE ARMORY 28 For rehabilitating the exterior and interior ... $ 600,000 29 LAWRENCEVILLE ARMORY 30 For rehabilitating the exterior and 31 replacing the roofing system ................. 450,000 32 LITCHFIELD ARMORY -11- BOB-CDBnew-re2000 1 For renovating the interior and exterior ....... 600,000 2 Total, Section 7a $1,650,000 3 Section 8. The following named amounts, or so much 4 thereof as may be necessary, are appropriated from the 5 Capital Development Fund to the Capital Development Board for 6 the Department of Natural Resources for the projects 7 hereinafter enumerated: 8 BEAVER DAM STATE PARK - MACOUPIN COUNTY 9 For rehabilitating dams, spillway, and 10 boat access facilities ....................... 450,000 11 CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES 12 For upgrading sewage treatment system .......... 1,070,000 13 ILLINOIS BEACH STATE PARK - LAKE COUNTY 14 For rehabilitating lodge entrance .............. 250,000 15 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY 16 For upgrading campground electrical ............ 250,000 17 KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES 18 For constructing sanitary sewer system, in 19 addition to funds previously appropriated .... 5,000,000 20 LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY 21 For replacing sewage treatment plant ........... 572,000 22 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY 23 For rehabilitating levee and well, in 24 addition to funds previously appropriated .... 3,600,000 25 SANGCHRIS STATE PARK - SANGAMON COUNTY 26 For upgrading campground electrical 27 system ....................................... 193,500 28 SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY 29 For planning and beginning renovation 30 of hatchery .................................. 496,000 31 WHITE PINES FOREST STATE PARK - OGLE COUNTY 32 For planning and beginning lodge and cabin 33 restoration .................................. 150,000 -12- BOB-CDBnew-re2000 1 STATEWIDE 2 For replacing roofing systems at the 3 following locations, at the approximate 4 cost set forth below ......................... 2,346,300 5 Beall Woods Conservation Area - 6 Wabash County .......................30,000 7 Eagle Creek State Park - 8 Shelby County .......................39,000 9 Eldon Hazlet State Park - 10 Clinton County ......................67,000 11 Fox Ridge State Park - 12 Coles County ........................34,000 13 Giant City State Park - 14 Jackson/Union Counties ..............96,000 15 Goose Lake Prairie State Park - 16 Grundy County ......................123,000 17 Hennepin Canal Parkway State Trail ..136,000 18 Illinois Beach State Park - 19 Lake County ........................787,000 20 Illinois Caverns Natural Area - 21 Monroe County .......................74,000 22 Kankakee River State Park - 23 Kankakee/Will Counties ..............74,000 24 Kickapoo State Park - 25 Vermilion County ....................41,000 26 Middle Fork State Fish & Wildlife 27 Area - Vermilion County .............12,900 28 Moraine Hills State Park - 29 McHenry County ......................91,000 30 Moraine View State Park - 31 McLean County.......................157,000 32 Ramsey Lake State Park - 33 Fayette County ......................69,000 34 Randolph County Conservation Area ....60,000 -13- BOB-CDBnew-re2000 1 Red Hills State Park - 2 Lawrence County .....................17,000 3 Saline County Conservation Area ......20,000 4 Sam Dale Lake Conservation Area - 5 Wayne County ........................15,000 6 Spitler Woods State Natural Area - 7 Macon County .........................8,400 8 Stephen A. Forbes State Park - 9 Marion County .......................37,000 10 Ten Mile Creek State Fish & 11 Wildlife Area - Jefferson/ 12 Hamilton Counties....................76,000 13 Union County Conservation Area .......97,000 14 Washington County Conservation Area ..49,000 15 Waste Management & Research Center - 16 Champaign ...........................43,000 17 William W. Powers Conservation Area - 18 Cook County .........................47,000 19 Wolf Creek State Park - 20 Shelby County .......................46,000 21 For replacing vault toilets at the following 22 locations, at the approximate cost set forth 23 below ........................................ 1,000,000 24 Anderson Lake Conservation Area - 25 Fulton/Schuyler Counties ...........156,000 26 Giant City State Park - 27 Jackson/Union Counties .............577,000 28 Randolph County Conservation Area ...230,000 29 Silver Springs State Park - 30 Kendall County .....................37,000 ____________ 31 Total, Section 8 $15,377,800 32 Section 8a. The following named amounts, or so much 33 thereof as may be necessary, are appropriated from the -14- BOB-CDBnew-re2000 1 General Revenue Fund to the Capital Development Board for the 2 Department of Natural Resources for the projects hereinafter 3 enumerated: 4 DICKSON MOUNDS MUSEUM - LEWISTOWN 5 For planning and beginning repair of 6 exterior walls ............................... $ 100,000 7 FOX RIDGE STATE PARK - COLES COUNTY 8 For rehabilitating historic structures ......... 210,000 9 HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY 10 For rehabilitating Aqueduct #6 ................. 590,000 11 ILLINOIS BEACH STATE PARK - LAKE COUNTY 12 For stabilizing shoreline ...................... 400,000 13 STATEWIDE 14 For maintaining lodge/concession program ....... 400,000 15 For rehabilitating or replacing 16 playground equipment ......................... 300,000 17 Total Section 8a $2,000,000 18 Section 9. The following named amounts, or so much 19 thereof as may be necessary, are appropriated from the 20 Capital Development Fund to the Capital Development Board for 21 the Department of Revenue for the projects hereinafter 22 enumerated: 23 WILLARD ICE BUILDING - SPRINGFIELD 24 For replacing underground sprinkler system ..... $ 295,000 25 For replacing the roof ......................... 1,385,000 26 Total, Section 9 $1,680,000 27 Section 9a. The following named amounts, or so much 28 thereof as may be necessary, are appropriated from the 29 General Revenue Fund to the Capital Development Board for the 30 Department of Revenue for the projects hereinafter 31 enumerated: 32 WILLARD ICE BUILDING - SPRINGFIELD -15- BOB-CDBnew-re2000 1 For repairing the exterior of the building ..... $ 425,000 2 For planning and rehabilitating the 3 plumbing system .............................. 50,000 4 For planning and beginning the upgrade of 5 the security and surveillance system ......... 100,000 6 For waterproofing and upgrading ramps .......... 500,000 7 Total, Section 9a $1,075,000 8 Section 10. The following named amounts, or so much 9 thereof as may be necessary, are appropriated from the 10 Capital Development Fund to the Capital Development Board for 11 the Department of State Police for the projects hereinafter 12 enumerated: 13 STATE POLICE TRAINING ACADEMY - SPRINGFIELD 14 For replacing portable classroom building ...... $ 1,000,000 15 STATEWIDE 16 For replacing roofing system at the 17 following locations at the approximate 18 cost set forth below ......................... 452,600 19 District 13 Headquarters, 20 DuQuoin ............................$72,000 21 Joliet Laboratory .....................60,000 22 District 6 Headquarters, 23 Pontiac .............................58,900 24 District 9 Headquarters, 25 Springfield ........................141,700 26 State Police Training Center, 27 Pawnee ..............................30,000 28 District 18 Headquarters, 29 Litchfield ..........................45,000 30 District 19 Headquarters, 31 Carmi ...............................45,000 ____________ 32 Total, Section 10 $1,452,600 -16- BOB-CDBnew-re2000 1 Section 10a. The following named amounts, or so much 2 thereof as may be necessary, are appropriated from the 3 General Revenue Fund to the Capital Development Board for the 4 Department of State Police for the projects hereinafter 5 enumerated: 6 DISTRICT 22 HEADQUARTERS - ULLIN 7 For upgrading mechanical systems ............... $ 25,000 8 FORENSIC SCIENCE LAB - CHICAGO 9 For upgrading exterior penthouse louvers ....... 210,000 10 Total, Section 10a $235,000 11 Section 11. The following named amounts, or so much 12 thereof as may be necessary, are appropriated from the 13 Capital Development Fund to the Capital Development Board for 14 the projects hereinafter enumerated: 15 SPRINGFIELD SUPREME COURT 16 For installing humidifier and water 17 filtration systems ........................... $ 1,600,000 18 For upgrading the library, in 19 addition to funds previously appropriated .... 450,000 20 THIRD DISTRICT APPELLATE COURT - OTTAWA 21 For replacing the Annex roof ................... 50,000 22 Total, Section 11 $2,100,000 23 Section 11a. The following named amounts, or so much 24 thereof as may be necessary, are appropriated from the 25 General Revenue Fund to the Capital Development Board for the 26 projects hereinafter enumerated: 27 THIRD DISTRICT APPELLATE COURT - OTTAWA 28 For tuckpointing and repairing exterior ........ $ 140,000 29 FIFTH DISTRICT APPELLATE COURT - MT. VERNON 30 For repairing plaster and painting ............. 176,000 31 Total, Section 11a $316,000 -17- BOB-CDBnew-re2000 1 Section 12. The following named amounts, or so much 2 thereof as may be necessary, are appropriated from the 3 Capital Development Fund to the Capital Development Board for 4 the Office of the Secretary of State for the projects 5 hereinafter enumerated: 6 CAPITOL COMPLEX - SPRINGFIELD 7 For upgrading electrical lighting and replacing 8 ceilings - Stratton Office Building .......... $ 5,500,000 9 For replacing mechanical piping - Klein 10 and Mason Warehouse........................... 290,000 11 For renovating the exterior of the Capitol 12 and Howlett Buildings ........................ 2,000,000 13 For renovating 222 S. College, in addition 14 to funds previously appropriated ............. 1,200,000 15 Total, Section 12 $8,990,000 16 Section 13. The following named amounts, or so much 17 thereof as may be necessary, are appropriated from the 18 Capital Development Fund to the Capital Development Board for 19 the Department of Veterans' Affairs for the projects 20 hereinafter enumerated: 21 ILLINOIS VETERANS' HOME - LASALLE 22 For constructing additional parking areas ...... $ 350,000 23 ILLINOIS VETERANS' HOME - MANTENO 24 For upgrading the electrical system ............ 1,400,000 25 For upgrading storm sewer ...................... 150,000 26 Total, Section 13 $1,900,000 27 Section 13a. The following named amounts, or so much 28 thereof as may be necessary, are appropriated from the 29 General Revenue Fund to the Capital Development Board for the 30 Department of Veterans' Affairs for the projects hereinafter 31 enumerated: 32 ILLINOIS VETERANS' HOME - ANNA -18- BOB-CDBnew-re2000 1 For repairing, upgrading and maintaining 2 various systems .............................. $ 380,000 3 ILLINOIS VETERANS' HOME - LASALLE 4 For replacing lighting ......................... 75,000 5 ILLINOIS VETERANS' HOME - MANTENO 6 For upgrading generators for emergency power ... 100,000 7 For enlarging doorways ......................... 95,000 8 Total, Section 13a $650,000 9 Section 14. The following named amounts, or so much 10 thereof as may be necessary, are appropriated from the 11 Capital Development Fund to the Capital Development Board for 12 the projects hereinafter enumerated: 13 STATEWIDE 14 For surveys and modifications to buildings 15 to meet requirements of the federal 16 Americans with Disabilities Act .............. $ 9,000,000 17 For abating hazardous materials ................ 5,000,000 18 For retrofitting or upgrading mechanized 19 refrigeration equipment (CFCs) ............... 7,000,000 20 For upgrading and remediating aboveground 21 and underground storage tanks ................ 3,500,000 22 Total, Section 14 $24,500,000 23 Section 14a. The following named amounts, or so much 24 thereof as may be necessary, are appropriated from the 25 General Revenue Fund to the Capital Development Board for the 26 projects hereinafter enumerated: 27 STATEWIDE 28 For remediating minor problems and 29 emergencies .................................. $ 3,815,000 30 For conducting construction site 31 archeological studies ........................ 245,000 32 For demolition of buildings .................... 5,000,000 -19- BOB-CDBnew-re2000 1 For surveying and abating asbestos- 2 containing materials ......................... 2,000,000 3 Total, Section 14a $11,060,000 4 Section 14b. The amount of $2,000,000, or so much 5 thereof as may be necessary, is appropriated from the 6 Asbestos Abatement Fund to the Capital Development Board for 7 asbestos surveys and emergency abatement in relation to 8 asbestos abatement in state governmental buildings or higher 9 education residential and auxiliary enterprise buildings. 10 Section 15. The following named amounts, or so much 11 thereof as may be necessary, are appropriated from the 12 Capital Development Fund to the Capital Development Board for 13 the Illinois Community College Board for the projects 14 hereinafter enumerated: 15 BELLEVILLE AREA COLLEGE 16 For renovating campus buildings and site 17 improvements at the Belleville and Red 18 Bud campuses ................................. $ 2,216,000 19 CITY COLLEGES OF CHICAGO 20 For remodeling for Workforce Preparation 21 Centers ...................................... 3,862,000 22 JOHN WOOD COMMUNITY COLLEGE - QUINCY 23 For constructing campus buildings and site 24 improvements, in addition to funds 25 previously appropriated ...................... 12,240,000 26 LAKE LAND COLLEGE - MATTOON 27 For constructing a Technology Building, a 28 parking area and for site improvements ....... 2,992,000 29 PARKLAND COLLEGE - CHAMPAIGN 30 For constructing a classroom/instructional 31 support building, in addition to 32 funds previously appropriated ................ 10,688,000 -20- BOB-CDBnew-re2000 1 PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS 2 For constructing an addition to the Adult 3 Training/Outreach Center, in addition to 4 funds previously appropriated ................ 10,961,000 5 RICHLAND COMMUNITY COLLEGE - DECATUR 6 For remodeling and constructing additions ...... 6,939,000 7 TRITON COLLEGE - RIVER GROVE 8 For rehabilitating the Liberal Arts 9 Building ..................................... 3,687,000 10 For rehabilitating the potable water 11 distribution system .......................... 659,000 12 Total, Section 15 $54,244,000 13 Section 16. The following named amounts, or so much 14 thereof as may be necessary, are appropriated from the 15 Capital Development Fund to the Capital Development Board for 16 the Illinois Board of Higher Education for the projects 17 hereinafter enumerated: 18 CHICAGO STATE UNIVERSITY 19 For planning and beginning to remodel 20 Building K and improving site ................ $ 1,100,000 21 EASTERN ILLINOIS UNIVERSITY - CHARLESTON 22 For planning and beginning to renovate 23 and expand the Fine Arts Center .............. 2,000,000 24 GOVERNORS STATE UNIVERSITY - UNIVERSITY PARK 25 For constructing a child development center 26 and an addition to the main building 27 and remodeling Wings E and F ................. 13,403,900 28 ILLINOIS STATE UNIVERSITY - NORMAL 29 For planning and beginning to rehabilitate 30 Schroeder Hall ............................... 1,200,000 31 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 32 For planning and beginning to remodel 33 Buildings A, B and E ......................... 800,000 -21- BOB-CDBnew-re2000 1 NORTHERN ILLINOIS UNIVERSITY - DEKALB 2 For planning a classroom building and 3 developing site in Hoffman Estates ........... $1,314,500 4 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE 5 For construction, renovation, and all other 6 costs necessary to replace the East St. 7 Louis Center, in addition to funds 8 previously appropriated ...................... 10,300,000 9 UNIVERSITY CENTER OF LAKE COUNTY 10 For planning and constructing a facility ....... 11,000,000 11 UNIVERSITY OF ILLINOIS - CHAMPAIGN/URBANA 12 For planning and beginning to construct 13 a central chiller plant ...................... 4,500,000 14 WESTERN ILLINOIS UNIVERSITY - MACOMB 15 For constructing a utility tunnel system, in 16 addition to funds previously appropriated .... 3,707,900 17 Total, Section 16 $49,326,300 18 Section 17. The sum of $10,869,200, is appropriated from 19 the Capital Development Fund to the Capital Development Board 20 for the Board of Higher Education for miscellaneous capital 21 improvements including construction, capital facilities, cost 22 of planning, supplies, equipment, materials, services and all 23 other expenses required to complete the work at the various 24 universities set forth below. This appropriated amount shall 25 be in addition to any other appropriated amounts which can be 26 expended for these purposes. 27 Chicago State University ..............218,500 28 Eastern Illinois University ...........409,000 29 Governors State University ............131,700 30 Illinois State University .............834,200 31 Northeastern Illinois University ......307,200 32 Northern Illinois University ..........933,600 -22- BOB-CDBnew-re2000 1 Western Illinois University ...........625,200 2 Southern Illinois University - 3 Carbondale .........................1,443,800 4 Southern Illinois University - 5 Edwardsville .........................544,800 6 University of Illinois - 7 Chicago Campus .....................2,378,300 8 University of Illinois - 9 Springfield Campus ...................157,200 10 University of Illinois - 11 Champaign/Urbana Campus ............2,885,700 12 Section 18. The sum of $3,630,800, is appropriated from 13 the Capital Development Fund to the Capital Development Board 14 for the Illinois Community College Board for miscellaneous 15 capital improvements including construction, capital 16 facilities, cost of planning, supplies, equipment, materials, 17 services and all other expenses required to complete the work 18 at the various community colleges. This appropriated amount 19 shall be in addition to any other appropriated amounts which 20 can be expended for these purposes. 21 Section 19. The sum of $347,000,000, or so much thereof 22 as may be necessary, is appropriated from the School 23 Construction Fund to the Capital Development Board for school 24 construction grants pursuant to the School Construction Law, 25 in addition to amounts previously appropriated for such 26 purposes. 27 Section 20. The sum of $40,000,000, or so much thereof 28 as may be necessary, is appropriated from the School 29 Infrastructure Fund to the Capital Development Board for 30 school construction grants pursuant to the School 31 Construction Law, in addition to amounts previously -23- BOB-CDBnew-re2000 1 appropriated for such purposes. 2 Section 21. No contract shall be entered into or 3 obligation incurred for any expenditures from appropriations 4 made in this Article until after the purposes and amounts 5 have been approved by the Governor. 6 ARTICLE 2 7 Section 1. The following named amounts, or so much 8 thereof as may be necessary and remain unexpended at the 9 close of business on June 30, 1999, from appropriations and 10 reappropriations heretofore made for such purposes in Article 11 90, Section 1, and Article 91, Section 1 of Public Act 12 90-585, are reappropriated from the Capital Development Fund 13 to the Capital Development Board for the Department of 14 Agriculture for the projects hereinafter enumerated: 15 ANIMAL DISEASE LABORATORY - CENTRALIA 16 (From Article 91, Section 1 of Public Act 90-585) 17 For upgrading the diagnostic laboratory 18 facility, in addition to funds previously 19 appropriated ................................. $ 200,000 20 For purchasing and upgrading 21 diagnostic laboratory ........................ 63,104 22 DUQUOIN STATE FAIRGROUNDS 23 (From Article 90, Section 1 of Public Act 90-585) 24 For constructing four livestock barns 25 (Phase II) ................................... 688,000 26 (From Article 91, Section 1 of Public Act 90-585) 27 For planning and beginning the 28 renovation of the Round Houses ............... 27,024 29 For replacement of the grandstand 30 bleachers .................................... 362,798 31 For planning and construction of -24- BOB-CDBnew-re2000 1 a livestock complex .......................... 6,837 2 For rehabilitation of the Grandstand ........... 13,403 3 For upgrading the racetrack, including the 4 racetrack walls .............................. 2,621,797 5 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD 6 (From Article 90, Section 1 of Public Act 90-585) 7 For replacing and renovating 8 racehorse barns (Phase II) ................... 700,000 9 For replacing and rehabilitating roofs ......... 536,000 10 For replacing Series 14 Barns (Phase I) ........ 3,192,445 11 (From Article 91, Section 1 of Public Act 90-585) 12 For replacing the HVAC system in the 13 Administration Building ...................... 909,249 14 For replacing and/or repairing sidewalks, 15 curbs, gutters and streets, in addition 16 to funds previously appropriated ............. 46,448 17 For upgrading the storm/sanitary and water 18 systems, in addition to funds previously 19 appropriated ................................. 1,028,567 20 For renovation or replacement of 21 comfort stations, in addition 22 to funds previously appropriated ............. 1,273,000 23 For renovation of the comfort stations- 24 Phase I ...................................... 74,803 25 For renovation of the Jr. Livestock Building, 26 including the cover over the outdoor 27 arena, roof, HVAC, plumbing and electrical 28 systems and installation of an elevator 29 for accessibility, and for upgrading 30 the sewer system ............................. 11,009 31 For planning and beginning the renovation 32 of the show horse barns ...................... 192,258 33 For rehabilitation of six racehorse barns- 34 Phase I ...................................... 165,046 -25- BOB-CDBnew-re2000 1 For planning and beginning the 2 rehabilitation of sidewalks, curbs, 3 gutters and streets .......................... 3,831 4 Total, Section 1 $12,115,619 5 Section 1.1. The following named amount, or so much 6 thereof as may be necessary and remains unexpended at the 7 close of business on June 30, 1999, from an appropriation 8 heretofore made for such purposes in Article 90, Section 1a 9 of Public Act 90-585, is reappropriated from the General 10 Revenue Fund to the Capital Development Board for the 11 Department of Agriculture for the project hereinafter 12 enumerated: 13 SPRINGFIELD 14 For surveying the electrical system ............ $ 195,000 15 Total, Section 1.1 $195,000 16 Section 2. The following named amounts, or so much 17 thereof as may be necessary and remain unexpended at the 18 close of business on June 30, 1999, from reappropriations 19 heretofore made for such purposes in Article 91, Section 2 of 20 Public Act 90-585, are reappropriated from the Capital 21 Development Fund to the Capital Development Board for the 22 Courts of Illinois for the projects hereinafter enumerated: 23 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN 24 (From Article 91, Section 2 of Public Act 90-585) 25 For replacing the roof ......................... $ 47,639 26 SPRINGFIELD - SUPREME COURT BUILDING 27 For planning and beginning the 28 library upgrade .............................. 106,800 29 For installation of an elevator and 30 replacement of the exterior lights ........... 28,496 31 For repairing the ramp, drainage system, 32 retaining wall and landscaping ............... 12,786 -26- BOB-CDBnew-re2000 1 Total, Section 2 $195,721 2 Section 2.1. The following named amount, or so much 3 thereof as may be necessary and remains unexpended at the 4 close of business on June 30, 1999, from a reappropriation 5 heretofore made for such purposes in Article 91, Section 2.1 6 of Public Act 90-585, is reappropriated from the General 7 Revenue Fund to the Capital Development Board for the project 8 hereinafter enumerated: 9 SUPREME COURT BUILDING - SPRINGFIELD 10 For tuckpointing and cleaning exterior ...........$ 209,781 11 Section 3. The following named amounts, or so much 12 thereof as may be necessary and remain unexpended at the 13 close of business on June 30, 1999, from appropriations and 14 reappropriations heretofore made for such purposes in Article 15 90, Section 2, and Article 91, Section 3 of Public Act 16 90-585, are reappropriated from the Capital Development Fund 17 to the Capital Development Board for the Department of 18 Central Management Services for the projects hereinafter 19 enumerated: 20 ELGIN REGIONAL OFFICE BUILDING 21 (From Article 91, Section 3 of Public Act 90-585) 22 For replacing the utility system ............... $ 2,625,000 23 ILLINOIS CENTER FOR REHABILITATION 24 AND EDUCATION (ROOSEVELT) - CHICAGO 25 (From Article 90, Section 2 of Public Act 90-585) 26 For converting and renovating tub rooms ........ 425,000 27 (From Article 91, Section 3 of Public Act 90-585) 28 For upgrading the HVAC system .................. 2,120,303 29 ILLINOIS CENTER FOR REHABILITATION AND 30 EDUCATION (WOOD) - CHICAGO 31 For replacing the skylight system 32 and roof flashing ............................ 40,775 -27- BOB-CDBnew-re2000 1 For installing security system and 2 perimeter lighting ........................... 237,322 3 CENTRAL STATE GARAGE - SPRINGFIELD 4 For replacing the roof and drainage system ..... 287,827 5 CHICAGO - STATE OF ILLINOIS CENTER 6 (From Article 90, Section 2 of Public Act 90-585) 7 For replacing roofing system and 8 insulation, in addition to funds 9 previously appropriated ...................... 875,335 10 (From Article 91, Section 3 of Public Act 90-585) 11 For completing the installation of elevators, in 12 addition to funds previously appropriated .... 650,760 13 For the correction of design/construction 14 deficiencies, including remedial work in 15 the heating, refrigeration, temperature 16 control and ventilation systems at the 17 State of Illinois Center at Chicago .......... 254,199 18 CHICAGO - STATE OF ILLINOIS BUILDING 19 For planning and beginning thefor20 renovation of the building 21 at 160 North LaSalle ......................... 46,367 22 CHICAGO MEDICAL CENTER 23 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION 24 For completing the upgrade of HVAC system, in 25 addition to funds previously appropriated .... 19,933 26 For construction of an independent living 27 apartment building ........................... 65,122 28 For rehabilitation of the air conditioning 29 system, installation of a sprinkler system 30 and improvements for handicapped 31 accessibility ................................ 51,764 32 CHICAGO MEDICAL CENTER 33 EVELYN EDWARDS CENTER 34 For replacement of the heating system .......... 25,274 -28- BOB-CDBnew-re2000 1 CHICAGO MEDICAL CENTER 2 OFFICE AND LABORATORY FACILITY 3 For replacement of the electric autoclave 4 boilers ...................................... 13,093 5 CHICAGO MEDICAL CENTER 6 VISUALLY HANDICAPPED INSTITUTE 7 For renovation of the loading dock ............. 46,058 8 REGIONAL OFFICE BUILDING - CHAMPAIGN 9 For replacement of roofing system and 10 rooftop heating and cooling unit ............. 44,849 11 SUBURBAN NORTH REGIONAL OFFICE BUILDING - 12 DES PLAINES 13 (From Article 90, Section 2 of Public Act 90-585) 14 For renovating offices for Environmental 15 Protection Agency, in addition to funds 16 previously appropriated ...................... 1,635,000 17 (From Article 91, Section 3 of Public Act 90-585) 18 For renovation of Suburban North Regional 19 Office Building (formerly Maine Township 20 North High School building), in addition 21 to funds previously appropriated for such 22 purpose, Phase III ........................... 5,236,999 23 For renovation and expansion of garage ......... 353,586 24 For designing and beginning the 25 renovation, phase III ........................ 269,338 26 For the purchase and renovation of the high 27 school ....................................... 17,210 28 OTTAWA STATE GARAGE 29 (From Article 90, Section 2 of Public Act 90-585) 30 For replacing state garage ..................... 1,400,000 31 (From Article 91, Section 3 of Public Act 90-585) 32 SPRINGFIELD - CAPITOL COMPLEX 33 For construction of a day care center, in 34 addition to funds previously appropriated -29- BOB-CDBnew-re2000 1 for such purpose ............................. 950,000 2 For construction of a day care center in the 3 Capitol Complex in Springfield ............... 244,348 4 COMPUTER FACILITY - SPRINGFIELD 5 For replacement of the halon fire 6 suppression system ........................... 813,330 7 ASH STREET COMPLEX - 8 MUSEUM AND COLLECTION CENTER - 9 SPRINGFIELD 10 For replacement of the roofing system .......... 667,928 11 MARION REGIONAL OFFICE BUILDING 12 (From Article 90, Section 2 of Public Act 90-585) 13 For replacing HVAC system and interior 14 lighting ..................................... 1,600,000 15 (From Article 91, Section 3 of Public Act 90-585) 16 For construction of a Regional Office 17 Building Addition ............................ 1,920,642 18 Total, Section 3 $22,937,362 19 Section 3.1. The following named amounts, or so much 20 thereof as may be necessary and remain unexpended at the 21 close of business on June 30, 1999, from appropriations and 22 reappropriations heretofore made for such purposes in Article 23 90, Section 2a, and Article 91, Section 3.1 of Public Act 24 90-585, are reappropriated from the General Revenue Fund to 25 the Capital Development Board for the Department of Central 26 Management Services for the projects hereinafter enumerated: 27 JAMES R. THOMPSON CENTER - CHICAGO 28 (From Article 91, Section 3.1 of Public Act 90-585) 29 For restoring the exterior plaza ............... $ 349,010 30 EAST ST. LOUIS - REGIONAL OFFICE 31 For replacing windows .......................... 59,308 32 CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY 33 (From Article 90, Section 2a of Public Act 90-585) -30- BOB-CDBnew-re2000 1 For rehabilitating exterior .................... 390,000 2 CHICAGO MEDICAL CENTER 3 ILLINOIS CENTER FOR REHABILITATION AND EDUCATION 4 (From Article 91, Section 3.1 of Public Act 90-585) 5 For rehabilitation for fire safety and 6 accessibility ................................ 11,086 7 Total, Section 3.1 $809,404 8 Section 4. The following named amounts, or so much 9 thereof as may be necessary and remain unexpended at the 10 close of business on June 30, 1999, from appropriations and 11 reappropriations heretofore made for such purposes in Article 12 90, Section 7, and Article 91, Section 4 of Public Act 13 90-585, are reappropriated from the Capital Development Fund 14 to the Capital Development Board for the Department of 15 Natural Resources for the projects hereinafter enumerated: 16 BABE WOODYARD STATE NATURAL AREA - 17 VERMILION COUNTY 18 (From Article 90, Section 7 of Public Act 90-585) 19 For developing the site and associated 20 land acquisition ............................. $ 3,300,000 21 BEALL WOODS STATE CONSERVATION AREA - 22 WABASH COUNTY 23 For replacing a visitors center ................ 488,000 24 CAVE-IN-ROCK STATE PARK - HARDIN COUNTY 25 For constructing a shower building 26 and upgrading the campground ................. 650,000 27 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY 28 (From Article 91, Section 4 of Public Act 90-585) 29 For construction of a concession building 30 and upgrading the horse concession, in 31 addition to funds previously appropriated .... 477,590 32 For planning and beginning the replacement 33 of concession buildings ...................... 17,092 -31- BOB-CDBnew-re2000 1 EAGLE CREEK STATE PARK - SHELBY COUNTY 2 For rehabilitation of the sewage treatment 3 system, in addition to funds previously 4 appropriated ................................. 217,750 5 For planning and rehabilitation of the 6 sewage treatment system ...................... 51,261 7 FORT MASSAC STATE PARK - MASSAC COUNTY 8 For planning and beginning the 9 reconstruction of the fort ................... 121,340 10 FERNE CLYFFE STATE PARK - 11 JOHNSON COUNTY 12 (From Article 90, Section 7 of Public Act 90-585) 13 For rehabilitating shower building ............. 215,000 14 FOX RIDGE STATE PARK - COLES COUNTY 15 For upgrading campground ....................... 340,000 16 (From Article 91, Section 4 of Public Act 90-585) 17 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA 18 For stabilizing the feeder canal bank .......... 398,085 19 For replacement and rehabilitation 20 of arch culverts and canal ................... 542,636 21 HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY 22 For dam rehabilitation and the State's share 23 to implement the ecological restoration 24 plan in cooperation with the U.S. 25 Army Corps of Engineers, and 26 land acquisition ............................. 858,655 27 For construction of a pole building 28 and hunter check station ..................... 83,816 29 (From Article 90, Section 7 of Public Act 90-585) 30 For replacing the hunter check station ......... 150,000 31 ILLINOIS-MICHIGAN CANAL STATE TRAIL 32 (From Article 91, Section 4 of Public Act 90-0585) 33 For stabilization of the aqueduct .............. 438,393 34 ILLINOIS BEACH STATE PARK - LAKE COUNTY -32- BOB-CDBnew-re2000 1 (From Article 90, Section 7 of Public Act 90-0585) 2 For constructing an office building ............ 650,000 3 For replacing sanitary sewer lines ............. 505,000 4 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY 5 (From Article 91, Section 4 of Public Act 90-585) 6 For rehabilitation of the concession 7 building, in addition to funds 8 previously appropriated ...................... 140,000 9 For rehabilitation of the concession building .. 87,975 10 KANKAKEE STATE PARK - KANKAKEE COUNTY 11 For planning and constructing a 12 sanitary sewer system ........................ 182,700 13 KICKAPOO STATE PARK - VERMILION COUNTY 14 For construction of a sewage treatment 15 plant, in addition to funds 16 previously appropriated ...................... 110,575 17 LINCOLN TRAIL STATE RECREATION AREA - 18 CLARK COUNTY 19 (From Article 90, Section 7 of Public Act 90-585) 20 For rehabilitating the day use area 21 and site ..................................... 1,281,000 22 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY 23 (From Article 91, Section 4 of Public Act 90-585) 24 For rehabilitating the levee system ............ 15,928 25 MORAINE HILLS STATE PARK - MCHENRY COUNTY 26 For renovation of the trail .................... 322,755 27 For replacement of restrooms and upgrading 28 the water system ............................. 725,811 29 MORAINE VIEW STATE PARK - MCLEAN COUNTY 30 For construction of a sewage treatment 31 system and plant ............................. 1,553,941 32 NORTH POINT MARINA - LAKE COUNTY 33 For construction of a breakwater structure ..... 1,048,259 34 For modifying the marina's docking system ...... 1,527,922 -33- BOB-CDBnew-re2000 1 NAUVOO STATE PARK - HANCOCK COUNTY 2 (From Article 90, Section 7 of Public Act 90-585) 3 For replacing water distribution 4 system ....................................... 241,000 5 PERE MARQUETTE STATE PARK - JERSEY COUNTY 6 (From Article 90, Section 7 of Public Act 90-585) 7 For replacing the lodge HVAC condensing unit, in 8 addition to funds previously appropriated .... 327,344 9 (From Article 91, Section 4 of Public Act 90-585) 10 For renovation of two buildings and 11 replacement of a storage building ............ 132,119 12 RAMSEY LAKE STATE PARK - FAYETTE COUNTY 13 (From Article 90, Section 7 of Public Act 90-585) 14 For rehabilitating shower building ............. 188,000 15 RED HILLS STATE PARK - LAWRENCE COUNTY 16 (From Article 91, Section 4 of Public Act 90-585) 17 For replacing the sewage treatment system, 18 in addition to funds previously appropriated . 510,000 19 For rehabilitating the dam ..................... 90,000 20 SANGANOIS CONSERVATION AREA - 21 CASS, MASON AND SCHUYLER COUNTIES 22 For rehabilitating the levee system ............ 315,000 23 SPRINGFIELD 24 (From Article 90, Section 7 of Public Act 90-585) 25 For constructing an office building and 26 interpretive center .......................... 29,795,641 27 STARVED ROCK STATE PARK - LASALLE COUNTY 28 For rehabilitating the sewer system ............ 1,055,000 29 For rehabilitating trails, in addition 30 to funds previously appropriated ............. 500,000 31 For upgrading the HVAC system .................. 445,000 32 (From Article 91, Section 4 of Public Act 90-585) 33 For construction of a Visitors' 34 Center, in addition to funds -34- BOB-CDBnew-re2000 1 previously appropriated ...................... 365,000 2 For rehabilitation of trails, in addition 3 to funds previously appropriated ............. 402,777 4 For reconstruction of the seawall, in 5 addition to funds previously 6 appropriated ................................. 58,193 7 For rehabilitation of the sewer 8 system - Phase I ............................. 121,614 9 For planning and beginning the 10 reconstruction of the seawall ................ 39,827 11 TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES 12 For planning and beginning 13 construction of a park ....................... 78,148 14 VOLO BOG NATURAL AREA - LAKE COUNTY 15 For rehabilitation of the visitors' center ..... 9,425 16 WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY 17 For rehabilitation of the sewage 18 treatment plant .............................. 164,072 19 For planning and construction of a marina, 20 installation of additional sewage lines, 21 recreational development and overnight 22 accommodations to be located on Rend 23 Lake ......................................... 14,599 24 TUNNEL HILL-CACHE RIVER STATE NATURAL AREA 25 (From Article 90, Section 7 of Public Act 90-585) 26 For constructing a visitor center and 27 purchasing land .............................. 4,000,000 28 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER 29 (FORMERLY BURNHAM HOSPITAL) 30 (From Article 91, Section 4 of Public Act 90-585) 31 For construction of a Natural History 32 Research Center for the space needs of 33 the Illinois Natural History Survey on 34 the campus of the University of Illinois...... 6,000,000 -35- BOB-CDBnew-re2000 1 For planning and construction of the 2 Natural History Research Center 3 for the space needs of the 4 Illinois Natural History Survey 5 on the campus of the University 6 of Illinois in Champaign ..................... 3,074,328 7 For planning and construction of 8 the Natural History Research Center 9 for the space needs of the Illinois 10 Natural History Survey on 11 the campus of the University of 12 Illinois in Champaign ........................ 41,834 13 NATURAL HISTORY SURVEY - CHAMPAIGN 14 For upgrading laboratories and installation 15 of storage units ............................. 96,562 16 STATE WATER SURVEY - CHAMPAIGN 17 (From Article 90, Section 7 of Public Act 90-585) 18 For upgrading and replacing the mechanical 19 system, in addition to funds 20 previously appropriated ...................... 2,200,000 21 (From Article 91, Section 4 of Public Act 90-585) 22 For renovation of office and 23 laboratory buildings ......................... 217,814 24 For replacement and upgrade of the 25 exterior lighting system ..................... 34,495 26 For planning and replacement of vehicle 27 storage/shop facilities ...................... 21,150 28 DICKSON MOUNDS - LEWISTOWN 29 For renovating Canton Liverpool 30 Toll Booth ................................... 68,100 31 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD 32 For the completion of site improvements ........ 400,891 33 STATE MUSEUM - SPRINGFIELD 34 (From Article 90, Section 7 of Public Act 90-585) -36- BOB-CDBnew-re2000 1 For renovating or replacing exhibits, in 2 addition to funds previously appropriated .... 5,500,000 3 For planning and beginning replacement 4 of the state museum .......................... 800,000 5 (From Article 91, Section 4 of Public Act 90-585) 6 For planning and replacement of the main 7 museum exhibits, in addition to funds 8 previously appropriated ...................... 539,400 9 For planning renovation of main museum 10 exhibits and for renovation of basement 11 galleries .................................... 32,611 12 STATEWIDE 13 (From Article 90, Section 7 of Public Act 90-585) 14 For replacing roofing systems at the 15 following locations at the approximate 16 costs set forth below ........................ 370,000 17 Lincoln Trail Homestead State 18 Park, Four buildings ............... 38,000 19 Silver Springs State Park, Three 20 Buildings ......................... 278,000 21 Weldon Springs State Park, Nine 22 Buildings .......................... 54,000 23 For constructing vault toilets at the following 24 locations at the approximate costs set forth 25 below ........................................ 852,000 26 Cave-In-Rock State Park ............ 192,000 27 Frank Holten State Park ............ 285,000 28 Golconda/Rauchfuss Hill ............. 79,000 29 I&M Canal - Gebhard Woods State 30 Park ............................... 35,000 31 Prophetstown State Park ............ 155,000 32 William W. Powers State Park ....... 106,000 33 For constructing hazardous material storage 34 buildings .................................... 275,000 -37- BOB-CDBnew-re2000 1 (From Article 91, Section 4 of Public Act 90-585) 2 For replacing concession buildings and 3 upgrading support facilities at the following 4 locations at the approximate costs set 5 forth below: ................................. 2,840,443 6 Kickapoo State Park ..................527,425 7 Rock Cut State Park ..................512,168 8 Stephen A. Forbes State Park .......1,800,850 9 For constructing vault toilets at the 10 following locations at the approximate 11 cost set forth below: ........................ 1,396,054 12 Apple River Canyon State Park ........285,000 13 Des Plaines Conservation Area ........240,000 14 Kankakee River State Park ............364,054 15 Lake Le-Aqua-Na State Park ...........231,000 16 Marshall County Conservation Area .....37,000 17 Morrison-Rockwood State Park .........202,000 18 Rice Lake Conservation Area ...........37,000 19 For replacing roofing systems and structural 20 repairs at the following locations at the 21 approximate costs set forth below: ........... 392,845 22 Mine Rescue Station, One building .....27,000 23 Castle Rock State Park, 24 One building .........................36,845 25 Dixon Springs State Park, 26 Three buildings ......................40,000 27 Cave-In-Rock State Park, 28 One building .........................25,000 29 Ferne Clyffe State Park, 30 One building .........................25,000 31 Hamilton County Conservation 32 Area, One building ...................29,000 33 Lake Murphysboro State Park 34 Two buildings ........................50,000 -38- BOB-CDBnew-re2000 1 Red Hills State Park, Two 2 buildings ............................30,000 3 Fox Ridge State Park, Six 4 buildings ............................65,000 5 Shelbyville Fish and Wildlife 6 Area, Two buildings ..................40,000 7 Newton Lake Fish and Wildlife 8 Area, One building ...................25,000 9 For repair or replacement of roofs and 10 parapet walls and reconstruction of 11 chimneys at the following locations 12 at the approximate costs set forth below ..... 520,556 13 Geological Survey - Applied Lab ......189,026 14 Water Survey - Eight Buildings .......100,000 15 Natural History Survey - Natural 16 Resources Studies Annex ..............67,000 17 Geological Survey - Natural 18 Resources Building ...................10,000 19 Water Survey - Parapet walls at 20 Buildings No. 4, 5 and 6 .............10,000 21 Dickson Mounds - Exterior restroom 22 and picnic shelter ...................14,530 23 Jake Wolf Fish Hatchery - 24 one building ........................130,000 25 For land acquisition ........................... 576,472 26 For maintaining the lodge and concession 27 facilities ................................... 68,994 28 For repairing and maintaining facilities ....... 42,278 29 For construction of hazardous material 30 storage buildings ............................ 227,024 31 For abating hazards caused by the presence 32 of asbestos-containing materials ............. 51,622 33 For planning, construction, reconstruction, 34 land acquisition and related costs, -39- BOB-CDBnew-re2000 1 utilities, site improvements, and all other 2 expenses necessary for various capital 3 improvements at parks, conservation areas, 4 and other facilities under the jurisdiction 5 of the Department of Natural Resources ....... 7,368,260 6 For construction and development of 7 multiple use facilities on lands owned 8 or managed by the Department of 9 Natural Resources, including all costs 10 for supplies, materials, labor, and 11 services required for the completion 12 of the following projects at the 13 approximate costs set forth below: ........... 8,913 14 For Volo Bog Natural Area 15 for replacement of a roof 16 and rehabilitation of the 17 emergency exit stairs at the 18 visitor center ........................5,144 19 For Volo Bog Natural Area for 20 the upgrading of the 21 Interpretive Center, including 22 the heating, ventilation, and 23 air conditioning system ...............3,769 ____________ 24 Total, Section 4 $89,371,889 25 Section 4.1. The following named amounts, or so much 26 thereof as may be necessary, from appropriations and 27 reappropriations heretofore made for such purposes in Article 28 90, Section 7a, and Article 91, Section 4.1 of Public Act 29 90-585, are reappropriated from the General Revenue Fund to 30 the Capital Development Board for the Department of Natural 31 Resources for the projects hereinafter enumerated: 32 APPLE RIVER CANYON STATE PARK - 33 JO DAVIESS COUNTY -40- BOB-CDBnew-re2000 1 (From Article 90, Section 7a of Public Act 90-585) 2 For stabilizing the river bank ................. $ 150,000 3 CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES 4 (From Article 91, Section 4.1 of Public Act 90-585) 5 For replacement of windows and floor tile 6 in Region 2 headquarters ..................... 80,585 7 GOLCONDA MARINA - POPE COUNTY 8 (From Article 90, Section 7a of Public Act 90-585) 9 For constructing a sewage lift station ......... 50,000 10 ILLINOIS BEACH STATE PARK - LAKE COUNTY 11 For stabilizing the shoreline .................. 400,000 12 (From Article 91, Section 4.1 of Public Act 90-585) 13 For stabilizing the shoreline .................. 65,477 14 For stabilization of the shoreline ............. 6,052 15 SPRING GROVE HATCHERY - MCHENRY COUNTY 16 For upgrading the septic system ................ 30,000 17 STARVED ROCK STATE PARK - LASALLE COUNTY 18 (From Article 90, Section 7a of Public Act 90-585) 19 For constructing erosion controls .............. 300,000 20 STATEWIDE 21 For maintaining lodge and concession 22 facilities ................................... 331,000 23 For rehabilitating or replacing playground 24 equipment .................................... 300,000 25 (From Article 91, Section 4.1 of Public Act 90-585) 26 For maintaining lodge and concession 27 facilities at various DNR locations .......... 135,508 28 For rehabilitating or replacing 29 playground equipment, in addition 30 to funds previously appropriated ............. 300,000 31 For maintenance of lodge and 32 concession facilities ........................ 63,907 33 For rehabilitation or replacement 34 of playground equipment ...................... 158,506 -41- BOB-CDBnew-re2000 1 For rehabilitation of trail systems ............ 96,232 2 For rehabilitation and replacement of 3 playground equipment ......................... 96,137 4 Total, Section 4.1 $2,563,404 5 Section 5. The following named amounts, or so much 6 thereof as may be necessary and remain unexpended at the 7 close of business on June 30, 1999, from appropriations and 8 reappropriations heretofore made for such purposes in Article 9 90, Section 3, and Article 91, Section 5 of Public Act 10 90-585, are reappropriated from the Capital Development Fund 11 to the Capital Development Board for the Department of 12 Corrections for the projects hereinafter enumerated: 13 (From Article 91, Section 5 of Public Act 90-585) 14 DANVILLE CORRECTIONAL CENTER 15 For renovation of interior and 16 exterior walls, in addition to 17 funds previously appropriated ................ $ 1,194,152 18 For correction of construction defects ......... 249,801 19 For planning, utilities, site improvements, 20 and other expenses necessary for the 21 construction of a correctional facility ...... 32,511 22 DECATUR WOMEN'S CORRECTIONAL CENTER 23 For the planning and conversion of 24 Meyer Mental Health Center into a 25 correctional facility ........................ 12,136,420 26 DIXON CORRECTIONAL CENTER 27 For renovation of the groundwater storage 28 tank and abatement of crawlspace 29 pipes in Buildings 26, 27 and 29 ............. 585,888 30 For upgrading the steam distribution system 31 and replacement of the boiler system 32 including asbestos abatement ................. 87,937 33 DWIGHT CORRECTIONAL CENTER -42- BOB-CDBnew-re2000 1 For upgrading water and sewer systems .......... 200,988 2 For renovating buildings, in addition 3 funds previously appropriated ................ 596,241 4 For constructing a gatehouse and 5 sally port and upgrading the 6 security system .............................. 2,301,455 7 For completion of medical unit, 8 in addition to funds previously 9 appropriated ................................. 369,489 10 For planning the expansion of the 11 Education Building and constructing 12 a dietary and a warehouse .................... 4,199,118 13 For renovation of buildings .................... 68,161 14 EAST MOLINE CORRECTIONAL CENTER 15 For upgrading the electrical 16 system ....................................... 2,142,024 17 For upgrading locking system, in addition 18 to funds previously appropriated ............. 44,965 19 HANNA CITY WORK CAMP 20 (From Article 90, Section 3 of Public Act 90-585) 21 For upgrading electrical system ................ 600,000 22 HILL CORRECTIONAL CENTER - GALESBURG 23 For upgrading and expanding freezer 24 capacity, in addition to funds 25 previously appropriated ...................... 950,000 26 For replacing domestic water lines ............. 410,000 27 ILLINOIS YOUTH CENTER - ST. CHARLES 28 For planning and beginning the upgrade 29 of existing facility ......................... 600,000 30 (From Article 91, Section 5 of Public Act 90-585) 31 ILLINOIS YOUTH CENTER - HARRISBURG 32 For upgrading the domestic water system ........ 619,149 33 For upgrading the HVAC system .................. 494,932 34 ILLINOIS YOUTH CENTER - JOLIET -43- BOB-CDBnew-re2000 1 For planning, site improvements, 2 utility upgrade, equipment and all 3 costs necessary to construct a 4 housing unit and dietary facility ............ 352,587 5 For completing the upgrade of electrical 6 systems, in addition to funds 7 previously appropriated ...................... 206,511 8 For upgrading the fire alarm system ............ 191,768 9 For completing the upgrade of the utilities, in 10 addition to funds previously appropriated .... 40,647 11 ILLINOIS YOUTH CENTER - PERE MARQUETTE 12 For upgrading the electrical 13 distribution system .......................... 35,281 14 ILLINOIS YOUTH CENTER - ST. CHARLES 15 For completing the upgrade of the water 16 distribution system, in addition to funds 17 previously appropriated ...................... 71,551 18 ILLINOIS YOUTH CENTER - VALLEY VIEW 19 For upgrading dormitory restrooms 20 and fixtures, in addition to 21 funds previously appropriated ................ 154,070 22 For planning and beginning the 23 upgrade of dormitory restrooms 24 and fixtures ................................. 54,213 25 JOLIET CORRECTIONAL CENTER 26 For correcting erosion and 27 stabilizing the masonry wall ................. 1,782,600 28 For upgrading the power house and 29 installation of a generator .................. 382,400 30 For completing the west cellhouse renovation, 31 including asbestos abatement, in addition 32 to funds previously appropriated ............. 538,762 33 LINCOLN CORRECTIONAL CENTER 34 For upgrading the water softener system ........ 93,258 -44- BOB-CDBnew-re2000 1 For upgrading the locking systems and doors .... 42,374 2 For upgrading the water supply ................. 112,077 3 For renovation of the Dietary, construction 4 of a cooler addition and installation 5 of blast chillers ............................ 487,520 6 LOGAN CORRECTIONAL CENTER 7 (From Article 90, Section 3 of Public Act 90-585) 8 For planning and beginning replacement 9 of the Dietary and Medical Buildings ......... 400,000 10 (From Article 91, Section 5 of Public Act 90-585) 11 For renovation of sewer system ................. 826,383 12 For renovation of the water tower .............. 124,144 13 For rehabilitation of the roof ventilation 14 systems ...................................... 77,948 15 MENARD CORRECTIONAL CENTER - CHESTER 16 (From Article 90, Section 3 of Public Act 90-585) 17 For completing the upgrade of roads and 18 sidewalks, in addition to funds 19 previously appropriated ...................... 300,000 20 For completing upgrade of North Cellhouse 21 plumbing system, in addition to funds 22 previously appropriated ...................... 400,000 23 For planning and beginning upgrade 24 of the storm tunnel .......................... 100,000 25 For replacing toilets and waste lines 26 at E/W Cellhouse ............................. 2,600,000 27 (From Article 91, Section 5 of Public Act 90-585) 28 For renovation or replacement of the 29 Old Hospital Building, in addition to 30 funds previously appropriated ................ 4,700,000 31 For replacing and installing 32 water storage tank ........................... 1,200,000 33 For replacing Boiler #2, in addition 34 to funds previously appropriated ............. 800,000 -45- BOB-CDBnew-re2000 1 For converting a room into a shower room ....... 366,412 2 For upgrading roads and sidewalks .............. 40,207 3 For upgrading the coal handling system 4 and repair or replace boiler system .......... 108,665 5 For conversion of the Maintenance Building 6 to an inmate dormitory ....................... 106,020 7 For conversion of the Administration 8 Building basement to a courtroom and 9 attorney offices ............................. 46,022 10 For upgrading the steam and water distribution 11 systems, in addition to funds previously 12 appropriated ................................. 729,410 13 For upgrading the steam and water distribution 14 systems and replacement of the MSU 15 "C" Building ................................. 67,624 16 For replacement of the chimney stack and 17 boilers, in addition to funds previously 18 appropriated ................................. 87,501 19 For replacement of hot water heaters and 20 deairing tanks ............................... 110,000 21 For planning and beginning the 22 renovation of the old 23 hospital building ............................ 175,135 24 For renovation of elements of the power 25 plants, including the main generator ......... 22,982 26 For planning and beginning thefor27 renovation of the Administration Building .... 15,604 28 PONTIAC CORRECTIONAL CENTER 29 (From Article 90, Section 3 of Public Act 90-585) 30 For completing replacement of hot water 31 lines, in addition to funds previously 32 appropriated ................................. 1,100,000 33 (From Article 91, Section 5 of Public Act 90-585) 34 For renovation of main sally port .............. 279,377 -46- BOB-CDBnew-re2000 1 STATEVILLE CORRECTIONAL CENTER - JOLIET 2 (From Article 90, Section 3 of Public Act 90-585) 3 For replacing power plant ...................... 10,000,000 4 For planning, design, construction, 5 equipment and all other necessary costs 6 for an Adult Reception and Classification 7 Center ....................................... 44,000,000 8 For upgrading storm drainage and 9 wastewater systems ........................... 1,200,000 10 For upgrading electrical system and elevator 11 and installing HVAC system ................... 1,200,000 12 (From Article 91, Section 5 of Public Act 90-585) 13 For replacement of the MSU ..................... 6,456,800 14 For upgrading the doors, locks and hardware 15 in B Cellhouse ............................... 35,682 16 SOUTHWESTERN ILLINOIS CORRECTIONAL FACILITY 17 For completing the conversion of existing 18 buildings into a minimum security 19 correctional facility, in addition to 20 funds previously appropriated ................ 10,601 21 VANDALIA CORRECTIONAL CENTER 22 For renovation of dormitory shower rooms ....... 423,560 23 VIENNA CORRECTIONAL CENTER 24 (From Article 90, Section 3 of Public Act 90-585) 25 For completing upgrade of the steam 26 distribution system, in addition to 27 funds previously appropriated ................ 940,000 28 For upgrading electrical system and 29 installing emergency generator ............... 1,200,000 30 (From Article 91, Section 5 of Public Act 90-585) 31 For renovating the kitchen ..................... 1,942,465 32 For upgrading the steam distribution system 33 and renovation of Powerhouse, in addition 34 to funds previously appropriated ............. 2,465,042 -47- BOB-CDBnew-re2000 1 For installation of security fencing ........... 173,201 2 For upgrading air conditioning system 3 and replacement of cooling tower ............. 1,100,000 4 For upgrading the electrical, plumbing and 5 HVAC systems in four buildings ............... 802,701 6 For completing the rehabilitation of duct 7 systems and walls, in addition to funds 8 previously appropriated ...................... 273,518 9 For planning and beginning the upgrade 10 of the steam distribution system ............. 148,888 11 For planning and beginning the replacement 12 of the absorption chiller and cooling tower .. 40,848 13 STATEWIDE 14 (From Article 90, Section 3 of Public Act 90-585) 15 For planning, design, construction, 16 equipment and all other necessary costs 17 for a juvenile facility ...................... 20,000,000 18 For replacing locks and doors at the 19 following locations at the approximate 20 cost set forth below ......................... 1,090,000 21 Dwight Correctional Center ......... 275,000 22 Illinois River Correctional 23 Center - Canton ................... 150,000 24 IYC - Joliet ....................... 500,000 25 IYC - Pere Marquette - Grafton ..... 165,000 26 For replacing roofing systems at the following 27 locations at the approximate cost set forth 28 below ........................................ 2,842,212 29 Dixon Correctional Center, 30 four buildings .................... 894,212 31 IYC - St. Charles, two buildings ... 440,000 32 Joliet Correctional Center, 33 six buildings ..................... 868,000 34 Logan Correctional Center - Lincoln -48- BOB-CDBnew-re2000 1 three buildings ................... 115,000 2 Menard Correctional Center - Chester 3 six buildings ..................... 270,000 4 Pontiac Correctional Center, 5 one building ...................... 255,000 6 For inspecting and upgrading water towers 7 at the following locations at the approximate 8 costs set forth below ........................ 3,590,000 9 Dixon Correctional Center, 10 Upgrade Water Tower ............. 1,000,000 11 Graham Correctional Center - Hillsboro 12 Upgrade Water Tower .............. 215,000 13 Joliet Correctional Center, 14 Upgrade Water Tower ............... 150,000 15 Logan Correctional Center - Lincoln 16 Complete Water Tower Upgrade ..... 600,000 17 Menard Correctional Center - Chester 18 Upgrade Water Tower .............. 325,000 19 Stateville Correctional Center - Joliet 20 Upgrade Water Tower ............ 1,000,000 21 Statewide, Inspect and Upgrade 22 Water Towers ...................... 300,000 23 For upgrading fire and safety systems at 24 the following locations at the approximate 25 costs set forth below, in addition to 26 funds previously appropriated ................ 3,370,000 27 Menard Correctional Center - 28 Chester ......................... 2,200,000 29 Sheridan Correctional Center ....... 320,000 30 Vienna Correctional Center ......... 850,000 31 (From Article 91, Section 5 of Public Act 90-585) 32 For replacing roofing systems at the 33 following locations at the approximate 34 costs set forth below: ....................... 1,635,772 -49- BOB-CDBnew-re2000 1 Big Muddy Correctional Center, Ina 2 Two buildings ....................... 98,772 3 East Moline Correctional Center, 4 Three buildings .................... 398,000 5 Graham Correctional Center, Hillsboro 6 Seven buildings .................... 600,000 7 Sheridan Correctional Center, LaSalle 8 Three buildings .................... 379,000 9 Stateville Correctional Center, Joliet 10 One building ....................... 160,000 11 For replacing doors and locks at the 12 following locations at the approximate 13 costs set forth below: ....................... 2,433,795 14 IYC - St. Charles ................... 546,795 15 Lincoln Correctional Center ......... 300,000 16 Jacksonville Correctional Center .... 664,000 17 Sheridan Correctional Center ........ 923,000 18 For upgrading fire safety systems at the 19 following locations at the approximate 20 costs set forth below, in addition to 21 funds previously appropriated: ............... 6,469,442 22 Menard Correctional Center ........ 1,969,442 23 Pontiac Correctional Center ....... 3,000,000 24 Stateville Correctional Center .... 1,500,000 25 For upgrading water and wastewater 26 systems at the following locations 27 at the approximate costs set forth below: .... 4,218,208 28 Big Muddy Correctional Center 29 for installing mechanical 30 bar screen ......................... 300,000 31 Centralia Correctional Center 32 for upgrading water 33 treatment plant .................. 1,436,208 34 East Moline Correctional Center -50- BOB-CDBnew-re2000 1 for upgrading sewer system ......... 565,000 2 Ed Jenison Work Camp (Paris) 3 for installing mechanical 4 bar screen ......................... 120,000 5 IYC - Harrisburg for upgrading 6 water distribution system .......... 500,000 7 Kankakee MSU for constructing 8 well #2 ............................ 300,000 9 IYC - St. Charles for upgrading 10 sewage/storm system ................ 767,000 11 IYC - Valley View for installing 12 mechanical bar screen .............. 230,000 13 For correction of deficiencies in 14 water systems at three correctional 15 facilities ................................... 100,000 16 For replacement of locks, windows and 17 doors at the following locations 18 as set forth below: .......................... 3,085,103 19 Dwight ............................... 34,000 20 IYC Harrisburg ...................... 849,000 21 IYC Joliet .......................... 310,000 22 Menard .............................. 990,000 23 Pontiac .............................. 78,103 24 IYC Valley View ..................... 460,000 25 Vienna .............................. 364,000 26 For planning, design, construction, 27 equipment and other necessary costs 28 for a Maximum Security Correctional 29 Center, in addition to funds previously 30 appropriated ................................. 95,000,000 31 For planning, design, construction, 32 equipment and other necessary costs 33 for a Correctional Facility for 34 juveniles .................................... 42,577,305 -51- BOB-CDBnew-re2000 1 For planning, design, construction, 2 equipment and other necessary costs 3 for a Medium Security Correctional 4 Facility ..................................... 66,998,938 5 For planning, construction, utilities, site 6 improvements, equipment and other expenses 7 necessary for the construction of a close 8 supervision super maximum security prison .... 1,113,373 9 For upgrading for fire safety at five 10 locations and replacing boilers............... 206,369 11 For correcting defects in the food preparation 12 areas, including roofs ....................... 125,979 13 For planning, construction, utilities, 14 site improvements, and other expenses 15 necessary for the construction of two 16 minimum and one medium security 17 prisons ...................................... 29,224 18 For renovation and improvements at various 19 correctional facilities at the approximate 20 costs set forth below: ....................... 117,693 21 Roof Replacement ......................70,000 22 Road Repavement .......................47,693 23 For replacement of cell doors and locks 24 and rehabilitation of locking systems at 25 the following locations at the approximate 26 costs set forth below: ....................... 118,902 27 Kankakee MSU 28 For rehabilitation of locking 29 systems .............................118,902 30 For renovation of roads and parking lots 31 and replacement of boilers at the 32 following locations at the approximate 33 costs set forth below ........................ 42,785 34 Dixon Correctional Center -52- BOB-CDBnew-re2000 1 For roads and parking .................6,000 2 Logan Correctional Center 3 For roads and parking .................5,656 4 Menard Correctional Center 5 For roads and parking and 6 replacement of boilers...............22,929 7 Vienna Correctional Center 8 For roads .............................8,200 9 For replacement of roofs at various Department of 10 Corrections locations ........................ 269,592 11 For roof replacement at the following 12 locations at the approximate costs 13 set forth below: ............................. 321,681 14 Graham Correctional Center 15 Five buildings ........................6,268 16 Graham Correctional Center 17 Thirty-two buildings ..................8,439 18 Menard Correctional Center 19 Warehouse Building ...................55,093 20 Menard Correctional Center 21 Five buildings ......................153,394 22 Pontiac Correctional Center 23 Eight buildings .......................6,221 24 Illinois Youth Center-St. Charles 25 Three buildings ......................29,830 26 Sheridan Correctional Center 27 Six buildings ........................15,482 28 Stateville Correctional Center 29 Seven buildings ......................23,000 30 Ill Youth Center-Valley View 31 Administration Building and 32 Kitchen Addition ....................23,954 ____________ 33 Total, Section 5 $375,381,963 -53- BOB-CDBnew-re2000 1 Section 5.1. The following named amounts, or so much 2 thereof as may be necessary and remain unexpended at the 3 close of business on June 30, 1999, from reappropriations 4 heretofore made for such purposes in Article 91, Section 5.1 5 of Public Act 90-585, are reappropriated from the General 6 Revenue Fund to the Capital Development Board for the 7 Department of Corrections for the projects hereinafter 8 enumerated: 9 (From Article 91, Section 5.1 of Public Act 90-585) 10 MENARD CORRECTIONAL CENTER - CHESTER 11 For stabilizing dams ........................... 95,600 12 For repairing masonry and 13 waterproofing exterior ....................... 245,000 14 STATEVILLE CORRECTIONAL CENTER - JOLIET 15 For tuckpointing buildings ..................... 200,000 16 VANDALIA CORRECTIONAL CENTER 17 For tuckpointing, waterproofing and 18 replacing facade ............................. 149,719 19 STATEWIDE 20 For energy conservation improvements at the 21 following locations at the approximate 22 costs set forth below: ....................... 56,018 23 Dwight Correctional Center ............ 7,000 24 Joliet Correctional Center 25 School Building ...................... 4,500 26 Menard Psychiatric Center 27 Randolph Hall ........................ 7,500 28 Stateville Correctional Center 29 Law Library .......................... 7,400 30 Pontiac Correctional Center .......... 27,893 31 Vienna Correctional Center ............ 1,725 32 For upgrading doors and locking systems at 33 the following locations at the approximate 34 costs set forth below: ....................... 577,182 -54- BOB-CDBnew-re2000 1 Illinois Youth Center-Warrenville 2 For replacement of doors 3 and locking systems ............... 577,182 ____________ 4 Total, Section 5.1 $1,323,519 5 Section 5.2. The amount of $195,615, or so much thereof 6 as may be necessary and remains unexpended from the General 7 Revenue Fund at the close of business on June 30, 1999, from 8 a reappropriation heretofore made for such purposes in 9 Article 91, Section 5.4 of Public Act 90-585, is 10 reappropriated to the Capital Development Board for the 11 Department of Corrections for all costs associated with the 12 completion of the super maximum security prison at Tamms, 13 Illinois. 14 Section 5.3. The amount of $1,570,556, or so much 15 thereof as may be necessary and remains unexpended at the 16 close of business on June 30, 1999, from a reappropriation 17 heretofore made for such purposes in Article 91, Section 5.5 18 of Public Act 90-585, is reappropriated from the General 19 Revenue Fund to the Capital Development Board for the 20 Department of Corrections for the projects hereinafter 21 enumerated at the approximate costs set forth below: 22 Danville Correctional Center - 23 For upgrading the hot water 24 distribution system .................$175,000 25 Joliet Correctional Center - 26 For replacement of the deep well .......13,000 27 Stateville Correctional Center- 28 For upgrading the plumbing systems in 29 four buildings .....................1,216,556 30 Menard Correctional Center - 31 For planning and to begin upgrading 32 the plumbing systems in two -55- BOB-CDBnew-re2000 1 buildings .............................65,000 2 Pontiac Correctional Center - 3 For upgrading the mechanical systems 4 and renovation of shower rooms ........56,000 5 Shawnee Correctional Center - 6 For upgrading the hot water 7 distribution system ...................45,000 8 Section 5.4. The following named amounts, or so much 9 thereof as may be necessary and remain unexpended at the 10 close of business on June 30, 1999, from appropriations 11 heretofore made for such purposes in Article 91, Section 5.6 12 of Public Act 90-585, are reappropriated from the General 13 Revenue Fund to the Capital Development Board for the 14 Department of Corrections for the projects hereinafter 15 enumerated: 16 DIXON CORRECTIONAL CENTER 17 For tuckpointing two buildings ................. $ 65,000 18 STATEVILLE CORRECTIONAL CENTER - JOLIET 19 For tuckpointing seven buildings ............... 10,617 20 Total, Section 5.4 $75,617 21 Section 6. The following named amounts, or so much 22 thereof as may be necessary and remains unexpended at the 23 close of business on June 30, 1999, from appropriations and 24 reappropriations heretofore made for such purposes in Article 25 90, Section 4, and Article 91, Section 6 of Public Act 90-585 26 are reappropriated from the Capital Development Fund to the 27 Capital Development Board for the Historic Preservation 28 Agency for the projects hereinafter enumerated: 29 BISHOP HILL HISTORIC SITE - 30 HENRY COUNTY 31 (From Article 90, Section 4 of Public Act 90-585) 32 For rehabilitating Bjorkland Hotel ............. $ 1,010,000 -56- BOB-CDBnew-re2000 1 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA 2 (From Article 91, Section 6 of Public Act 90-585) 3 For renovation of the Cahokia Courthouse 4 and the Jarrot House ......................... 364,640 5 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE 6 For replacement of Monk's Mounds stairs ........ 465,000 7 For restoration of Monk's Mound ................ 1,082,491 8 For purchasing private land within historic 9 site boundary ................................ 209,314 10 For replacement of Monk's Mounds stairs ........ 75,591 11 DAVID DAVIS MANSION - BLOOMINGTON 12 For renovation of the David Davis Mansion 13 to eliminate basement leakage ................ 145,936 14 DAVID DAVIS HOME 15 To acquire a residence to be 16 converted to a Visitors Center ............... 249,400 17 FORT DE CHARTRES - RANDOLPH COUNTY 18 For replacing Maintenance Building ............. 259,116 19 GALENA HISTORIC SITE 20 (From Article 90, Section 4 of Public Act 90-585) 21 For structural stabilization and 22 rehabilitation of five historic 23 structures in the Grant Home District 24 including the Biesman, Nolan, Gill, 25 Coville, and Donegan houses .................. 427,000 26 LEWIS AND CLARK STATE MEMORIAL - 27 MADISON COUNTY 28 For constructing interpretive center, 29 and development of the historic site 30 in addition to funds previously 31 appropriated ................................. 1,700,000 32 (From Article 91, Section 6 of Public Act 90-585) 33 For the construction of an interpretive 34 center and development of the historic -57- BOB-CDBnew-re2000 1 site ......................................... 440,000 2 LINCOLN LOG CABIN HISTORIC SITE - 3 COLES COUNTY 4 (From Article 90, Section 4 of Public Act 90-585) 5 For constructing visitors center, Phase II, 6 and developing day use area .................. 1,669,000 7 (From Article 91, Section 6 of Public Act 90-585) 8 For construction of a visitors center .......... 71,656 9 For replacement of bridges ..................... 49,137 10 For construction of a visitor center and 11 museum, Phase I .............................. 44,736 12 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG 13 (From Article 90, Section 4 of Public Act 90-585) 14 For renovating village entrance and 15 completing visitors center ................... 735,000 16 (From Article 91, Section 6 of Public Act 90-585) 17 For rehabilitation of the sewage treatment 18 plant ........................................ 86,512 19 LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD 20 (From Article 90, Section 4 of Public Act 90-585) 21 For planning and beginning the Lincoln 22 Presidential Center, in addition to 23 funds previously appropriated ................ 7,700,000 24 POSTVILLE COURTHOUSE HISTORIC SITE - 25 LINCOLN 26 For rehabilitating Courthouse and site ......... 368,000 27 PULLMAN FACTORY HISTORIC SITE - CHICAGO 28 (From Article 91, Section 6 of Public Act 90-585) 29 For stabilization of the structure and for planning 30 and beginning restoration .................... 751,151 31 OLD STATE CAPITOL - SPRINGFIELD 32 (From Article 90, Section 4 of Public Act 90-585) 33 For rehabilitating Old State Capitol ........... 1,159,000 34 (From Article 91, Section 6 of Public Act 90-585) -58- BOB-CDBnew-re2000 1 For renovating garage ramp ..................... 158,832 2 For renovation of the Old State 3 Capitol to eliminate basement 4 leakage ...................................... 162,714 5 VACHEL LINDSAY HOME 6 (From Article 90, Section 4 of Public Act 90-585) 7 For rehabilitating home ........................ 762,000 8 VANDALIA STATE HOUSE 9 (From Article 90, Section 4 of Public Act 90-585) 10 For replacing roof and rehabilitating 11 exterior ..................................... 508,000 12 (From Article 91, Section 6 of Public Act 90-585) 13 For rehabilitating HVAC and electrical 14 systems and interior ......................... 378,000 15 STATEWIDE 16 For replacing roofing systems at the 17 following locations at the approximate 18 costs set forth below: ....................... 325,543 19 Fort De Chartres, Randolph County .... 93,000 20 Washburne House, Galena .............. 12,543 21 David Davis Mansion, Bloomington ..... 25,000 22 Bishop Hill House, Henry County ..... 195,000 23 For matching ISTEA federal grant funds ......... 500,000 24 Total, Section 6 $21,857,769 25 Section 6.1. The amount of $54,510, or so much thereof 26 as may be necessary and remains unexpended at the close of 27 business on June 30, 1999, from a reappropriation heretofore 28 made for such purpose in Article 91, Section 6.1 of Public 29 Act 90-585, is reappropriated from the Capital Development 30 Fund to the Capital Development Board for the Historic 31 Preservation Agency for the purchase and rehabilitation of 32 the State Journal Register Building in Springfield. -59- BOB-CDBnew-re2000 1 Section 6.2. The amount of $52,326, or so much thereof 2 as may be necessary and remains unexpended at the close of 3 business on June 30, 1999, from a reappropriation heretofore 4 made for such purpose in Article 91, Section 6.2 of Public 5 Act 90-585, is reappropriated from the Capital Development 6 Fund to the Capital Development Board for the Historic 7 Preservation Agency for acquiring the Zimmerman 8 archaeological site in LaSalle County and for associated 9 costs, planning, stabilization, restoration and all other 10 expenses necessary to comply with the intent of this 11 appropriation. 12 Section 6.3. The amount of $2,300,000, or so much 13 thereof as may be necessary and remains unexpended at the 14 close of business on June 30, 1999, from a reappropriation 15 heretofore made for such purposes in Article 91, Section 6.3 16 of Public Act 90-585, is reappropriated from the Capital 17 Development Fund to the Capital Development Board for 18 planning and beginning the construction of a new historical 19 library and Lincoln Center. 20 Section 6.4 The sum of $800,000, or so much thereof as 21 may be necessary and as remains unexpended at the close of 22 business on June 30, 1999, from reappropriations heretofore 23 made in Article 78, Section 7 of Public Act 90-0585, is 24 reappropriated from the Capital Development Fund to the 25 Capital Development Board for the Historic Preservation 26 Agency (formerly appropriated to the Historic Preservation 27 Agency) for the construction of an interpretive center and 28 development of the historic site at the Lewis and Clark 29 National Trail Site No. 1 in Madison County. 30 Section 6.5. The following named amounts, or so much -60- BOB-CDBnew-re2000 1 thereof as may be necessary and remain unexpended at the 2 close of business on June 30, 1999, from appropriations 3 heretofore made for such purposes in Article 90, Section 4a, 4 and Article 91, Section 6.5 of Public Act 90-585, are 5 reappropriated from the General Revenue Fund to the Capital 6 Development Board for the Historic Preservation Agency for 7 the projects hereinafter enumerated: 8 FORT DE CHARTRES HISTORIC SITE - 9 RANDOLPH COUNTY 10 (From Article 90, Section 4a of Public Act 90-585) 11 For planning and beginning restoration 12 of powder magazine ........................... $ 100,000 13 LINCOLN'S NEW SALEM HISTORIC SITE - 14 PETERSBURG 15 For removing sewage lagoon and treatment 16 plant ........................................ 407,000 17 For rehabilitating saw mill and grist 18 mill ......................................... 219,000 19 METAMORA COURTHOUSE HISTORIC SITE 20 For rehabilitating courthouse .................. 474,000 21 (From Article 91, Section 6.5 of Public Act 90-585) 22 JOURNAL REGISTER BUILDING - SPRINGFIELD 23 For renovating building ........................ 648,213 24 DANA THOMAS HOUSE - SPRINGFIELD 25 For restoring the exterior and interior ........ 249,243 26 Total, Section 6.5 $2,097,456 27 Section 7. The sum of $71,890, or so much thereof as may 28 be necessary and remains unexpended at the close of business 29 on June 30, 1999, from a reappropriation heretofore made for 30 such purposes in Article 91, Section 7 of Public Act 90-585, 31 is reappropriated from the Capital Development Fund to the 32 Capital Development Board for the Legislative Space Needs 33 Commission for architectural/engineering fees, planning, -61- BOB-CDBnew-re2000 1 construction, reconstruction, rehabilitation, and all other 2 necessary costs for remodeling and relocation of various 3 legislative services agencies located in the Capitol and 4 Stratton Office buildings at the approximate costs set forth 5 below: 6 For the Joint Committee on 7 Administrative Rules ..............$ 71,890 8 Section 8. The following named amounts, or so much 9 thereof as may be necessary and remain unexpended at the 10 close of business on June 30, 1999, from appropriations and 11 reappropriations heretofore made for such purposes in Article 12 90, Section 5, and Article 91, Section 8 of Public Act 13 90-585, are reappropriated from the Capital Development Fund 14 to the Capital Development Board for the Department of Human 15 Services (formerly the Department of Mental Health and 16 Developmental Disabilities) for the projects hereinafter 17 enumerated: 18 ALTON MENTAL HEALTH CENTER - MADISON COUNTY 19 (From Article 91, Section 8 of Public Act 90-585) 20 For constructing two building additions 21 at the Forensic Complex ...................... 11,786,174 22 For rehabilitation of the central dietary ...... 1,803,719 23 For replacement of life/safety and 24 security system in a residential 25 building ..................................... 61,011 26 For replacement of the chiller and 27 connection of the HVAC to the energy 28 management system ............................ 5,048 29 For replacement of two cooling towers in 30 the Willow Building .......................... 4,631 31 CHESTER MENTAL HEALTH CENTER - CHESTER 32 (From Article 90, Section 5 of Public Act 90-585) 33 For renovating kitchen area .................... 967,000 -62- BOB-CDBnew-re2000 1 (From Article 91, Section 8 of Public Act 90-585) 2 For replacing fencing and upgrading 3 recreational yard ............................ 1,342,930 4 For renovating support and residential 5 area ......................................... 3,831,353 6 For installation of emergency generator 7 and upgrading EMS system ..................... 57,985 8 For construction of a storage building ........ 25,003 9 For construction of a Rehabilitative 10 Services building ............................ 28,380 11 For replacement of the emergency generator ..... 11,435 12 SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE 13 (FORMERLY THE CHICAGO METRO C&A) 14 For planning and renovation of residential 15 and program units for children and 16 adolescent services .......................... 794,770 17 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO 18 (From Article 90, Section 5 of Public Act 90-585) 19 For upgrading fire/life safety systems, in 20 addition to funds previously appropriated .... 235,000 21 (From Article 91, Section 8 of Public Act 90-585) 22 For renovating residential units, in 23 addition to funds previously 24 appropriated ................................. 2,171,000 25 For renovation of utility rooms and installation 26 of drinking fountains ........................ 218,000 27 For renovation of the West Campus Nurses' 28 Stations ..................................... 381,713 29 For renovation of Henry Horner Children's 30 Center and West Campus for fire and 31 life safety codes ............................ 641,912 32 For renovation of the West Campus shower 33 and toilet rooms ............................. 303,615 34 For rehabilitation of the bathroom shower -63- BOB-CDBnew-re2000 1 walls in ten buildings ....................... 16,780 2 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA 3 (From Article 90, Section 5 of Public Act 90-585) 4 For rehabilitating Cypress Building ............ 1,546,000 5 (From Article 91, Section 8 of Public Act 90-585) 6 For completing HVAC system upgrade, 7 in addition to funds previously 8 appropriated ................................. 1,405,677 9 For upgrading the mechanical equipment, 10 in addition to funds previously 11 appropriated ................................. 422,529 12 For renovating a residential building, 13 in addition to funds previously 14 appropriated ................................. 826,447 15 For upgrading the mechanical equipment, 16 in addition to funds previously 17 appropriated ................................. 57,556 18 For planning and beginning the renovation of a 19 residential building ......................... 6,268 20 For separating and upgrading of the combined 21 sewer system, in addition to funds 22 previously appropriated ...................... 20,674 23 For rehabilitation of resident buildings 24 and upgrading of temperature controls ........ 33,786 25 ELGIN MENTAL HEALTH CENTER - KANE COUNTY 26 (From Article 90, Section 5 of Public Act 90-585): 27 For replacing power plant and engineering 28 building ..................................... 8,029,000 29 (From Article 91, Section 8 of Public Act 90-585): 30 For renovating the central dietary 31 and kitchen .................................. 3,958,200 32 For construction of an Adult Psychiatric 33 Building, in addition to funds previously 34 appropriated ................................. 3,681,000 -64- BOB-CDBnew-re2000 1 For construction of roads, parking lots 2 and street lights ............................ 2,414,095 3 For upgrading and expanding the mechanical 4 infrastructure, in addition to funds 5 previously appropriated ...................... 3,361,237 6 For construction of a forensic services complex 7 at Elgin Mental Health Center, in addition 8 to funds previously appropriated ............. 3,909,765 9 For construction of a forensic services 10 complex, in addition to funds previously 11 appropriated ................................. 365,494 12 For renovation of the HVAC systems, 13 replacement of windows and installation 14 of security screens, in addition 15 to funds previously appropriated ............. 2,062,047 16 For construction of a Forensic Services 17 Facility, in addition to funds 18 previously appropriated ..................... 371,116 19 For upgrading and expanding mechanical 20 infrastructure, in addition to funds 21 previously appropriated ...................... 13,918 22 For upgrading for fire and life safety ......... 368,270 23 For planning the renovation of the Forensic 24 Building and abating asbestos ................ 251,946 25 For renovation of the Central Stores 26 Building ..................................... 85,679 27 For upgrading the security systems and 28 constructing a multi-purpose building 29 for the Forensic Complex ..................... 8,910 30 For the demolition of the Old Main Building 31 and construction of an Adult 32 Psychiatric Center ........................... 357,773 33 FOX DEVELOPMENTAL CENTER - DWIGHT 34 (From Article 90, Section 5 of Public Act 90-585) -65- BOB-CDBnew-re2000 1 For renovating dietary, in addition 2 to funds previously appropriated ............. 842,445 3 (From Article 91, Section 8 of Public Act 90-585) 4 For replacement of absorbers and 5 upgrading HVAC system ........................ 724,467 6 For renovation of dietary ...................... 632,788 7 For renovation of Building #8 and 8 window replacement of Building 9 #1, in addition to funds 10 previously appropriated ...................... 299,963 11 HOWE DEVELOPMENTAL CENTER - TINLEY PARK 12 (From Article 90, Section 5 of Public Act 90-585) 13 For replacing roofs ............................ 81,000 14 For planning and beginning access 15 to water supply from village ................. 78,000 16 For planning and rehabilitation of 17 utility tunnels .............................. 250,000 18 (From Article 91, Section 8 of Public Act 90-585) 19 For renovation of residential buildings ........ 2,513,102 20 For replacement of steam and 21 condensate lines ............................. 79,275 22 For renovation of the boilers in the power 23 plant ........................................ 29,856 24 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY 25 For extending chilled water line ............... 312,085 26 For rehabilitation of bathrooms and 27 replacing doors .............................. 382,910 28 For rehabilitation of the electrical 29 distributions system, in addition to 30 Funds previously appropriated ................ 184,895 31 For installation of fire safety systems in 32 four buildings and replacement of a 33 code compliance generator .................... 94,758 34 KILEY DEVELOPMENTAL CENTER - WAUKEGAN -66- BOB-CDBnew-re2000 1 For renovating homes ........................... 741,000 2 For renovation of homes ........................ 31,718 3 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY 4 (From Article 90, Section 5 of Public Act 90-585) 5 For upgrading power plant and installing 6 EMS, in addition to funds previously 7 appropriated ................................. 1,794,838 8 For renovating Elmhurst Cottage ................ 1,905,000 9 (From Article 91, Section 8 of Public Act 90-585) 10 For installation of a rethermalization food 11 service system, in addition to funds 12 previously appropriated ...................... 706,518 13 For upgrading the architectural and mechanical 14 systems, in addition to funds 15 previously appropriated ...................... 504,454 16 For installation of a code compliance 17 generator .................................... 18,466 18 For installation of rethermalization food 19 service system ............................... 40,842 20For expansion of the sprinkler system in21four buildings ............................... 185,08022 For installation of air conditioning in 23 Coty and Dietary Buildings ................... 37,371 24 For upgrading the HVAC systems, including 25 chillers ..................................... 25,157 26 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST 27 (From Article 90, Section 5 of Public Act 90-585) 28 For replacing plumbing, HVAC and 29 boiler systems ............................... 796,000 30 (From Article 91, Section 8 of Public Act 90-585) 31 For renovation of residential buildings, 32 in addition to funds previously 33 appropriated ................................. 1,888,500 34 For rehabilitation of the roads and parking -67- BOB-CDBnew-re2000 1 areas and constructing walks ................. 597,571 2 For renovation of residences ................... 140,758 3 For renovation of restrooms for accessibility 4 in two buildings ............................. 4,538 5 For renovation of bathrooms in 15 residences ... 79,196 6 MADDEN MENTAL HEALTH CENTER - HINES 7 For renovating dietary ......................... 910,000 8 For renovation of pavilions, in addition 9 to funds previously appropriated ............. 844,000 10 For renovation of pavilions .................... 141,905 11 For upgrading residences for safety and 12 security ..................................... 80,382 13 For replacement of a cooling tower and 14 chiller and installation of an emergency 15 generator .................................... 223,621 16 For replacement of hot water heaters ........... 86,160 17 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD 18 (From Article 90, Section 5 of Public Act 90-585) 19 For renovating Stevenson Hall .................. 984,000 20 (From Article 91, Section 8 of Public Act 90-585) 21 For replacement of the HVAC management 22 control panel, in addition to funds 23 previously appropriated ...................... 68,864 24 For rehabilitation of the dietary facility ..... 390,261 25 MURRAY DEVELOPMENTAL CENTER - CENTRALIA 26 For rehabilitating the emergency 27 electrical system ............................ 298,038 28 For renovating Elm Cottage ..................... 2,935,932 29For installation of fire safety systems ........ 537,16730 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 31 (From Article 90, Section 5 of Public Act 90-585) 32 For planning and beginning the upgrade 33 of steam and condensate lines ................ 320,000 34 For rehabilitating HVAC system ................. 1,166,000 -68- BOB-CDBnew-re2000 1 (From Article 91, Section 8 of Public Act 90-585) 2 For replacing cooling towers and 3 rehabilitating absorbers ..................... 1,040,000 4 For completion of the HVAC system, in 5 addition to funds previously 6 appropriated ................................. 87,283 7 For replacement of boiler, in 8 addition to funds previously 9 appropriated ................................. 765,000 10 For replacement of water mains 11 and valves ................................... 1,750,205 12 For planning and beginning sewer and 13 manhole renovation ........................... 46,793 14 For rehabilitation of the boilers .............. 184,605 15 For planning and replacement of windows ........ 234,721 16 For installation of an emergency generator ..... 72,104 17 For upgrading fire safety systems in the 18 support buildings ............................ 163,978 19 For installation of air conditioning in 20 Building #704, in addition to funds 21 previously appropriated ...................... 104,551 22 For replacement of cooling towers in 23 Buildings #100A and #100B .................... 26,402 24 For installation of air conditioning in 25 Buildings #502 and #514 ...................... 42,938 26 SINGER MENTAL HEALTH CENTER - ROCKFORD 27 (From Article 90, Section 5 of Public Act 90-585) 28 For replacing roofs ............................ 248,000 29 (From Article 91, Section 8 of Public Act 90-585) 30 For renovating mechanicals and 31 residential areas ............................ 2,691,675 32 For replacement of absorbers ................... 186,339 33 (From Article 90, Section 5 of Public Act 90-585) 34 TINLEY PARK MENTAL HEALTH CENTER -69- BOB-CDBnew-re2000 1 For upgrading fire/life safety systems 2 and bedroom lighting, in addition to 3 funds previously appropriated ................ 236,000 4 TINLEY PARK MENTAL HEALTH CENTER/ 5 HOWE DEVELOPMENTAL CENTER 6 (From Article 91, Section 8 of Public Act 90-585) 7 For replacement of the bar screen and 8 renovating the sewer system, in 9 addition to funds previously appropriated .... 180,005 10 For rehabilitation of the electrical 11 distribution system, in addition to 12 funds previously appropriated ................ 2,158,753 13 For renovating and making mechanical 14 improvements to Spruce Hall and Maple Hall ... 149,650 15 For renovation for accessibility in four 16 buildings .................................... 137,036 17 For planning the sewer system renovation and 18 replacement of the rag catcher ............... 197,071 19 For renovation for fire and life safety in 20 three residences ............................. 211,124 21 For renovation of nursing stations and 22 medication rooms in three residences ......... 17,741 23 For replacement of the windows in nine 24 buildings .................................... 28,935 25 ZELLER MENTAL HEALTH CENTER - PEORIA 26 For renovation of the nurses' stations, 27 in addition to funds previously 28 appropriated ................................. 1,720,000 29 For renovation of Nurses' Stations and 30 seclusion rooms .............................. 148,916 31 For replacement of the heating and cooling 32 pumps ........................................ 8,357 33 STATEWIDE 34 For replacing roofing systems at the -70- BOB-CDBnew-re2000 1 following locations at the approximate 2 costs set forth below: ....................... 207,600 3 Elgin Mental Health Center, 4 five buildings .....................150,000 5 Jacksonville Mental Health and 6 Developmental Center, 7 two buildings..........................57,600 8 For replacement of roofing systems at the 9 following locations at the approximate costs 10 set forth below: ............................. 1,334,305 11 Alton Mental Health Center ...........75,000 12 Choate Mental Health and 13 Developmental Center ...............45,000 14 Chester Mental Health Center ........663,305 15 Fox Developmental Center .............50,000 16 Howe Developmental Center ...........140,000 17 Jacksonville Developmental Center ....17,000 18 Lincoln Developmental Center ........344,000 19 For construction of a forensic services complex 20 at Alton Mental Health Center and Elgin 21 Mental Health Center, in addition to funds 22 previously appropriated ...................... 36,901 23 For conducting the preliminary design 24 and to begin to construct, convert and/ 25 or rehabilitate a forensic facility .......... 94,918 26 For upgrading roads and parking lots at 27 the following locations at the 28 approximate costs set forth below: ........... 38,106 29 McFarland Mental Health Ctr ...........5,544 30 Shapiro Developmental Center .........32,562 31 For rehabilitation of water towers - 32 Murray and Chester ........................... 377,077 33 For replacement of roofs at the following 34 locations at the approximate costs set -71- BOB-CDBnew-re2000 1 forth below: ................................. 666,480 2 Alton Mental Health Center - 3 Five buildings .....................50,000 4 Elgin Mental Health Center - 5 Three buildings ....................52,000 6 Lincoln Developmental Center - 7 Three buildings ....................80,000 8 Lincoln Developmental Center - 9 Four buildings ......................6,601 10 Ludeman Developmental Center - 11 Support buildings ..................50,000 12 Ludeman Developmental Center- 13 Residences .........................22,158 14 Mabley Developmental Center - 15 One building ......................103,517 16 Madden Mental Health Center - 17 Buildings and covered walkways ......5,000 18 McFarland Mental Health Center - 19 Three buildings .....................5,000 20 Meyer Mental Health Center - 21 One building ........................2,000 22 Shapiro Developmental Center - 23 Three buildings ...................187,000 24 Shapiro Developmental Center - 25 Two buildings ......................16,351 26 Shapiro Developmental Center - 27 Five buildings .....................67,831 28 Tinley Park Mental Health Center - 29 One building ........................7,252 30 Tinley Park Mental Health Center - 31 Oak Hall ...........................11,770 32 STATEWIDE - FIRE SAFETY 33 For installation of fire safety systems 34 (Formerly for Murray Developmental Center) ..... 537,167 -72- BOB-CDBnew-re2000 1 For installation of fire safety systems 2 (Formerly for Lincoln Developmental Center) .... 185,080 3 To renovate fire safety systems, including 4 installation of sprinklers, at the following 5 locations at the approximate costs set 6 forth below: ................................. 335,022 7 Singer Mental Health Center .........335,022 8 For fire safety and other work necessary to meet 9 state and federal certification standards for 10 the following projects: 11 For installation of sprinkler systems at 12 Chicago-Read Mental Health Center .......... 118,099 13 For installation of sprinkler systems at 14 Murray Developmental Center ................ 2,000 15 Total, Section 8 $99,282,417 16 Section 8A. The following named amounts, or so much 17 thereof as may be necessary and remain unexpended at the 18 close of business on June 30, 1999, from appropriations and 19 reappropriations heretofore made for such purposes in 20 Article 90, Section 5.1, and Article 91, Section 8A of Public 21 Act 90-585, are reappropriated from the Capital Development 22 Fund to the Capital Development Board for the Department of 23 Human Services (formerly the Department of Rehabilitation 24 Services) for the projects hereinafter enumerated: 25 ILLINOIS SCHOOL FOR THE DEAF -JACKSONVILLE 26 (From Article 90, Section 5.1 of Public Act 90-585) 27 For installing HVAC and upgrading electrical 28 and replacing doors .......................... $ 1,400,000 29 (From Article 91, Section 8A of Public Act 90-585) 30 For completing the HVAC system upgrade, 31 in addition to funds previously 32 appropriated ................................. 300,000 33 For replacing the storm and sanitary -73- BOB-CDBnew-re2000 1 system ....................................... 1,922,385 2 For renovating Unit 5 .......................... 201,552 3 For planning and beginning the 4 upgrade of the heat and smoke 5 detection system ............................. 61,087 6 For the renovation of Cullom Hall .............. 1,977,831 7 For construction of an addition to Unit #5 ..... 20,634 8 For rehabilitation of the domestic hot and 9 cold water piping in six buildings ........... 190,056 10 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED -JACKSONVILLE 11 (From Article 90, Section 5.1 of Public Act 90-585) 12 For installing sewers .......................... 1,200,000 13 For constructing a new building to 14 replace buildings 2, 3 and 4, 15 in addition to funds previously 16 appropriated ................................. 3,300,000 17 (From Article 91, Section 8A of Public Act 90-585) 18 For rehabilitating the power house ............. 275,000 19 For the replacement of Buildings 20 #2, #3, and #4 ............................... 628,083 21 For replacement of Buildings 5 and 6 for 22 an Independent Living Center ................. 824,291 23 Total, Section 8A $12,300,919 24 Section 8.1. The following named amounts, or so much 25 thereof as may be necessary and remain unexpended at the 26 close of business on June 30, 1999, from appropriations and 27 reappropriations heretofore made for such purposes in 28 Article 90, Section 5a, and Article 91, Section 8.1 of Public 29 Act 90-585, are reappropriated from the General Revenue Fund 30 to the Capital Development Board for the Department of Human 31 Services (formerly the Department of Mental Health and 32 Developmental Disabilities) for the projects hereinafter 33 enumerated: -74- BOB-CDBnew-re2000 1 ALTON MENTAL HEALTH CENTER 2 (From Article 91, Section 8.1 of Public Act 90-585) 3 For replacing windows in four buildings ........ $1,162,450 4 CHESTER MENTAL HEALTH CENTER 5 For replacing backflow prevention 6 devices ...................................... 76,864 7 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER 8 For renovation of turbines in the powerhouse ... 28,364 9 FOX DEVELOPMENTAL CENTER - DWIGHT 10 (From Article 90, Section 5a of Public Act 90-585) 11 For replacing windows .......................... 578,000 12 JACKSONVILLE DEVELOPMENTAL CENTER 13 For replacing stoker and controls .............. 206,000 14 For planning and beginning the rehabilitation 15 of the water tower and smokestack ............ 80,000 16 (From Article 91, Section 8.1 of Public Act 90-585) 17 For the demolition of Carriel Hall, 18 rerouting utility lines, 19 providing parking lot, and planning 20 the demolition of Building 41 ................ 53,792 21 LINCOLN DEVELOPMENTAL CENTER 22 For replacing windows .......................... 723,511 23 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 24 For replacing windows in complex 25 buildings .................................... 486,000 26 TINLEY PARK MENTAL HEALTH CENTER 27 For installing windows in residential 28 buildings .................................... 748,375 29 For repairing the exterior of Spruce Hall ...... 56,350 30 For rehabilitating exterior of 31 residential building at Tinley ............... 19,683 32 ZELLER MENTAL HEALTH CENTER - PEORIA 33 For replacing windows .......................... 1,434,835 34 STATEWIDE -75- BOB-CDBnew-re2000 1 (From Article 90, Section 5a of Public Act 90-585) 2 For resurfacing roads at Chicago-Read, 3 Tinley Park and Murray ....................... 2,000,000 4 (From Article 91, Section 8.1 of Public Act 90-585) 5 For repair of the exterior masonry 6 walls, in addition to funds previously 7 appropriated ................................. 142,787 8 For repair of the exterior masonry walls 9 at Fox, Shapiro and Tinley Park/Howe ......... 138,521 10 For renovation of fire safety systems at the 11 following locations at the approximate 12 costs set forth below: ....................... 1,639 13 Singer Mental Health Center ...........1,639 14 For installation of smoke detection systems, 15 smoke compartmentation, and other fire 16 safety and certification improvements at 17 Murray Developmental Center .................. 225,449 18 Total, Section 8.1 $8,162,620 19 Section 8A.1. The following named amounts, or so much 20 thereof as may be necessary and remain unexpended at the 21 close of business on June 30, 1999, from appropriations and 22 reappropriations heretofore made for such purposes in Article 23 90, Section 5a.1, and Article 91, Section 8A.1 of Public Act 24 90-585, are reappropriated from the General Revenue Fund to 25 the Capital Development Board for the Department of Human 26 Services (formerly the Department of Rehabilitation Services) 27 for the projects hereinafter enumerated: 28 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 29 (From Article 90, Section 5a.1 of Public Act 90-585) 30 For installing humidity controls ............... $ 155,000 31 For installing an all-weather 32 running track ................................ 190,000 33 (From Article 91, Section 8A.1 of Public Act 90-585) -76- BOB-CDBnew-re2000 1 For installing an emergency generator .......... 501,710 2 For installing security systems in 3 three buildings .............................. 28,439 4 For renovation of buildings and lead 5 paint abatement .............................. 213,443 6 Total Section 8A.1 $1,088,592 7 Section 9. The following named amounts, or so much 8 thereof as may be necessary and remain unexpended at the 9 close of business on June 30, 1999, from appropriations and 10 reappropriations heretofore made for such purposes in 11 Article 90, Section 6, and Article 91, Section 9 of Public 12 Act 90-585, are reappropriated from the Capital Development 13 Fund to the Capital Development Board for the Department of 14 Military Affairs for the projects hereinafter enumerated: 15 AURORA ARMORY 16 (From Article 91, Section 9 of Public Act 90-585) 17 For planning and beginning construction of 18 an armory .................................... $ 10,820 19 CAMP LINCOLN - SPRINGFIELD 20 (From Article 90, Section 6 of Public Act 90-585) 21 For renovating heating system and 22 replacing windows ............................ 908,000 23 (From Article 91, Section 9 of Public Act 90-585) 24 For construction of a military academy 25 facility ..................................... 638,820 26 For site improvements and construction for 27 a military academy facility, including 28 repair and reconstruction of access 29 roads and drives at Camp Lincoln ............. 24,062 30 For planning, design, site improvements, and 31 other costs associated with the conversion 32 of the old "Castle" or Commissary Building 33 for use as a military museum ................. 122,068 -77- BOB-CDBnew-re2000 1 CARBONDALE ARMORY 2 For upgrading mechanical systems ............... 1,335,539 3 CRESTWOOD ARMORY 4 (From Article 90, Section 6 of Public Act 90-585) 5 For replacing roofing system and 6 rehabilitating exterior ...................... 1,217,525 7 DANVILLE ARMORY 8 (From Article 91, Section 9 of Public Act 90-585) 9 For planning and construction of a new armory .. 1,070,000 10 DECATUR ARMORY 11 For the state's share for additional planning 12 and construction of a new armory and 13 Organizational Maintenance Shop .............. 9,594 14 DIXON ARMORY - LEE COUNTY 15 (From Article 90, Section 6 of Public Act 90-585) 16 For upgrading mechanical and 17 electrical systems ........................... 1,866,000 18 (From Article 91, Section 9 of Public Act 90-585) 19 For construction of an addition, 20 remodeling, extending utilities and 21 installing a kitchen ......................... 26,321 22 DONNELLEY BUILDING 23 For the rehabilitation and renovation of 24 the Donnelley Building and purchase of 25 land for parking ............................. 184,885 26 GENERAL JONES ARMORY 27 For renovation of the exterior and interior, 28 mechanical areas and expansion of the 29 parking lot, in addition to amounts 30 previously appropriated ...................... 1,165,919 31 For renovation of the exterior, including 32 windows ...................................... 11,405 33 For replacement of the Assembly Hall 34 roofing system including its structural -78- BOB-CDBnew-re2000 1 system ....................................... 210,904 2 For renovation of the armory, including 3 equipment, in addition to amounts 4 previously appropriated ...................... 33,725 5 For renovation of the armory, including 6 equipment, in addition to amounts 7 previously appropriated for this purpose ..... 11,276 8 For the state's share for renovation ........... 10,796 9 KANKAKEE ARMORY 10 For providing the State's share for 11 construction of an Armory and Army 12 Reserve Center, including equipment .......... 14,752 13 For the state's share for planning 14 and beginning an armory and Army 15 Reserve Center ............................... 2,064 16 LITCHFIELD ARMORY 17 For rehabilitation of exterior and upgrading 18 the interior ................................. 14,933 19 MACHESNEY PARK ARMORY (ROCKFORD) 20 For the state's share for additional planning 21 and construction of an armory and 22 Organizational Maintenance Shop .............. 218,047 23 MARSEILLES ARMORY 24 For planning and beginning four 25 buildings and wastewater facilities .......... 7,444 26 NORTHWEST ARMORY - CHICAGO 27 For renovation of interior and exterior, 28 in addition to funds previously 29 appropriated for such purposes ............... 1,200,000 30 PARIS ARMORY 31 For rehabilitation of the exterior and 32 upgrading the interior ....................... 30,796 33 PEORIA ARMORY 34 For providing the State's share for -79- BOB-CDBnew-re2000 1 construction of an armory and Army 2 Reserve Center, including equipment .......... 5,596 3 ROCK ISLAND ARMORY 4 For construction of an armory and 5 maintenance shop ............................. 78,850 6 SALEM ARMORY - MARION COUNTY 7 For replacement of the boiler and 8 all domestic plumbing, piping and 9 fixtures, and upgrading of the 10 kitchen, including equipment ................. 289,061 11 SAUK AREA CAREER SCHOOL - CRESTWOOD 12 For the purchase and renovation of the 13 former Sauk Area Career School, converting 14 to an armory and upgrading the parking 15 lot .......................................... 84,023 16 STREATOR ARMORY - LASALLE COUNTY 17 For renovation of the mechanical 18 systems, in addition to funds 19 previously appropriated ...................... 125,321 20 WAUKEGAN ARMORY 21 (From Article 90, Section 6 of Public Act 90-585) 22 For replacing roofing system ................... 415,000 23 (From Article 91, Section 9 of Public Act 90-585) 24 For renovation of exterior walls, and 25 replacement of doors and windows ............. 47,851 26 WEST FRANKFORT ARMORY 27 (From Article 90, Section 6 of Public Act 90-585) 28 For replacing roofs and rehabilitating 29 exterior ..................................... 1,197,000 30 (From Article 91, Section 9 of Public Act 90-585) 31 For remodeling and installation of a kitchen ... 52,428 32 WILLIAMSON COUNTY ARMORY 33 For providing the State's share for planning 34 and construction of a new armory, in -80- BOB-CDBnew-re2000 1 addition to amounts previously 2 appropriated ................................. 14,316 3 WOODSTOCK ARMORY 4 For the state's share for additional planning 5 and construction of an armory ................ 4,273 6 STATEWIDE 7 For replacement of roofs at the 8 following locations at the 9 approximate costs set forth below: ........... 40,238 10 Litchfield Armory ....................19,193 11 Springfield Military Academy .........21,045 12 For replacement of roofs at the following 13 locations at the approximate costs set 14 forth below .................................. 115,420 15 Camp Lincoln - AGO Building .......115,420 ____________ 16 Total, Section 9 $12,815,072 17 Section 9.1. The following named amounts, or so much 18 thereof as may be necessary and remain unexpended at the 19 close of business on June 30, 1999, from reappropriations 20 heretofore made for such purposes in Article 91, Section 9.1 21 of Public Act 90-585, are reappropriated from the General 22 Revenue Fund to the Capital Development Board for the 23 Department of Military Affairs for the projects hereinafter 24 enumerated: 25 LAWRENCEVILLE ARMORY 26 For renovating interior ........................ $ 170,749 27 STATEWIDE 28 For the following projects at the approximate 29 costs set forth below: ....................... 86,000 30 Broadway Armory - Chicago 31 For repair of the heating 32 system .............................50,000 33 Freeport Armory -81- BOB-CDBnew-re2000 1 For renovation of the armory 2 and parking area, including 3 installation of a security 4 fence ..............................36,000 ____________ 5 Total, Section 9.1 $256,749 6 Section 10. The following named amounts, or so much 7 thereof as may be necessary and remain unexpended at the 8 close of business on June 30, 1999, from reappropriations 9 heretofore made for such purposes in Article 91, Section 10 10 of Public Act 90-585, are reappropriated from the Capital 11 Development Fund to the Capital Development Board for the 12 Department of Revenue for the project hereinafter enumerated: 13 WILLARD ICE BUILDING - SPRINGFIELD 14 For upgrading the uninterruptible power 15 system, in addition to funds previously 16 appropriated ................................. $ 1,200,000 17 For replacing the halon fire suppression 18 system ....................................... 344,000 19 For completion of the replacement of the 20 fire alarm and security system ............... 70,000 21 For upgrade of the uninterruptible 22 power system ................................. 1,060,210 23 Total, Section 10 $2,674,210 24 Section 10.1. The following named amount, or so much 25 thereof as may be necessary and remains unexpended at the 26 close of business on June 30, 1999, from an appropriation 27 heretofore made for such purposes in Article 90, Section 8a 28 of Public Act 90-585, is reappropriated from the General 29 Revenue Fund to the Capital Development Board for the 30 Department of Revenue for the project hereinafter enumerated: 31 WILLARD ICE BUILDING - SPRINGFIELD 32 For resealing and replacing atrium windows ..... $ 1,208,000 -82- BOB-CDBnew-re2000 1 Total, Section 10.1 $1,208,000 2 Section 11. The following named amounts, or so much 3 thereof as may be necessary and remain unexpended at the 4 close of business on June 30, 1999, from appropriations and 5 reappropriations heretofore made for such purposes in Article 6 90, Section 9, and Article 91, Section 12 of Public Act 7 90-585, are reappropriated from the Capital Development Fund 8 to the Capital Development Board for the Department of State 9 Police for the projects hereinafter enumerated: 10 (From Article 91, Section 12 of Public Act 90-585) 11 CAIRO (ULLIN) - DISTRICT 22 12 For construction of a firing range and radio 13 tower ........................................ $ 537,480 14 CARMI - DISTRICT 19 HEADQUARTERS 15 For planning and beginning the 16 rehabilitation of Headquarters 17 facilities ................................... 14,944 18 CHICAGO FORENSIC LABORATORY 19 For construction of a laboratory and 20 parking facilities ........................... 86,407 21 EAST MOLINE - DISTRICT 7 22 For rehabilitation of the headquarters 23 facilities and replacement of the 24 radio garage ................................. 70,726 25 LITCHFIELD - DISTRICT 18 HEADQUARTERS 26 For planning and beginning the 27 rehabilitation of Headquarters facilities ... 3,156 28 SPRINGFIELD ARMORY 29 (From Article 90, Section 9 of Public Act 90-585) 30 For planning and design of the rehabilitation 31 and site improvements of the Springfield 32 Armory, in addition to funds previously 33 appropriated ................................. 1,500,000 -83- BOB-CDBnew-re2000 1 SPRINGFIELD - STATE POLICE TRAINING ACADEMY 2 (From Article 91, Section 12 of Public Act 90-585) 3 For rehabilitation of the facility, including 4 replacement of the HVAC system and 5 installation of an elevator .................. 28,818 6 STERLING - DISTRICT 1 7 For planning, construction, reconstruction, 8 demolition of existing buildings, and 9 all costs related to the relocation of 10 the headquarters, in addition to funds 11 previously appropriated ...................... 488,013 12 For land acquisition, planning, construction, 13 reconstruction, demolition of existing 14 buildings, and all costs related to the 15 relocation of the District 1 Police 16 Headquarters in Sterling ..................... 7,149 17 STATEWIDE 18 (From Article 90, Section 9 of Public Act 90-585) 19 For replacing the roofing systems at various 20 facilities at the approximate costs set 21 forth below .................................. 167,000 22 District 17 - LaSalle ............... 41,000 23 Springfield, Radio Repair 24 Laboratory ......................... 36,000 25 Springfield, Communications 26 Building ........................... 90,000 27 For replacing radio communication towers, 28 equipment buildings and installing emergency 29 power generators at the following locations: 30 Pecatonica, Elwood, Kingston, Mason 31 City ......................................... 2,000,000 32 (From Article 91, Section 12 of Public Act 90-585) 33 For replacing radio communication 34 towers and equipment buildings and -84- BOB-CDBnew-re2000 1 installing emergency power 2 generators at Andover, Eaton, 3 Pecatonica, and Cypress ...................... 1,150,000 4 For replacing the roofs and roof 5 drainage systems at various locations, 6 at the approximate costs set forth below: .... 110,904 7 DuQuoin, District #13 .................79,043 8 Springfield, District #9 and 9 Supply Building ......................31,861 10 For replacing radio communication 11 towers, equipment, buildings and 12 installing emergency power 13 generators at various locations .............. 1,037,536 14 District #22, Effingham (Mason site) 15 District #10, Pesotum 16 District #21, Askum 17 District #6, Pontiac 18 For replacing the roofing and roof 19 drainage systems at various facilities 20 at the approximate costs set forth 21 below ........................................ 1,352 22 District #8, Metamora ..................1,352 ____________ 23 Total, Section 11 $7,203,485 24 Section 11.1. The following named amount, or so much 25 thereof as may be necessary and remains unexpended at the 26 close of business on June 30, 1999, from an appropriation 27 heretofore made in Article 90, Section 9a of Public Act 28 90-585, is reappropriated from the General Revenue Fund to 29 the Capital Development Board for the Department of State 30 Police for the project hereinafter enumerated: 31 TRAINING FACILITY - PAWNEE 32 For rehabilitating the driving track ........... $ 513,000 33 Total, Section 11.1 $513,000 -85- BOB-CDBnew-re2000 1 Section 12. The following named amounts, or so much 2 thereof as may be necessary and remain unexpended at the 3 close of business on June 30, 1999, from appropriations and 4 reappropriations heretofore made for such purposes in 5 Article 90, Section 10, and Article 91, Section 13 of Public 6 Act 90-585, are reappropriated from the Capital Development 7 Fund to the Capital Development Board for the Department of 8 Veterans' Affairs for the projects hereinafter enumerated: 9 ILLINOIS VETERANS' HOME - ANNA 10 (From Article 91, Section 13 of Public Act 90-585) 11 For purchasing equipment, in addition to funds 12 previously appropriated ...................... $ 18,095 13 ILLINOIS VETERANS' HOME - LASALLE 14 For construction of a storage building ........ 178,380 15 For installation of a medical gas system 16 and for additional funding for a 17 Special Care Unit ............................ 8,366 18 ILLINOIS VETERANS' HOME - MANTENO 19 (From Article 90, Section 10 of Public Act 90-585) 20 For constructing a multi-purpose 21 building ..................................... 439,000 22 (From Article 91, Section 13 of Public Act 90-585) 23 For construction of a special care facility .... 5,456,887 24 For replacement of roofs and upgrade 25 of sewer system, in addition to funds 26 previously appropriated ...................... 47,886 27 For air conditioning the interconnects ......... 41,964 28 For replacement of the roof on Kilbourne, 29 Meyers and Billings and upgrade 30 of sewer system, in addition to 31 funds previously appropriated ................ 88,363 32 ILLINOIS VETERANS' HOME - QUINCY 33 (From Article 90, Section 10 of Public Act 90-585) 34 For improvements to meet licensure -86- BOB-CDBnew-re2000 1 standards .................................... 9,000,000 2 (From Article 91, Section 13 of Public Act 90-585) 3 For renovating Lippincott Hall ................. 164,542 4 For replacing steam lines ...................... 83,000 5 For replacing the domestic hot water loop ...... 221,449 6 For renovating the elevator .................... 72,319 7 Total, Section 12 $15,820,251 8 Section 12.1. The following named amounts, or so much 9 thereof as may be necessary and remain unexpended at the 10 close of business on June 30, 1999, from appropriations and 11 reappropriations heretofore made for such purposes in Article 12 90, Section 10a, and Article 91, Section 13.1 of Public Act 13 90-585, are reappropriated from the General Revenue Fund to 14 the Capital Development Board for the Department of Veterans' 15 Affairs for the projects hereinafter enumerated: 16 ILLINOIS VETERANS' HOME - ANNA 17 (From Article 90, Section 10a of Public Act 90-585) 18 Complete visitors center, in addition 19 to funds previously appropriated ............. $ 100,000 20 For installing lighting, benches, 21 landscaping and ADA improvements ............. 934,000 22 ILLINOIS VETERANS' HOME - LASALLE 23 For installing wall protection ................. 107,000 24 (From Article 91, Section 13.1 of Public Act 90-585) 25 For relocating security alarm 26 system ....................................... 37,800 27 ILLINOIS VETERANS' HOME - MANTENO 28 (From Article 90, Section 10a of Public Act 90-585) 29 For tuckpointing and repairing masonry ......... 1,026,000 30 (From Article 91, Section 13.1 of Public Act 90-585) 31 For replacing wiring in light poles ............ 144,615 32 For replacing exterior doors and frames ........ 179,715 33 For replacement of sewer lines, repair and -87- BOB-CDBnew-re2000 1 replacement of bar screens, and 2 rehabilitation of the water tower and 3 reservoir .................................... 172,532 4 ILLINOIS VETERANS' HOME - QUINCY 5 (From Article 90, Section 10a of Public Act 90-585) 6 For resurfacing Schapers Hospital 7 parking lot .................................. 91,000 8 Total, Section 12.1 $2,792,662 9 Section 13. The following named amounts, or so much 10 thereof as may be necessary and remain unexpended at the 11 close of business on June 30, 1999, from appropriations and 12 reappropriations heretofore made for such purposes in Article 13 90, Sections 11.01, 11.02, and 11.03; and Article 91, Section 14 14 of Public Act 90-585, are reappropriated from the Capital 15 Development Fund to the Capital Development Board for the 16 projects hereinafter enumerated: 17 ATTORNEY GENERAL BUILDING - SPRINGFIELD 18 (From Article 90, Section 11.01 of Public Act 90-585) 19 For planning andannex or addition and 20 beginning construction of 21 parking facilities ........................... $ 200,000 22 (From Article 91, Section 14 of Public Act 90-585) 23 For planning energy improvements and upgrading 24 HVAC and electrical systems .................. 6,329 25 For energy improvements and upgrading the 26 HVAC, security and electrical systems, 27 in addition to funds previously 28 appropriated - Attorney General's 29 Building ..................................... 179,772 30 MT. VERNON APPELLATE COURT BUILDING 31 (From Article 90, Section 11.01 of Public Act 90-585) 32 For expanding the courthouse ................... 1,625,000 33 SPRINGFIELD - SUPREME COURT BUILDING -88- BOB-CDBnew-re2000 1 (From Article 90, Section 11.01 of Public Act 90-585) 2 For replacing plumbing system .................. 1,000,000 3 (From Article 91, Section 14 of Public Act 90-585) 4 For replacement of side walls and steps, in addition 5 to funds previously appropriated ............. 74,857 6 SPRINGFIELD - CAPITOL COMPLEX 7 (From Article 90, Section 11.02 of Public Act 90-585) 8 For upgrading HVAC system at the Archives 9 Building, in addition to funds previously 10 appropriated ................................. 375,000 11 For renovating 222 South College 12 Building ..................................... 2,500,000 13 (From Article 91, Section 14 of Public Act 90-585) 14 For installing fire/security alarm 15 system ....................................... 1,050,800 16 For stabilizing the parking ramp ............... 493,719 17 For renovating the interior, exterior and 18 site improvements, in addition to 19 funds previously appropriated - 20 Executive Mansion ............................ 79,036 21 For upgrading environmental equipment 22 and HVAC, in addition to funds previously 23 appropriated - Archives Building ............. 2,150,000 24 For planning and beginning the rehabilitation 25 of the Power Plant ........................... 3,757,051 26 For upgrading sewer system - Capitol Complex, 27 in addition to funds previously 28 appropriated ................................. 1,157,366 29 For renovation of the lower level and 30 ground floor, in addition to funds 31 previously appropriated - Old Power Plant .... 367,703 32 For upgrading the life/safety and security 33 systems - Capitol Building ................... 2,105,256 34 For upgrading the refrigeration equipment - -89- BOB-CDBnew-re2000 1 Capitol Complex .............................. 2,317,409 2 For renovating mechanical system - 3 Capitol Complex, in addition to funds 4 previously appropriated ...................... 1,365,022 5 For planning and beginning the upgrade 6 of environmental equipment and HVAC .......... 54,437 7 For renovation of mechanical systems, in 8 addition to funds previously appropriated .... 19,804 9 For upgrading the elevators .................... 11,906 10 For providing a parking facility for the 11 Bloom and Harris Buildings, including 12 land acquisition ............................. 248,024 13 For all costs associated with the design 14 and planning for asbestos abatement, 15 window replacement, energy conservation 16 improvements, replacement of carpeting and 17 ceiling tiles, handicap accessibility 18 improvements, and rehabilitation of the 19 water and air distribution systems in the 20 Stratton Office Building ..................... 310,572 21 For planning and design and beginningof22 the rehabilitation of the 23 Springfield Armory ........................... 527,823 24 For renovation of the Waterways Building for 25 the Fourth District of the Appellate Court ... 3,500,240 26 SPRINGFIELD - SIU CONSOLIDATED LABORATORIES 27 For construction of an addition to the 28 laboratory facility for Southern Illinois 29 University, Environmental Protection Agency 30 and Department of Public Health .............. 81,987 31 STATE CAPITOL BUILDING 32 For upgrading the life/safety and 33 security systems, in addition to 34 funds previously appropriated ................ 2,600,000 -90- BOB-CDBnew-re2000 1 STRATTON OFFICE BUILDING - SPRINGFIELD 2 For installing fire alarm system ............... 400,000 3 STATEWIDE 4 (From Article 90, Section 11.03 of Public Act 90-585) 5 For surveys and modifications to buildings 6 to meets requirements of the federal 7 Americans With Disabilities Act .............. 5,000,000 8 For retrofitting or upgrading mechanized 9 refrigeration equipment (CFCs) ............... 7,000,000 10 For abating hazardous materials ................ 5,000,000 11 For upgrading and remediating underground 12 storage tanks ................................ 7,500,000 13 (From Article 91, Section 14 of Public Act 90-585): 14 For surveys and modifications to 15 buildings to meet requirements of the 16 federal Americans with Disabilities Act ...... 5,000,000 17 For abatement of hazardous materials ........... 5,000,000 18 For upgrading/retrofitting mechanized 19 refrigeration equipment (CFC's) .............. 4,598,112 20 For upgrade and remediation of underground 21 storage tanks ................................ 3,332,710 22 For renovation to meet the requirements 23 of the Americans with Disabilities Act ....... 3,000,000 24 For abatement of hazardous materials ........... 2,085,887 25 For upgrade and remediation of 26 underground storage tanks .................... 1,786,578 27 For survey for and abatement of 28 asbestos-containing materials ................ 1,389,934 29 For upgrade/retrofit of mechanized 30 refrigeration equipment (CFC's) .............. 3,984,861 31 For abatement of hazardous conditions, 32 including underground storage tanks, 33 in addition to funds previously 34 appropriated ................................. 895,197 -91- BOB-CDBnew-re2000 1 For surveys and modifications to buildings 2 to meet requirements of the federal 3 Americans with Disabilities Act .............. 21,618,468 4 For demolition of buildings .................... 2,685,078 5 For retrofitting/upgrading mechanical 6 refrigeration equipment ...................... 304,455 7 For planning and beginning construction of 8 quick chill food factories ................... 133,946 9 For abating hazardous conditions, including 10 underground storage tanks, in addition to 11 funds previously appropriated ................ 117,584 12 For the planning, upgrade and replacement of 13 potentially hazardous underground storage 14 tanks ........................................ 607,016 15 For surveys and abatement of asbestos- 16 containing materials ......................... 1,073,533 17 For asbestos abatement located during 18 Asbestos Abatement Authority and other 19 surveys to eliminate significant health 20 hazards ...................................... 324,025 21 For planning and abatement of asbestos, and 22 replenishment of initial project 23 construction costs in bondable projects 24 at various state owned facilities ............ 391,427 25 Total, Section 13 $111,387,924 26 Section 13.1. The sum of $373,000, or so much thereof as 27 may be necessary and remains unexpended at the close of 28 business on June 30, 1999, from a reappropriation heretofore 29 made for such purpose in Article 90, Section 11.04 of Public 30 Act 90-585,is reappropriated from the Capital Development 31 Fund to the Capital Development Board for the Illinois 32 Medical District Commission, to renovate the Commission's 33 office building, including replacing the HVAC system and -92- BOB-CDBnew-re2000 1 roof. 2 Section 13.2. The amount of $51,193, or so much thereof 3 as may be necessary and remains unexpended at the close of 4 business on June 30, 1999, from a reappropriation heretofore 5 made for such purpose in Article 91, Section 14.1 of Public 6 Act 90-585, is reappropriated from the Capital Development 7 Fund to the Capital Development Board for planning, 8 construction and equipment for a joint laboratory facility 9 for the Illinois Environmental Protection Agency, the 10 Department of Public Health, and the Southern Illinois 11 University School of Medicine at the SIU Medical Facility in 12 Springfield. 13 Section 13.3. The sum of $825,000, or so much thereof as 14 may be necessary and remains unexpended on June 30, 1999, 15 from a reappropriation heretofore made for such purposes in 16 Article 91, Section 14.2 of Public Act 90-585, is 17 reappropriated from the Capital Development Fund to the 18 Capital Development Board for the Secretary of State for a 19 grant to the Edgebrook Library for all costs associated with 20 the miscellaneous costs incurred for construction or other 21 purposes. 22 Section 13.4. The sum of $40,000, or so much thereof as 23 may be necessary and remains unexpended at the close of 24 business on June 30, 1999, from an appropriation heretofore 25 made for such purposes in Article 91, Section 14.3 of Public 26 Act 90-585, is reappropriated from the Capital Development 27 Fund to the Capital Development Board for the Secretary of 28 State for a grant to the Wilmette Library for all costs 29 associated with planning, construction, reconstruction, and 30 rehabilitation or other purposes. -93- BOB-CDBnew-re2000 1 Section 14. The following named amounts, or so much 2 thereof as may be necessary and remain unexpended at the 3 close of business on June 30, 1999, from appropriations and 4 reappropriations heretofore made for such purposes in Article 5 90, Sections 11.01a and 11.03a, and Article 91, Section 15 of 6 Public Act 90-585, are reappropriated from the General 7 Revenue Fund to the Capital Development Board for the 8 projects hereinafter enumerated: 9 SECOND DISTRICT APPELLATE COURT - ELGIN 10 (From Article 90, Section 11.01a of Public Act 90-585) 11 For upgrading mechanical systems 12 and building exterior ........................ 190,000 13 EXECUTIVE MANSION - SPRINGFIELD 14 For renovating interior, exterior and site, in 15 addition to funds previously appropriated .... 190,000 16 STATEWIDE 17 (From Article 90, Section 11.03a of Public Act 90-585): 18 For surveying and abating asbestos- 19 containing materials ......................... 1,000,000 20 For remediating minor problems 21 and emergencies .............................. 3,002,000 22 For conducting construction site 23 archeological studies ........................ 245,000 24 For demolishing buildings ...................... 4,800,000 25 (From Article 91, Section 15 of Public Act 90-585): 26 For repair of minor problems and 27 emergencies .................................. 3,142,246 28 For construction site archeological 29 studies ...................................... 200,000 30 For surveys for and abatement of 31 asbestos-containing material ................. 915,902 32 For demolition of buildings .................... 5,000,000 33 For repair of minor problems and 34 emergencies .................................. 389,954 -94- BOB-CDBnew-re2000 1 For tuckpointing and exterior repair 2 of state buildings ........................... 415,393 3 For surveys for asbestos containing 4 material ..................................... 131,410 5 For construction site archaeological 6 studies ...................................... 26,347 7 For survey of asbestos-containing 8 materials .................................... 139,312 9 For repairing minor problems and for 10 emergencies, in addition to funds 11 previously appropriated ...................... 31,934 12 For repairing minor problems and emergencies 13 for agencies ................................. 218,017 14 For the planning and abatement of asbestos 15 hazards, and replenishment of initial 16 project construction costs in 17 non-bondable projects at various 18 state owned facilities ....................... 150,055 19 Total, Section 14 $20,187,570 20 Section 14.1. The sum of $203,509, or so much thereof as 21 may be necessary and remains unexpended at the close of 22 business on June 30, 1999, from an appropriation heretofore 23 made for such purposes in Article 91, Section 15.4 of Public 24 Act 90-585, is reappropriated from the General Revenue Fund 25 to the Capital Development Board for a grant to Lincoln Land 26 Community College for all costs associated with the 27 remodeling of Cass Gymnasium. 28 Section 14.2. The sum of $1,408,035, or so much thereof 29 as may be necessary and remains unexpended at the close of 30 business on June 30, 1999, from an appropriation heretofore 31 made for such purposes in Article 91, Section 15.5 of Public 32 Act 90-585, is reappropriated from the General Revenue Fund -95- BOB-CDBnew-re2000 1 to the Capital Development Board for a grant to Lincoln Land 2 Community College for all costs associated with the 3 construction of a new Rural Education and Technology Center. 4 Section 14.3. The sum of $192,435, or so much of that 5 amount as may be necessary and remains unexpended at the 6 close of business on June 30, 1999, from a reappropriation 7 heretofore made for such purposes in Article 91, Section 15.6 8 of Public Act 90-585, is reappropriated to the Capital 9 Development Board from the General Revenue Fund for the 10 planning and construction of the Anna Veterans Home Visitor 11 Center. 12 Section 14.4. The amount of $121,342, or so much thereof 13 as may be necessary and remains unexpended at the close of 14 business on June 30, 1999, from an appropriation heretofore 15 made for such purposes in Article 91, Section 15.7 of Public 16 Act 90-585, is reappropriated from the General Revenue Fund 17 to the Capital Development Board for planning, design, 18 construction, renovation, and all other necessary costs for 19 the Market House in Galena. 20 Section 14.5. The sum of $738,010, or so much thereof as 21 may be necessary and remains unexpended on June 30, 1999, 22 from an appropriation heretofore made for such purposes in 23 Article 91, Section 15.8 of Public Act 90-585, is 24 reappropriated from the General Revenue Fund to the Capital 25 Development Board for planning and renovation of Founders 26 Memorial Library at Northern Illinois University. 27 Section 15. The amount of $26,942,277, or so much 28 thereof as may be necessary and remains unexpended at the 29 close of business on June 30, 1999, from an appropriation 30 heretofore made for such purposes in Article 91, Section 16 -96- BOB-CDBnew-re2000 1 of Public Act 90-585, is reappropriated from the School 2 Infrastructure Fund to the Capital Development Board for 3 school construction project grants pursuant to the School 4 Construction Law. 5 Section 16. The sum of $67,000,000, or so much thereof 6 as may be necessary and remains unexpended at the close of 7 business on June 30, 1999, from an appropriation heretofore 8 made for such purposes in Article 90, Section 16 of Public 9 Act 90-585, is reappropriated from the School Infrastructure 10 Fund to the Capital Development Board for school construction 11 grants pursuant to the School Construction Law. 12 Section 17. The sum of $243,696,855, or so much thereof 13 as may be necessary and remains unexpended at the close of 14 business on June 30, 1999, from an appropriation heretofore 15 made for such purposes in Article 90, Section 17 of Public 16 Act 90-585, is reappropriated from the School Construction 17 Fund to the Capital Development Board for school construction 18 grants pursuant to the School Construction Law. 19 Section 18. The sum of $270,189, or so much thereof as 20 may be necessary and remains unexpended at the close of 21 business on June 30, 1999, from a reappropriation heretofore 22 made for such purposes in Article 91, Section 17 of Public 23 Act 90-585, is reappropriated from the Asbestos Abatement 24 Fund to the Capital Development Board for asbestos surveys in 25 relation to the asbestos abatement of State Governmental 26 Buildings. 27 Section 19. The following named amounts, or so much 28 thereof as may be necessary and remain unexpended at the 29 close of business on June 30, 1999, from appropriations and -97- BOB-CDBnew-re2000 1 reappropriations heretofore made for such purposes in Article 2 90, Section 13, and Article 91, Section 18 of Public Act 3 90-585, are reappropriated from the Capital Development Fund 4 to the Capital Development Board for the Board of Higher 5 Education for the projects hereinafter enumerated: 6 ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA 7 (From Article 90, Section 13 of Public Act 90-585) 8 For replacing carpeting, constructing storage 9 building and various site improvements, 10 including extending communications 11 conduit system ............................... $ 1,310,000 12 (From Article 91, Section 18 of Public Act 90-585) 13 For replacing air conditioning units, 14 controls and upgrading the energy 15 management system ............................ 2,330,390 16 For remodeling the Information Resource 17 Technology Center ............................ 59,521 18 For renovation of the laboratory areas, 19 including a greenhouse ....................... 59,817 20 For the purchase, renovation and improvement 21 of the North Campus High School site of 22 the Aurora West School District 129, 23 including construction of four dormitories, 24 equipment purchases and other expenses for 25 use by the Illinois Mathematics and Science 26 Academy ...................................... 1,198,505 27 Total, Section 19 $4,958,233 28 Section 20. The following named amounts, or so much 29 thereof as may be necessary and remain unexpended at the 30 close of business on June 30, 1999, from appropriations and 31 reappropriations heretofore made for such purposes in Article 32 90, Section 12, and Article 91, Section 19 of of Public Act 33 90-585, are reappropriated from the Capital Development Fund -98- BOB-CDBnew-re2000 1 to the Capital Development Board for the Illinois Community 2 College Board for the projects hereinafter enumerated: 3 BELLEVILLE AREA COLLEGE 4 (From Article 91, Section 19 of Public Act 90-585) 5 For constructing a building, additions 6 and site improvements at the 7 Belleville and Red Bud campuses, 8 in addition to funds previously 9 appropriated ................................. $ 9,755,834 10 For planning buildings, additions and 11 site improvements ............................ 545,565 12 CITY COLLEGES OF CHICAGO/KENNEDY KING 13 (From Article 90, Section 12 of Public Act 90-585) 14 For remodeling for a culinary arts 15 educational facility ......................... 10,875,000 16 (From Article 91, Section 19 of Public Act 90-585) 17 DANVILLE AREA COMMUNITY COLLEGE - VERMILION COUNTY 18 To rehabilitate infrastructure, 19 construct a classroom facility 20 and a day care center, in addition 21 to funds previously appropriated ............. 1,722,476 22 For rehabilitation of infrastructure 23 and beginning construction of a 24 classroom facility ........................... 977,353 25 For rehabilitation of the infrastructure and 26 planning campus buildings .................... 727,990 27 COLLEGE OF DUPAGE 28 For completing the addition to 29 the Student Resource Center .................. 141,532 30 ELGIN COMMUNITY COLLEGE 31 For construction of addition, site improvements, 32 remodeling and purchasing equipment .......... 512,362 33 For planning, design, site improvements, utility 34 adjustments, and any other costs associated -99- BOB-CDBnew-re2000 1 with construction of a new Instructional 2 Building at Elgin Community College .......... 66,600 3 HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON 4 For constructing buildings and making 5 site improvements, including equipment ....... 19,208,135 6 For planning buildings, parking areas, 7 utilities, and site development and 8 preliminary site preparation 9 required to establish permanent 10 campus facilities ............................ 1,772,950 11 JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE 12 For constructing additions and site 13 improvements, in addition to funds 14 previously appropriated ...................... 10,840,477 15 For construction of classroom facility, 16 and remodeling the existing facility, 17 including utilities and site improvements .... 24,745 18 JOHN WOOD COMMUNITY COLLEGE - QUINCY 19 (From Article 90, Section 12 of Public Act 90-585) 20 For planning campus buildings and site 21 improvements ................................. 1,871,800 22 (From Article 91, Section 19 of Public Act 90-585) 23 For construction of a science and technology 24 center and access road ....................... 8,978 25 JOLIET JUNIOR COLLEGE 26 (From Article 90, Section 12 of Public Act 90-585) 27 For remodeling campus buildings ................ 220,900 28 (From Article 91, Section 19 of Public Act 90-585) 29 For construction of a business and technology 30 center and remodeling the main campus 31 building ..................................... 107,081 32 For planning, design and site preparation of 33 a Business Technology Center ................. 2,983 34 COLLEGE OF LAKE COUNTY -100- BOB-CDBnew-re2000 1 For construction of a multi-use Instructional 2 Center, including acquisition of equipment 3 and remodeling of existing facilities ........ 17,407 4 (From Article 90, Section 12 of Public Act 90-585) 5 LAKE LAND COLLEGE - MATTOON 6 For constructing a classroom/administration 7 building and purchasing equipment, in addition 8 to funds previously appropriated ............. 5,336,800 9 LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY 10 For constructing a classroom/administration 11 building ..................................... 10,125,000 12 (From Article 91, Section 19 of Public Act 90-585) 13 For renovation of buildings, construction of an 14 addition and site improvements ............... 27,764 15 For construction of health, mathematics and 16 science laboratory facilities and 17 remodeling Fobes Hall ........................ 259,974 18 For renovation of the main complex ............. 14,925 19 For planning, design, and site preparation, 20 and construction of a multi-purpose 21 building ..................................... 22,932 22 LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD 23 (From Article 90, Section 12 of Public Act 90-585) 24 For constructing an addition and remodeling 25 Sangamon and Menard Halls .................... 3,777,700 26 (From Article 91, Section 19 of Public Act 90-585) 27 MCHENRY COUNTY COLLEGE 28 For construction of an addition, including 29 equipment, a parking area and 30 site improvements ............................ 19,993 31 MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS 32 (From Article 90, Section 12 of Public Act 90-585) 33 For constructing a classroom/administration 34 building, providing site improvements and -101- BOB-CDBnew-re2000 1 purchasing equipment, in addition to 2 funds previously appropriated ................ 8,309,200 3 (From Article 91, Section 19 of Public Act 90-585) 4 For planning and constructing a new classroom 5 facility ..................................... 362,212 6 For providing for an architectural engineering 7 study, renovations, construction, 8 reconstruction and remodeling of Buildings 9 A, B and L ................................... 417,365 10 PRAIRIE STATE COMMUNITY COLLEGE - CHICAGO HEIGHTS 11 For construction of a Learning Resource 12 Center addition .............................. 19,180 13 REND LAKE COLLEGE - INA 14 (From Article 90, Section 12 of Public Act 90-585) 15 For constructing a north access road, 16 including security lighting and drainage ..... 365,269 17 For replacing utility piping ................... 1,546,400 18 (From Article 91, Section 19 of Public Act 90-585) 19 For construction of an aquatic and 20 rehabilitation center ........................ 13,443 21 SHAWNEE COMMUNITY COLLEGE - ULLIN 22 For constructing additions, parking 23 facilities, and renovating buildings, 24 including equipment .......................... 7,328,707 25 SOUTHEASTERN ILLINOIS COLLEGE - HARRISBURG 26 For construction of humanities, 27 administration, and child care facilities 28 and remodeling campus buildings .............. 61,417 29 TRITON COMMUNITY COLLEGE - RIVER GROVE 30 For planning, site improvements, construction 31 and other expenses necessary for the 32 construction of an addition to the Learning 33 Resource Center .............................. 115,893 34 WILLIAM RAINEY HARPER COMMUNITY COLLEGE - PALATINE -102- BOB-CDBnew-re2000 1 For constructing a Multi-purpose 2 Instructional Center and renovating 3 Building A Cafeteria ......................... 6,823,200 4 For planning, developing, and designing a 5 multi-purpose telecommunications 6 instructional delivery center ................ 113,812 7 STATEWIDE - CONSTRUCTION DEFECTS 8 For planning, construction and renovation 9 to correct defectively designed or 10 constructed community college facilities, 11 provided that monies recovered based upon 12 claims arising out of such defective design 13 or construction shall be paid to the state 14 as required by Section 105.12 of the Public 15 Community College Act as reimbursement for 16 monies expended pursuant to this 17 appropriation ................................ 1,016,231 18 Total, Section 20 $105,477,585 19 Section 20A. The sum of $4,941,654, or so much thereof 20 as may be necessary and remains unexpended at the close of 21 business on June 30, 1999, from a reappropriation heretofore 22 made for such purposes in Article 91, Section 19A of Public 23 Act 90-585, is reappropriated from the Capital Development 24 Fund to the Capital Development Board for the Illinois 25 Community College Board for miscellaneous capital 26 improvements including construction, reconstruction, 27 remodeling, improvement, repair and installation of capital 28 facilities, cost of planning, supplies, equipment, materials, 29 services and all other expenses required to complete the work 30 at the various community colleges. This appropriation shall 31 be in addition to any other appropriated amounts which can be 32 expended for these purposes. -103- BOB-CDBnew-re2000 1 Section 20B. The sum of $6,343,805, or so much thereof 2 as may be necessary and remains unexpended at the close of 3 business on June 30, 1999, from a reappropriation heretofore 4 made for such purposes in Article 91, Section 19B of Public 5 Act 90-585, is reappropriated from the Capital Development 6 Fund to the Capital Development Board for the Illinois 7 Community College Board for miscellaneous capital 8 improvements including construction, reconstruction, 9 remodeling, improvement, repair and installation of capital 10 facilities, cost of planning, supplies, equipment, materials, 11 services and all other expenses required to complete the work 12 at the various community colleges. This appropriation shall 13 be in addition to any other appropriated amounts which can be 14 expended for these purposes. 15 Section 20C. The sum of $2,521,400, or so much thereof 16 as may be necessary and remains unexpended at the close of 17 business on June 30, 1999, from a reappropriation heretofore 18 made for such purposes in Article 91, Section 19C of Public 19 Act 90-585, is reappropriated from the Capital Development 20 Fund to the Capital Development Board for the Illinois 21 Community College Board for grants to community colleges for 22 miscellaneous capital improvements including construction, 23 reconstruction, remodeling, improvements, repair and 24 installation of capital facilities, cost of planning, 25 supplies, equipment, materials, services, and all other 26 expenses required to complete the work. This appropriation 27 shall be in addition to any other appropriated amounts which 28 can be expended for these purposes. 29 Section 20D. The sum of $3,756,000, or so much thereof 30 as may be necessary and remains unexpended at the close of 31 business on June 30, 1999, from an appropriation heretofore 32 made for such purpose in Article 90, Section 15 of Public Act -104- BOB-CDBnew-re2000 1 90-585 is reappropriated from the Capital Development Fund to 2 the Capital Development Board for the Illinois Community 3 College Board for miscellaneous capital improvements 4 including construction, capital facilities, cost of planning, 5 supplies, equipment, materials, services and all other 6 expenses required to complete the work at the various 7 community colleges. This appropriation shall be in addition 8 to any other appropriated amounts which can be expended for 9 these purposes. 10 Section 21. The following named amounts, or so much 11 thereof as may be necessary and remain unexpended at the 12 close of business on June 30, 1999, from appropriations and 13 reappropriations heretofore made for such purposes in Article 14 90, Section 13 and Article 91, Section 20 of Public Act 15 90-585, are reappropriated from the Capital Development Fund 16 to the Capital Development Board for the Board of Higher 17 Education for the projects hereinafter enumerated: 18 CHICAGO STATE UNIVERSITY 19 (From Article 90, Section 13 of Public Act 90-585) 20 For upgrading campus infrastructure, 21 in addition to the funds 22 previously appropriated ...................... 2,700,000 23 (From Article 91, Section 20 of Public Act 90-585) 24 For renovating buildings and upgrading 25 mechanical systems ........................... $ 3,300,000 26 For renovating campus buildings and 27 upgrading mechanical systems ................. 2,432,200 28 For providing campus health and safety 29 improvements ................................. 40,221 30 EASTERN ILLINOIS UNIVERSITY - CHARLESTON 31 (From Article 90, Section 13 of Public Act 90-585) 32 For upgrading campus buildings for health, 33 safety and environmental improvements ........ 1,302,100 -105- BOB-CDBnew-re2000 1 (From Article 91, Section 20 of Public Act 90-585) 2 For constructing an addition and 3 renovating Booth Library ..................... 16,764,500 4 For planning an addition and renovation 5 of Booth Library ............................. 771,992 6 For construction of an addition and 7 remodeling Buzzard Building .................. 199,327 8 For upgrading the energy management system 9 and HVAC systems and installation of a chilled 10 water loop between various buildings ......... 31,252 11 For completing conversion to a coal-fired 12 power plant .................................. 52,986 13 For completion of the construction and 14 renovation of the heating system ............. 37,703 15 For planning, equipment, site improvements, 16 construction and renovation of the heating 17 system to restore coal burning capability .... 30,429 18 GOVERNORS STATE UNIVERSITY - PARK FOREST 19 (From Article 90, Section 13 of Public Act 90-585) 20 For planning and beginning the 21 main building renovations, 22 a child development center, and 23 faculty offices .............................. 1,500,000 24 (From Article 91, Section 20 of Public Act 90-585) 25 For upgrading and replacing cooling 26 and refrigeration systems and 27 equipment .................................... 1,985,811 28 For renovation of the main building ............ 422,825 29 For remodeling Main Building ................... 346,063 30 For renovation of the main building ............ 49,954 31 For remodeling the main building ............... 171,802 32 (From Article 90, Section 13 of Public Act 90-585) 33 ILLINOIS STATE UNIVERSITY - NORMAL 34 For remodeling Julian and Moulton Halls ........ 7,050,000 -106- BOB-CDBnew-re2000 1 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 2 For replacing fire alarm systems, lighting 3 and ceilings ................................. 2,561,800 4 (From Article 91, Section 20 of Public Act 90-585) 5 For renovating the auditorium in 6 Building E ................................... 7,131,614 7 For upgrading the boilers and related 8 control systems .............................. 12,626 9 For fire safety modifications at the 10 facility ..................................... 981,903 11 For renovation of Buildings E, F, and 12 the auditorium, and demolition and 13 replacement of Buildings G, J and M, 14 in addition to amounts previously 15 appropriated ................................. 829,569 16 For remodeling the library ..................... 171,978 17 NORTHERN ILLINOIS UNIVERSITY - DEKALB 18 For renovating Altgeld Hall and 19 purchasing equipment ......................... 19,150,400 20 (From Article 90, Section 13 of Public Act 90-585) 21 For upgrading storm waterway controls in 22 addition to funds previously appropriated .... 6,716,000 23 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE 24 For upgrading and remodeling Anthony Hall ...... 3,131,100 25 (From Article 91, Section 20 of Public Act 90-585) 26 For site improvements and purchasing 27 equipment for the Engineering and 28 Technology Building .......................... 423,681 29 For planning addition, remodeling and 30 upgrading the HVAC system in Altgeld Hall .... 574,000 31 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE 32 For construction of the Engineering Facility 33 building and related site improvements ....... 16,893,162 34 (From Article 90, Section 13 of Public Act 90-585) -107- BOB-CDBnew-re2000 1 For planning and beginning construction 2 or renovation for a classroom/administration 3 facility in addition to funds previously 4 appropriated ................................. 1,179,600 5 UNIVERSITY OF ILLINOIS - CHICAGO 6 For remodeling the Clinical 7 Sciences Building ............................ 15,000,000 8 (From Article 91, Section 20 of Public Act 90-585) 9 For the renovation of the court area and 10 Lecture Center, in addition to funds 11 previously appropriated ...................... 3,760,506 12 UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN 13 For constructing an Agricultural 14 Library ...................................... 9,500,000 15 For completion of campus flood control ......... 6,000,000 16 (From Article 90, Section 13 of Public Act 90-585) 17 For remodeling the Mechanical Engineering 18 Laboratory Building .......................... 7,365,000 19 UNIVERSITY OF ILLINOIS - SPRINGFIELD 20 For constructing and improving campus 21 roadways, in addition to funds previously 22 appropriated ................................. 2,252,855 23 WESTERN ILLINOIS UNIVERSITY - MACOMB 24 (From Article 91, Section 20 of Public Act 90-585) 25 For remodeling Horrabin Hall and 26 beginning to convert Simpkins Hall 27 gymnasium and adjacent areas into 28 a performing arts facility ................... 2,153,696 29 For construction of a steam and electrical 30 utility tunnel ............................... 211,374 31 (From Article 90, Section 13, Public Act 90-585) 32 For constructing a utility tunnel and 33 installing piping, lines and cables .......... 6,313,400 34 For remodeling Horrabin and Simpkins -108- BOB-CDBnew-re2000 1 Halls, in addition to funds 2 previously appropriated....................... 1,655,400 3 Total, Section 21 $153,158,829 4 Section 21.1. The sum of $237,635, or so much thereof as 5 may be necessary and remains unexpended at the close of 6 business on June 30, 1999, from a reappropriation heretofore 7 made for such purposes in Article 91, Section 20.1 of Public 8 Act 90-585, is reappropriated from the Capital Development 9 Fund to the Capital Development Board for the Board of Higher 10 Education for miscellaneous capital improvements including 11 construction, reconstruction, remodeling, improvement, repair 12 and installation of capital facilities, cost of planning, 13 supplies, equipment, materials, services and all other 14 expenses required for completing the the work at the colleges 15 and universities. This appropriation shall be in addition to 16 any other appropriated amounts which can be expended for 17 these purposes. 18 Section 21.2. The following named amounts, or so much 19 thereof as may be necessary and remain unexpended at the 20 close of business on June 30, 1999, from reappropriations 21 heretofore made for such purposes in Article 91, Section 20.2 22 of Public Act 90-585, are reappropriated from the Capital 23 Development Fund to the Capital Development Board for the 24 Board of Higher Education for miscellaneous capital 25 improvements including construction, reconstruction, 26 remodeling, improvement, repair and installation of capital 27 facilities, cost of planning, supplies, equipment, materials, 28 services and all other expenses required to complete the work 29 at the colleges and universities hereinafter enumerated. This 30 appropriation shall be in addition to any other appropriated 31 amounts which can be expended for these purposes: 32 Eastern Illinois University .................. $ 24,385 -109- BOB-CDBnew-re2000 1 Northeastern Illinois University ............. 149,786 2 Western Illinois University .................. 455,704 3 Total, Section 21.2 $629,875 4 Section 21.3. The sum of $14,663,596, or so much thereof 5 as may be necessary and remains unexpended at the close of 6 business on June 30, 1999, from a reappropriation heretofore 7 made for such purposes in Article 91, Section 20.3 of Public 8 Act 90-585, is reappropriated from the Capital Development 9 Fund to the Capital Development Board for the Board of Higher 10 Education for miscellaneous capital improvements, including 11 construction, reconstruction, remodeling, improvement, repair 12 and installation of capital facilities, cost of planning, 13 supplies, equipment, materials, services and all other 14 expenses required to complete the work at the various 15 universities set forth below. This appropriation shall be in 16 addition to any other appropriated amounts which can be 17 expended for these purposes. 18 For Chicago State University ......... 301,400 19 For Eastern Illinois University ...... 564,100 20 For Governors State University ....... 122,972 21 For Illinois State University ...... 1,150,279 22 For Northeastern Illinois University . 423,700 23 For Northern Illinois University ... 1,287,700 24 For Western Illinois University ...... 858,250 25 For Southern Illinois University - 26 Carbondale ........................ 1,808,728 27 For Southern Illinois University - 28 Edwardsville ........................ 751,500 29 For University of Illinois - 30 Chicago ........................... 3,280,400 31 For University of Illinois - 32 Springfield ......................... 134,267 33 For University of Illinois - -110- BOB-CDBnew-re2000 1 Urbana-Champaign .................. 3,980,300 2 Section 21.4. The sum of $11,244,000, or so much thereof 3 as may be necessary and remains unexpended at the close of 4 business on June 30, 1999, from an appropriation heretofore 5 made for such purposes in Article 90, Section 14 of Public 6 Act 90-585, is reappropriated from the Capital Development 7 Fund to the Capital Development Board for the Board of Higher 8 Education for miscellaneous capital improvements including 9 construction, capital facilities, cost of planning, various 10 universities set forth below. This appropriation shall be in 11 addition to any other appropriated amounts which can be 12 expended for these purposes. 13 For Chicago State University ........... 226,000 14 For Eastern Illinois University ........ 423,100 15 For Governors State University ......... 136,200 16 For Illinois State University .......... 863,000 17 For Northeastern Illinois University ... 317,800 18 For Northern Illinois University ....... 965,800 19 For Western Illinois University ........ 646,800 20 For Southern Illinois University - 21 Carbondale ......................... 1,493,600 22 For Southern Illinois University - 23 Edwardsville ......................... 563,600 24 For University of Illinois - Chicago . 2,460,300 25 For University of Illinois - 26 Springfield .......................... 162,600 27 For University of Illinois - 28 Urbana-Champaign ................... 2,985,200 29 Section 22. The following named amounts, or so much 30 thereof as may be necessary and remain unexpended at the 31 close of business on June 30, 1999, from reappropriations 32 heretofore made for such purposes in Article 91, Section 21 -111- BOB-CDBnew-re2000 1 of Public Act 90-585, are reappropriated from the Capital 2 Development Fund to the Capital Development Board for the 3 Board of Higher Education for the projects hereinafter 4 enumerated: 5 ILLINOIS STATE UNIVERSITY - NORMAL 6 For construction of science laboratory 7 facilities ................................... $ 173,569 8 NORTHERN ILLINOIS UNIVERSITY 9 For upgrading the storm waterway controls 10 and campus drives ............................ 1,023,738 11 For construction of tunnels and installation 12 of utility piping ............................ 30,177 13 For renovation of heating plants and the 14 HVAC system .................................. 54,699 15 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD 16 For construction of the Rockford Center 17 facilities ................................... 35,982 18 Total, Section 22 $1,318,165 19 Section 22.1. The sum of $2,174,555, or so much thereof 20 as may be necessary and remains unexpended at the close of 21 business on June 30, 1999, from a reappropriation heretofore 22 made for such purposes in Article 91, Section 21.1 of Public 23 Act 90-585, is reappropriated from the Capital Development 24 Fund to the Capital Development Board for the Board of Higher 25 Education for miscellaneous capital improvements, including 26 construction, reconstruction, remodeling, improvement, repair 27 and installation of capital facilities, cost of planning, 28 supplies, equipment, materials, services and all other 29 expenses required for completing the the work at the colleges 30 and universities. This appropriation shall be in addition to 31 any other appropriated amounts which can be expended for 32 these purposes. -112- BOB-CDBnew-re2000 1 Section 22.2. The following named amounts, or so much 2 thereof as may be necessary and remain unexpended at the 3 close of business on June 30, 1999, from reappropriations 4 heretofore made for such purposes in Article 91, Section 21.2 5 of Public Act 90-585, are reappropriated from the Capital 6 Development Fund to the Capital Development Board for the 7 Board of Higher Education for miscellaneous capital 8 improvements, including construction, reconstruction, 9 remodeling, improvements, repair and installation of capital 10 facilities, cost of planning, supplies, equipment, materials, 11 services, and all other expenses required to complete the 12 work at the colleges and universities hereinafter enumerated. 13 This appropriation shall be in addition to any other 14 appropriated amounts which can be expended for these 15 purposes: 16 Northern Illinois University ................... 1,185,487 17 Total, Section 22.2 $1,185,487 18 Section 22.3. The sum of $21,156, or so much thereof as 19 may be necessary and remains unexpended at the close of 20 business on June 30, 1999, from a reappropriation heretofore 21 made for such purposes in Article 91, Section 21.3 of Public 22 Act 90-585, is reappropriated from the Capital Development 23 Fund to the Capital Development Board for the Board of Higher 24 Education for Northern Illinois University, for the planning, 25 architectural engineering, purchase, site improvements and 26 construction or remodeling of a site in Rockford for use as a 27 campus. 28 Section 22.4. The following named amounts, or so much 29 thereof as may be necessary, and remain unexpended at the 30 close of business on June 30, 1999, from appropriations 31 heretofore made for such purposes in Article 91, Section 21.4 32 of Public Act 90-585, are reappropriated from the Capital -113- BOB-CDBnew-re2000 1 Development Fund to the Capital Development Board for the 2 Board of Higher Education for miscellaneous capital 3 improvements including construction, reconstruction, 4 remodeling, improvement, repair and installation of capital 5 facilities, cost of planning, supplies, equipment, materials, 6 services and all other expenses required to complete the work 7 at the various universities set forth below. This 8 appropriation shall be in addition to any other appropriated 9 amounts which can be expended for these purposes. 10 For Chicago State University ................. $ 508,212 11 For Eastern Illinois University .............. 528,004 12 For Governors State University ............... 185,351 13 For Illinois State University ................ 1,536,981 14 For Northeastern Illinois University ......... 735,000 15 For Northern Illinois University ............. 2,162,141 16 For Southern Illinois University ............. 1,564,754 17 For University of Illinois ................... 8,329,783 18 For Western Illinois University .............. 1,465,825 19 Total, Section 22.4 $17,016,051 20 Section 23. The following named amounts, or so much 21 thereof as may be necessary and remain unexpended at the 22 close of business on June 30, 1999, from reappropriations 23 heretofore made for such purposes in Article 91, Section 22 24 of Public Act 90-585, are reappropriated from the Capital 25 Development Fund to the Capital Development Board for the 26 Board of Trustees of Southern Illinois University for the 27 projects hereinafter enumerated: 28 CARBONDALE CAMPUS 29 For construction of an engineering building 30 annex ........................................ $ 77,968 31 For remodeling the Communications Building ..... 9,756 32 EDWARDSVILLE CAMPUS 33 For replacement of the high temperature water -114- BOB-CDBnew-re2000 1 distribution system .......................... 188,842 2 For infrastructure, site development, and 3 other necessary costs associated with 4 the development of University Park ........... 7,501 5 For costs associated with the consolidation 6 of the music facilities ...................... 24,336 7 For planning and construction of an Art and 8 Design Facility .............................. 25,089 9 Total, Section 23 $333,492 10 Section 23.1. The sum of $817,493, or so much thereof as 11 may be necessary and remains unexpended at the close of 12 business on June 30, 1999, from a reappropriation heretofore 13 made for such purposes in Article 91, Section 22.1 of Public 14 Act 90-585, is reappropriated from the Capital Development 15 Fund to the Capital Development Board for Southern Illinois 16 University for miscellaneous capital improvements including 17 construction, reconstruction, remodeling, improvements, 18 repair and installation of capital facilities, cost of 19 planning, supplies, equipment, materials, services, and all 20 other expenses required to complete the work. This 21 appropriation shall be in addition to any other appropriated 22 amounts which can be expended for these purposes. 23 Section 24. The following named amounts, or so much 24 thereof as may be necessary and remain unexpended at the 25 close of business on June 30, 1999, from reappropriations 26 heretofore made for such purposes in Article 91, Section 23 27 of Public Act 90-585, are reappropriated from the Capital 28 Development Fund to the Capital Development Board for the 29 Board of Trustees of the University of Illinois for the 30 projects hereinafter enumerated: 31 UNIVERSITY CENTER - CHICAGO 32 For remodeling Alumni Hall, Phase II, -115- BOB-CDBnew-re2000 1 including utilities .......................... 83,708 2 HEALTH SCIENCE CENTER 3 For remodeling the Neuropsychiatric 4 Institute .................................... 746,749 5 URBANA-CHAMPAIGN CAMPUS 6 For initiating a campus flood 7 control project .............................. 1,296,572 8 Total, Section 24 $2,127,029 9 Section 24.1. The sum of $3,715,959, or so much thereof 10 as may be necessary and remains unexpended at the close of 11 business on June 30, 1999, from a reappropriation heretofore 12 made for such purposes in Article 91, Section 23.1 of Public 13 Act 90-585, is reappropriated from the Capital Development 14 Fund to the Capital Development Board for the Board of 15 Trustees of the University of Illinois for miscellaneous 16 capital improvements including construction, reconstruction, 17 remodeling, improvement, repair and installation of capital 18 facilities, cost of planning, supplies, equipment, materials, 19 services and all other expenses required for completing the 20 work at the colleges and universities. This appropriation 21 shall be in addition to any other appropriated amounts which 22 can be expended for these purposes. 23 Section 24.2. The following named amount, or so much 24 thereof as may be necessary and remains unexpended at the 25 close of business on June 30, 1999, from a reappropriation 26 heretofore made for such purposes in Article 91, Section 23.2 27 of Public Act 90-585, is reappropriated from the General 28 Revenue Fund to the Capital Development Board for the Board 29 of Trustees of the University of Illinois for the project 30 hereinafter enumerated: 31 HEALTH SCIENCE CENTER - CHICAGO 32 For energy conservation improvements at -116- BOB-CDBnew-re2000 1 Taylor Street Hospital, the College of 2 Pharmacy Building, and the Clinical 3 Science Building ............................. $ 24,780 4 Total, Section 24.2 $24,780 5 Section 24.3. The sum of $4,500,000, or so much thereof 6 as may be necessary and remains unexpended at the close of 7 business on June 30, 1999, from a reappropriation heretofore 8 made for such purposes in Article 91, Section 23.3 of Public 9 Act 90-585, is reappropriated from the Capital Development 10 Fund to the Capital Development Board for the Board of 11 Trustees of the University of Illinois (formerly for the 12 Department of Human Services) for renovation of the School of 13 Public Health and Psychiatric Institute (formerly the ISPI 14 building). 15 Section 25. The following named amounts, or so much 16 thereof as may be necessary, and remain unexpended at the 17 close of business on June 30, 1999, from an appropriation and 18 reappropriations heretofore made for such purposes in Article 19 90, Section 13 and Article 91, Section 24 of Public Act 20 90-585, are reappropriated from the Capital Development Fund 21 to the following Universities (formerly to the Capital 22 Development Board for the Universities) for the projects 23 hereinafter enumerated: 24 (From Article 91, Section 24 of Public Act 90-585) 25 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 26 For purchasing equipment 27 for the Fine Arts Complex .................... 4,000,000 28 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE 29 For purchasing Bio-Science building 30 equipment .................................... 8,086 31 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE 32 (From Article 90, Section 13 of Public Act 90-585) -117- BOB-CDBnew-re2000 1 For purchasing equipment for the Engineering 2 Building ..................................... 6,000,000 3 UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN 4 (From Article 91, Section 24 of Public Act 90-585) 5 For purchasing equipment for Temple 6 Hoyne Buell Hall ............................. 99,494 7 Total, Section 25 $10,107,580 8 Section 26. In addition to any amounts heretofore 9 appropriated for such purposes, the sum of $1,802, or so much 10 thereof as may be necessary and remains unexpended at the 11 close of business on June 30, 1999, from a reappropriation 12 heretofore made for such purposes in Article 91, Section 25 13 of Public Act 90-585, is reappropriated from the Capital 14 Development Fund to the Secretary of State for planning, 15 remodeling, relocation, permanent equipment, and any other 16 related expenses, including architectural and engineering 17 fees associated with construction and remodeling of office 18 space and other support areas under the jurisdiction of the 19 House of Representatives, and to various legislative services 20 agencies in both the Capitol and Stratton Office Buildings. 21 Section 27. The sum of $300,000, or so much thereof as 22 may be necessary and remains unexpended at the close of 23 business on June 30, 1999, from an appropriation heretofore 24 made for such purposes in Article 90, Section 19 of Public 25 Act 90-585, is reappropriated from the General Revenue Fund 26 to the Capital Development Board for a grant to the Nipper 27 School in Maryville for all costs associated with 28 infrastructure improvements, including, but not limited to, 29 roof and mechanical system replacement. 30 Section 28. The sum of $50,000, or so much thereof as 31 may be necessary and remains unexpended at the close of -118- BOB-CDBnew-re2000 1 business on June 30, 1999, from an appropriation heretofore 2 made for such purposes in Article 90, Section 24 of Public 3 Act 90-585, as amended by Section 8 of House Bill 871 of the 4 90th General Assembly, is reappropriated from the General 5 Revenue Fund to the Capital Development Board for a grant to 6 the Tilden Fire Protection District for land acquisition, 7 planning, design, construction, reconstruction, renovation, 8 rehabilitation, and all other costs associated with the fire 9 district building project. 10 Section 29. The sum of $189,987, or so much thereof as 11 may be necessary and remains unexpended at the close of 12 business on June 30, 1999, from an appropriation heretofore 13 made for such purposes in Article 90, Section 30 of Public 14 Act 90-585, is reappropriated from the Capital Development 15 Fund to the Capital Development Board for a grant to the City 16 of Mattoon for land acquisition, planning, design, 17 construction, reconstruction, renovation, rehabilitation, 18 equipping, and all other costs associated with a 19 police/public safety building. 20 Section 30. The sum of $350,000, or so much thereof as 21 may be necessary and remains unexpended at the close of 22 business on June 30, 1999, from an appropriation heretofore 23 made for such purposes in Article 90, Section 34 of Public 24 Act 90-585, is reappropriated from the General Revenue Fund 25 to the Capital Development Board for a grant to the 26 Argenta-Oreana Fire Protection District for land acquisition, 27 planning, design, construction, reconstruction, renovation, 28 rehabilitation, operation, and all other costs associated 29 with a new firehouse. 30 Section 31. The sum of $250,000, or so much thereof as 31 may be necessary and remains unexpended at the close of -119- BOB-CDBnew-re2000 1 business on June 30, 1999, from an appropriation heretofore 2 made for such purposes in Article 90, Section 37 of Public 3 Act 90-585, is reappropriated from the Capital Development 4 Fund to the Capital Development Board for a grant to the 5 College of Lake County for all costs associated with the 6 renovation of the Southlake Education Center. 7 Section 32. The sum of $30,000, or so much thereof as 8 may be necessary and remains unexpended at the close of 9 business on June 30, 1999, from an appropriation heretofore 10 made for such purposes in Article 90, Section 39 of Public 11 Act 90-585, is reappropriated from the General Revenue Fund 12 to the Capital Development Board for a grant to the Village 13 of St. Peter for all costs associated with the construction 14 and rehabilitation of community park restrooms to assure 15 compliance with the Americans With Disabilities Act. 16 Section 33. The sum of $1,000,000, or so much thereof as 17 may be necessary and remains unexpended at the close of 18 business on June 30, 1999, from an appropriation heretofore 19 made for such purposes in Article 90, Section 40 of Public 20 Act 90-585, is reappropriated from the Capital Development 21 Fund to the Capital Development Board for a grant to Parkland 22 College for capital improvements. 23 Section 34. The sum of $1,250,000, or so much thereof as 24 may be necessary and remains unexpended at the close of 25 business on June 30, 1999, from an appropriation heretofore 26 made for such purposes in Article 90, Section 42 of Public 27 Act 90-585, is reappropriated from the Capital Development 28 Fund to the Capital Development Board for a fish processing 29 center at Pinckneyville Correctional Center. 30 Section 35. The sum of $175,500, or so much thereof as -120- BOB-CDBnew-re2000 1 may be necessary and remains unexpended at the close of 2 business on June 30, 1999, from an appropriation heretofore 3 made for such purposes in Article 90, Section 43 of Public 4 Act 90-585, is reappropriated from the General Revenue Fund 5 to the Capital Development Board for a grant to Prairie State 6 College for planning for Outreach/Adult Training Center. 7 Section 36. The sum of $1,000,000, or so much thereof as 8 may be necessary and remains unexpended at the close of 9 business on June 30, 1999, from an appropriation heretofore 10 made for such purposes in Article 90, Section 44 of Public 11 Act 90-585, is reappropriated from the Capital Development 12 Fund to the Capital Development Board for planning for 13 expansion at McHenry County College at Crystal Lake. 14 Section 37. The sum of $500,000, or so much thereof as 15 may be necessary and remains unexpended at the close of 16 business on June 30, 1999, from an appropriation heretofore 17 made for such purposes in Article 90, Section 45 of Public 18 Act 90-585, is reappropriated from the General Revenue Fund 19 to the Capital Development Board for a grant to Spoon River 20 College for Macomb Campus renovation and classroom 21 enhancements. 22 Section 38. The sum of $250,000, or so much thereof as 23 may be necessary and remains unexpended at the close of 24 business on June 30, 1999, from an appropriation heretofore 25 made for such purposes in Article 90, Section 46 of Public 26 Act 90-585, is reappropriated from the Capital Development 27 Fund to the Capital Development Board for a grant to Rock 28 Valley College for planning for a new instructional building. 29 Section 39. The sum of $50,000, or so much thereof as 30 may be necessary and remains unexpended at the close of -121- BOB-CDBnew-re2000 1 business on June 30, 1999, from an appropriation heretofore 2 made for such purposes in Article 90, Section 49 of Public 3 Act 90-585, as amended by Section 8 of House Bill 871 of the 4 90th General Assembly, is reappropriated from the Capital 5 Development Fund to the Capital Development Board for all 6 costs associated with construction of the Silvis Community 7 Center in the City of Silvas. 8 Section 40. No contract shall be entered into or 9 obligation incurred for any expenditures from appropriations 10 made in this Article until after the purposes and amounts 11 have been approved in writing by the Governor. 12 Section 99. Effective date. This Act takes effect on 13 July 1, 1999.