State of Illinois
91st General Assembly
Legislation

   [ Search ]   [ Legislation ]
[ Home ]   [ Back ]   [ Bottom ]


[ Engrossed ][ House Amendment 001 ][ House Amendment 003 ]
[ Senate Amendment 001 ]

91_SB0598

                                            BOB-CDBnew-re2000

 1        AN ACT making appropriations and reappropriations.

 2        Be  it  enacted  by  the People of the State of Illinois,
 3    represented in the General Assembly:

 4                              ARTICLE 1

 5        Section 1.  The  following  named  amounts,  or  so  much
 6    thereof  as  may  be  necessary,  are  appropriated  from the
 7    Capital Development Fund to the Capital Development Board for
 8    the Department of Agriculture for  the  projects  hereinafter
 9    enumerated:
10                      DUQUOIN STATE FAIRGROUNDS
11    For renovating roundhouses ..................... $    600,000
12                   GALESBURG DIAGNOSTIC LABORATORY
13    For purchasing the facility ....................    3,200,000
14              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
15    For completing the HVAC replacement
16      in the Administration Building, in
17      addition to funds previously appropriated ....      485,000
18    For replacing and repairing roofs,
19      Phase II .....................................      810,000
20    For extending the fiber optics system ..........      250,000
21    For installing HVAC system and
22      restrooms in the Orr Building ................    1,100,000
23        Total, Section 1                               $6,445,000

24        Section  1a.  The  following  named  amount,  or  so much
25    thereof as may be necessary, is appropriated from the General
26    Revenue  Fund  to  the  Capital  Development  Board  for  the
27    Department  of  Agriculture  for  the   project   hereinafter
28    enumerated:
29              ILLINOIS STATE FAIRGROUNDS -  SPRINGFIELD
30    For upgrading infield lighting on one mile
 
                            -2-             BOB-CDBnew-re2000
 1      and one-half mile tracks .......................$   335,000

 2        Section  2.  The  following  named  amounts,  or  so much
 3    thereof as  may  be  necessary,  are  appropriated  from  the
 4    Capital Development Fund to the Capital Development Board for
 5    the   Department  of  Central  Management  Services  for  the
 6    projects hereinafter enumerated:
 7                      CENTRAL COMPUTER FACILITY
 8    For installing a cooling tower and fire alarm
 9      system and various other improvements ........ $    581,000
10           OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER
11    For planning and beginning the renovation
12      of the facility ..............................    2,500,000
13                SPRINGFIELD REGIONAL OFFICE BUILDING
14    For replacing the potable water system .........      825,000
15    For upgrading the parking lot ..................      175,000
16        Total, Section 2                               $4,081,000

17        Section 2a.  The following  named  amounts,  or  so  much
18    thereof  as  may  be  necessary,  are  appropriated  from the
19    General Revenue Fund to the Capital Development Board for the
20    Department of Central Management Services  for  the  projects
21    hereinafter enumerated:
22          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
23                     (ROOSEVELT ROAD) - CHICAGO
24    For rehabilitating the pool area ............... $    150,000
25                 JAMES R. THOMPSON CENTER - CHICAGO
26    For investigating structural columns
27      deterioration ................................       50,000
28                STATE OF ILLINOIS BUILDING - CHICAGO
29    For restoring exterior limestone and
30      masonry ......................................      550,000
31                         PARIS STATE GARAGE
32    For replacing overhead lighting and
 
                            -3-             BOB-CDBnew-re2000
 1      pneumatic system .............................      205,000
 2                        WATSEKA STATE GARAGE
 3    For replacing lighting, windows and
 4      overhead doors ...............................      110,000
 5        Total, Section 2a                              $1,065,000

 6        Section  3.  The  following  named  amounts,  or  so much
 7    thereof as  may  be  necessary,  are  appropriated  from  the
 8    Capital Development Fund to the Capital Development Board for
 9    the  Department  of  Corrections for the projects hereinafter
10    enumerated:
11                     DWIGHT CORRECTIONAL CENTER
12    For upgrading the water treatment plant ........ $  1,000,000
13                   EAST MOLINE CORRECTIONAL CENTER
14    For upgrading fire alarm and building
15      automation systems ...........................      900,000
16                 ILLINOIS YOUTH CENTER - HARRISBURG
17    For upgrading mechanical control system ........      515,000
18                ILLINOIS YOUTH CENTER  - VALLEY VIEW
19    For replacing boilers, controls, hot
20      water heaters and softeners in
21      residential units and administration
22      building .....................................    1,300,000
23                 ILLINOIS YOUTH CENTER - WARRENVILLE
24    For rehabilitation of the administration
25      building .....................................      791,000
26         LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE
27    For constructing two cellhouses, in
28      addition to funds previously appropriated ....   14,300,000
29                MENARD CORRECTIONAL CENTER - CHESTER
30    For improving ventilation and dehumidification
31      systems in the kitchen and dining rooms ......      500,000
32    For replacing shower room and guard tower ......      500,000
33    For upgrading mechanical bar screen and storm
 
                            -4-             BOB-CDBnew-re2000
 1      and sanitary sewer system ....................    1,300,000
 2                    SHERIDAN CORRECTIONAL CENTER
 3    For replacing doors and locks ..................      150,000
 4               STATEVILLE CORRECTIONAL CENTER - JOLIET
 5    For constructing a housing unit, cellhouse,
 6      vehicle maintenance building and
 7      warehouse for the reception and
 8      classification center, in addition to
 9      funds previously appropriated ................   28,500,000
10    For replacing windows in B House ...............    3,000,000
11    For replacing cell fronts in F House ...........    1,000,000
12    For upgrading plumbing system in F House,
13      in addition to funds previously
14      appropriated .................................    3,500,000
15                   TAYLORVILLE CORRECTIONAL CENTER
16    For upgrading shower ventilation system ........      250,000
17                     THOMSON CORRECTIONAL CENTER
18    For constructing three cellhouses and
19      expanding educational and vocational
20      space, in addition to funds previously
21      appropriated .................................   38,400,000
22                    VANDALIA CORRECTIONAL CENTER
23    For planning and beginning construction
24      for a slaughter house and meat plant .........      500,000
25    For repairing exterior masonry, in addition
26      to funds previously appropriated .............      750,000
27                     VIENNA CORRECTIONAL CENTER
28    For replacing windows, in addition to
29      funds previously appropriated ................      800,000
30                              STATEWIDE
31    For planning, design, construction, equipment
32      and all other necessary costs for a
33      female multi-security level
34      correctional center ..........................   80,000,000
 
                            -5-             BOB-CDBnew-re2000
 1    For replacing roofing systems at the
 2      following locations at the approximate
 3      cost set forth below .........................    1,100,000
 4        Vienna Correctional Center ..........500,000
 5        Sheridan Correctional Center ........600,000
 6    For replacing or installing mechanical bar
 7      screens at the following locations at the
 8      approximate cost set forth below .............      840,000
 9        Graham Correctional Center -
10         Hillsboro ..........................340,000
11        Western Illinois Correctional
12         Center - Mt. Sterling ..............350,000
13        Shawnee Correctional Center -
14         Vienna .............................150,000
15    For upgrading security control systems and
16      panels in housing units at the following
17      locations at the approximate cost set
18      forth below ..................................    4,850,000
19        Danville Correctional Center ........500,000
20        Hill Correctional Center -
21         Galesburg ........................1,500,000
22        Western Illinois Correctional
23         Center - Mt. Sterling ..............675,000
24        Illinois River Correctional
25         Center - Canton ....................675,000
26        Shawnee Correctional Center -
27         Vienna ...........................1,500,000 ____________
28        Total, Section 3                             $184,746,000

29        Section 3a.  The following  named  amounts,  or  so  much
30    thereof  as  may  be  necessary,  are  appropriated  from the
31    General Revenue Fund to the Capital Development Board for the
32    Department  of  Corrections  for  the  projects   hereinafter
33    enumerated:
 
                            -6-             BOB-CDBnew-re2000
 1                  JACKSONVILLE CORRECTIONAL CENTER
 2    For replacing inner perimeter sidewalk ......... $    330,000
 3                    VANDALIA CORRECTIONAL CENTER
 4    For replacing showers in six buildings, in
 5      addition to funds previously appropriated ....      600,000
 6        Total, Section 3a                                $930,000

 7        Section  4.  The  following  named  amounts,  or  so much
 8    thereof as  may  be  necessary,  are  appropriated  from  the
 9    Capital Development Fund to the Capital Development Board for
10    the Historic Preservation Agency for the projects hereinafter
11    enumerated:
12          FORT DE CHARTRES HISTORIC SITE - RANDOLPH COUNTY
13    For restoring the powder magazine .............. $    305,000
14            LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD
15    For rehabilitating site and providing
16      irrigation system ............................      445,000
17              LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD
18    For rehabilitating interior and exterior .......      755,000
19                   OLD STATE CAPITOL - SPRINGFIELD
20    For providing structural stabilization .........    2,000,000
21                     UNION STATION - SPRINGFIELD
22    For purchasing and rehabilitating ..............    2,810,000
23        Total, Section 4                               $6,315,000

24        Section  4a.  The  following  named  amounts,  or so much
25    thereof as  may  be  necessary,  are  appropriated  from  the
26    General  Revenue  Fund   to the Capital Development Board for
27    the Historic Preservation Agency for the projects hereinafter
28    enumerated:
29             CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
30    For replacing the Orientation
31      Theater screen ............................... $    220,000
32                   DANA THOMAS HOUSE - SPRINGFIELD
 
                            -7-             BOB-CDBnew-re2000
 1    For restoring exterior and interior ............      450,000
 2                        GALENA HISTORIC SITE
 3    For rehabilitating Washburne House .............      564,000
 4           LINCOLN'S NEW SALEM HISTORIC SITE - PETERSBURG
 5    For resurfacing village and service roads ......      125,000
 6    For rehabilitating lift stations ...............      395,000
 7                   OLD STATE CAPITOL - SPRINGFIELD
 8    For replacing the bottom cylinder of
 9      the hydraulic elevator .......................       50,000
10        Total, Section 4a                              $1,804,000

11        Section 5.  The  following  named  amounts,  or  so  much
12    thereof  as  may  be  necessary,  are  appropriated  from the
13    Capital Development Fund to the Capital Development Board for
14    the Department of Human Services for the projects hereinafter
15    enumerated:
16                    CHESTER MENTAL HEALTH CENTER
17    For upgrading access control/duress system ..... $  1,500,000
18                  FOX DEVELOPMENTAL CENTER - DWIGHT
19    For upgrading electrical system and installing
20      an emergency generator .......................      842,000
21               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
22    For renovating residences, in addition to
23      funds previously appropriated ................    2,792,000
24             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
25    For renovating the fire alarm systems, in
26      addition to funds previously appropriated ....      500,000
27      ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE
28    For completing the powerhouse rehabilitation, in
29      addition to funds previously appropriated ....      400,000
30                  JACKSONVILLE DEVELOPMENTAL CENTER
31    For rehabilitating cooling towers at
32      the power plant ..............................      270,000
33             LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
 
                            -8-             BOB-CDBnew-re2000
 1    For renovating residential and neighborhood
 2      homes, in addition to funds previously
 3      appropriated .................................    1,850,000
 4                 MADDEN MENTAL HEALTH CENTER - HINES
 5    For renovating pavilions for safety/security,
 6      in addition to funds previously appropriated .    1,200,000
 7            MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
 8    For renovating Kennedy Hall ....................    2,500,000
 9               MURRAY MENTAL HEALTH CENTER - CENTRALIA
10    For replacing energy management system .........      815,000
11               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
12    For upgrading HVAC systems in four
13      residential buildings ........................    1,210,000
14                ZELLER MENTAL HEALTH CENTER - PEORIA
15    For upgrading HVAC and mechanical systems ......      685,000
16                              STATEWIDE
17    For replacing and repairing roofing systems
18      at the following locations at the approximate
19      cost set forth below .........................    2,310,000
20        Choate Developmental Center -
21         Anna ...............................300,000
22        Chicago-Read Mental Health Center ...100,000
23        Tinley Park Mental Health Center.....185,000
24        Illinois School for the Visually
25         Impaired - Jacksonville ............160,000
26        Shapiro Developmental Center -
27         Kankakee ...........................545,000
28        Kiley Developmental Center -
29         Waukegan ...........................300,000
30        Ludeman Developmental center -
31         Park Forest ........................720,000
32    For upgrading roads at the following
33      locations at the approximate
34      cost set forth below .........................    1,000,000
 
                            -9-             BOB-CDBnew-re2000
 1        Howe Developmental Center -
 2         Tinley Park ........................520,000
 3        Shapiro Developmental center -
 4         Kankakee ...........................480,000 ____________
 5        Total, Section 5                              $17,874,000

 6        Section 5a.  The following  named  amounts,  or  so  much
 7    thereof  as  may  be  necessary,  are  appropriated  from the
 8    General Revenue Fund to the Capital Development Board for the
 9    Department of Human Services  for  the  projects  hereinafter
10    enumerated:
11                 CHOATE MENTAL HEALTH CENTER - ANNA
12    For life/safety improvements ................... $    175,000
13             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
14    For upgrading kitchen equipment ................      750,000
15                  JACKSONVILLE DEVELOPMENTAL CENTER
16    For upgrading HVAC systems in the Drake and
17      Gillespie buildings ..........................      245,000
18                              STATEWIDE
19    For resurfacing and repairing roads at the
20      following locations at the approximate cost
21      set forth below ..............................    1,000,000
22        Alton Mental Health Center ..........590,000
23        Choate Mental Health Center -
24         Anna ...............................210,000
25        Lincoln Developmental Center ........200,000 ____________
26        Total, Section 5a                              $2,170,000

27        Section  6.  The  following  named  amounts,  or  so much
28    thereof as  may  be  necessary,  are  appropriated  from  the
29    General Revenue Fund to the Capital Development Board for the
30    Medical  District  Commission  for  the  projects hereinafter
31    enumerated:
32               CHICAGO TECHNOLOGY PARK RESEARCH CENTER
 
                            -10-            BOB-CDBnew-re2000
 1    For renovating the Research Center ............. $    770,000
 2    For upgrading centrifugal chillers .............      235,000
 3        Total, Section 6                               $1,005,000

 4        Section 7.  The  following  named  amounts,  or  so  much
 5    thereof  as  may  be  necessary,  are  appropriated  from the
 6    Capital Development Fund to the Capital Development Board for
 7    the  Department  of  Military  Affairs   for   the   projects
 8    hereinafter enumerated:
 9                          CHAMPAIGN ARMORY
10    For replacing roofing systems and
11      rehabilitating exterior walls ................ $    300,000
12                           DELAVAN ARMORY
13    For rehabilitating the exterior and
14      replacing roofing system .....................      700,000
15                           PONTIAC ARMORY
16    For rehabilitating the exterior and
17      replacing the roofing system .................      600,000
18                           STREATOR ARMORY
19    For replacing the roofing system and
20      tuckpointing walls ...........................      300,000
21        Total, Section 7                               $1,900,000

22        Section  7a.  The  following  named  amounts,  or so much
23    thereof as  may  be  necessary,  are  appropriated  from  the
24    General Revenue Fund to the Capital Development Board for the
25    Department  of  Military Affairs for the projects hereinafter
26    enumerated:
27                          CARBONDALE ARMORY
28    For rehabilitating the exterior and interior ... $    600,000
29                        LAWRENCEVILLE ARMORY
30    For rehabilitating the exterior and
31      replacing the roofing system .................      450,000
32                          LITCHFIELD ARMORY
 
                            -11-            BOB-CDBnew-re2000
 1    For renovating the interior and exterior .......      600,000
 2        Total, Section 7a                              $1,650,000

 3        Section 8.  The  following  named  amounts,  or  so  much
 4    thereof  as  may  be  necessary,  are  appropriated  from the
 5    Capital Development Fund to the Capital Development Board for
 6    the  Department  of  Natural  Resources  for   the   projects
 7    hereinafter enumerated:
 8               BEAVER DAM STATE PARK - MACOUPIN COUNTY
 9    For rehabilitating dams, spillway, and
10      boat access facilities .......................      450,000
11          CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES
12    For upgrading sewage treatment system ..........    1,070,000
13               ILLINOIS BEACH STATE PARK - LAKE COUNTY
14    For rehabilitating lodge entrance ..............      250,000
15            JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
16    For upgrading campground electrical ............      250,000
17         KANKAKEE RIVER STATE PARK - KANKAKEE/WILL COUNTIES
18    For constructing sanitary sewer system, in
19      addition to funds previously appropriated ....    5,000,000
20           LAKE LE-AQUA-NA STATE PARK - STEPHENSON COUNTY
21    For replacing sewage treatment plant ...........      572,000
22            MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
23    For rehabilitating levee and well, in
24      addition to funds previously appropriated ....    3,600,000
25               SANGCHRIS STATE PARK - SANGAMON COUNTY
26    For upgrading campground electrical
27      system .......................................      193,500
28           SPRING GROVE FISHERIES CENTER - MCHENRY COUNTY
29    For planning and beginning renovation
30      of hatchery ..................................      496,000
31             WHITE PINES FOREST STATE PARK - OGLE COUNTY
32    For planning and beginning lodge and cabin
33      restoration ..................................      150,000
 
                            -12-            BOB-CDBnew-re2000
 1                              STATEWIDE
 2    For replacing roofing systems at the
 3      following locations, at the approximate
 4      cost set forth below .........................    2,346,300
 5        Beall Woods Conservation Area -
 6         Wabash County .......................30,000
 7        Eagle Creek State Park -
 8         Shelby County .......................39,000
 9        Eldon Hazlet State Park -
10         Clinton County ......................67,000
11        Fox Ridge State Park -
12         Coles County ........................34,000
13        Giant City State Park -
14         Jackson/Union Counties ..............96,000
15        Goose Lake Prairie State Park -
16         Grundy County ......................123,000
17        Hennepin Canal Parkway State Trail ..136,000
18        Illinois Beach State Park -
19         Lake County ........................787,000
20        Illinois Caverns Natural Area -
21         Monroe County .......................74,000
22        Kankakee River State Park -
23         Kankakee/Will Counties ..............74,000
24        Kickapoo State Park -
25         Vermilion County ....................41,000
26        Middle Fork State Fish & Wildlife
27         Area - Vermilion County .............12,900
28        Moraine Hills State Park -
29         McHenry County ......................91,000
30        Moraine View State Park -
31         McLean County.......................157,000
32        Ramsey Lake State Park -
33         Fayette County ......................69,000
34        Randolph County Conservation Area ....60,000
 
                            -13-            BOB-CDBnew-re2000
 1        Red Hills State Park -
 2         Lawrence County .....................17,000
 3        Saline County Conservation Area ......20,000
 4        Sam Dale Lake Conservation Area -
 5         Wayne County ........................15,000
 6        Spitler Woods State Natural Area -
 7         Macon County .........................8,400
 8        Stephen A. Forbes State Park -
 9         Marion County .......................37,000
10        Ten Mile Creek State Fish &
11         Wildlife Area - Jefferson/
12         Hamilton Counties....................76,000
13        Union County Conservation Area .......97,000
14        Washington County Conservation Area ..49,000
15        Waste Management & Research Center -
16         Champaign ...........................43,000
17        William W. Powers Conservation Area -
18         Cook County .........................47,000
19        Wolf Creek State Park -
20         Shelby County .......................46,000
21    For replacing vault toilets at the following
22      locations, at the approximate cost set forth
23      below ........................................    1,000,000
24        Anderson Lake Conservation Area -
25         Fulton/Schuyler Counties ...........156,000
26        Giant City State Park -
27         Jackson/Union Counties .............577,000
28        Randolph County Conservation Area ...230,000
29        Silver Springs State Park -
30          Kendall County .....................37,000 ____________
31        Total, Section 8                              $15,377,800

32        Section  8a.  The  following  named  amounts,  or so much
33    thereof as  may  be  necessary,  are  appropriated  from  the
 
                            -14-            BOB-CDBnew-re2000
 1    General Revenue Fund to the Capital Development Board for the
 2    Department  of Natural Resources for the projects hereinafter
 3    enumerated:
 4                  DICKSON MOUNDS MUSEUM - LEWISTOWN
 5    For planning and beginning repair of
 6      exterior walls ............................... $    100,000
 7                 FOX RIDGE STATE PARK - COLES COUNTY
 8    For rehabilitating historic structures .........      210,000
 9             HENNEPIN CANAL PARKWAY - ROCK ISLAND COUNTY
10    For rehabilitating Aqueduct #6 .................      590,000
11               ILLINOIS BEACH STATE PARK - LAKE COUNTY
12    For stabilizing shoreline ......................      400,000
13                              STATEWIDE
14    For maintaining lodge/concession program .......      400,000
15    For rehabilitating or replacing
16      playground equipment .........................      300,000
17        Total Section 8a                               $2,000,000

18        Section 9.  The  following  named  amounts,  or  so  much
19    thereof  as  may  be  necessary,  are  appropriated  from the
20    Capital Development Fund to the Capital Development Board for
21    the  Department  of  Revenue  for  the  projects  hereinafter
22    enumerated:
23                 WILLARD ICE BUILDING - SPRINGFIELD
24    For replacing underground sprinkler system ..... $    295,000
25    For replacing the roof .........................    1,385,000
26        Total, Section 9                               $1,680,000

27        Section 9a.  The following  named  amounts,  or  so  much
28    thereof  as  may  be  necessary,  are  appropriated  from the
29    General Revenue Fund to the Capital Development Board for the
30    Department  of   Revenue   for   the   projects   hereinafter
31    enumerated:
32                 WILLARD ICE BUILDING - SPRINGFIELD
 
                            -15-            BOB-CDBnew-re2000
 1    For repairing the exterior of the building ..... $    425,000
 2    For planning and rehabilitating the
 3      plumbing system ..............................       50,000
 4    For planning and beginning the upgrade of
 5      the security and surveillance system .........      100,000
 6    For waterproofing and upgrading ramps ..........      500,000
 7        Total, Section 9a                              $1,075,000

 8        Section  10.  The  following  named  amounts,  or so much
 9    thereof as  may  be  necessary,  are  appropriated  from  the
10    Capital Development Fund to the Capital Development Board for
11    the  Department  of State Police for the projects hereinafter
12    enumerated:
13             STATE POLICE TRAINING ACADEMY - SPRINGFIELD
14    For replacing portable classroom building ...... $  1,000,000
15                              STATEWIDE
16    For replacing roofing system at the
17      following locations at the approximate
18      cost set forth below .........................      452,600
19       District 13 Headquarters,
20         DuQuoin ............................$72,000
21       Joliet Laboratory .....................60,000
22       District 6 Headquarters,
23         Pontiac .............................58,900
24       District 9 Headquarters,
25         Springfield ........................141,700
26       State Police Training Center,
27         Pawnee ..............................30,000
28       District 18 Headquarters,
29         Litchfield ..........................45,000
30       District 19 Headquarters,
31         Carmi ...............................45,000 ____________
32        Total, Section 10                              $1,452,600
 
                            -16-            BOB-CDBnew-re2000
 1        Section 10a.  The following named  amounts,  or  so  much
 2    thereof  as  may  be  necessary,  are  appropriated  from the
 3    General Revenue Fund to the Capital Development Board for the
 4    Department of  State  Police  for  the  projects  hereinafter
 5    enumerated:
 6                  DISTRICT 22 HEADQUARTERS - ULLIN
 7    For upgrading mechanical systems ............... $     25,000
 8                   FORENSIC SCIENCE LAB - CHICAGO
 9    For upgrading exterior penthouse louvers .......      210,000
10        Total, Section 10a                               $235,000

11        Section  11.  The  following  named  amounts,  or so much
12    thereof as  may  be  necessary,  are  appropriated  from  the
13    Capital Development Fund to the Capital Development Board for
14    the projects hereinafter enumerated:
15                      SPRINGFIELD SUPREME COURT
16    For installing humidifier and water
17      filtration systems ........................... $  1,600,000
18    For upgrading the library, in
19      addition to funds previously appropriated ....      450,000
20               THIRD DISTRICT APPELLATE COURT - OTTAWA
21    For replacing the Annex roof ...................       50,000
22        Total, Section 11                              $2,100,000

23        Section  11a.  The  following  named  amounts, or so much
24    thereof as  may  be  necessary,  are  appropriated  from  the
25    General Revenue Fund to the Capital Development Board for the
26    projects hereinafter enumerated:
27               THIRD DISTRICT APPELLATE COURT - OTTAWA
28    For tuckpointing and repairing exterior ........ $    140,000
29             FIFTH DISTRICT APPELLATE COURT - MT. VERNON
30    For repairing plaster and painting .............      176,000
31        Total, Section 11a                               $316,000
 
                            -17-            BOB-CDBnew-re2000
 1        Section  12.  The  following  named  amounts,  or so much
 2    thereof as  may  be  necessary,  are  appropriated  from  the
 3    Capital Development Fund to the Capital Development Board for
 4    the  Office  of  the  Secretary  of  State  for  the projects
 5    hereinafter enumerated:
 6                    CAPITOL COMPLEX - SPRINGFIELD
 7    For upgrading electrical lighting and replacing
 8      ceilings - Stratton Office Building .......... $  5,500,000
 9    For replacing mechanical piping - Klein
10      and Mason Warehouse...........................      290,000
11    For renovating the exterior of the Capitol
12      and Howlett Buildings ........................    2,000,000
13    For renovating 222 S. College, in addition
14      to funds previously appropriated .............    1,200,000
15        Total, Section 12                              $8,990,000

16        Section 13.  The following  named  amounts,  or  so  much
17    thereof  as  may  be  necessary,  are  appropriated  from the
18    Capital Development Fund to the Capital Development Board for
19    the  Department  of  Veterans'  Affairs  for   the   projects
20    hereinafter enumerated:
21                  ILLINOIS VETERANS' HOME - LASALLE
22    For constructing additional parking areas ...... $    350,000
23                  ILLINOIS VETERANS' HOME - MANTENO
24    For upgrading the electrical system ............    1,400,000
25    For upgrading storm sewer ......................      150,000
26        Total, Section 13                              $1,900,000

27        Section  13a.  The  following  named  amounts, or so much
28    thereof as  may  be  necessary,  are  appropriated  from  the
29    General Revenue Fund to the Capital Development Board for the
30    Department  of Veterans' Affairs for the projects hereinafter
31    enumerated:
32                   ILLINOIS VETERANS' HOME - ANNA
 
                            -18-            BOB-CDBnew-re2000
 1    For repairing, upgrading and maintaining
 2      various systems .............................. $    380,000
 3                  ILLINOIS VETERANS' HOME - LASALLE
 4    For replacing lighting .........................       75,000
 5                  ILLINOIS VETERANS' HOME - MANTENO
 6    For upgrading generators for emergency power ...      100,000
 7    For enlarging doorways .........................       95,000
 8        Total, Section 13a                               $650,000

 9        Section 14.  The following  named  amounts,  or  so  much
10    thereof  as  may  be  necessary,  are  appropriated  from the
11    Capital Development Fund to the Capital Development Board for
12    the projects hereinafter enumerated:
13                              STATEWIDE
14    For surveys and modifications to buildings
15      to meet requirements of the federal
16      Americans with Disabilities Act .............. $  9,000,000
17    For abating hazardous materials ................    5,000,000
18    For retrofitting or upgrading mechanized
19      refrigeration equipment (CFCs) ...............    7,000,000
20    For upgrading and remediating aboveground
21      and underground storage tanks ................    3,500,000
22        Total, Section 14                             $24,500,000

23        Section 14a.  The following named  amounts,  or  so  much
24    thereof  as  may  be  necessary,  are  appropriated  from the
25    General Revenue Fund to the Capital Development Board for the
26    projects hereinafter enumerated:
27                              STATEWIDE
28    For remediating minor problems and
29      emergencies .................................. $  3,815,000
30    For conducting construction site
31      archeological studies ........................      245,000
32    For demolition of buildings ....................    5,000,000
 
                            -19-            BOB-CDBnew-re2000
 1    For surveying and abating asbestos-
 2      containing materials .........................    2,000,000
 3        Total, Section 14a                            $11,060,000

 4        Section 14b.   The  amount  of  $2,000,000,  or  so  much
 5    thereof  as  may  be  necessary,  is  appropriated  from  the
 6    Asbestos  Abatement Fund to the Capital Development Board for
 7    asbestos surveys  and  emergency  abatement  in  relation  to
 8    asbestos  abatement in state governmental buildings or higher
 9    education residential and auxiliary enterprise buildings.

10        Section 15.    The following named amounts,  or  so  much
11    thereof  as  may  be  necessary,  are  appropriated  from the
12    Capital Development Fund to the Capital Development Board for
13    the  Illinois  Community  College  Board  for  the   projects
14    hereinafter enumerated:
15                       BELLEVILLE AREA COLLEGE
16    For renovating campus buildings and site
17      improvements at the Belleville and Red
18      Bud campuses ................................. $  2,216,000
19                      CITY COLLEGES OF CHICAGO
20    For remodeling for Workforce Preparation
21      Centers ......................................    3,862,000
22                JOHN WOOD COMMUNITY COLLEGE - QUINCY
23    For constructing campus buildings and site
24      improvements, in addition to funds
25      previously appropriated ......................   12,240,000
26                     LAKE LAND COLLEGE - MATTOON
27    For constructing a Technology Building, a
28      parking area and for site improvements .......    2,992,000
29                    PARKLAND COLLEGE - CHAMPAIGN
30    For constructing a classroom/instructional
31      support building, in addition to
32      funds previously appropriated ................   10,688,000
 
                            -20-            BOB-CDBnew-re2000
 1               PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS
 2    For constructing an addition to the Adult
 3      Training/Outreach Center, in addition to
 4      funds previously appropriated ................   10,961,000
 5                RICHLAND COMMUNITY COLLEGE - DECATUR
 6    For remodeling and constructing additions ......    6,939,000
 7                    TRITON COLLEGE - RIVER GROVE
 8    For rehabilitating the Liberal Arts
 9      Building .....................................    3,687,000
10    For rehabilitating the potable water
11      distribution system ..........................      659,000
12        Total, Section 15                             $54,244,000

13        Section  16.     The  following named amounts, or so much
14    thereof as  may  be  necessary,  are  appropriated  from  the
15    Capital Development Fund to the Capital Development Board for
16    the  Illinois  Board  of  Higher  Education  for the projects
17    hereinafter enumerated:
18                      CHICAGO STATE UNIVERSITY
19    For planning and beginning to remodel
20      Building K and improving site ................ $  1,100,000
21              EASTERN ILLINOIS UNIVERSITY - CHARLESTON
22    For planning and beginning to renovate
23      and expand the Fine Arts Center ..............    2,000,000
24            GOVERNORS STATE UNIVERSITY - UNIVERSITY PARK
25    For constructing a child development center
26      and an addition to the main building
27      and remodeling Wings E and F .................   13,403,900
28                 ILLINOIS STATE UNIVERSITY - NORMAL
29    For planning and beginning to rehabilitate
30      Schroeder Hall ...............................    1,200,000
31             NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
32    For planning and beginning to remodel
33      Buildings A, B and E .........................      800,000
 
                            -21-            BOB-CDBnew-re2000
 1                NORTHERN ILLINOIS UNIVERSITY - DEKALB
 2    For planning a classroom building and
 3      developing site in Hoffman Estates ...........   $1,314,500
 4             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
 5    For construction, renovation, and all other
 6      costs necessary to replace the East St.
 7      Louis Center, in addition to funds
 8      previously appropriated ......................   10,300,000
 9                  UNIVERSITY CENTER OF LAKE COUNTY
10    For planning and constructing a facility .......   11,000,000
11              UNIVERSITY OF ILLINOIS - CHAMPAIGN/URBANA
12    For planning and beginning to construct
13      a central chiller plant ......................    4,500,000
14                WESTERN ILLINOIS UNIVERSITY - MACOMB
15    For constructing a utility tunnel system, in
16      addition to funds previously appropriated ....    3,707,900
17        Total, Section 16                             $49,326,300

18        Section 17.  The sum of $10,869,200, is appropriated from
19    the Capital Development Fund to the Capital Development Board
20    for the Board of Higher Education for  miscellaneous  capital
21    improvements including construction, capital facilities, cost
22    of planning, supplies, equipment, materials, services and all
23    other  expenses  required to complete the work at the various
24    universities set forth below.  This appropriated amount shall
25    be in addition to any other appropriated amounts which can be
26    expended for these purposes.

27      Chicago State University ..............218,500
28      Eastern Illinois University ...........409,000
29      Governors State University ............131,700
30      Illinois State University .............834,200
31      Northeastern Illinois University ......307,200
32      Northern Illinois University ..........933,600
 
                            -22-            BOB-CDBnew-re2000
 1      Western Illinois University ...........625,200
 2      Southern Illinois University -
 3       Carbondale .........................1,443,800
 4      Southern Illinois University -
 5       Edwardsville .........................544,800
 6      University of Illinois -
 7       Chicago Campus .....................2,378,300
 8      University of Illinois -
 9       Springfield Campus ...................157,200
10      University of Illinois -
11       Champaign/Urbana Campus ............2,885,700

12        Section 18.  The sum of $3,630,800, is appropriated  from
13    the Capital Development Fund to the Capital Development Board
14    for  the  Illinois  Community College Board for miscellaneous
15    capital   improvements   including   construction,    capital
16    facilities, cost of planning, supplies, equipment, materials,
17    services and all other expenses required to complete the work
18    at  the various community colleges.  This appropriated amount
19    shall be in addition to any other appropriated amounts  which
20    can be expended for these purposes.

21        Section  19.  The sum of $347,000,000, or so much thereof
22    as  may  be  necessary,  is  appropriated  from  the   School
23    Construction Fund to the Capital Development Board for school
24    construction  grants pursuant to the School Construction Law,
25    in addition  to  amounts  previously  appropriated  for  such
26    purposes.

27        Section  20.  The  sum of $40,000,000, or so much thereof
28    as  may  be  necessary,  is  appropriated  from  the   School
29    Infrastructure  Fund  to  the  Capital  Development Board for
30    school   construction   grants   pursuant   to   the   School
31    Construction  Law,  in   addition   to   amounts   previously
 
                            -23-            BOB-CDBnew-re2000
 1    appropriated for such purposes.

 2        Section  21.   No  contract  shall  be  entered  into  or
 3    obligation  incurred for any expenditures from appropriations
 4    made in this Article until after  the  purposes  and  amounts
 5    have been approved by the Governor.


 6                              ARTICLE 2

 7        Section  1.  The  following  named  amounts,  or  so much
 8    thereof as may be necessary  and  remain  unexpended  at  the
 9    close  of  business on June 30, 1999, from appropriations and
10    reappropriations heretofore made for such purposes in Article
11    90, Section 1, and  Article  91,  Section  1  of  Public  Act
12    90-585,  are reappropriated from the Capital Development Fund
13    to the  Capital  Development  Board  for  the  Department  of
14    Agriculture for the projects hereinafter enumerated:
15                ANIMAL DISEASE LABORATORY - CENTRALIA
16    (From Article 91, Section 1 of Public Act 90-585)
17    For upgrading the diagnostic laboratory
18      facility, in addition to funds previously
19      appropriated ................................. $    200,000
20    For purchasing and upgrading
21      diagnostic laboratory ........................       63,104
22                      DUQUOIN STATE FAIRGROUNDS
23    (From Article 90, Section 1 of Public Act 90-585)
24    For constructing four livestock barns
25      (Phase II) ...................................      688,000
26    (From Article 91, Section 1 of Public Act 90-585)
27    For planning and beginning the
28      renovation of the Round Houses ...............       27,024
29    For replacement of the grandstand
30      bleachers ....................................      362,798
31    For planning and construction of
 
                            -24-            BOB-CDBnew-re2000
 1      a livestock complex ..........................        6,837
 2    For rehabilitation of the Grandstand ...........       13,403
 3    For upgrading the racetrack, including the
 4      racetrack walls ..............................    2,621,797
 5              ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD
 6    (From Article 90, Section 1 of Public Act 90-585)
 7    For replacing and renovating
 8      racehorse barns (Phase II) ...................      700,000
 9    For replacing and rehabilitating roofs .........      536,000
10    For replacing Series 14 Barns (Phase I) ........    3,192,445
11    (From Article 91, Section 1 of Public Act 90-585)
12    For replacing the HVAC system in the
13      Administration Building ......................      909,249
14    For replacing and/or repairing sidewalks,
15      curbs, gutters and streets, in addition
16      to funds previously appropriated .............       46,448
17    For upgrading the storm/sanitary and water
18      systems, in addition to funds previously
19      appropriated .................................    1,028,567
20    For renovation or replacement of
21      comfort stations, in addition
22      to funds previously appropriated .............    1,273,000
23    For renovation of the comfort stations-
24      Phase I ......................................       74,803
25    For renovation of the Jr. Livestock Building,
26      including the cover over the outdoor
27      arena, roof, HVAC, plumbing and electrical
28      systems and installation of an elevator
29      for accessibility, and for upgrading
30      the sewer system .............................       11,009
31    For planning and beginning the renovation
32      of the show horse barns ......................      192,258
33    For rehabilitation of six racehorse barns-
34      Phase I ......................................      165,046
 
                            -25-            BOB-CDBnew-re2000
 1    For planning and beginning the
 2      rehabilitation of sidewalks, curbs,
 3      gutters and streets ..........................        3,831
 4        Total, Section 1                              $12,115,619

 5        Section  1.1.  The  following  named  amount,  or so much
 6    thereof as may be necessary and  remains  unexpended  at  the
 7    close  of  business  on  June 30, 1999, from an appropriation
 8    heretofore made for such purposes in Article 90,  Section  1a
 9    of  Public  Act  90-585,  is  reappropriated from the General
10    Revenue  Fund  to  the  Capital  Development  Board  for  the
11    Department  of  Agriculture  for  the   project   hereinafter
12    enumerated:
13                             SPRINGFIELD
14    For surveying the electrical system ............ $    195,000
15        Total, Section 1.1                               $195,000

16        Section  2.  The  following  named  amounts,  or  so much
17    thereof as may be necessary  and  remain  unexpended  at  the
18    close  of  business  on  June 30, 1999, from reappropriations
19    heretofore made for such purposes in Article 91, Section 2 of
20    Public  Act  90-585,  are  reappropriated  from  the  Capital
21    Development Fund to the Capital  Development  Board  for  the
22    Courts of Illinois for the projects hereinafter enumerated:
23          SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN
24    (From Article 91, Section 2 of Public Act 90-585)
25    For replacing the roof ......................... $     47,639
26                SPRINGFIELD - SUPREME COURT BUILDING
27    For planning and beginning the
28      library upgrade ..............................      106,800
29    For installation of an elevator and
30      replacement of the exterior lights ...........       28,496
31    For repairing the ramp, drainage system,
32      retaining wall and landscaping ...............       12,786
 
                            -26-            BOB-CDBnew-re2000
 1        Total, Section 2                                 $195,721

 2        Section  2.1.  The  following  named  amount,  or so much
 3    thereof as may be necessary and  remains  unexpended  at  the
 4    close  of  business  on June 30, 1999, from a reappropriation
 5    heretofore made for such purposes in Article 91, Section  2.1
 6    of  Public  Act  90-585,  is  reappropriated from the General
 7    Revenue Fund to the Capital Development Board for the project
 8    hereinafter enumerated:
 9                SUPREME COURT BUILDING - SPRINGFIELD
10    For tuckpointing and cleaning exterior ...........$   209,781

11        Section 3.  The  following  named  amounts,  or  so  much
12    thereof  as  may  be  necessary  and remain unexpended at the
13    close of business on June 30, 1999, from  appropriations  and
14    reappropriations heretofore made for such purposes in Article
15    90,  Section  2,  and  Article  91,  Section  3 of Public Act
16    90-585, are reappropriated from the Capital Development  Fund
17    to  the  Capital  Development  Board  for  the  Department of
18    Central Management  Services  for  the  projects  hereinafter
19    enumerated:
20                   ELGIN REGIONAL OFFICE BUILDING
21    (From Article 91, Section 3 of Public Act 90-585)
22    For replacing the utility system ............... $  2,625,000
23                 ILLINOIS CENTER FOR REHABILITATION
24                 AND EDUCATION (ROOSEVELT) - CHICAGO
25    (From Article 90, Section 2 of Public Act 90-585)
26    For converting and renovating tub rooms ........      425,000
27    (From Article 91, Section 3 of Public Act 90-585)
28    For upgrading the HVAC system ..................    2,120,303
29               ILLINOIS CENTER FOR REHABILITATION AND
30                     EDUCATION (WOOD) - CHICAGO
31    For replacing the skylight system
32      and roof flashing ............................       40,775
 
                            -27-            BOB-CDBnew-re2000
 1    For installing security system and
 2      perimeter lighting ...........................      237,322
 3                 CENTRAL STATE GARAGE - SPRINGFIELD
 4    For replacing the roof and drainage system .....      287,827
 5                 CHICAGO - STATE OF ILLINOIS CENTER
 6    (From Article 90, Section 2 of Public Act 90-585)
 7    For replacing roofing system and
 8      insulation, in addition to funds
 9      previously appropriated ......................      875,335
10    (From Article 91, Section 3 of Public Act 90-585)
11    For completing the installation of elevators, in
12      addition to funds previously appropriated ....      650,760
13    For the correction of design/construction
14      deficiencies, including remedial work in
15      the heating, refrigeration, temperature
16      control and ventilation systems at the
17      State of Illinois Center at Chicago ..........      254,199
18                CHICAGO - STATE OF ILLINOIS BUILDING
19    For planning and beginning the for
20      renovation of the building
21      at 160 North LaSalle .........................       46,367
22                       CHICAGO MEDICAL CENTER
23          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
24    For completing the upgrade of HVAC system, in
25      addition to funds previously appropriated ....       19,933
26    For construction of an independent living
27      apartment building ...........................       65,122
28    For rehabilitation of the air conditioning
29      system, installation of a sprinkler system
30      and improvements for handicapped
31      accessibility ................................       51,764
32                       CHICAGO MEDICAL CENTER
33                        EVELYN EDWARDS CENTER
34    For replacement of the heating system ..........       25,274
 
                            -28-            BOB-CDBnew-re2000
 1                       CHICAGO MEDICAL CENTER
 2                   OFFICE AND LABORATORY FACILITY
 3    For replacement of the electric autoclave
 4      boilers ......................................       13,093
 5                       CHICAGO MEDICAL CENTER
 6                   VISUALLY HANDICAPPED INSTITUTE
 7    For renovation of the loading dock .............       46,058
 8                REGIONAL OFFICE BUILDING - CHAMPAIGN
 9    For replacement of roofing system and
10      rooftop heating and cooling unit .............       44,849
11              SUBURBAN NORTH REGIONAL OFFICE BUILDING -
12                             DES PLAINES
13    (From Article 90, Section 2 of Public Act 90-585)
14    For renovating offices for Environmental
15      Protection Agency, in addition to funds
16      previously appropriated ......................    1,635,000
17    (From Article 91, Section 3 of Public Act 90-585)
18    For renovation of Suburban North Regional
19      Office Building (formerly Maine Township
20      North High School building), in addition
21      to funds previously appropriated for such
22      purpose, Phase III ...........................    5,236,999
23    For renovation and expansion of garage .........      353,586
24    For designing and beginning the
25      renovation, phase III ........................      269,338
26    For the purchase and renovation of the high
27      school .......................................       17,210
28                         OTTAWA STATE GARAGE
29    (From Article 90, Section 2 of Public Act 90-585)
30    For replacing state garage .....................    1,400,000
31    (From Article 91, Section 3 of Public Act 90-585)
32                    SPRINGFIELD - CAPITOL COMPLEX
33    For construction of a day care center, in
34      addition to funds previously appropriated
 
                            -29-            BOB-CDBnew-re2000
 1      for such purpose .............................      950,000
 2    For construction of a day care center in the
 3      Capitol Complex in Springfield ...............      244,348
 4                   COMPUTER FACILITY - SPRINGFIELD
 5    For replacement of the halon fire
 6      suppression system ...........................      813,330
 7                        ASH STREET COMPLEX -
 8                   MUSEUM AND COLLECTION CENTER -
 9                             SPRINGFIELD
10    For replacement of the roofing system ..........      667,928
11                   MARION REGIONAL OFFICE BUILDING
12    (From Article 90, Section 2 of Public Act 90-585)
13    For replacing HVAC system and interior
14      lighting .....................................    1,600,000
15    (From Article 91, Section 3 of Public Act 90-585)
16    For construction of a Regional Office
17      Building Addition ............................    1,920,642
18        Total, Section 3                              $22,937,362

19        Section  3.1.  The  following  named  amounts, or so much
20    thereof as may be necessary  and  remain  unexpended  at  the
21    close  of  business on June 30, 1999, from appropriations and
22    reappropriations heretofore made for such purposes in Article
23    90, Section 2a, and Article 91, Section  3.1  of  Public  Act
24    90-585,  are  reappropriated from the General Revenue Fund to
25    the Capital Development Board for the Department  of  Central
26    Management Services for the projects hereinafter enumerated:
27                 JAMES R. THOMPSON CENTER - CHICAGO
28    (From Article 91, Section 3.1 of Public Act 90-585)
29    For restoring the exterior plaza ............... $    349,010
30                  EAST ST. LOUIS - REGIONAL OFFICE
31    For replacing windows ..........................       59,308
32           CHICAGO MEDICAL CENTER - OFFICE AND LABORATORY
33    (From Article 90, Section 2a of Public Act 90-585)
 
                            -30-            BOB-CDBnew-re2000
 1    For rehabilitating exterior ....................      390,000
 2                       CHICAGO MEDICAL CENTER
 3          ILLINOIS CENTER FOR REHABILITATION AND EDUCATION
 4    (From Article 91, Section 3.1 of Public Act 90-585)
 5    For rehabilitation for fire safety and
 6      accessibility ................................       11,086
 7        Total, Section 3.1                               $809,404

 8        Section  4.  The  following  named  amounts,  or  so much
 9    thereof as may be necessary  and  remain  unexpended  at  the
10    close  of  business on June 30, 1999, from appropriations and
11    reappropriations heretofore made for such purposes in Article
12    90, Section 7, and  Article  91,  Section  4  of  Public  Act
13    90-585,  are reappropriated from the Capital Development Fund
14    to the  Capital  Development  Board  for  the  Department  of
15    Natural Resources for the projects hereinafter enumerated:
16                 BABE WOODYARD STATE NATURAL AREA -
17                          VERMILION COUNTY
18    (From Article 90, Section 7 of Public Act 90-585)
19    For developing the site and associated
20      land acquisition ............................. $  3,300,000
21                BEALL WOODS STATE CONSERVATION AREA -
22                            WABASH COUNTY
23    For replacing a visitors center ................      488,000
24               CAVE-IN-ROCK STATE PARK - HARDIN COUNTY
25    For constructing a shower building
26      and upgrading the campground .................      650,000
27             CHAIN O' LAKES STATE PARK - MCHENRY COUNTY
28    (From Article 91, Section 4 of Public Act 90-585)
29    For construction of a concession building
30      and upgrading the horse concession, in
31      addition to funds previously appropriated ....      477,590
32    For planning and beginning the replacement
33      of concession buildings ......................       17,092
 
                            -31-            BOB-CDBnew-re2000
 1               EAGLE CREEK STATE PARK - SHELBY COUNTY
 2    For rehabilitation of the sewage treatment
 3      system, in addition to funds previously
 4      appropriated .................................      217,750
 5    For planning and rehabilitation of the
 6      sewage treatment system ......................       51,261
 7               FORT MASSAC STATE PARK - MASSAC COUNTY
 8    For planning and beginning the
 9      reconstruction of the fort ...................      121,340
10                      FERNE CLYFFE STATE PARK -
11                           JOHNSON COUNTY
12    (From Article 90, Section 7 of Public Act 90-585)
13    For rehabilitating shower building .............      215,000
14                 FOX RIDGE STATE PARK - COLES COUNTY
15    For upgrading campground .......................      340,000
16    (From Article 91, Section 4 of Public Act 90-585)
17          HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA
18    For stabilizing the feeder canal bank ..........      398,085
19    For replacement and rehabilitation
20      of arch culverts and canal ...................      542,636
21         HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY
22    For dam rehabilitation and the State's share
23      to implement the ecological restoration
24      plan in cooperation with the U.S.
25      Army Corps of Engineers, and
26      land acquisition .............................      858,655
27    For construction of a pole building
28      and hunter check station .....................       83,816
29    (From Article 90, Section 7 of Public Act 90-585)
30    For replacing the hunter check station .........      150,000
31                 ILLINOIS-MICHIGAN CANAL STATE TRAIL
32    (From Article 91, Section 4 of Public Act 90-0585)
33    For stabilization of the aqueduct ..............      438,393
34               ILLINOIS BEACH STATE PARK - LAKE COUNTY
 
                            -32-            BOB-CDBnew-re2000
 1    (From Article 90, Section 7 of Public Act 90-0585)
 2    For constructing an office building ............      650,000
 3    For replacing sanitary sewer lines .............      505,000
 4            JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY
 5    (From Article 91, Section 4 of Public Act 90-585)
 6    For rehabilitation of the concession
 7      building, in addition to funds
 8      previously appropriated ......................      140,000
 9    For rehabilitation of the concession building ..       87,975
10                KANKAKEE STATE PARK - KANKAKEE COUNTY
11    For planning and constructing a
12      sanitary sewer system ........................      182,700
13               KICKAPOO STATE PARK - VERMILION COUNTY
14    For construction of a sewage treatment
15      plant, in addition to funds
16      previously appropriated ......................      110,575
17                LINCOLN TRAIL STATE RECREATION AREA -
18                            CLARK COUNTY
19    (From Article 90, Section 7 of Public Act 90-585)
20    For rehabilitating the day use area
21      and site .....................................    1,281,000
22            MERMET LAKE CONSERVATION AREA - MASSAC COUNTY
23    (From Article 91, Section 4 of Public Act 90-585)
24    For rehabilitating the levee system ............       15,928
25              MORAINE HILLS STATE PARK - MCHENRY COUNTY
26    For renovation of the trail ....................      322,755
27    For replacement of restrooms and upgrading
28      the water system .............................      725,811
29               MORAINE VIEW STATE PARK - MCLEAN COUNTY
30    For construction of a sewage treatment
31      system and plant .............................    1,553,941
32                  NORTH POINT MARINA - LAKE COUNTY
33    For construction of a breakwater structure .....    1,048,259
34    For modifying the marina's docking system ......    1,527,922
 
                            -33-            BOB-CDBnew-re2000
 1                 NAUVOO STATE PARK - HANCOCK COUNTY
 2    (From Article 90, Section 7 of Public Act 90-585)
 3    For replacing water distribution
 4      system .......................................      241,000
 5              PERE MARQUETTE STATE PARK - JERSEY COUNTY
 6    (From Article 90, Section 7 of Public Act 90-585)
 7    For replacing the lodge HVAC condensing unit, in
 8      addition to funds previously appropriated ....      327,344
 9    (From Article 91, Section 4 of Public Act 90-585)
10    For renovation of two buildings and
11      replacement of a storage building ............      132,119
12               RAMSEY LAKE STATE PARK - FAYETTE COUNTY
13    (From Article 90, Section 7 of Public Act 90-585)
14    For rehabilitating shower building .............      188,000
15               RED HILLS STATE PARK - LAWRENCE COUNTY
16    (From Article 91, Section 4 of Public Act 90-585)
17    For replacing the sewage treatment system,
18      in addition to funds previously appropriated .      510,000
19    For rehabilitating the dam .....................       90,000
20                    SANGANOIS CONSERVATION AREA -
21                  CASS, MASON AND SCHUYLER COUNTIES
22    For rehabilitating the levee system ............      315,000
23                             SPRINGFIELD
24    (From Article 90, Section 7 of Public Act 90-585)
25    For constructing an office building and
26      interpretive center ..........................   29,795,641
27              STARVED ROCK STATE PARK - LASALLE COUNTY
28    For rehabilitating the sewer system ............    1,055,000
29    For rehabilitating trails, in addition
30      to funds previously appropriated .............      500,000
31    For upgrading the HVAC system ..................      445,000
32    (From Article 91, Section 4 of Public Act 90-585)
33    For construction of a Visitors'
34      Center, in addition to funds
 
                            -34-            BOB-CDBnew-re2000
 1      previously appropriated ......................      365,000
 2    For rehabilitation of trails, in addition
 3      to funds previously appropriated .............      402,777
 4    For reconstruction of the seawall, in
 5      addition to funds previously
 6      appropriated .................................       58,193
 7    For rehabilitation of the sewer
 8      system - Phase I .............................      121,614
 9    For planning and beginning the
10      reconstruction of the seawall ................       39,827
11             TRI-COUNTY PARK - COOK/KANE/DUPAGE COUNTIES
12    For planning and beginning
13      construction of a park .......................       78,148
14                 VOLO BOG NATURAL AREA - LAKE COUNTY
15    For rehabilitation of the visitors' center .....        9,425
16           WAYNE FITZGERRELL STATE PARK - FRANKLIN COUNTY
17    For rehabilitation of the sewage
18      treatment plant ..............................      164,072
19    For planning and construction of a marina,
20      installation of additional sewage lines,
21      recreational development and overnight
22      accommodations to be located on Rend
23      Lake .........................................       14,599
24             TUNNEL HILL-CACHE RIVER STATE NATURAL AREA
25    (From Article 90, Section 7 of Public Act 90-585)
26    For constructing a visitor center and
27      purchasing land ..............................    4,000,000
28      NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER
29                     (FORMERLY BURNHAM HOSPITAL)
30    (From Article 91, Section 4 of Public Act 90-585)
31    For construction of a Natural History
32      Research Center for the space needs of
33      the Illinois Natural History Survey on
34      the campus of the University of Illinois......    6,000,000
 
                            -35-            BOB-CDBnew-re2000
 1    For planning and construction of the
 2      Natural History Research Center
 3      for the space needs of the
 4      Illinois Natural History Survey
 5      on the campus of the University
 6      of Illinois in Champaign .....................    3,074,328
 7    For planning and construction of
 8      the Natural History Research Center
 9      for the space needs of the Illinois
10        Natural History Survey on
11      the campus of the University of
12      Illinois in Champaign ........................       41,834
13                 NATURAL HISTORY SURVEY - CHAMPAIGN
14    For upgrading laboratories and installation
15      of storage units .............................       96,562
16                   STATE WATER SURVEY - CHAMPAIGN
17    (From Article 90, Section 7 of Public Act 90-585)
18    For upgrading and replacing the mechanical
19      system, in addition to funds
20      previously appropriated ......................    2,200,000
21    (From Article 91, Section 4 of Public Act 90-585)
22    For renovation of office and
23      laboratory buildings .........................      217,814
24    For replacement and upgrade of the
25      exterior lighting system .....................       34,495
26    For planning and replacement of vehicle
27      storage/shop facilities ......................       21,150
28                     DICKSON MOUNDS - LEWISTOWN
29    For renovating Canton Liverpool
30      Toll Booth ...................................       68,100
31      STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD
32    For the completion of site improvements ........      400,891
33                     STATE MUSEUM - SPRINGFIELD
34    (From Article 90, Section 7 of Public Act 90-585)
 
                            -36-            BOB-CDBnew-re2000
 1    For renovating or replacing exhibits, in
 2      addition to funds previously appropriated ....    5,500,000
 3    For planning and beginning replacement
 4      of the state museum ..........................      800,000
 5    (From Article 91, Section 4 of Public Act 90-585)
 6    For planning and replacement of the main
 7      museum exhibits, in addition to funds
 8      previously appropriated ......................      539,400
 9    For planning renovation of main museum
10      exhibits and for renovation of basement
11      galleries ....................................       32,611
12                              STATEWIDE
13    (From Article 90, Section 7 of Public Act 90-585)
14    For replacing roofing systems at the
15      following locations at the approximate
16      costs set forth below ........................      370,000
17        Lincoln Trail Homestead State
18         Park, Four buildings ............... 38,000
19        Silver Springs State Park, Three
20         Buildings ......................... 278,000
21        Weldon Springs State Park, Nine
22         Buildings .......................... 54,000
23    For constructing vault toilets at the following
24      locations at the approximate costs set forth
25      below ........................................      852,000
26        Cave-In-Rock State Park ............ 192,000
27        Frank Holten State Park ............ 285,000
28        Golconda/Rauchfuss Hill ............. 79,000
29        I&M Canal - Gebhard Woods State
30         Park ............................... 35,000
31        Prophetstown State Park ............ 155,000
32        William W. Powers State Park ....... 106,000
33    For constructing hazardous material storage
34      buildings ....................................      275,000
 
                            -37-            BOB-CDBnew-re2000
 1    (From Article 91, Section 4 of Public Act 90-585)
 2    For replacing concession buildings and
 3      upgrading support facilities at the following
 4      locations at the approximate costs set
 5      forth below: .................................    2,840,443
 6       Kickapoo State Park ..................527,425
 7       Rock Cut State Park ..................512,168
 8       Stephen A. Forbes State Park .......1,800,850
 9    For constructing vault toilets at the
10      following locations at the approximate
11      cost set forth below: ........................    1,396,054
12       Apple River Canyon State Park ........285,000
13       Des Plaines Conservation Area ........240,000
14       Kankakee River State Park ............364,054
15       Lake Le-Aqua-Na State Park ...........231,000
16       Marshall County Conservation Area .....37,000
17       Morrison-Rockwood State Park .........202,000
18       Rice Lake Conservation Area ...........37,000
19    For replacing roofing systems and structural
20      repairs at the following locations at the
21      approximate costs set forth below: ...........      392,845
22       Mine Rescue Station, One building .....27,000
23       Castle Rock State Park,
24        One building .........................36,845
25       Dixon Springs State Park,
26        Three buildings ......................40,000
27       Cave-In-Rock State Park,
28        One building .........................25,000
29       Ferne Clyffe State Park,
30        One building .........................25,000
31       Hamilton County Conservation
32        Area, One building ...................29,000
33       Lake Murphysboro State Park
34        Two buildings ........................50,000
 
                            -38-            BOB-CDBnew-re2000
 1       Red Hills State Park, Two
 2        buildings ............................30,000
 3       Fox Ridge State Park, Six
 4        buildings ............................65,000
 5       Shelbyville Fish and Wildlife
 6        Area, Two buildings ..................40,000
 7       Newton Lake Fish and Wildlife
 8        Area, One building ...................25,000
 9    For repair or replacement of roofs and
10      parapet walls and reconstruction of
11      chimneys at the following locations
12      at the approximate costs set forth below .....      520,556
13       Geological Survey - Applied Lab ......189,026
14       Water Survey - Eight Buildings .......100,000
15       Natural History Survey - Natural
16        Resources Studies Annex ..............67,000
17       Geological Survey - Natural
18        Resources Building ...................10,000
19       Water Survey - Parapet walls at
20        Buildings No. 4, 5 and 6 .............10,000
21       Dickson Mounds - Exterior restroom
22        and picnic shelter ...................14,530
23       Jake Wolf Fish Hatchery -
24        one building ........................130,000
25    For land acquisition ...........................      576,472
26    For maintaining the lodge and concession
27      facilities ...................................       68,994
28    For repairing and maintaining facilities .......       42,278
29    For construction of hazardous material
30      storage buildings ............................      227,024
31    For abating hazards caused by the presence
32      of asbestos-containing materials .............       51,622
33    For planning, construction, reconstruction,
34      land acquisition and related costs,
 
                            -39-            BOB-CDBnew-re2000
 1      utilities, site improvements, and all other
 2      expenses necessary for various capital
 3      improvements at parks, conservation areas,
 4      and other facilities under the jurisdiction
 5      of the Department of Natural Resources .......    7,368,260
 6    For construction and development of
 7      multiple use facilities on lands owned
 8      or managed by the Department of
 9      Natural Resources, including all costs
10      for supplies, materials, labor, and
11      services required for the completion
12      of the following projects at the
13      approximate costs set forth below: ...........        8,913
14       For Volo Bog Natural Area
15        for replacement of a roof
16        and rehabilitation of the
17        emergency exit stairs at the
18        visitor center ........................5,144
19       For Volo Bog Natural Area for
20        the upgrading of the
21        Interpretive Center, including
22        the heating, ventilation, and
23        air conditioning system ...............3,769 ____________
24        Total, Section 4                              $89,371,889

25        Section  4.1.  The  following  named  amounts, or so much
26    thereof  as  may  be  necessary,  from   appropriations   and
27    reappropriations heretofore made for such purposes in Article
28    90,  Section  7a,  and  Article 91, Section 4.1 of Public Act
29    90-585, are reappropriated from the General Revenue  Fund  to
30    the  Capital  Development Board for the Department of Natural
31    Resources for the projects hereinafter enumerated:
32                   APPLE RIVER CANYON STATE PARK -
33                          JO DAVIESS COUNTY
 
                            -40-            BOB-CDBnew-re2000
 1    (From Article 90, Section 7a of Public Act 90-585)
 2    For stabilizing the river bank ................. $    150,000
 3          CHAIN O'LAKES STATE PARK - LAKE/MCHENRY COUNTIES
 4    (From Article 91, Section 4.1 of Public Act 90-585)
 5    For replacement of windows and floor tile
 6      in Region 2 headquarters .....................       80,585
 7                    GOLCONDA MARINA - POPE COUNTY
 8    (From Article 90, Section 7a of Public Act 90-585)
 9    For constructing a sewage lift station .........       50,000
10               ILLINOIS BEACH STATE PARK - LAKE COUNTY
11    For stabilizing the shoreline ..................      400,000
12    (From Article 91, Section 4.1 of Public Act 90-585)
13    For stabilizing the shoreline ..................       65,477
14    For stabilization of the shoreline .............        6,052
15               SPRING GROVE HATCHERY - MCHENRY COUNTY
16    For upgrading the septic system ................       30,000
17              STARVED ROCK STATE PARK - LASALLE COUNTY
18    (From Article 90, Section 7a of Public Act 90-585)
19    For constructing erosion controls ..............      300,000
20                              STATEWIDE
21    For maintaining lodge and concession
22      facilities ...................................      331,000
23    For rehabilitating or replacing playground
24      equipment ....................................      300,000
25    (From Article 91, Section 4.1 of Public Act 90-585)
26    For maintaining lodge and concession
27      facilities at various DNR locations ..........      135,508
28    For rehabilitating or replacing
29      playground equipment, in addition
30      to funds previously appropriated .............      300,000
31    For maintenance of lodge and
32      concession facilities ........................       63,907
33    For rehabilitation or replacement
34      of playground equipment ......................      158,506
 
                            -41-            BOB-CDBnew-re2000
 1    For rehabilitation of trail systems ............       96,232
 2    For rehabilitation and replacement of
 3      playground equipment .........................       96,137
 4        Total, Section 4.1                             $2,563,404

 5        Section 5.  The  following  named  amounts,  or  so  much
 6    thereof  as  may  be  necessary  and remain unexpended at the
 7    close of business on June 30, 1999, from  appropriations  and
 8    reappropriations heretofore made for such purposes in Article
 9    90,  Section  3,  and  Article  91,  Section  5 of Public Act
10    90-585, are reappropriated from the Capital Development  Fund
11    to  the  Capital  Development  Board  for  the  Department of
12    Corrections for the projects hereinafter enumerated:
13    (From Article 91, Section 5 of Public Act 90-585)
14                    DANVILLE CORRECTIONAL CENTER
15    For renovation of interior and
16      exterior walls, in addition to
17      funds previously appropriated ................ $  1,194,152
18    For correction of construction defects .........      249,801
19    For planning, utilities, site improvements,
20      and other expenses necessary for the
21      construction of a correctional facility ......       32,511
22                 DECATUR WOMEN'S CORRECTIONAL CENTER
23    For the planning and conversion of
24      Meyer Mental Health Center into a
25      correctional facility ........................   12,136,420
26                      DIXON CORRECTIONAL CENTER
27    For renovation of the groundwater storage
28      tank and abatement of crawlspace
29      pipes in Buildings 26, 27 and 29 .............      585,888
30    For upgrading the steam distribution system
31      and replacement of the boiler system
32      including asbestos abatement .................       87,937
33                     DWIGHT CORRECTIONAL CENTER
 
                            -42-            BOB-CDBnew-re2000
 1    For upgrading water and sewer systems ..........      200,988
 2    For renovating buildings, in addition
 3      funds previously appropriated ................      596,241
 4    For constructing a gatehouse and
 5      sally port and upgrading the
 6      security system ..............................    2,301,455
 7    For completion of medical unit,
 8      in addition to funds previously
 9      appropriated .................................      369,489
10    For planning the expansion of the
11      Education Building and constructing
12      a dietary and a warehouse ....................    4,199,118
13    For renovation of buildings ....................       68,161
14                   EAST MOLINE CORRECTIONAL CENTER
15    For upgrading the electrical
16      system .......................................    2,142,024
17    For upgrading locking system, in addition
18      to funds previously appropriated .............       44,965
19                        HANNA CITY WORK CAMP
20    (From Article 90, Section 3 of Public Act 90-585)
21    For upgrading electrical system ................      600,000
22                HILL CORRECTIONAL CENTER - GALESBURG
23    For upgrading and expanding freezer
24      capacity, in addition to funds
25      previously appropriated ......................      950,000
26    For replacing domestic water lines .............      410,000
27                 ILLINOIS YOUTH CENTER - ST. CHARLES
28    For planning and beginning the upgrade
29      of existing facility .........................      600,000
30    (From Article 91, Section 5 of Public Act 90-585)
31                 ILLINOIS YOUTH CENTER - HARRISBURG
32    For upgrading the domestic water system ........      619,149
33    For upgrading the HVAC system ..................      494,932
34                   ILLINOIS YOUTH CENTER - JOLIET
 
                            -43-            BOB-CDBnew-re2000
 1    For planning, site improvements,
 2      utility upgrade, equipment and all
 3      costs necessary to construct a
 4      housing unit and dietary facility ............      352,587
 5    For completing the upgrade of electrical
 6      systems, in addition to funds
 7      previously appropriated ......................      206,511
 8    For upgrading the fire alarm system ............      191,768
 9    For completing the upgrade of the utilities, in
10      addition to funds previously appropriated ....       40,647
11               ILLINOIS YOUTH CENTER - PERE MARQUETTE
12    For upgrading the electrical
13      distribution system ..........................       35,281
14                 ILLINOIS YOUTH CENTER - ST. CHARLES
15    For completing the upgrade of the water
16      distribution system, in addition to funds
17      previously appropriated ......................       71,551
18                 ILLINOIS YOUTH CENTER - VALLEY VIEW
19    For upgrading dormitory restrooms
20      and fixtures, in addition to
21      funds previously appropriated ................      154,070
22    For planning and beginning the
23      upgrade of dormitory restrooms
24      and fixtures .................................       54,213
25                     JOLIET CORRECTIONAL CENTER
26    For correcting erosion and
27      stabilizing the masonry wall .................    1,782,600
28    For upgrading the power house and
29      installation of a generator ..................      382,400
30    For completing the west cellhouse renovation,
31      including asbestos abatement, in addition
32      to funds previously appropriated .............      538,762
33                     LINCOLN CORRECTIONAL CENTER
34    For upgrading the water softener system ........       93,258
 
                            -44-            BOB-CDBnew-re2000
 1    For upgrading the locking systems and doors ....       42,374
 2    For upgrading the water supply .................      112,077
 3    For renovation of the Dietary, construction
 4      of a cooler addition and installation
 5      of blast chillers ............................      487,520
 6                      LOGAN CORRECTIONAL CENTER
 7    (From Article 90, Section 3 of Public Act 90-585)
 8    For planning and beginning replacement
 9      of the Dietary and Medical Buildings .........      400,000
10    (From Article 91, Section 5 of Public Act 90-585)
11    For renovation of sewer system .................      826,383
12    For renovation of the water tower ..............      124,144
13    For rehabilitation of the roof ventilation
14      systems ......................................       77,948
15                MENARD CORRECTIONAL CENTER - CHESTER
16    (From Article 90, Section 3 of Public Act 90-585)
17    For completing the upgrade of roads and
18      sidewalks, in addition to funds
19      previously appropriated ......................      300,000
20    For completing upgrade of North Cellhouse
21      plumbing system, in addition to funds
22      previously appropriated ......................      400,000
23    For planning and beginning upgrade
24      of the storm tunnel ..........................      100,000
25    For replacing toilets and waste lines
26      at E/W Cellhouse .............................    2,600,000
27    (From Article 91, Section 5 of Public Act 90-585)
28    For renovation or replacement of the
29      Old Hospital Building, in addition to
30      funds previously appropriated ................    4,700,000
31    For replacing and installing
32      water storage tank ...........................    1,200,000
33    For replacing Boiler #2, in addition
34      to funds previously appropriated .............      800,000
 
                            -45-            BOB-CDBnew-re2000
 1    For converting a room into a shower room .......      366,412
 2    For upgrading roads and sidewalks ..............       40,207
 3    For upgrading the coal handling system
 4      and repair or replace boiler system ..........      108,665
 5    For conversion of the Maintenance Building
 6      to an inmate dormitory .......................      106,020
 7    For conversion of the Administration
 8      Building basement to a courtroom and
 9      attorney offices .............................       46,022
10    For upgrading the steam and water distribution
11      systems, in addition to funds previously
12      appropriated .................................      729,410
13    For upgrading the steam and water distribution
14      systems and replacement of the MSU
15      "C" Building .................................       67,624
16    For replacement of the chimney stack and
17      boilers, in addition to funds previously
18      appropriated .................................       87,501
19    For replacement of hot water heaters and
20      deairing tanks ...............................      110,000
21    For planning and beginning the
22      renovation of the old
23      hospital building ............................      175,135
24    For renovation of elements of the power
25      plants, including the main generator .........       22,982
26    For planning and beginning the for
27      renovation of the Administration Building ....       15,604
28                     PONTIAC CORRECTIONAL CENTER
29    (From Article 90, Section 3 of Public Act 90-585)
30    For completing replacement of hot water
31      lines, in addition to funds previously
32      appropriated .................................    1,100,000
33    (From Article 91, Section 5 of Public Act 90-585)
34    For renovation of main sally port ..............      279,377
 
                            -46-            BOB-CDBnew-re2000
 1               STATEVILLE CORRECTIONAL CENTER - JOLIET
 2    (From Article 90, Section 3 of Public Act 90-585)
 3    For replacing power plant ......................   10,000,000
 4    For planning, design, construction,
 5      equipment and all other necessary costs
 6      for an Adult Reception and Classification
 7      Center .......................................   44,000,000
 8    For upgrading storm drainage and
 9      wastewater systems ...........................    1,200,000
10    For upgrading electrical system and elevator
11      and installing HVAC system ...................    1,200,000
12    (From Article 91, Section 5 of Public Act 90-585)
13    For replacement of the MSU .....................    6,456,800
14    For upgrading the doors, locks and hardware
15      in B Cellhouse ...............................       35,682
16             SOUTHWESTERN ILLINOIS CORRECTIONAL FACILITY
17    For completing the conversion of existing
18      buildings into a minimum security
19      correctional facility, in addition to
20      funds previously appropriated ................       10,601
21                    VANDALIA CORRECTIONAL CENTER
22    For renovation of dormitory shower rooms .......      423,560
23                     VIENNA CORRECTIONAL CENTER
24    (From Article 90, Section 3 of Public Act 90-585)
25    For completing upgrade of the steam
26      distribution system, in addition to
27      funds previously appropriated ................      940,000
28    For upgrading electrical system and
29      installing emergency generator ...............    1,200,000
30    (From Article 91, Section 5 of Public Act 90-585)
31    For renovating the kitchen .....................    1,942,465
32    For upgrading the steam distribution system
33      and renovation of Powerhouse, in addition
34      to funds previously appropriated .............    2,465,042
 
                            -47-            BOB-CDBnew-re2000
 1    For installation of security fencing ...........      173,201
 2    For upgrading air conditioning system
 3      and replacement of cooling tower .............    1,100,000
 4    For upgrading the electrical, plumbing and
 5      HVAC systems in four buildings ...............      802,701
 6    For completing the rehabilitation of duct
 7      systems and walls, in addition to funds
 8      previously appropriated ......................      273,518
 9    For planning and beginning the upgrade
10      of the steam distribution system .............      148,888
11    For planning and beginning the replacement
12      of the absorption chiller and cooling tower ..       40,848
13                              STATEWIDE
14    (From Article 90, Section 3 of Public Act 90-585)
15    For planning, design, construction,
16      equipment and all other necessary costs
17      for a juvenile facility ......................   20,000,000
18    For replacing locks and doors at the
19      following locations at the approximate
20      cost set forth below .........................    1,090,000
21        Dwight Correctional Center ......... 275,000
22        Illinois River Correctional
23         Center - Canton ................... 150,000
24        IYC - Joliet ....................... 500,000
25        IYC - Pere Marquette - Grafton ..... 165,000
26    For replacing roofing systems at the following
27      locations at the approximate cost set forth
28      below ........................................    2,842,212
29        Dixon Correctional Center,
30         four buildings .................... 894,212
31        IYC - St. Charles, two buildings ... 440,000
32        Joliet Correctional Center,
33         six buildings ..................... 868,000
34        Logan Correctional Center - Lincoln
 
                            -48-            BOB-CDBnew-re2000
 1         three buildings ................... 115,000
 2        Menard Correctional Center - Chester
 3         six buildings ..................... 270,000
 4        Pontiac Correctional Center,
 5         one building ...................... 255,000
 6    For inspecting and upgrading water towers
 7      at the following locations at the approximate
 8      costs set forth below ........................    3,590,000
 9        Dixon Correctional Center,
10         Upgrade Water Tower ............. 1,000,000
11        Graham Correctional Center - Hillsboro
12         Upgrade Water Tower  .............. 215,000
13        Joliet Correctional Center,
14         Upgrade Water Tower ............... 150,000
15        Logan Correctional Center - Lincoln
16         Complete Water Tower Upgrade  ..... 600,000
17        Menard Correctional Center - Chester
18         Upgrade Water Tower  .............. 325,000
19        Stateville Correctional Center - Joliet
20         Upgrade Water Tower  ............ 1,000,000
21        Statewide, Inspect and Upgrade
22         Water Towers ...................... 300,000
23    For upgrading fire and safety systems at
24      the following locations at the approximate
25      costs set forth below, in addition to
26      funds previously appropriated ................    3,370,000
27        Menard Correctional Center -
28         Chester ......................... 2,200,000
29        Sheridan Correctional Center ....... 320,000
30        Vienna Correctional Center ......... 850,000
31    (From Article 91, Section 5 of Public Act 90-585)
32    For replacing roofing systems at the
33      following locations at the approximate
34      costs set forth below: .......................    1,635,772
 
                            -49-            BOB-CDBnew-re2000
 1       Big Muddy Correctional Center, Ina
 2        Two buildings ....................... 98,772
 3       East Moline Correctional Center,
 4        Three buildings .................... 398,000
 5       Graham Correctional Center, Hillsboro
 6        Seven buildings .................... 600,000
 7       Sheridan Correctional Center, LaSalle
 8        Three buildings .................... 379,000
 9       Stateville Correctional Center, Joliet
10        One building ....................... 160,000
11    For replacing doors and locks at the
12      following locations at the approximate
13      costs set forth below: .......................    2,433,795
14       IYC - St. Charles ................... 546,795
15       Lincoln Correctional Center ......... 300,000
16       Jacksonville Correctional Center .... 664,000
17       Sheridan Correctional Center ........ 923,000
18    For upgrading fire safety systems at the
19      following locations at the approximate
20      costs set forth below, in addition to
21      funds previously appropriated: ...............    6,469,442
22       Menard Correctional Center ........ 1,969,442
23       Pontiac Correctional Center ....... 3,000,000
24       Stateville Correctional Center .... 1,500,000
25    For upgrading water and wastewater
26      systems at the following locations
27      at the approximate costs set forth below: ....    4,218,208
28       Big Muddy Correctional Center
29        for installing mechanical
30        bar screen ......................... 300,000
31       Centralia Correctional Center
32        for upgrading water
33        treatment plant .................. 1,436,208
34       East Moline Correctional Center
 
                            -50-            BOB-CDBnew-re2000
 1        for upgrading sewer system ......... 565,000
 2       Ed Jenison Work Camp (Paris)
 3        for installing mechanical
 4        bar screen ......................... 120,000
 5       IYC - Harrisburg for upgrading
 6        water distribution system .......... 500,000
 7       Kankakee MSU for constructing
 8        well #2 ............................ 300,000
 9       IYC - St. Charles for upgrading
10        sewage/storm system ................ 767,000
11       IYC - Valley View for installing
12        mechanical bar screen .............. 230,000
13    For correction of deficiencies in
14      water systems at three correctional
15      facilities ...................................      100,000
16    For replacement of locks, windows and
17      doors at the following locations
18      as set forth below: ..........................    3,085,103
19       Dwight ............................... 34,000
20       IYC Harrisburg ...................... 849,000
21       IYC Joliet .......................... 310,000
22       Menard .............................. 990,000
23       Pontiac .............................. 78,103
24       IYC Valley View ..................... 460,000
25       Vienna .............................. 364,000
26    For planning, design, construction,
27      equipment and other necessary costs
28      for a Maximum Security Correctional
29      Center, in addition to funds previously
30      appropriated .................................   95,000,000
31    For planning, design, construction,
32      equipment and other necessary costs
33      for a Correctional Facility for
34      juveniles ....................................   42,577,305
 
                            -51-            BOB-CDBnew-re2000
 1    For planning, design, construction,
 2      equipment and other necessary costs
 3      for a Medium Security Correctional
 4      Facility .....................................   66,998,938
 5    For planning, construction, utilities, site
 6      improvements, equipment and other expenses
 7      necessary for the construction of a close
 8      supervision super maximum security prison ....    1,113,373
 9    For upgrading for fire safety at five
10      locations and replacing boilers...............      206,369
11    For correcting defects in the food preparation
12      areas, including roofs .......................      125,979
13    For planning, construction, utilities,
14      site improvements, and other expenses
15      necessary for the construction of two
16      minimum and one medium security
17      prisons ......................................       29,224
18    For renovation and improvements at various
19      correctional facilities at the approximate
20      costs set forth below: .......................      117,693
21       Roof Replacement ......................70,000
22       Road Repavement .......................47,693
23    For replacement of cell doors and locks
24      and rehabilitation of locking systems at
25      the following locations at the approximate
26      costs set forth below: .......................      118,902
27       Kankakee MSU
28        For rehabilitation of locking
29        systems .............................118,902
30    For renovation of roads and parking lots
31      and replacement of boilers at the
32      following locations at the approximate
33      costs set forth below ........................       42,785
34       Dixon Correctional Center
 
                            -52-            BOB-CDBnew-re2000
 1        For roads and parking .................6,000
 2       Logan Correctional Center
 3        For roads and parking .................5,656
 4       Menard Correctional Center
 5        For roads and parking and
 6         replacement of boilers...............22,929
 7       Vienna Correctional Center
 8        For roads .............................8,200
 9    For replacement of roofs at various Department of
10      Corrections locations ........................      269,592
11    For roof replacement at the following
12      locations at the approximate costs
13      set forth below: .............................      321,681
14       Graham Correctional Center
15        Five buildings ........................6,268
16       Graham Correctional Center
17        Thirty-two buildings ..................8,439
18       Menard Correctional Center
19        Warehouse Building ...................55,093
20       Menard Correctional Center
21        Five buildings ......................153,394
22       Pontiac Correctional Center
23        Eight buildings .......................6,221
24       Illinois Youth Center-St. Charles
25        Three buildings ......................29,830
26       Sheridan Correctional Center
27        Six buildings ........................15,482
28       Stateville Correctional Center
29        Seven buildings ......................23,000
30       Ill Youth Center-Valley View
31        Administration Building and
32         Kitchen Addition ....................23,954 ____________
33        Total, Section 5                             $375,381,963
 
                            -53-            BOB-CDBnew-re2000
 1        Section 5.1.  The following named  amounts,  or  so  much
 2    thereof  as  may  be  necessary  and remain unexpended at the
 3    close of business on June  30,  1999,  from  reappropriations
 4    heretofore  made for such purposes in Article 91, Section 5.1
 5    of Public Act 90-585, are  reappropriated  from  the  General
 6    Revenue  Fund  to  the  Capital  Development  Board  for  the
 7    Department   of  Corrections  for  the  projects  hereinafter
 8    enumerated:
 9    (From Article 91, Section 5.1 of Public Act 90-585)
10                MENARD CORRECTIONAL CENTER - CHESTER
11    For stabilizing dams ...........................       95,600
12    For repairing masonry and
13      waterproofing exterior .......................      245,000
14               STATEVILLE CORRECTIONAL CENTER - JOLIET
15    For tuckpointing buildings .....................      200,000
16                    VANDALIA CORRECTIONAL CENTER
17    For tuckpointing, waterproofing and
18      replacing facade .............................      149,719
19                              STATEWIDE
20    For energy conservation improvements at the
21      following locations at the approximate
22      costs set forth below: .......................       56,018
23       Dwight Correctional Center ............ 7,000
24       Joliet Correctional Center
25        School Building ...................... 4,500
26       Menard Psychiatric Center
27        Randolph Hall ........................ 7,500
28       Stateville Correctional Center
29        Law Library .......................... 7,400
30       Pontiac Correctional Center .......... 27,893
31       Vienna Correctional Center ............ 1,725
32    For upgrading doors and locking systems at
33      the following locations at the approximate
34      costs set forth below: .......................      577,182
 
                            -54-            BOB-CDBnew-re2000
 1       Illinois Youth Center-Warrenville
 2        For replacement of doors
 3         and locking systems ............... 577,182 ____________
 4        Total, Section 5.1                             $1,323,519

 5        Section 5.2.  The amount of $195,615, or so much  thereof
 6    as  may  be necessary and remains unexpended from the General
 7    Revenue Fund at the close of business on June 30, 1999,  from
 8    a  reappropriation  heretofore  made  for  such  purposes  in
 9    Article   91,   Section   5.4   of   Public  Act  90-585,  is
10    reappropriated to  the  Capital  Development  Board  for  the
11    Department  of  Corrections for all costs associated with the
12    completion of the super maximum  security  prison  at  Tamms,
13    Illinois.

14        Section  5.3.  The  amount  of  $1,570,556,  or  so  much
15    thereof  as  may  be  necessary and remains unexpended at the
16    close of business on June 30, 1999,  from  a  reappropriation
17    heretofore  made for such purposes in Article 91, Section 5.5
18    of Public Act 90-585,  is  reappropriated  from  the  General
19    Revenue  Fund  to  the  Capital  Development  Board  for  the
20    Department   of  Corrections  for  the  projects  hereinafter
21    enumerated at the approximate costs set forth below:
22    Danville Correctional Center -
23      For upgrading the hot water
24       distribution system .................$175,000
25    Joliet Correctional Center -
26      For replacement of the deep well .......13,000
27    Stateville Correctional Center-
28      For upgrading the plumbing systems in
29       four buildings .....................1,216,556
30    Menard Correctional Center -
31      For planning and to begin upgrading
32       the plumbing systems in two
 
                            -55-            BOB-CDBnew-re2000
 1       buildings .............................65,000
 2    Pontiac Correctional Center -
 3      For upgrading the mechanical systems
 4       and renovation of shower rooms ........56,000
 5    Shawnee Correctional Center -
 6      For upgrading the hot water
 7       distribution system ...................45,000

 8        Section 5.4.  The following named  amounts,  or  so  much
 9    thereof  as  may  be  necessary  and remain unexpended at the
10    close of business  on  June  30,  1999,  from  appropriations
11    heretofore  made for such purposes in Article 91, Section 5.6
12    of Public Act 90-585, are  reappropriated  from  the  General
13    Revenue  Fund  to  the  Capital  Development  Board  for  the
14    Department   of  Corrections  for  the  projects  hereinafter
15    enumerated:
16                      DIXON CORRECTIONAL CENTER
17    For tuckpointing two buildings ................. $     65,000
18               STATEVILLE CORRECTIONAL CENTER - JOLIET
19    For tuckpointing seven buildings ...............       10,617
20        Total, Section 5.4                                $75,617

21        Section 6.  The  following  named  amounts,  or  so  much
22    thereof  as  may  be  necessary and remains unexpended at the
23    close of business on June 30, 1999, from  appropriations  and
24    reappropriations heretofore made for such purposes in Article
25    90, Section 4, and Article 91, Section 6 of Public Act 90-585
26    are  reappropriated  from the Capital Development Fund to the
27    Capital  Development  Board  for  the  Historic  Preservation
28    Agency for the projects hereinafter enumerated:
29                     BISHOP HILL HISTORIC SITE -
30                            HENRY COUNTY
31    (From Article 90, Section 4 of Public Act 90-585)
32    For rehabilitating Bjorkland Hotel ............. $  1,010,000
 
                            -56-            BOB-CDBnew-re2000
 1             CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA
 2    (From Article 91, Section 6 of Public Act 90-585)
 3    For renovation of the Cahokia Courthouse
 4      and the Jarrot House .........................      364,640
 5             CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE
 6    For replacement of Monk's Mounds stairs ........      465,000
 7    For restoration of Monk's Mound ................    1,082,491
 8    For purchasing private land within historic
 9      site boundary ................................      209,314
10    For replacement of Monk's Mounds stairs ........       75,591
11                  DAVID DAVIS MANSION - BLOOMINGTON
12    For renovation of the David Davis Mansion
13      to eliminate basement leakage ................      145,936
14                          DAVID DAVIS HOME
15    To acquire a residence to be
16      converted to a Visitors Center ...............      249,400
17                 FORT DE CHARTRES - RANDOLPH COUNTY
18    For replacing Maintenance Building .............      259,116
19                        GALENA HISTORIC SITE
20    (From Article 90, Section 4 of Public Act 90-585)
21    For structural stabilization and
22      rehabilitation of five historic
23      structures in the Grant Home District
24      including the Biesman, Nolan, Gill,
25      Coville, and Donegan houses ..................      427,000
26                  LEWIS AND CLARK STATE MEMORIAL -
27                           MADISON COUNTY
28    For constructing interpretive center,
29      and development of the historic site
30      in addition to funds previously
31      appropriated .................................    1,700,000
32    (From Article 91, Section 6 of Public Act 90-585)
33    For the construction of an interpretive
34      center and development of the historic
 
                            -57-            BOB-CDBnew-re2000
 1      site .........................................      440,000
 2                  LINCOLN LOG CABIN HISTORIC SITE -
 3                            COLES COUNTY
 4    (From Article 90, Section 4 of Public Act 90-585)
 5    For constructing visitors center, Phase II,
 6      and developing day use area ..................    1,669,000
 7    (From Article 91, Section 6 of Public Act 90-585)
 8    For construction of a visitors center ..........       71,656
 9    For replacement of bridges .....................       49,137
10    For construction of a visitor center and
11      museum, Phase I ..............................       44,736
12            LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG
13    (From Article 90, Section 4 of Public Act 90-585)
14    For renovating village entrance and
15      completing visitors center ...................      735,000
16    (From Article 91, Section 6 of Public Act 90-585)
17    For rehabilitation of the sewage treatment
18      plant ........................................       86,512
19              LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD
20    (From Article 90, Section 4 of Public Act 90-585)
21    For planning and beginning the Lincoln
22      Presidential Center, in addition to
23      funds previously appropriated ................    7,700,000
24                POSTVILLE COURTHOUSE HISTORIC SITE -
25                               LINCOLN
26    For rehabilitating Courthouse and site .........      368,000
27               PULLMAN FACTORY HISTORIC SITE - CHICAGO
28    (From Article 91, Section 6 of Public Act 90-585)
29    For stabilization of the structure and for planning
30      and beginning restoration ....................      751,151
31                   OLD STATE CAPITOL - SPRINGFIELD
32    (From Article 90, Section 4 of Public Act 90-585)
33    For rehabilitating Old State Capitol ...........    1,159,000
34    (From Article 91, Section 6 of Public Act 90-585)
 
                            -58-            BOB-CDBnew-re2000
 1    For renovating garage ramp .....................      158,832
 2    For renovation of the Old State
 3      Capitol to eliminate basement
 4      leakage ......................................      162,714
 5                         VACHEL LINDSAY HOME
 6    (From Article 90, Section 4 of Public Act 90-585)
 7    For rehabilitating home ........................      762,000
 8                        VANDALIA STATE HOUSE
 9    (From Article 90, Section 4 of Public Act 90-585)
10    For replacing roof and rehabilitating
11      exterior .....................................      508,000
12    (From Article 91, Section 6 of Public Act 90-585)
13    For rehabilitating HVAC and electrical
14      systems and interior .........................      378,000
15                              STATEWIDE
16    For replacing roofing systems at the
17      following locations at the approximate
18      costs set forth below: .......................      325,543
19       Fort De Chartres, Randolph County .... 93,000
20       Washburne House, Galena .............. 12,543
21       David Davis Mansion, Bloomington ..... 25,000
22       Bishop Hill House, Henry County ..... 195,000
23    For matching ISTEA federal grant funds .........      500,000
24        Total, Section 6                              $21,857,769

25        Section 6.1.  The amount of $54,510, or so  much  thereof
26    as  may  be  necessary and remains unexpended at the close of
27    business on June 30, 1999, from a reappropriation  heretofore
28    made  for  such  purpose in Article 91, Section 6.1 of Public
29    Act 90-585, is reappropriated from  the  Capital  Development
30    Fund  to  the  Capital  Development  Board  for  the Historic
31    Preservation Agency for the purchase  and  rehabilitation  of
32    the State Journal Register Building in Springfield.
 
                            -59-            BOB-CDBnew-re2000
 1        Section  6.2.  The  amount of $52,326, or so much thereof
 2    as may be necessary and remains unexpended at  the  close  of
 3    business  on June 30, 1999, from a reappropriation heretofore
 4    made for such purpose in Article 91, Section  6.2  of  Public
 5    Act  90-585,  is  reappropriated from the Capital Development
 6    Fund to  the  Capital  Development  Board  for  the  Historic
 7    Preservation    Agency    for    acquiring    the   Zimmerman
 8    archaeological site in  LaSalle  County  and  for  associated
 9    costs,  planning,  stabilization,  restoration  and all other
10    expenses  necessary  to  comply  with  the  intent  of   this
11    appropriation.

12        Section  6.3.  The  amount  of  $2,300,000,  or  so  much
13    thereof  as  may  be  necessary and remains unexpended at the
14    close of business on June 30, 1999,  from  a  reappropriation
15    heretofore  made for such purposes in Article 91, Section 6.3
16    of Public Act 90-585,  is  reappropriated  from  the  Capital
17    Development   Fund  to  the  Capital  Development  Board  for
18    planning and beginning the construction of a  new  historical
19    library and Lincoln Center.

20        Section  6.4  The  sum of $800,000, or so much thereof as
21    may be necessary and as remains unexpended at  the  close  of
22    business  on  June 30, 1999, from reappropriations heretofore
23    made in Article 78, Section  7  of  Public  Act  90-0585,  is
24    reappropriated  from  the  Capital  Development  Fund  to the
25    Capital  Development  Board  for  the  Historic  Preservation
26    Agency (formerly appropriated to  the  Historic  Preservation
27    Agency)  for  the  construction of an interpretive center and
28    development of the historic  site  at  the  Lewis  and  Clark
29    National Trail Site No. 1 in Madison County.


30        Section  6.5.  The  following  named  amounts, or so much
 
                            -60-            BOB-CDBnew-re2000
 1    thereof as may be necessary  and  remain  unexpended  at  the
 2    close  of  business  on  June  30,  1999, from appropriations
 3    heretofore made for such purposes in Article 90, Section  4a,
 4    and  Article  91,  Section  6.5  of  Public  Act  90-585, are
 5    reappropriated from the General Revenue Fund to  the  Capital
 6    Development  Board  for  the Historic Preservation Agency for
 7    the projects hereinafter enumerated:
 8                  FORT DE CHARTRES HISTORIC SITE -
 9                           RANDOLPH COUNTY
10    (From Article 90, Section 4a of Public Act 90-585)
11    For planning and beginning restoration
12      of powder magazine ........................... $    100,000
13                 LINCOLN'S NEW SALEM HISTORIC SITE -
14                             PETERSBURG
15    For removing sewage lagoon and treatment
16      plant ........................................      407,000
17    For rehabilitating saw mill and grist
18      mill .........................................      219,000
19                  METAMORA COURTHOUSE HISTORIC SITE
20    For rehabilitating courthouse ..................      474,000
21    (From Article 91, Section 6.5 of Public Act 90-585)
22               JOURNAL REGISTER BUILDING - SPRINGFIELD
23    For renovating building ........................      648,213
24                   DANA THOMAS HOUSE - SPRINGFIELD
25    For restoring the exterior and interior ........      249,243
26        Total, Section 6.5                             $2,097,456

27        Section 7.  The sum of $71,890, or so much thereof as may
28    be necessary and remains unexpended at the close of  business
29    on  June 30, 1999, from a reappropriation heretofore made for
30    such purposes in Article 91, Section 7 of Public Act  90-585,
31    is  reappropriated  from  the Capital Development Fund to the
32    Capital Development Board for  the  Legislative  Space  Needs
33    Commission   for  architectural/engineering  fees,  planning,
 
                            -61-            BOB-CDBnew-re2000
 1    construction, reconstruction, rehabilitation, and  all  other
 2    necessary  costs  for  remodeling  and  relocation of various
 3    legislative services agencies  located  in  the  Capitol  and
 4    Stratton  Office buildings at the approximate costs set forth
 5    below:
 6      For the Joint Committee on
 7       Administrative Rules ..............$   71,890

 8        Section 8.  The  following  named  amounts,  or  so  much
 9    thereof  as  may  be  necessary  and remain unexpended at the
10    close of business on June 30, 1999, from  appropriations  and
11    reappropriations heretofore made for such purposes in Article
12    90,  Section  5,  and  Article  91,  Section  8 of Public Act
13    90-585, are reappropriated from the Capital Development  Fund
14    to  the Capital Development Board for the Department of Human
15    Services  (formerly  the  Department  of  Mental  Health  and
16    Developmental  Disabilities)  for  the  projects  hereinafter
17    enumerated:
18             ALTON MENTAL HEALTH CENTER - MADISON COUNTY
19    (From Article 91, Section 8 of Public Act 90-585)
20    For constructing two building additions
21      at the Forensic Complex ......................   11,786,174
22    For rehabilitation of the central dietary ......    1,803,719
23    For replacement of life/safety and
24      security system in a residential
25      building .....................................       61,011
26    For replacement of the chiller and
27      connection of the HVAC to the energy
28      management system ............................        5,048
29    For replacement of two cooling towers in
30      the Willow Building ..........................        4,631
31               CHESTER MENTAL HEALTH CENTER - CHESTER
32    (From Article 90, Section 5 of Public Act 90-585)
33    For renovating kitchen area ....................      967,000
 
                            -62-            BOB-CDBnew-re2000
 1    (From Article 91, Section 8 of Public Act 90-585)
 2    For replacing fencing and upgrading
 3      recreational yard ............................    1,342,930
 4    For renovating support and residential
 5      area .........................................    3,831,353
 6    For installation of emergency generator
 7      and upgrading EMS system .....................       57,985
 8    For construction of a storage building  ........       25,003
 9    For construction of a Rehabilitative
10      Services building ............................       28,380
11    For replacement of the emergency generator .....       11,435
12          SCHOOL OF PUBLIC HEALTH AND PSYCHIATRIC INSTITUTE
13                  (FORMERLY THE CHICAGO METRO C&A)
14    For planning and renovation of residential
15      and program units for children and
16      adolescent services ..........................      794,770
17             CHICAGO READ MENTAL HEALTH CENTER - CHICAGO
18    (From Article 90, Section 5 of Public Act 90-585)
19    For upgrading fire/life safety systems, in
20      addition to funds previously appropriated ....      235,000
21    (From Article 91, Section 8 of Public Act 90-585)
22    For renovating residential units, in
23      addition to funds previously
24      appropriated .................................    2,171,000
25    For renovation of utility rooms and installation
26      of drinking fountains ........................      218,000
27    For renovation of the West Campus Nurses'
28      Stations .....................................      381,713
29    For renovation of Henry Horner Children's
30      Center and West Campus for fire and
31      life safety codes ............................      641,912
32    For renovation of the West Campus shower
33      and toilet rooms .............................      303,615
34    For rehabilitation of the bathroom shower
 
                            -63-            BOB-CDBnew-re2000
 1      walls in ten buildings .......................       16,780
 2        CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA
 3    (From Article 90, Section 5 of Public Act 90-585)
 4    For rehabilitating Cypress Building ............    1,546,000
 5    (From Article 91, Section 8 of Public Act 90-585)
 6    For completing HVAC system upgrade,
 7      in addition to funds previously
 8      appropriated .................................    1,405,677
 9    For upgrading the mechanical equipment,
10      in addition to funds previously
11      appropriated .................................      422,529
12    For renovating a residential building,
13      in addition to funds previously
14      appropriated .................................      826,447
15    For upgrading the mechanical equipment,
16      in addition to funds previously
17      appropriated .................................       57,556
18    For planning and beginning the renovation of a
19      residential building .........................        6,268
20    For separating and upgrading of the combined
21      sewer system, in addition to funds
22      previously appropriated ......................       20,674
23    For rehabilitation of resident buildings
24      and upgrading of temperature controls ........       33,786
25              ELGIN MENTAL HEALTH CENTER - KANE COUNTY
26    (From Article 90, Section 5 of Public Act 90-585):
27    For replacing power plant and engineering
28      building .....................................    8,029,000
29    (From Article 91, Section 8 of Public Act 90-585):
30    For renovating the central dietary
31      and kitchen ..................................    3,958,200
32    For construction of an Adult Psychiatric
33      Building, in addition to funds previously
34      appropriated .................................    3,681,000
 
                            -64-            BOB-CDBnew-re2000
 1    For construction of roads, parking lots
 2      and street lights ............................    2,414,095
 3    For upgrading and expanding the mechanical
 4      infrastructure, in addition to funds
 5      previously appropriated ......................    3,361,237
 6    For construction of a forensic services complex
 7      at Elgin Mental Health Center, in addition
 8      to funds previously appropriated .............    3,909,765
 9    For construction of a forensic services
10      complex, in addition to funds previously
11      appropriated .................................      365,494
12    For renovation of the HVAC systems,
13      replacement of windows and installation
14      of security screens, in addition
15      to funds previously appropriated .............    2,062,047
16    For construction of a Forensic Services
17      Facility, in addition to funds
18      previously appropriated  .....................      371,116
19    For upgrading and expanding mechanical
20      infrastructure, in addition to funds
21      previously appropriated ......................       13,918
22    For upgrading for fire and life safety .........      368,270
23    For planning the renovation of the Forensic
24      Building and abating asbestos ................      251,946
25    For renovation of the Central Stores
26      Building .....................................       85,679
27    For upgrading the security systems and
28      constructing a multi-purpose building
29      for the Forensic Complex .....................        8,910
30    For the demolition of the Old Main Building
31      and construction of an Adult
32      Psychiatric Center ...........................      357,773
33                  FOX DEVELOPMENTAL CENTER - DWIGHT
34    (From Article 90, Section 5 of Public Act 90-585)
 
                            -65-            BOB-CDBnew-re2000
 1    For renovating dietary, in addition
 2      to funds previously appropriated .............      842,445
 3    (From Article 91, Section 8 of Public Act 90-585)
 4    For replacement of absorbers and
 5      upgrading HVAC system ........................      724,467
 6    For renovation of dietary ......................      632,788
 7    For renovation of Building #8 and
 8      window replacement of Building
 9      #1, in addition to funds
10      previously appropriated ......................      299,963
11               HOWE DEVELOPMENTAL CENTER - TINLEY PARK
12    (From Article 90, Section 5 of Public Act 90-585)
13    For replacing roofs ............................       81,000
14    For planning and beginning access
15      to water supply from village .................       78,000
16    For planning and rehabilitation of
17      utility tunnels ..............................      250,000
18    (From Article 91, Section 8 of Public Act 90-585)
19    For renovation of residential buildings ........    2,513,102
20    For replacement of steam and
21      condensate lines .............................       79,275
22    For renovation of the boilers in the power
23      plant ........................................       29,856
24          JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY
25    For extending chilled water line ...............      312,085
26    For rehabilitation of bathrooms and
27      replacing doors ..............................      382,910
28    For rehabilitation of the electrical
29      distributions system, in addition to
30      Funds previously appropriated ................      184,895
31    For installation of fire safety systems in
32      four buildings and replacement of a
33      code compliance generator ....................       94,758
34                KILEY DEVELOPMENTAL CENTER - WAUKEGAN
 
                            -66-            BOB-CDBnew-re2000
 1    For renovating homes ...........................      741,000
 2    For renovation of homes ........................       31,718
 3             LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY
 4    (From Article 90, Section 5 of Public Act 90-585)
 5    For upgrading power plant and installing
 6      EMS, in addition to funds previously
 7      appropriated .................................    1,794,838
 8    For renovating Elmhurst Cottage ................    1,905,000
 9    (From Article 91, Section 8 of Public Act 90-585)
10    For installation of a rethermalization food
11      service system, in addition to funds
12      previously appropriated ......................      706,518
13    For upgrading the architectural and mechanical
14      systems, in addition to funds
15      previously appropriated ......................      504,454
16    For installation of a code compliance
17      generator ....................................       18,466
18    For installation of rethermalization food
19      service system ...............................       40,842
20    For expansion of the sprinkler system in
21      four buildings ...............................      185,080
22    For installation of air conditioning in
23      Coty and Dietary Buildings ...................       37,371
24    For upgrading the HVAC systems, including
25      chillers .....................................       25,157
26             LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST
27    (From Article 90, Section 5 of Public Act 90-585)
28    For replacing plumbing, HVAC and
29      boiler systems ...............................      796,000
30    (From Article 91, Section 8 of Public Act 90-585)
31    For renovation of residential buildings,
32      in addition to funds previously
33      appropriated .................................    1,888,500
34    For rehabilitation of the roads and parking
 
                            -67-            BOB-CDBnew-re2000
 1      areas and constructing walks .................      597,571
 2    For renovation of residences ...................      140,758
 3    For renovation of restrooms for accessibility
 4      in two buildings .............................        4,538
 5    For renovation of bathrooms in 15 residences ...       79,196
 6                 MADDEN MENTAL HEALTH CENTER - HINES
 7    For renovating dietary .........................      910,000
 8    For renovation of pavilions, in addition
 9      to funds previously appropriated .............      844,000
10    For renovation of pavilions ....................      141,905
11    For upgrading residences for safety and
12      security .....................................       80,382
13    For replacement of a cooling tower and
14      chiller and installation of an emergency
15      generator ....................................      223,621
16    For replacement of hot water heaters ...........       86,160
17            MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD
18    (From Article 90, Section 5 of Public Act 90-585)
19    For renovating Stevenson Hall ..................      984,000
20    (From Article 91, Section 8 of Public Act 90-585)
21    For replacement of the HVAC management
22      control panel, in addition to funds
23      previously appropriated ......................       68,864
24    For rehabilitation of the dietary facility .....      390,261
25               MURRAY DEVELOPMENTAL CENTER - CENTRALIA
26    For rehabilitating the emergency
27      electrical system ............................      298,038
28    For renovating Elm Cottage .....................    2,935,932
29    For installation of fire safety systems ........      537,167
30               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
31    (From Article 90, Section 5 of Public Act 90-585)
32    For planning and beginning the upgrade
33      of steam and condensate lines ................      320,000
34    For rehabilitating HVAC system .................    1,166,000
 
                            -68-            BOB-CDBnew-re2000
 1    (From Article 91, Section 8 of Public Act 90-585)
 2    For replacing cooling towers and
 3      rehabilitating absorbers .....................    1,040,000
 4    For completion of the HVAC system, in
 5      addition to funds previously
 6      appropriated .................................       87,283
 7    For replacement of boiler, in
 8      addition to funds previously
 9      appropriated .................................      765,000
10    For replacement of water mains
11      and valves ...................................    1,750,205
12    For planning and beginning sewer and
13      manhole renovation ...........................       46,793
14    For rehabilitation of the boilers ..............      184,605
15    For planning and replacement of windows ........      234,721
16    For installation of an emergency generator .....       72,104
17    For upgrading fire safety systems in the
18      support buildings ............................      163,978
19    For installation of air conditioning in
20      Building #704, in addition to funds
21      previously appropriated ......................      104,551
22    For replacement of cooling towers in
23      Buildings #100A and #100B ....................       26,402
24    For installation of air conditioning in
25      Buildings #502 and #514 ......................       42,938
26               SINGER MENTAL HEALTH CENTER - ROCKFORD
27    (From Article 90, Section 5 of Public Act 90-585)
28    For replacing roofs ............................      248,000
29    (From Article 91, Section 8 of Public Act 90-585)
30    For renovating mechanicals and
31      residential areas ............................    2,691,675
32    For replacement of absorbers ...................      186,339
33    (From Article 90, Section 5 of Public Act 90-585)
34                  TINLEY PARK MENTAL HEALTH CENTER
 
                            -69-            BOB-CDBnew-re2000
 1    For upgrading fire/life safety systems
 2      and bedroom lighting, in addition to
 3      funds previously appropriated ................      236,000
 4                  TINLEY PARK MENTAL HEALTH CENTER/
 5                      HOWE DEVELOPMENTAL CENTER
 6    (From Article 91, Section 8 of Public Act 90-585)
 7    For replacement of the bar screen and
 8      renovating the sewer system, in
 9      addition to funds previously appropriated ....      180,005
10    For rehabilitation of the electrical
11      distribution system, in addition to
12      funds previously appropriated ................    2,158,753
13    For renovating and making mechanical
14      improvements to Spruce Hall and Maple Hall ...      149,650
15    For renovation for accessibility in four
16      buildings ....................................      137,036
17    For planning the sewer system renovation and
18      replacement of the rag catcher ...............      197,071
19    For renovation for fire and life safety in
20      three residences .............................      211,124
21    For renovation of nursing stations and
22      medication rooms in three residences .........       17,741
23    For replacement of the windows in nine
24      buildings ....................................       28,935
25                ZELLER MENTAL HEALTH CENTER - PEORIA
26    For renovation of the nurses' stations,
27      in addition to funds previously
28      appropriated .................................    1,720,000
29    For renovation of Nurses' Stations and
30      seclusion rooms ..............................      148,916
31    For replacement of the heating and cooling
32      pumps ........................................        8,357
33                              STATEWIDE
34    For replacing roofing systems at the
 
                            -70-            BOB-CDBnew-re2000
 1      following locations at the approximate
 2      costs set forth below: .......................      207,600
 3       Elgin Mental Health Center,
 4         five buildings .....................150,000
 5       Jacksonville Mental Health and
 6         Developmental Center,
 7       two buildings..........................57,600
 8    For replacement of roofing systems at the
 9      following locations at the approximate costs
10      set forth below: .............................    1,334,305
11        Alton Mental Health Center ...........75,000
12        Choate Mental Health and
13          Developmental Center ...............45,000
14        Chester Mental Health Center ........663,305
15        Fox Developmental Center .............50,000
16        Howe Developmental Center ...........140,000
17        Jacksonville Developmental Center ....17,000
18        Lincoln Developmental Center ........344,000
19    For construction of a forensic services complex
20      at Alton Mental Health Center and Elgin
21      Mental Health Center, in addition to funds
22      previously appropriated ......................       36,901
23    For conducting the preliminary design
24      and to begin to construct, convert and/
25      or rehabilitate a forensic facility ..........       94,918
26    For upgrading roads and parking lots at
27      the following locations at the
28      approximate costs set forth below: ...........       38,106
29        McFarland Mental Health Ctr ...........5,544
30        Shapiro Developmental Center .........32,562
31    For rehabilitation of water towers -
32      Murray and Chester ...........................      377,077
33    For replacement of roofs at the following
34      locations at the approximate costs set
 
                            -71-            BOB-CDBnew-re2000
 1      forth below: .................................      666,480
 2        Alton Mental Health Center -
 3          Five buildings .....................50,000
 4        Elgin Mental Health Center -
 5          Three buildings ....................52,000
 6        Lincoln Developmental Center -
 7          Three buildings ....................80,000
 8        Lincoln Developmental Center -
 9          Four buildings ......................6,601
10        Ludeman Developmental Center -
11          Support buildings ..................50,000
12        Ludeman Developmental Center-
13          Residences .........................22,158
14        Mabley Developmental Center -
15          One building ......................103,517
16        Madden Mental Health Center -
17          Buildings and covered walkways ......5,000
18        McFarland Mental Health Center -
19          Three buildings .....................5,000
20        Meyer Mental Health Center -
21          One building ........................2,000
22        Shapiro Developmental Center -
23          Three buildings ...................187,000
24        Shapiro Developmental Center -
25          Two buildings ......................16,351
26        Shapiro Developmental Center -
27          Five buildings .....................67,831
28        Tinley Park Mental Health Center -
29          One building ........................7,252
30        Tinley Park Mental Health Center -
31          Oak Hall ...........................11,770
32                       STATEWIDE - FIRE SAFETY
33    For installation of fire safety systems
34    (Formerly for Murray Developmental Center) .....      537,167
 
                            -72-            BOB-CDBnew-re2000
 1    For installation of fire safety systems
 2    (Formerly for Lincoln Developmental Center) ....      185,080
 3    To renovate fire safety systems, including
 4      installation of sprinklers, at the following
 5      locations at the approximate costs set
 6      forth below: .................................      335,022
 7        Singer Mental Health Center .........335,022
 8    For fire safety and other work necessary to meet
 9      state and federal certification standards for
10      the following projects:
11       For installation of sprinkler systems at
12        Chicago-Read Mental Health Center ..........      118,099
13       For installation of sprinkler systems at
14        Murray Developmental Center ................        2,000
15        Total, Section 8                              $99,282,417

16        Section 8A.  The following  named  amounts,  or  so  much
17    thereof  as  may  be  necessary  and remain unexpended at the
18    close of business on June 30, 1999, from  appropriations  and
19    reappropriations   heretofore   made  for  such  purposes  in
20    Article 90, Section 5.1, and Article 91, Section 8A of Public
21    Act 90-585, are reappropriated from the  Capital  Development
22    Fund  to  the Capital Development Board for the Department of
23    Human Services (formerly the  Department  of   Rehabilitation
24    Services) for the projects hereinafter enumerated:
25             ILLINOIS SCHOOL FOR THE DEAF -JACKSONVILLE
26    (From Article 90, Section 5.1 of Public Act 90-585)
27    For installing HVAC and upgrading electrical
28      and replacing doors .......................... $  1,400,000
29    (From Article 91, Section 8A of Public Act 90-585)
30    For completing the HVAC system upgrade,
31      in addition to funds previously
32      appropriated .................................      300,000
33    For replacing the storm and sanitary
 
                            -73-            BOB-CDBnew-re2000
 1      system .......................................    1,922,385
 2    For renovating Unit 5 ..........................      201,552
 3    For planning and beginning the
 4      upgrade of the heat and smoke
 5      detection system .............................       61,087
 6    For the renovation of Cullom Hall ..............    1,977,831
 7    For construction of an addition to Unit #5 .....       20,634
 8    For rehabilitation of the domestic hot and
 9      cold water piping in six buildings ...........      190,056
10       ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED -JACKSONVILLE
11    (From Article 90, Section 5.1 of Public Act 90-585)
12    For installing sewers ..........................    1,200,000
13    For constructing a new building to
14      replace buildings 2, 3 and 4,
15      in addition to funds previously
16      appropriated .................................    3,300,000
17    (From Article 91, Section 8A of Public Act 90-585)
18    For rehabilitating the power house .............      275,000
19    For the replacement of Buildings
20      #2, #3, and #4 ...............................      628,083
21    For replacement of Buildings 5 and 6 for
22      an Independent Living Center .................      824,291
23        Total, Section 8A                             $12,300,919

24        Section  8.1.  The  following  named  amounts, or so much
25    thereof as may be necessary  and  remain  unexpended  at  the
26    close  of  business on June 30, 1999, from appropriations and
27    reappropriations  heretofore  made  for  such   purposes   in
28    Article 90, Section 5a, and Article 91, Section 8.1 of Public
29    Act  90-585, are reappropriated from the General Revenue Fund
30    to the Capital Development Board for the Department of  Human
31    Services  (formerly  the  Department  of  Mental  Health  and
32    Developmental  Disabilities)  for  the  projects  hereinafter
33    enumerated:
 
                            -74-            BOB-CDBnew-re2000
 1                     ALTON MENTAL HEALTH CENTER
 2    (From Article 91, Section 8.1 of Public Act 90-585)
 3    For replacing windows in four buildings ........   $1,162,450
 4                    CHESTER MENTAL HEALTH CENTER
 5    For replacing backflow prevention
 6      devices ......................................       76,864
 7            CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER
 8    For renovation of turbines in the powerhouse ...       28,364
 9                  FOX DEVELOPMENTAL CENTER - DWIGHT
10    (From Article 90, Section 5a of Public Act 90-585)
11    For replacing windows ..........................      578,000
12                  JACKSONVILLE DEVELOPMENTAL CENTER
13    For replacing stoker and controls ..............      206,000
14    For planning and beginning the rehabilitation
15      of the water tower and smokestack ............       80,000
16    (From Article 91, Section 8.1 of Public Act 90-585)
17    For the demolition of Carriel Hall,
18      rerouting utility lines,
19      providing parking lot, and planning
20      the demolition of Building 41 ................       53,792
21                    LINCOLN DEVELOPMENTAL CENTER
22    For replacing windows ..........................      723,511
23               SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE
24    For replacing windows in complex
25      buildings ....................................      486,000
26                  TINLEY PARK MENTAL HEALTH CENTER
27    For installing windows in residential
28      buildings ....................................      748,375
29    For repairing the exterior of Spruce Hall ......       56,350
30    For rehabilitating exterior of
31      residential building at Tinley ...............       19,683
32                ZELLER MENTAL HEALTH CENTER - PEORIA
33    For replacing windows ..........................    1,434,835
34                              STATEWIDE
 
                            -75-            BOB-CDBnew-re2000
 1    (From Article 90, Section 5a of Public Act 90-585)
 2    For resurfacing roads at Chicago-Read,
 3      Tinley Park and Murray .......................    2,000,000
 4    (From Article 91, Section 8.1 of Public Act 90-585)
 5    For repair of the exterior masonry
 6      walls, in addition to funds previously
 7      appropriated .................................      142,787
 8    For repair of the exterior masonry walls
 9      at Fox, Shapiro and Tinley Park/Howe .........      138,521
10    For renovation of fire safety systems at the
11      following locations at the approximate
12      costs set forth below: .......................        1,639
13        Singer Mental Health Center ...........1,639
14    For installation of smoke detection systems,
15      smoke compartmentation, and other fire
16      safety and certification improvements at
17      Murray Developmental Center ..................      225,449
18        Total, Section 8.1                             $8,162,620

19        Section  8A.1.  The  following  named amounts, or so much
20    thereof as may be necessary  and  remain  unexpended  at  the
21    close  of  business on June 30, 1999, from appropriations and
22    reappropriations heretofore made for such purposes in Article
23    90, Section 5a.1, and Article 91, Section 8A.1 of Public  Act
24    90-585,  are  reappropriated from the General Revenue Fund to
25    the Capital Development Board for  the  Department  of  Human
26    Services (formerly the Department of Rehabilitation Services)
27    for the projects hereinafter enumerated:
28             ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE
29    (From Article 90, Section 5a.1 of Public Act 90-585)
30    For installing humidity controls ............... $    155,000
31    For installing an all-weather
32      running track ................................      190,000
33    (From Article 91, Section 8A.1 of Public Act 90-585)
 
                            -76-            BOB-CDBnew-re2000
 1    For installing an emergency generator ..........      501,710
 2    For installing security systems in
 3      three buildings ..............................       28,439
 4    For renovation of buildings and lead
 5      paint abatement ..............................      213,443
 6        Total Section 8A.1                             $1,088,592

 7        Section  9.  The  following  named  amounts,  or  so much
 8    thereof as may be necessary  and  remain  unexpended  at  the
 9    close  of  business on June 30, 1999, from appropriations and
10    reappropriations  heretofore  made  for  such   purposes   in
11    Article  90,  Section  6, and Article 91, Section 9 of Public
12    Act 90-585, are reappropriated from the  Capital  Development
13    Fund  to  the Capital Development Board for the Department of
14    Military Affairs for the projects hereinafter enumerated:
15                            AURORA ARMORY
16    (From Article 91, Section 9 of Public Act 90-585)
17    For planning and beginning construction of
18      an armory .................................... $     10,820
19                     CAMP LINCOLN - SPRINGFIELD
20    (From Article 90, Section 6 of Public Act 90-585)
21    For renovating heating system and
22      replacing windows ............................      908,000
23    (From Article 91, Section 9 of Public Act 90-585)
24    For construction of a military academy
25      facility .....................................      638,820
26    For site improvements and construction for
27      a military academy facility, including
28      repair and reconstruction of access
29      roads and drives at Camp Lincoln .............       24,062
30    For planning, design, site improvements, and
31      other costs associated with the conversion
32      of the old "Castle" or Commissary Building
33      for use as a military museum .................      122,068
 
                            -77-            BOB-CDBnew-re2000
 1                          CARBONDALE ARMORY
 2    For upgrading mechanical systems ...............    1,335,539
 3                          CRESTWOOD ARMORY
 4    (From Article 90, Section 6 of Public Act 90-585)
 5    For replacing roofing system and
 6      rehabilitating exterior ......................    1,217,525
 7                           DANVILLE ARMORY
 8    (From Article 91, Section 9 of Public Act 90-585)
 9    For planning and construction of a new armory ..    1,070,000
10                           DECATUR ARMORY
11    For the state's share for additional planning
12      and construction of a new armory and
13      Organizational Maintenance Shop ..............        9,594
14                      DIXON ARMORY - LEE COUNTY
15    (From Article 90, Section 6 of Public Act 90-585)
16    For upgrading mechanical and
17      electrical systems ...........................    1,866,000
18    (From Article 91, Section 9 of Public Act 90-585)
19    For construction of an addition,
20      remodeling, extending utilities and
21      installing a kitchen .........................       26,321
22                         DONNELLEY BUILDING
23    For the rehabilitation and renovation of
24      the Donnelley Building and purchase of
25      land for parking .............................      184,885
26                        GENERAL JONES ARMORY
27    For renovation of the exterior and interior,
28      mechanical areas and expansion of the
29      parking lot, in addition to amounts
30      previously appropriated ......................    1,165,919
31    For renovation of the exterior, including
32      windows ......................................       11,405
33    For replacement of the Assembly Hall
34      roofing system including its structural
 
                            -78-            BOB-CDBnew-re2000
 1      system .......................................      210,904
 2    For renovation of the armory, including
 3      equipment, in addition to amounts
 4      previously appropriated ......................       33,725
 5    For renovation of the armory, including
 6      equipment, in addition to amounts
 7      previously appropriated for this purpose .....       11,276
 8    For the state's share for renovation ...........       10,796
 9                           KANKAKEE ARMORY
10    For providing the State's share for
11      construction of an Armory and Army
12      Reserve Center, including equipment ..........       14,752
13    For the state's share for planning
14      and beginning an armory and Army
15      Reserve Center ...............................        2,064
16                          LITCHFIELD ARMORY
17    For rehabilitation of exterior and upgrading
18      the interior .................................       14,933
19                  MACHESNEY PARK ARMORY (ROCKFORD)
20    For the state's share for additional planning
21      and construction of an armory and
22      Organizational Maintenance Shop ..............      218,047
23                          MARSEILLES ARMORY
24    For planning and beginning four
25      buildings and wastewater facilities ..........        7,444
26                     NORTHWEST ARMORY - CHICAGO
27    For renovation of interior and exterior,
28      in addition to funds previously
29      appropriated for such purposes ...............    1,200,000
30                            PARIS ARMORY
31    For rehabilitation of the exterior and
32      upgrading the interior .......................       30,796
33                            PEORIA ARMORY
34    For providing the State's share for
 
                            -79-            BOB-CDBnew-re2000
 1      construction of an armory and Army
 2      Reserve Center, including equipment ..........        5,596
 3                         ROCK ISLAND ARMORY
 4    For construction of an armory and
 5      maintenance shop .............................       78,850
 6                    SALEM ARMORY - MARION COUNTY
 7    For replacement of the boiler and
 8      all domestic plumbing, piping and
 9      fixtures, and upgrading of the
10      kitchen, including equipment .................      289,061
11                 SAUK AREA CAREER SCHOOL - CRESTWOOD
12    For the purchase and renovation of the
13      former Sauk Area Career School, converting
14      to an armory and upgrading the parking
15      lot ..........................................       84,023
16                  STREATOR ARMORY - LASALLE COUNTY
17    For renovation of the mechanical
18      systems, in addition to funds
19      previously appropriated ......................      125,321
20                           WAUKEGAN ARMORY
21    (From Article 90, Section 6 of Public Act 90-585)
22    For replacing roofing system ...................      415,000
23    (From Article 91, Section 9 of Public Act 90-585)
24    For renovation of exterior walls, and
25      replacement of doors and windows .............       47,851
26                        WEST FRANKFORT ARMORY
27    (From Article 90, Section 6 of Public Act 90-585)
28    For replacing roofs and rehabilitating
29      exterior .....................................    1,197,000
30    (From Article 91, Section 9 of Public Act 90-585)
31    For remodeling and installation of a kitchen ...       52,428
32                      WILLIAMSON COUNTY ARMORY
33    For providing the State's share for planning
34      and construction of a new armory, in
 
                            -80-            BOB-CDBnew-re2000
 1      addition to amounts previously
 2      appropriated .................................       14,316
 3                          WOODSTOCK ARMORY
 4    For the state's share for additional planning
 5      and construction of an armory ................        4,273
 6                              STATEWIDE
 7    For replacement of roofs at the
 8      following locations at the
 9      approximate costs set forth below: ...........       40,238
10        Litchfield Armory ....................19,193
11        Springfield Military Academy .........21,045
12    For replacement of roofs at the following
13      locations at the approximate costs set
14      forth below ..................................      115,420
15          Camp Lincoln - AGO Building .......115,420 ____________
16        Total, Section 9                              $12,815,072

17        Section 9.1.  The following named  amounts,  or  so  much
18    thereof  as  may  be  necessary  and remain unexpended at the
19    close of business on June  30,  1999,  from  reappropriations
20    heretofore  made for such purposes in Article 91, Section 9.1
21    of Public Act 90-585, are  reappropriated  from  the  General
22    Revenue  Fund  to  the  Capital  Development  Board  for  the
23    Department  of  Military Affairs for the projects hereinafter
24    enumerated:
25                        LAWRENCEVILLE ARMORY
26    For renovating interior ........................ $    170,749
27                              STATEWIDE
28    For the following projects at the approximate
29      costs set forth below: .......................       86,000
30        Broadway Armory - Chicago
31          For repair of the heating
32          system .............................50,000
33        Freeport Armory
 
                            -81-            BOB-CDBnew-re2000
 1          For renovation of the armory
 2          and parking area, including
 3          installation of a security
 4          fence ..............................36,000 ____________
 5        Total, Section 9.1                               $256,749

 6        Section 10.  The following  named  amounts,  or  so  much
 7    thereof  as  may  be  necessary  and remain unexpended at the
 8    close of business on June  30,  1999,  from  reappropriations
 9    heretofore  made for such purposes in  Article 91, Section 10
10    of Public Act 90-585, are  reappropriated  from  the  Capital
11    Development  Fund  to  the  Capital Development Board for the
12    Department of Revenue for the project hereinafter enumerated:
13                 WILLARD ICE BUILDING - SPRINGFIELD
14    For upgrading the uninterruptible power
15      system, in addition to funds previously
16      appropriated ................................. $  1,200,000
17    For replacing the halon fire suppression
18      system .......................................      344,000
19    For completion of the replacement of the
20      fire alarm and security system ...............       70,000
21    For upgrade of the uninterruptible
22      power system .................................    1,060,210
23        Total, Section 10                              $2,674,210

24        Section 10.1.  The following named  amount,  or  so  much
25    thereof  as  may  be  necessary and remains unexpended at the
26    close of business on June 30,  1999,  from  an  appropriation
27    heretofore  made  for such purposes in Article 90, Section 8a
28    of Public Act 90-585,  is  reappropriated  from  the  General
29    Revenue  Fund  to  the  Capital  Development  Board  for  the
30    Department of Revenue for the project hereinafter enumerated:
31                 WILLARD ICE BUILDING - SPRINGFIELD
32    For resealing and replacing atrium windows ..... $  1,208,000
 
                            -82-            BOB-CDBnew-re2000
 1        Total, Section 10.1                            $1,208,000

 2        Section  11.  The  following  named  amounts,  or so much
 3    thereof as may be necessary  and  remain  unexpended  at  the
 4    close  of  business on June 30, 1999, from appropriations and
 5    reappropriations heretofore made for such purposes in Article
 6    90, Section 9, and Article  91,  Section  12  of  Public  Act
 7    90-585,  are reappropriated from the Capital Development Fund
 8    to the Capital Development Board for the Department of  State
 9    Police for the projects hereinafter enumerated:
10    (From Article 91, Section 12 of Public Act 90-585)
11                     CAIRO (ULLIN) - DISTRICT 22
12    For construction of a firing range and radio
13      tower ........................................ $    537,480
14                  CARMI - DISTRICT 19 HEADQUARTERS
15    For planning and beginning the
16      rehabilitation of Headquarters
17      facilities ...................................       14,944
18                    CHICAGO FORENSIC LABORATORY
19    For construction of a laboratory and
20      parking facilities ...........................       86,407
21                      EAST MOLINE - DISTRICT 7
22    For rehabilitation of the headquarters
23      facilities and replacement of the
24      radio garage .................................       70,726
25                LITCHFIELD - DISTRICT 18 HEADQUARTERS
26    For planning and beginning the
27      rehabilitation of Headquarters  facilities ...        3,156
28                         SPRINGFIELD ARMORY
29    (From Article 90, Section 9 of Public Act 90-585)
30    For planning and design of the rehabilitation
31      and site improvements of the Springfield
32      Armory, in addition to funds previously
33      appropriated .................................    1,500,000
 
                            -83-            BOB-CDBnew-re2000
 1             SPRINGFIELD - STATE POLICE TRAINING ACADEMY
 2    (From Article 91, Section 12 of Public Act 90-585)
 3    For rehabilitation of the facility, including
 4      replacement of the HVAC system and
 5      installation of an elevator ..................       28,818
 6                        STERLING - DISTRICT 1
 7    For planning, construction, reconstruction,
 8      demolition of existing buildings, and
 9      all costs related to the relocation of
10      the headquarters, in addition to funds
11      previously appropriated ......................      488,013
12    For land acquisition, planning, construction,
13      reconstruction, demolition of existing
14      buildings, and all costs related to the
15      relocation of the District 1 Police
16      Headquarters in Sterling .....................        7,149
17                              STATEWIDE
18    (From Article 90, Section 9 of Public Act 90-585)
19    For replacing the roofing systems at various
20      facilities at the approximate costs set
21      forth below ..................................      167,000
22        District 17 - LaSalle ............... 41,000
23        Springfield, Radio Repair
24         Laboratory ......................... 36,000
25        Springfield, Communications
26         Building ........................... 90,000
27    For replacing radio communication towers,
28      equipment buildings and installing emergency
29      power generators at the following locations:
30      Pecatonica, Elwood, Kingston, Mason
31      City .........................................    2,000,000
32    (From Article 91, Section 12 of Public Act 90-585)
33    For replacing radio communication
34      towers and equipment buildings and
 
                            -84-            BOB-CDBnew-re2000
 1      installing emergency power
 2      generators at Andover, Eaton,
 3      Pecatonica, and Cypress ......................    1,150,000
 4    For replacing the roofs and roof
 5      drainage systems at various locations,
 6      at the approximate costs set forth below: ....      110,904
 7       DuQuoin, District #13 .................79,043
 8       Springfield, District #9 and
 9        Supply Building ......................31,861
10    For replacing radio communication
11      towers, equipment, buildings and
12      installing emergency power
13      generators at various locations ..............    1,037,536
14       District #22, Effingham (Mason site)
15       District #10, Pesotum
16       District #21, Askum
17       District #6, Pontiac
18    For replacing the roofing and roof
19      drainage systems at various facilities
20      at the approximate costs set forth
21      below ........................................        1,352
22       District #8, Metamora ..................1,352 ____________
23        Total, Section 11                              $7,203,485

24        Section  11.1.  The  following  named  amount, or so much
25    thereof as may be necessary and  remains  unexpended  at  the
26    close  of  business  on  June 30, 1999, from an appropriation
27    heretofore made in Article  90,  Section  9a  of  Public  Act
28    90-585,  is  reappropriated  from the General Revenue Fund to
29    the Capital Development Board for  the  Department  of  State
30    Police for the project hereinafter enumerated:
31                     TRAINING FACILITY - PAWNEE
32    For rehabilitating the driving track ........... $    513,000
33        Total, Section 11.1                              $513,000
 
                            -85-            BOB-CDBnew-re2000
 1        Section  12.  The  following  named  amounts,  or so much
 2    thereof as may be necessary  and  remain  unexpended  at  the
 3    close  of  business on June 30, 1999, from appropriations and
 4    reappropriations  heretofore  made  for  such   purposes   in
 5    Article  90, Section 10, and Article 91, Section 13 of Public
 6    Act 90-585, are  reappropriated from the Capital  Development
 7    Fund  to  the Capital Development Board for the Department of
 8    Veterans' Affairs for the projects hereinafter enumerated:
 9                   ILLINOIS VETERANS' HOME - ANNA
10    (From Article 91, Section 13 of Public Act 90-585)
11    For purchasing equipment, in addition to funds
12      previously appropriated ...................... $     18,095
13                  ILLINOIS VETERANS' HOME - LASALLE
14    For construction of a storage building  ........      178,380
15    For installation of a medical gas system
16      and for additional funding for a
17      Special Care Unit ............................        8,366
18                  ILLINOIS VETERANS' HOME - MANTENO
19    (From Article 90, Section 10 of Public Act 90-585)
20    For constructing a multi-purpose
21      building .....................................      439,000
22    (From Article 91, Section 13 of Public Act 90-585)
23    For construction of a special care facility ....    5,456,887
24    For replacement of roofs and upgrade
25      of sewer system, in addition to funds
26      previously appropriated ......................       47,886
27    For air conditioning the interconnects .........       41,964
28    For replacement of the roof on Kilbourne,
29      Meyers and Billings and upgrade
30      of sewer system, in addition to
31      funds previously appropriated ................       88,363
32                  ILLINOIS VETERANS' HOME - QUINCY
33    (From Article 90, Section 10 of Public Act 90-585)
34    For improvements to meet licensure
 
                            -86-            BOB-CDBnew-re2000
 1      standards ....................................    9,000,000
 2    (From Article 91, Section 13 of Public Act 90-585)
 3    For renovating Lippincott Hall .................      164,542
 4    For replacing steam lines ......................       83,000
 5    For replacing the domestic hot water loop ......      221,449
 6    For renovating the elevator ....................       72,319
 7        Total, Section 12                             $15,820,251

 8        Section 12.1.  The following named amounts,  or  so  much
 9    thereof  as  may  be  necessary  and remain unexpended at the
10    close of business on June 30, 1999, from  appropriations  and
11    reappropriations heretofore made for such purposes in Article
12    90,  Section  10a, and Article 91, Section 13.1 of Public Act
13    90-585, are reappropriated from the General Revenue  Fund  to
14    the Capital Development Board for the Department of Veterans'
15    Affairs for the projects hereinafter enumerated:
16                   ILLINOIS VETERANS' HOME - ANNA
17    (From Article 90, Section 10a of Public Act 90-585)
18    Complete visitors center, in addition
19      to funds previously appropriated ............. $    100,000
20    For installing lighting, benches,
21      landscaping and ADA improvements .............      934,000
22                  ILLINOIS VETERANS' HOME - LASALLE
23    For installing wall protection .................      107,000
24    (From Article 91, Section 13.1 of Public Act 90-585)
25    For relocating security alarm
26      system .......................................       37,800
27                  ILLINOIS VETERANS' HOME - MANTENO
28    (From Article 90, Section 10a of Public Act 90-585)
29    For tuckpointing and repairing masonry .........    1,026,000
30    (From Article 91, Section 13.1 of Public Act 90-585)
31    For replacing wiring in light poles ............      144,615
32    For replacing exterior doors and frames ........      179,715
33    For replacement of sewer lines, repair and
 
                            -87-            BOB-CDBnew-re2000
 1      replacement of bar screens, and
 2      rehabilitation of the water tower and
 3      reservoir ....................................      172,532
 4                  ILLINOIS VETERANS' HOME - QUINCY
 5    (From Article 90, Section 10a of Public Act 90-585)
 6    For resurfacing Schapers Hospital
 7      parking lot ..................................       91,000
 8        Total, Section 12.1                            $2,792,662

 9        Section  13.  The  following  named  amounts,  or so much
10    thereof as may be necessary  and  remain  unexpended  at  the
11    close  of  business on June 30, 1999, from appropriations and
12    reappropriations heretofore made for such purposes in Article
13    90, Sections 11.01, 11.02, and 11.03; and Article 91, Section
14    14 of Public Act 90-585, are reappropriated from the  Capital
15    Development  Fund  to  the  Capital Development Board for the
16    projects hereinafter enumerated:
17              ATTORNEY GENERAL BUILDING - SPRINGFIELD
18    (From Article 90, Section 11.01 of Public Act 90-585)
19    For planning and annex or addition and
20      beginning construction of
21      parking facilities ........................... $    200,000
22    (From Article 91, Section 14 of Public Act 90-585)
23    For planning energy improvements and upgrading
24      HVAC and electrical systems ..................        6,329
25    For energy improvements and upgrading the
26      HVAC, security and electrical systems,
27      in addition to funds previously
28      appropriated - Attorney General's
29      Building .....................................      179,772
30                 MT. VERNON APPELLATE COURT BUILDING
31    (From Article 90, Section 11.01 of Public Act 90-585)
32    For expanding the courthouse ...................    1,625,000
33                SPRINGFIELD - SUPREME COURT BUILDING
 
                            -88-            BOB-CDBnew-re2000
 1    (From Article 90, Section 11.01 of Public Act 90-585)
 2    For replacing plumbing system ..................    1,000,000
 3    (From Article 91, Section 14 of Public Act 90-585)
 4    For replacement of side walls and steps, in addition
 5      to funds previously appropriated .............       74,857
 6                    SPRINGFIELD - CAPITOL COMPLEX
 7    (From Article 90, Section 11.02 of Public Act 90-585)
 8    For upgrading HVAC system at the Archives
 9      Building, in addition to funds previously
10      appropriated .................................      375,000
11    For renovating 222 South College
12      Building .....................................    2,500,000
13    (From Article 91, Section 14 of Public Act 90-585)
14    For installing fire/security alarm
15      system .......................................    1,050,800
16    For stabilizing the parking ramp ...............      493,719
17    For renovating the interior, exterior and
18      site improvements, in addition to
19      funds previously appropriated -
20      Executive Mansion ............................       79,036
21    For upgrading environmental equipment
22      and HVAC, in addition to funds previously
23      appropriated - Archives Building .............    2,150,000
24    For planning and beginning the rehabilitation
25      of the Power Plant ...........................    3,757,051
26    For upgrading sewer system - Capitol Complex,
27      in addition to funds previously
28      appropriated .................................    1,157,366
29    For renovation of the lower level and
30      ground floor, in addition to funds
31      previously appropriated - Old Power Plant ....      367,703
32    For upgrading the life/safety and security
33      systems - Capitol Building ...................    2,105,256
34    For upgrading the refrigeration equipment -
 
                            -89-            BOB-CDBnew-re2000
 1      Capitol Complex ..............................    2,317,409
 2    For renovating mechanical system -
 3      Capitol Complex, in addition to funds
 4      previously appropriated ......................    1,365,022
 5    For planning and beginning the upgrade
 6      of environmental equipment and HVAC ..........       54,437
 7    For renovation of mechanical systems, in
 8      addition to funds previously appropriated ....       19,804
 9    For upgrading the elevators ....................       11,906
10    For providing a parking facility for the
11      Bloom and Harris Buildings, including
12      land acquisition .............................      248,024
13    For all costs associated with the design
14      and planning for asbestos abatement,
15      window replacement, energy conservation
16      improvements, replacement of carpeting and
17      ceiling tiles, handicap accessibility
18      improvements, and rehabilitation of the
19      water and air distribution systems in the
20      Stratton Office Building .....................      310,572
21    For planning and design and beginning of
22      the rehabilitation of the
23      Springfield Armory ...........................      527,823
24    For renovation of the Waterways Building for
25      the Fourth District of the Appellate Court ...    3,500,240
26             SPRINGFIELD - SIU CONSOLIDATED LABORATORIES
27    For construction of an addition to the
28      laboratory facility for Southern Illinois
29      University, Environmental Protection Agency
30      and Department of Public Health ..............       81,987
31                       STATE CAPITOL BUILDING
32    For upgrading the life/safety and
33      security systems, in addition to
34      funds previously appropriated ................    2,600,000
 
                            -90-            BOB-CDBnew-re2000
 1               STRATTON OFFICE BUILDING - SPRINGFIELD
 2    For installing fire alarm system ...............      400,000
 3                              STATEWIDE
 4    (From Article 90, Section 11.03 of Public Act 90-585)
 5    For surveys and modifications to buildings
 6      to meets requirements of the federal
 7      Americans With Disabilities Act ..............    5,000,000
 8    For retrofitting or upgrading mechanized
 9      refrigeration equipment (CFCs) ...............    7,000,000
10    For abating hazardous materials ................    5,000,000
11    For upgrading and remediating underground
12      storage tanks ................................    7,500,000
13    (From Article 91, Section 14 of Public Act 90-585):
14    For surveys and modifications to
15      buildings to meet requirements of the
16      federal Americans with Disabilities Act ......    5,000,000
17    For abatement of hazardous materials ...........    5,000,000
18    For upgrading/retrofitting mechanized
19      refrigeration equipment (CFC's) ..............    4,598,112
20    For upgrade and remediation of underground
21      storage tanks ................................    3,332,710
22    For renovation to meet the requirements
23      of the Americans with Disabilities Act .......    3,000,000
24    For abatement of hazardous materials ...........    2,085,887
25    For upgrade and remediation of
26      underground storage tanks ....................    1,786,578
27    For survey for and abatement of
28      asbestos-containing materials ................    1,389,934
29    For upgrade/retrofit of mechanized
30      refrigeration equipment (CFC's) ..............    3,984,861
31    For abatement of hazardous conditions,
32      including underground storage tanks,
33      in addition to funds previously
34      appropriated .................................      895,197
 
                            -91-            BOB-CDBnew-re2000
 1    For surveys and modifications to buildings
 2      to meet requirements of the federal
 3      Americans with Disabilities Act ..............   21,618,468
 4    For demolition of buildings ....................    2,685,078
 5    For retrofitting/upgrading mechanical
 6      refrigeration equipment ......................      304,455
 7    For planning and beginning construction of
 8      quick chill food factories ...................      133,946
 9    For abating hazardous conditions, including
10      underground storage tanks, in addition to
11      funds previously appropriated ................      117,584
12    For the planning, upgrade and replacement of
13      potentially hazardous underground storage
14      tanks ........................................      607,016
15    For surveys and abatement of asbestos-
16      containing materials .........................    1,073,533
17    For asbestos abatement located during
18      Asbestos Abatement Authority and other
19      surveys to eliminate significant health
20      hazards ......................................      324,025
21    For planning and abatement of asbestos, and
22      replenishment of initial project
23      construction costs in bondable projects
24      at various state owned facilities ............      391,427
25        Total, Section 13                            $111,387,924

26        Section 13.1.  The sum of $373,000, or so much thereof as
27    may be necessary and  remains  unexpended  at  the  close  of
28    business  on June 30, 1999, from a reappropriation heretofore
29    made for such purpose in Article 90, Section 11.04 of  Public
30    Act  90-585,is  reappropriated  from  the Capital Development
31    Fund to  the  Capital  Development  Board  for  the  Illinois
32    Medical  District  Commission,  to  renovate the Commission's
33    office building, including  replacing  the  HVAC  system  and
 
                            -92-            BOB-CDBnew-re2000
 1    roof.

 2        Section  13.2.  The amount of $51,193, or so much thereof
 3    as may be necessary and remains unexpended at  the  close  of
 4    business  on June 30, 1999, from a reappropriation heretofore
 5    made for such purpose in Article 91, Section 14.1  of  Public
 6    Act  90-585,  is  reappropriated from the Capital Development
 7    Fund  to  the  Capital  Development   Board   for   planning,
 8    construction  and  equipment  for a joint laboratory facility
 9    for  the  Illinois  Environmental  Protection   Agency,   the
10    Department  of  Public  Health,  and  the  Southern  Illinois
11    University  School of Medicine at the SIU Medical Facility in
12    Springfield.

13        Section 13.3.  The sum of $825,000, or so much thereof as
14    may be necessary and remains unexpended  on  June  30,  1999,
15    from  a  reappropriation heretofore made for such purposes in
16    Article  91,  Section  14.2  of   Public   Act   90-585,   is
17    reappropriated  from  the  Capital  Development  Fund  to the
18    Capital Development Board for the Secretary of  State  for  a
19    grant  to the Edgebrook Library for all costs associated with
20    the miscellaneous costs incurred for  construction  or  other
21    purposes.

22        Section  13.4.  The sum of $40,000, or so much thereof as
23    may be necessary and  remains  unexpended  at  the  close  of
24    business  on  June 30, 1999, from an appropriation heretofore
25    made for such purposes in Article 91, Section 14.3 of  Public
26    Act  90-585,  is  reappropriated from the Capital Development
27    Fund to the Capital Development Board for  the  Secretary  of
28    State  for  a  grant  to  the  Wilmette Library for all costs
29    associated with planning, construction,  reconstruction,  and
30    rehabilitation or other purposes.
 
                            -93-            BOB-CDBnew-re2000
 1        Section  14.  The  following  named  amounts,  or so much
 2    thereof as may be necessary  and  remain  unexpended  at  the
 3    close  of  business on June 30, 1999, from appropriations and
 4    reappropriations heretofore made for such purposes in Article
 5    90, Sections 11.01a and 11.03a, and Article 91, Section 15 of
 6    Public  Act  90-585,  are  reappropriated  from  the  General
 7    Revenue  Fund  to  the  Capital  Development  Board  for  the
 8    projects hereinafter enumerated:
 9               SECOND DISTRICT APPELLATE COURT - ELGIN
10    (From Article 90, Section 11.01a of Public Act 90-585)
11    For upgrading mechanical systems
12      and building exterior ........................      190,000
13                   EXECUTIVE MANSION - SPRINGFIELD
14    For renovating interior, exterior and site, in
15      addition to funds previously appropriated ....      190,000
16                              STATEWIDE
17    (From Article 90, Section 11.03a of Public Act 90-585):
18    For surveying and abating asbestos-
19      containing materials .........................    1,000,000
20    For remediating minor problems
21      and emergencies ..............................    3,002,000
22    For conducting construction site
23      archeological studies ........................      245,000
24    For demolishing buildings ......................    4,800,000
25    (From Article 91, Section 15 of Public Act 90-585):
26    For repair of minor problems and
27      emergencies ..................................    3,142,246
28    For construction site archeological
29      studies ......................................      200,000
30    For surveys for and abatement of
31      asbestos-containing material .................      915,902
32    For demolition of buildings ....................    5,000,000
33    For repair of minor problems and
34      emergencies ..................................      389,954
 
                            -94-            BOB-CDBnew-re2000
 1    For tuckpointing and exterior repair
 2      of state buildings ...........................      415,393
 3    For surveys for asbestos containing
 4      material .....................................      131,410
 5    For construction site archaeological
 6      studies ......................................       26,347
 7    For survey of asbestos-containing
 8      materials ....................................      139,312
 9    For repairing minor problems and for
10      emergencies, in addition to funds
11      previously appropriated ......................       31,934
12    For repairing minor problems and emergencies
13      for agencies .................................      218,017
14    For the planning and abatement of asbestos
15      hazards, and replenishment of initial
16      project construction costs in
17      non-bondable projects at various
18      state owned facilities .......................      150,055
19        Total, Section 14                             $20,187,570

20        Section 14.1.  The sum of $203,509, or so much thereof as
21    may be necessary and  remains  unexpended  at  the  close  of
22    business  on  June 30, 1999, from an appropriation heretofore
23    made for such purposes in Article 91, Section 15.4 of  Public
24    Act  90-585,  is reappropriated from the General Revenue Fund
25    to the Capital Development Board for a grant to Lincoln  Land
26    Community   College   for   all  costs  associated  with  the
27    remodeling of Cass Gymnasium.

28        Section 14.2.  The sum of $1,408,035, or so much  thereof
29    as  may  be  necessary and remains unexpended at the close of
30    business on June 30, 1999, from an  appropriation  heretofore
31    made  for such purposes in Article 91, Section 15.5 of Public
32    Act 90-585, is reappropriated from the General  Revenue  Fund
 
                            -95-            BOB-CDBnew-re2000
 1    to  the Capital Development Board for a grant to Lincoln Land
 2    Community  College  for  all  costs   associated   with   the
 3    construction of a new Rural Education and Technology Center.

 4        Section  14.3.  The  sum  of $192,435, or so much of that
 5    amount as may be necessary  and  remains  unexpended  at  the
 6    close  of  business  on June 30, 1999, from a reappropriation
 7    heretofore made for such purposes in Article 91, Section 15.6
 8    of Public  Act  90-585,  is  reappropriated  to  the  Capital
 9    Development  Board  from  the  General  Revenue  Fund for the
10    planning and construction of the Anna Veterans  Home  Visitor
11    Center.

12        Section 14.4.  The amount of $121,342, or so much thereof
13    as  may  be  necessary and remains unexpended at the close of
14    business on June 30, 1999, from an  appropriation  heretofore
15    made  for such purposes in Article 91, Section 15.7 of Public
16    Act 90-585, is reappropriated from the General  Revenue  Fund
17    to  the  Capital  Development  Board  for  planning,  design,
18    construction,  renovation,  and all other necessary costs for
19    the Market House in Galena.

20        Section 14.5.  The sum of $738,010, or so much thereof as
21    may be necessary and remains unexpended  on  June  30,  1999,
22    from  an  appropriation  heretofore made for such purposes in
23    Article  91,  Section  15.8  of   Public   Act   90-585,   is
24    reappropriated  from  the General Revenue Fund to the Capital
25    Development Board for planning  and  renovation  of  Founders
26    Memorial Library at Northern Illinois University.

27        Section  15.  The  amount  of  $26,942,277,  or  so  much
28    thereof  as  may  be  necessary and remains unexpended at the
29    close of business on June 30,  1999,  from  an  appropriation
30    heretofore  made  for such purposes in Article 91, Section 16
 
                            -96-            BOB-CDBnew-re2000
 1    of Public Act  90-585,  is  reappropriated  from  the  School
 2    Infrastructure  Fund  to  the  Capital  Development Board for
 3    school construction project grants  pursuant  to  the  School
 4    Construction Law.

 5        Section  16.  The  sum of $67,000,000, or so much thereof
 6    as may be necessary and remains unexpended at  the  close  of
 7    business  on  June 30, 1999, from an appropriation heretofore
 8    made for such purposes in Article 90, Section  16  of  Public
 9    Act  90-585, is reappropriated from the School Infrastructure
10    Fund to the Capital Development Board for school construction
11    grants pursuant to the School Construction Law.

12        Section 17.  The sum of $243,696,855, or so much  thereof
13    as  may  be  necessary and remains unexpended at the close of
14    business on June 30, 1999, from an  appropriation  heretofore
15    made  for  such  purposes in Article 90, Section 17 of Public
16    Act 90-585, is reappropriated from  the  School  Construction
17    Fund to the Capital Development Board for school construction
18    grants pursuant to the School Construction Law.


19        Section  18.  The  sum of $270,189, or so much thereof as
20    may be necessary and  remains  unexpended  at  the  close  of
21    business  on June 30, 1999, from a reappropriation heretofore
22    made for such purposes in Article 91, Section  17  of  Public
23    Act  90-585,  is  reappropriated  from the Asbestos Abatement
24    Fund to the Capital Development Board for asbestos surveys in
25    relation to the  asbestos  abatement  of  State  Governmental
26    Buildings.

27        Section  19.  The  following  named  amounts,  or so much
28    thereof as may be necessary  and  remain  unexpended  at  the
29    close  of  business on June 30, 1999, from appropriations and
 
                            -97-            BOB-CDBnew-re2000
 1    reappropriations heretofore made for such purposes in Article
 2    90, Section 13, and Article 91,  Section  18  of  Public  Act
 3    90-585,  are reappropriated from the Capital Development Fund
 4    to the Capital Development Board  for  the  Board  of  Higher
 5    Education for the projects hereinafter enumerated:
 6          ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA
 7    (From Article 90, Section 13 of Public Act 90-585)
 8    For replacing carpeting, constructing storage
 9      building and various site improvements,
10      including extending communications
11      conduit system ............................... $  1,310,000
12    (From Article 91, Section 18 of Public Act 90-585)
13    For replacing air conditioning units,
14      controls and upgrading the energy
15      management system ............................    2,330,390
16    For remodeling the Information Resource
17      Technology Center ............................       59,521
18    For renovation of the laboratory areas,
19      including a greenhouse .......................       59,817
20    For the purchase, renovation and improvement
21      of the North Campus High School site of
22      the Aurora West School District 129,
23      including construction of four dormitories,
24      equipment purchases and other expenses for
25      use by the Illinois Mathematics and Science
26      Academy ......................................    1,198,505
27        Total, Section 19                              $4,958,233

28        Section  20.  The  following  named  amounts,  or so much
29    thereof as may be necessary  and  remain  unexpended  at  the
30    close  of  business on June 30, 1999, from appropriations and
31    reappropriations heretofore made for such purposes in Article
32    90, Section 12, and Article 91, Section 19 of of  Public  Act
33    90-585,  are reappropriated from the Capital Development Fund
 
                            -98-            BOB-CDBnew-re2000
 1    to the Capital Development Board for the  Illinois  Community
 2    College Board for the projects hereinafter enumerated:
 3                       BELLEVILLE AREA COLLEGE
 4    (From Article 91, Section 19 of Public Act 90-585)
 5    For constructing a building, additions
 6      and site improvements at the
 7      Belleville and Red Bud campuses,
 8      in addition to funds previously
 9      appropriated .................................  $ 9,755,834
10    For planning buildings, additions and
11      site improvements ............................      545,565
12                CITY COLLEGES OF CHICAGO/KENNEDY KING
13    (From Article 90, Section 12 of Public Act 90-585)
14    For remodeling for a culinary arts
15      educational facility .........................   10,875,000
16    (From Article 91, Section 19 of Public Act 90-585)
17         DANVILLE AREA COMMUNITY COLLEGE - VERMILION COUNTY
18    To rehabilitate infrastructure,
19      construct a classroom facility
20      and a day care center, in addition
21      to funds previously appropriated .............    1,722,476
22    For rehabilitation of infrastructure
23      and beginning construction of a
24      classroom facility ...........................      977,353
25    For rehabilitation of the infrastructure and
26      planning campus buildings ....................      727,990
27                          COLLEGE OF DUPAGE
28    For completing the addition to
29      the Student Resource Center ..................      141,532
30                       ELGIN COMMUNITY COLLEGE
31    For construction of addition, site improvements,
32      remodeling and purchasing equipment ..........      512,362
33    For planning, design, site improvements, utility
34      adjustments, and any other costs associated
 
                            -99-            BOB-CDBnew-re2000
 1      with construction of a new Instructional
 2      Building at Elgin Community College ..........       66,600
 3              HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON
 4    For constructing buildings and making
 5      site improvements, including equipment .......   19,208,135
 6    For planning buildings, parking areas,
 7      utilities, and site development and
 8      preliminary site preparation
 9      required to establish permanent
10      campus facilities ............................    1,772,950
11            JOHN A. LOGAN COMMUNITY COLLEGE - CARTERVILLE
12    For constructing additions and site
13      improvements, in addition to funds
14      previously appropriated ......................   10,840,477
15    For construction of classroom facility,
16      and remodeling the existing facility,
17      including utilities and site improvements ....       24,745
18                JOHN WOOD COMMUNITY COLLEGE - QUINCY
19    (From Article 90, Section 12 of Public Act 90-585)
20    For planning campus buildings and site
21      improvements .................................    1,871,800
22    (From Article 91, Section 19 of Public Act 90-585)
23    For construction of a science and technology
24      center and access road .......................        8,978
25                        JOLIET JUNIOR COLLEGE
26    (From Article 90, Section 12 of Public Act 90-585)
27    For remodeling campus buildings ................      220,900
28    (From Article 91, Section 19 of Public Act 90-585)
29    For construction of a business and technology
30      center and remodeling the main campus
31      building .....................................      107,081
32    For planning, design and site preparation of
33      a Business Technology Center .................        2,983
34                       COLLEGE OF LAKE COUNTY
 
                            -100-           BOB-CDBnew-re2000
 1    For construction of a multi-use Instructional
 2      Center, including acquisition of equipment
 3      and remodeling of existing facilities ........       17,407
 4    (From Article 90, Section 12 of Public Act 90-585)
 5                     LAKE LAND COLLEGE - MATTOON
 6    For constructing a classroom/administration
 7      building and purchasing equipment, in addition
 8      to funds previously appropriated .............    5,336,800
 9             LEWIS AND CLARK COMMUNITY COLLEGE - GODFREY
10    For constructing a classroom/administration
11      building .....................................   10,125,000
12    (From Article 91, Section 19 of Public Act 90-585)
13    For renovation of buildings, construction of an
14      addition and site improvements ...............       27,764
15    For construction of health, mathematics and
16      science laboratory facilities and
17      remodeling Fobes Hall ........................      259,974
18    For renovation of the main complex .............       14,925
19    For planning, design, and site preparation,
20      and construction of a multi-purpose
21      building .....................................       22,932
22            LINCOLN LAND COMMUNITY COLLEGE - SPRINGFIELD
23    (From Article 90, Section 12 of Public Act 90-585)
24    For constructing an addition and remodeling
25      Sangamon and Menard Halls ....................    3,777,700
26    (From Article 91, Section 19 of Public Act 90-585)
27                       MCHENRY COUNTY COLLEGE
28    For construction of an addition, including
29      equipment, a parking area and
30      site improvements ............................       19,993
31           MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS
32    (From Article 90, Section 12 of Public Act 90-585)
33    For constructing a classroom/administration
34      building, providing site improvements and
 
                            -101-           BOB-CDBnew-re2000
 1      purchasing equipment, in addition to
 2      funds previously appropriated ................    8,309,200
 3    (From Article 91, Section 19 of Public Act 90-585)
 4    For planning and constructing a new classroom
 5      facility .....................................      362,212
 6    For providing for an architectural engineering
 7      study, renovations, construction,
 8      reconstruction and remodeling of Buildings
 9      A, B and L ...................................      417,365
10          PRAIRIE STATE COMMUNITY COLLEGE - CHICAGO HEIGHTS
11    For construction of a Learning Resource
12      Center addition ..............................       19,180
13                       REND LAKE COLLEGE - INA
14    (From Article 90, Section 12 of Public Act 90-585)
15    For constructing a north access road,
16      including security lighting and drainage .....      365,269
17    For replacing utility piping ...................    1,546,400
18    (From Article 91, Section 19 of Public Act 90-585)
19    For construction of an aquatic and
20      rehabilitation center ........................       13,443
21                  SHAWNEE COMMUNITY COLLEGE - ULLIN
22    For constructing additions, parking
23      facilities, and renovating buildings,
24      including equipment ..........................    7,328,707
25             SOUTHEASTERN ILLINOIS COLLEGE - HARRISBURG
26    For construction of humanities,
27      administration, and child care facilities
28      and remodeling campus buildings ..............       61,417
29               TRITON COMMUNITY COLLEGE - RIVER GROVE
30    For planning, site improvements, construction
31      and other expenses necessary for the
32      construction of an addition to the Learning
33      Resource Center ..............................      115,893
34         WILLIAM RAINEY HARPER COMMUNITY COLLEGE - PALATINE
 
                            -102-           BOB-CDBnew-re2000
 1    For constructing a Multi-purpose
 2      Instructional Center and renovating
 3      Building A Cafeteria .........................    6,823,200
 4    For planning, developing, and designing a
 5      multi-purpose telecommunications
 6      instructional delivery center ................      113,812
 7                  STATEWIDE - CONSTRUCTION DEFECTS
 8    For planning, construction and renovation
 9      to correct defectively designed or
10      constructed community college facilities,
11      provided that monies recovered based upon
12      claims arising out of such defective design
13      or construction shall be paid to the state
14      as required by Section 105.12 of the Public
15      Community College Act as reimbursement for
16      monies expended pursuant to this
17      appropriation ................................    1,016,231
18        Total, Section 20                            $105,477,585

19        Section  20A.  The  sum of $4,941,654, or so much thereof
20    as may be necessary and remains unexpended at  the  close  of
21    business  on June 30, 1999, from a reappropriation heretofore
22    made for such purposes in Article 91, Section 19A  of  Public
23    Act  90-585,  is  reappropriated from the Capital Development
24    Fund to  the  Capital  Development  Board  for  the  Illinois
25    Community    College    Board   for   miscellaneous   capital
26    improvements    including    construction,    reconstruction,
27    remodeling, improvement, repair and installation  of  capital
28    facilities, cost of planning, supplies, equipment, materials,
29    services and all other expenses required to complete the work
30    at  the various community colleges.  This appropriation shall
31    be in addition to any other appropriated amounts which can be
32    expended for these purposes.
 
                            -103-           BOB-CDBnew-re2000
 1        Section 20B.  The sum of $6,343,805, or so  much  thereof
 2    as  may  be  necessary and remains unexpended at the close of
 3    business on June 30, 1999, from a reappropriation  heretofore
 4    made  for  such purposes in Article 91, Section 19B of Public
 5    Act 90-585, is reappropriated from  the  Capital  Development
 6    Fund  to  the  Capital  Development  Board  for  the Illinois
 7    Community   College   Board   for    miscellaneous    capital
 8    improvements    including    construction,    reconstruction,
 9    remodeling,  improvement,  repair and installation of capital
10    facilities, cost of planning, supplies, equipment, materials,
11    services and all other expenses required to complete the work
12    at the various community colleges.  This appropriation  shall
13    be in addition to any other appropriated amounts which can be
14    expended for these purposes.

15        Section  20C.  The  sum of $2,521,400, or so much thereof
16    as may be necessary and remains unexpended at  the  close  of
17    business  on June 30, 1999, from a reappropriation heretofore
18    made for such purposes in  Article 91, Section 19C of  Public
19    Act  90-585,  is  reappropriated from the Capital Development
20    Fund to  the  Capital  Development  Board  for  the  Illinois
21    Community  College Board for grants to community colleges for
22    miscellaneous capital  improvements  including  construction,
23    reconstruction,    remodeling,   improvements,   repair   and
24    installation  of  capital  facilities,  cost   of   planning,
25    supplies,  equipment,  materials,  services,  and  all  other
26    expenses  required  to  complete the work. This appropriation
27    shall be in addition to any other appropriated amounts  which
28    can be expended for these purposes.

29        Section  20D.  The  sum of $3,756,000, or so much thereof
30    as may be necessary and remains unexpended at  the  close  of
31    business  on  June 30, 1999, from an appropriation heretofore
32    made for such purpose in Article 90, Section 15 of Public Act
 
                            -104-           BOB-CDBnew-re2000
 1    90-585 is reappropriated from the Capital Development Fund to
 2    the Capital Development  Board  for  the  Illinois  Community
 3    College   Board   for   miscellaneous   capital  improvements
 4    including construction, capital facilities, cost of planning,
 5    supplies,  equipment,  materials,  services  and  all   other
 6    expenses  required  to  complete  the  work  at  the  various
 7    community  colleges.  This appropriation shall be in addition
 8    to any other appropriated amounts which can be  expended  for
 9    these purposes.

10        Section  21.  The  following  named  amounts,  or so much
11    thereof as may be necessary  and  remain  unexpended  at  the
12    close  of  business on June 30, 1999, from appropriations and
13    reappropriations heretofore made for such purposes in Article
14    90, Section 13 and Article  91,  Section  20  of  Public  Act
15    90-585,  are reappropriated from the Capital Development Fund
16    to the Capital Development Board  for  the  Board  of  Higher
17    Education for the projects hereinafter enumerated:
18                      CHICAGO STATE UNIVERSITY
19    (From Article 90, Section 13 of Public Act 90-585)
20    For upgrading campus infrastructure,
21      in addition to the funds
22      previously appropriated ......................    2,700,000
23    (From Article 91, Section 20 of Public Act 90-585)
24    For renovating buildings and upgrading
25      mechanical systems ...........................  $ 3,300,000
26    For renovating campus buildings and
27      upgrading mechanical systems .................    2,432,200
28    For providing campus health and safety
29      improvements .................................       40,221
30              EASTERN ILLINOIS UNIVERSITY - CHARLESTON
31    (From Article 90, Section 13 of Public Act 90-585)
32    For upgrading campus buildings for health,
33      safety and environmental improvements ........    1,302,100
 
                            -105-           BOB-CDBnew-re2000
 1    (From Article 91, Section 20 of Public Act 90-585)
 2    For constructing an addition and
 3      renovating Booth Library .....................   16,764,500
 4    For planning an addition and renovation
 5      of Booth Library .............................      771,992
 6    For construction of an addition and
 7      remodeling Buzzard Building ..................      199,327
 8    For upgrading the energy management system
 9      and HVAC systems and installation of a chilled
10      water loop between various buildings .........       31,252
11    For completing conversion to a coal-fired
12      power plant ..................................       52,986
13    For completion of the construction and
14      renovation of the heating system .............       37,703
15    For planning, equipment, site improvements,
16      construction and renovation of the heating
17      system to restore coal burning capability ....       30,429
18              GOVERNORS STATE UNIVERSITY - PARK FOREST
19    (From Article 90, Section 13 of Public Act 90-585)
20    For planning and beginning the
21      main building renovations,
22      a child development center, and
23      faculty offices ..............................    1,500,000
24    (From Article 91, Section 20 of Public Act 90-585)
25    For upgrading and replacing cooling
26      and refrigeration systems and
27      equipment ....................................    1,985,811
28    For renovation of the main building ............      422,825
29    For remodeling Main Building ...................      346,063
30    For renovation of the main building ............       49,954
31    For remodeling the main building ...............      171,802
32    (From Article 90, Section 13 of Public Act 90-585)
33                 ILLINOIS STATE UNIVERSITY - NORMAL
34    For remodeling Julian and Moulton Halls ........    7,050,000
 
                            -106-           BOB-CDBnew-re2000
 1             NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
 2    For replacing fire alarm systems, lighting
 3      and ceilings .................................    2,561,800
 4    (From Article 91, Section 20 of Public Act 90-585)
 5    For renovating the auditorium in
 6      Building E ...................................    7,131,614
 7    For upgrading the boilers and related
 8      control systems ..............................       12,626
 9    For fire safety modifications at the
10      facility .....................................      981,903
11    For renovation of Buildings E, F, and
12      the auditorium, and demolition and
13      replacement of Buildings G, J and M,
14      in addition to amounts previously
15      appropriated .................................      829,569
16    For remodeling the library .....................      171,978
17                NORTHERN ILLINOIS UNIVERSITY - DEKALB
18    For renovating Altgeld Hall and
19      purchasing equipment .........................   19,150,400
20    (From Article 90, Section 13 of Public Act 90-585)
21    For upgrading storm waterway controls in
22      addition to funds previously appropriated ....    6,716,000
23              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
24    For upgrading and remodeling Anthony Hall ......    3,131,100
25    (From Article 91, Section 20 of Public Act 90-585)
26    For site improvements and purchasing
27      equipment for the Engineering and
28      Technology Building ..........................      423,681
29    For planning addition, remodeling and
30      upgrading the HVAC system in Altgeld Hall ....      574,000
31             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
32    For construction of the Engineering Facility
33      building and related site improvements .......   16,893,162
34    (From Article 90, Section 13 of Public Act 90-585)
 
                            -107-           BOB-CDBnew-re2000
 1    For planning and beginning construction
 2      or renovation for a classroom/administration
 3      facility in addition to funds previously
 4      appropriated .................................    1,179,600
 5                  UNIVERSITY OF ILLINOIS - CHICAGO
 6    For remodeling the Clinical
 7      Sciences Building ............................   15,000,000
 8    (From Article 91, Section 20 of Public Act 90-585)
 9    For the renovation of the court area and
10      Lecture Center, in addition to funds
11      previously appropriated ......................    3,760,506
12              UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN
13    For constructing an Agricultural
14      Library ......................................    9,500,000
15    For completion of campus flood control .........    6,000,000
16    (From Article 90, Section 13 of Public Act 90-585)
17    For remodeling the Mechanical Engineering
18      Laboratory Building ..........................    7,365,000
19                UNIVERSITY OF ILLINOIS - SPRINGFIELD
20    For constructing and improving campus
21      roadways, in addition to funds previously
22      appropriated .................................    2,252,855
23                WESTERN ILLINOIS UNIVERSITY - MACOMB
24    (From Article 91, Section 20 of Public Act 90-585)
25    For remodeling Horrabin Hall and
26      beginning to convert Simpkins Hall
27      gymnasium and adjacent areas into
28      a performing arts facility ...................    2,153,696
29    For construction of a steam and electrical
30      utility tunnel ...............................      211,374
31    (From Article 90, Section 13, Public Act 90-585)
32    For constructing a utility tunnel and
33      installing piping, lines and cables ..........    6,313,400
34    For remodeling Horrabin and Simpkins
 
                            -108-           BOB-CDBnew-re2000
 1      Halls, in addition to funds
 2      previously appropriated.......................    1,655,400
 3        Total, Section 21                            $153,158,829

 4        Section 21.1.  The sum of $237,635, or so much thereof as
 5    may  be  necessary  and  remains  unexpended  at the close of
 6    business on June 30, 1999, from a reappropriation  heretofore
 7    made for such purposes in  Article 91, Section 20.1 of Public
 8    Act  90-585,  is  reappropriated from the Capital Development
 9    Fund to the Capital Development Board for the Board of Higher
10    Education for miscellaneous  capital  improvements  including
11    construction, reconstruction, remodeling, improvement, repair
12    and  installation  of  capital  facilities, cost of planning,
13    supplies,  equipment,  materials,  services  and  all   other
14    expenses required for completing the the work at the colleges
15    and universities.  This appropriation shall be in addition to
16    any  other  appropriated  amounts  which  can be expended for
17    these purposes.

18        Section 21.2.  The following named amounts,  or  so  much
19    thereof  as  may  be  necessary  and remain unexpended at the
20    close of business on June  30,  1999,  from  reappropriations
21    heretofore made for such purposes in Article 91, Section 20.2
22    of  Public  Act  90-585,  are reappropriated from the Capital
23    Development Fund to the Capital  Development  Board  for  the
24    Board   of   Higher   Education   for  miscellaneous  capital
25    improvements    including    construction,    reconstruction,
26    remodeling, improvement, repair and installation  of  capital
27    facilities, cost of planning, supplies, equipment, materials,
28    services and all other expenses required to complete the work
29    at the colleges and universities hereinafter enumerated. This
30    appropriation  shall be in addition to any other appropriated
31    amounts which can be expended for these purposes:
32      Eastern Illinois University .................. $     24,385
 
                            -109-           BOB-CDBnew-re2000
 1      Northeastern Illinois University .............      149,786
 2      Western Illinois University ..................      455,704
 3        Total, Section 21.2                              $629,875

 4        Section 21.3.  The sum of $14,663,596, or so much thereof
 5    as may be necessary and remains unexpended at  the  close  of
 6    business  on June 30, 1999, from a reappropriation heretofore
 7    made for such purposes in Article 91, Section 20.3 of  Public
 8    Act  90-585,  is  reappropriated from the Capital Development
 9    Fund to the Capital Development Board for the Board of Higher
10    Education for miscellaneous  capital improvements,  including
11    construction, reconstruction, remodeling, improvement, repair
12    and  installation  of  capital  facilities, cost of planning,
13    supplies,  equipment,  materials,  services  and  all   other
14    expenses  required  to  complete  the  work  at  the  various
15    universities set forth below.  This appropriation shall be in
16    addition  to  any  other  appropriated  amounts  which can be
17    expended for these purposes.
18      For Chicago State University ......... 301,400
19      For Eastern Illinois University ...... 564,100
20      For Governors State University ....... 122,972
21      For Illinois State University ...... 1,150,279
22      For Northeastern Illinois University . 423,700
23      For Northern Illinois University ... 1,287,700
24      For Western Illinois University ...... 858,250
25      For Southern Illinois University -
26       Carbondale ........................ 1,808,728
27      For Southern Illinois University -
28       Edwardsville ........................ 751,500
29      For University of Illinois -
30       Chicago ........................... 3,280,400
31      For University of Illinois -
32       Springfield ......................... 134,267
33      For University of Illinois -
 
                            -110-           BOB-CDBnew-re2000
 1       Urbana-Champaign .................. 3,980,300

 2        Section 21.4.  The sum of $11,244,000, or so much thereof
 3    as may be necessary and remains unexpended at  the  close  of
 4    business  on  June 30, 1999, from an appropriation heretofore
 5    made for such purposes in Article 90, Section  14  of  Public
 6    Act  90-585,  is  reappropriated from the Capital Development
 7    Fund to the Capital Development Board for the Board of Higher
 8    Education for miscellaneous  capital  improvements  including
 9    construction,  capital  facilities, cost of planning, various
10    universities set forth below.  This appropriation shall be in
11    addition to any  other  appropriated  amounts  which  can  be
12    expended for these purposes.
13    For Chicago State University ........... 226,000
14    For Eastern Illinois University ........ 423,100
15    For Governors State University ......... 136,200
16    For Illinois State University .......... 863,000
17    For Northeastern Illinois University ... 317,800
18    For Northern Illinois University ....... 965,800
19    For Western Illinois University ........ 646,800
20    For Southern Illinois University -
21      Carbondale ......................... 1,493,600
22    For Southern Illinois University -
23      Edwardsville ......................... 563,600
24    For University of Illinois - Chicago . 2,460,300
25    For University of Illinois -
26      Springfield .......................... 162,600
27    For University of Illinois -
28      Urbana-Champaign ................... 2,985,200

29        Section  22.  The  following  named  amounts,  or so much
30    thereof as may be necessary  and  remain  unexpended  at  the
31    close  of  business  on  June 30, 1999, from reappropriations
32    heretofore made for such purposes in  Article 91, Section  21
 
                            -111-           BOB-CDBnew-re2000
 1    of  Public  Act  90-585,  are reappropriated from the Capital
 2    Development Fund to the Capital  Development  Board  for  the
 3    Board  of  Higher  Education  for  the  projects  hereinafter
 4    enumerated:
 5                 ILLINOIS STATE UNIVERSITY - NORMAL
 6    For construction of science laboratory
 7      facilities ................................... $    173,569
 8                    NORTHERN ILLINOIS UNIVERSITY
 9    For upgrading the storm waterway controls
10      and campus drives ............................    1,023,738
11    For construction of tunnels and installation
12      of utility piping ............................       30,177
13    For renovation of heating plants and the
14      HVAC system ..................................       54,699
15               NORTHERN ILLINOIS UNIVERSITY - ROCKFORD
16    For construction of the Rockford Center
17      facilities ...................................       35,982
18        Total, Section 22                              $1,318,165

19        Section  22.1.  The sum of $2,174,555, or so much thereof
20    as may be necessary and remains unexpended at  the  close  of
21    business  on June 30, 1999, from a reappropriation heretofore
22    made for such purposes in  Article 91, Section 21.1 of Public
23    Act 90-585, is reappropriated from  the  Capital  Development
24    Fund to the Capital Development Board for the Board of Higher
25    Education  for  miscellaneous capital improvements, including
26    construction, reconstruction, remodeling, improvement, repair
27    and installation of capital  facilities,  cost  of  planning,
28    supplies,   equipment,  materials,  services  and  all  other
29    expenses required for completing the the work at the colleges
30    and universities.  This appropriation shall be in addition to
31    any other appropriated amounts  which  can  be  expended  for
32    these purposes.
 
                            -112-           BOB-CDBnew-re2000
 1        Section  22.2.  The  following  named amounts, or so much
 2    thereof as may be necessary  and  remain  unexpended  at  the
 3    close  of  business  on  June 30, 1999, from reappropriations
 4    heretofore made for such purposes in Article 91, Section 21.2
 5    of Public Act 90-585, are  reappropriated  from  the  Capital
 6    Development  Fund  to  the  Capital Development Board for the
 7    Board  of  Higher   Education   for   miscellaneous   capital
 8    improvements,    including    construction,   reconstruction,
 9    remodeling, improvements, repair and installation of  capital
10    facilities, cost of planning, supplies, equipment, materials,
11    services,  and  all  other  expenses required to complete the
12    work at the colleges and universities hereinafter enumerated.
13    This  appropriation  shall  be  in  addition  to  any   other
14    appropriated   amounts   which  can  be  expended  for  these
15    purposes:
16    Northern Illinois University ...................    1,185,487
17        Total, Section 22.2                            $1,185,487

18        Section 22.3.  The sum of $21,156, or so much thereof  as
19    may  be  necessary  and  remains  unexpended  at the close of
20    business on June 30, 1999, from a reappropriation  heretofore
21    made  for such purposes in Article 91, Section 21.3 of Public
22    Act 90-585, is reappropriated from  the  Capital  Development
23    Fund to the Capital Development Board for the Board of Higher
24    Education for Northern Illinois University, for the planning,
25    architectural  engineering,  purchase,  site improvements and
26    construction or remodeling of a site in Rockford for use as a
27    campus.

28        Section 22.4.  The following named amounts,  or  so  much
29    thereof  as  may  be  necessary, and remain unexpended at the
30    close of business  on  June  30,  1999,  from  appropriations
31    heretofore made for such purposes in Article 91, Section 21.4
32    of  Public  Act  90-585,  are reappropriated from the Capital
 
                            -113-           BOB-CDBnew-re2000
 1    Development Fund to the Capital  Development  Board  for  the
 2    Board   of   Higher   Education   for  miscellaneous  capital
 3    improvements    including    construction,    reconstruction,
 4    remodeling, improvement, repair and installation  of  capital
 5    facilities, cost of planning, supplies, equipment, materials,
 6    services and all other expenses required to complete the work
 7    at   the   various   universities   set  forth  below.   This
 8    appropriation shall be in addition to any other  appropriated
 9    amounts which can be expended for these purposes.
10      For Chicago State University ................. $    508,212
11      For Eastern Illinois University ..............      528,004
12      For Governors State University ...............      185,351
13      For Illinois State University ................    1,536,981
14      For Northeastern Illinois University .........      735,000
15      For Northern Illinois University .............    2,162,141
16      For Southern Illinois University .............    1,564,754
17      For University of Illinois ...................    8,329,783
18      For Western Illinois University ..............    1,465,825
19        Total, Section 22.4                           $17,016,051

20        Section  23.  The  following  named  amounts,  or so much
21    thereof as may be necessary  and  remain  unexpended  at  the
22    close  of  business  on  June 30, 1999, from reappropriations
23    heretofore made for such purposes in  Article 91, Section  22
24    of  Public  Act  90-585,  are reappropriated from the Capital
25    Development Fund to the Capital  Development  Board  for  the
26    Board  of  Trustees  of  Southern Illinois University for the
27    projects hereinafter enumerated:
28                          CARBONDALE CAMPUS
29    For construction of an engineering building
30      annex ........................................ $     77,968
31    For remodeling the Communications Building .....        9,756
32                         EDWARDSVILLE CAMPUS
33    For replacement of the high temperature water
 
                            -114-           BOB-CDBnew-re2000
 1      distribution system ..........................      188,842
 2    For infrastructure, site development, and
 3      other necessary costs associated with
 4      the development of University Park ...........        7,501
 5    For costs associated with the consolidation
 6      of the music facilities ......................       24,336
 7    For planning and construction of an Art and
 8      Design Facility ..............................       25,089
 9        Total, Section 23                                $333,492

10        Section 23.1.  The sum of $817,493, or so much thereof as
11    may be necessary and  remains  unexpended  at  the  close  of
12    business  on June 30, 1999, from a reappropriation heretofore
13    made for such purposes in  Article 91, Section 22.1 of Public
14    Act 90-585, is reappropriated from  the  Capital  Development
15    Fund  to  the Capital Development Board for Southern Illinois
16    University for miscellaneous capital  improvements  including
17    construction,   reconstruction,   remodeling,   improvements,
18    repair  and  installation  of  capital  facilities,  cost  of
19    planning,  supplies,  equipment, materials, services, and all
20    other  expenses  required  to  complete   the   work.    This
21    appropriation  shall be in addition to any other appropriated
22    amounts which can be expended for these purposes.

23        Section 24.  The following  named  amounts,  or  so  much
24    thereof  as  may  be  necessary  and remain unexpended at the
25    close of business on June  30,  1999,  from  reappropriations
26    heretofore  made for such purposes in  Article 91, Section 23
27    of Public Act 90-585, are  reappropriated  from  the  Capital
28    Development  Fund  to  the  Capital Development Board for the
29    Board of Trustees of  the  University  of  Illinois  for  the
30    projects hereinafter enumerated:
31                    UNIVERSITY CENTER - CHICAGO
32    For remodeling Alumni Hall, Phase II,
 
                            -115-           BOB-CDBnew-re2000
 1      including utilities ..........................       83,708
 2                        HEALTH SCIENCE CENTER
 3    For remodeling the Neuropsychiatric
 4      Institute ....................................      746,749
 5                       URBANA-CHAMPAIGN CAMPUS
 6    For initiating a campus flood
 7      control project ..............................    1,296,572
 8        Total, Section 24                              $2,127,029

 9        Section  24.1.  The sum of $3,715,959, or so much thereof
10    as may be necessary and remains unexpended at  the  close  of
11    business  on June 30, 1999, from a reappropriation heretofore
12    made for such purposes in  Article 91, Section 23.1 of Public
13    Act 90-585, is reappropriated from  the  Capital  Development
14    Fund  to  the  Capital  Development  Board  for  the Board of
15    Trustees of the  University  of  Illinois  for  miscellaneous
16    capital  improvements including construction, reconstruction,
17    remodeling, improvement, repair and installation  of  capital
18    facilities, cost of planning, supplies, equipment, materials,
19    services  and  all other expenses required for completing the
20    work at the colleges and  universities.   This  appropriation
21    shall  be in addition to any other appropriated amounts which
22    can be expended for these purposes.

23        Section 24.2.  The following named  amount,  or  so  much
24    thereof  as  may  be  necessary and remains unexpended at the
25    close of business on June 30, 1999,  from  a  reappropriation
26    heretofore made for such purposes in Article 91, Section 23.2
27    of  Public  Act  90-585,  is  reappropriated from the General
28    Revenue Fund to the Capital Development Board for  the  Board
29    of  Trustees  of  the  University of Illinois for the project
30    hereinafter enumerated:
31                   HEALTH SCIENCE CENTER - CHICAGO
32    For energy conservation improvements at
 
                            -116-           BOB-CDBnew-re2000
 1      Taylor Street Hospital, the College of
 2      Pharmacy Building, and the Clinical
 3      Science Building ............................. $     24,780
 4        Total, Section 24.2                               $24,780

 5        Section 24.3.  The sum of $4,500,000, or so much  thereof
 6    as  may  be  necessary and remains unexpended at the close of
 7    business on June 30, 1999, from a reappropriation  heretofore
 8    made  for such purposes in Article 91, Section 23.3 of Public
 9    Act 90-585, is reappropriated from  the  Capital  Development
10    Fund  to  the  Capital  Development  Board  for  the Board of
11    Trustees of the University  of  Illinois  (formerly  for  the
12    Department of Human Services) for renovation of the School of
13    Public  Health  and  Psychiatric Institute (formerly the ISPI
14    building).

15        Section 25.  The following  named  amounts,  or  so  much
16    thereof  as  may  be  necessary, and remain unexpended at the
17    close of business on June 30, 1999, from an appropriation and
18    reappropriations heretofore made for such purposes in Article
19    90, Section 13 and Article  91,  Section  24  of  Public  Act
20    90-585,  are reappropriated from the Capital Development Fund
21    to  the  following  Universities  (formerly  to  the  Capital
22    Development Board for  the  Universities)  for  the  projects
23    hereinafter enumerated:
24    (From Article 91, Section 24 of Public Act 90-585)
25             NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO
26    For purchasing equipment
27      for the Fine Arts Complex ....................    4,000,000
28              SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE
29    For purchasing Bio-Science building
30      equipment ....................................        8,086
31             SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE
32    (From Article 90, Section 13 of Public Act 90-585)
 
                            -117-           BOB-CDBnew-re2000
 1    For purchasing equipment for the Engineering
 2      Building .....................................    6,000,000
 3              UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN
 4    (From Article 91, Section 24 of Public Act 90-585)
 5    For purchasing equipment for Temple
 6      Hoyne Buell Hall .............................       99,494
 7        Total, Section 25                             $10,107,580

 8        Section   26.  In  addition  to  any  amounts  heretofore
 9    appropriated for such purposes, the sum of $1,802, or so much
10    thereof as may be necessary and  remains  unexpended  at  the
11    close  of  business  on June 30, 1999, from a reappropriation
12    heretofore made for such purposes in Article 91,  Section  25
13    of  Public  Act  90-585,  is  reappropriated from the Capital
14    Development Fund to the  Secretary  of  State  for  planning,
15    remodeling,  relocation,  permanent  equipment, and any other
16    related expenses,  including  architectural  and  engineering
17    fees  associated  with  construction and remodeling of office
18    space and other support areas under the jurisdiction  of  the
19    House of Representatives, and to various legislative services
20    agencies in both the Capitol and Stratton Office Buildings.

21        Section  27.  The  sum of $300,000, or so much thereof as
22    may be necessary and  remains  unexpended  at  the  close  of
23    business  on  June 30, 1999, from an appropriation heretofore
24    made for such purposes in Article 90, Section  19  of  Public
25    Act  90-585,  is reappropriated from the General Revenue Fund
26    to the Capital Development Board for a grant  to  the  Nipper
27    School   in   Maryville   for   all   costs  associated  with
28    infrastructure improvements, including, but not  limited  to,
29    roof and mechanical system replacement.

30        Section  28.  The  sum  of $50,000, or so much thereof as
31    may be necessary and  remains  unexpended  at  the  close  of
 
                            -118-           BOB-CDBnew-re2000
 1    business  on  June 30, 1999, from an appropriation heretofore
 2    made for such purposes in Article 90, Section  24  of  Public
 3    Act  90-585, as amended by Section 8 of House Bill 871 of the
 4    90th General Assembly, is  reappropriated  from  the  General
 5    Revenue  Fund to the Capital Development Board for a grant to
 6    the Tilden Fire Protection  District  for  land  acquisition,
 7    planning,  design,  construction, reconstruction, renovation,
 8    rehabilitation, and all other costs associated with the  fire
 9    district building project.

10        Section  29.  The  sum of $189,987, or so much thereof as
11    may be necessary and  remains  unexpended  at  the  close  of
12    business  on  June 30, 1999, from an appropriation heretofore
13    made for such purposes in Article 90, Section  30  of  Public
14    Act  90-585,  is  reappropriated from the Capital Development
15    Fund to the Capital Development Board for a grant to the City
16    of  Mattoon   for   land   acquisition,   planning,   design,
17    construction,   reconstruction,  renovation,  rehabilitation,
18    equipping,  and   all   other   costs   associated   with   a
19    police/public safety building.

20        Section  30.  The  sum of $350,000, or so much thereof as
21    may be necessary and  remains  unexpended  at  the  close  of
22    business  on  June 30, 1999, from an appropriation heretofore
23    made for such purposes in Article 90, Section  34  of  Public
24    Act  90-585,  is reappropriated from the General Revenue Fund
25    to  the  Capital  Development  Board  for  a  grant  to   the
26    Argenta-Oreana Fire Protection District for land acquisition,
27    planning,  design,  construction, reconstruction, renovation,
28    rehabilitation, operation, and  all  other  costs  associated
29    with a new firehouse.

30        Section  31.  The  sum of $250,000, or so much thereof as
31    may be necessary and  remains  unexpended  at  the  close  of
 
                            -119-           BOB-CDBnew-re2000
 1    business  on  June 30, 1999, from an appropriation heretofore
 2    made for such purposes in Article 90, Section  37  of  Public
 3    Act  90-585,  is  reappropriated from the Capital Development
 4    Fund to the Capital Development Board  for  a  grant  to  the
 5    College  of  Lake  County  for  all costs associated with the
 6    renovation of the Southlake Education Center.

 7        Section 32.  The sum of $30,000, or so  much  thereof  as
 8    may  be  necessary  and  remains  unexpended  at the close of
 9    business on June 30, 1999, from an  appropriation  heretofore
10    made  for  such  purposes in Article 90, Section 39 of Public
11    Act 90-585, is reappropriated from the General  Revenue  Fund
12    to  the  Capital Development Board for a grant to the Village
13    of St. Peter for all costs associated with  the  construction
14    and  rehabilitation  of  community  park  restrooms to assure
15    compliance with the Americans With Disabilities Act.

16        Section 33.  The sum of $1,000,000, or so much thereof as
17    may be necessary and  remains  unexpended  at  the  close  of
18    business  on  June 30, 1999, from an appropriation heretofore
19    made for such purposes in Article 90, Section  40  of  Public
20    Act  90-585,  is  reappropriated from the Capital Development
21    Fund to the Capital Development Board for a grant to Parkland
22    College for capital improvements.

23        Section 34.  The sum of $1,250,000, or so much thereof as
24    may be necessary and  remains  unexpended  at  the  close  of
25    business  on  June 30, 1999, from an appropriation heretofore
26    made for such purposes in Article 90, Section  42  of  Public
27    Act  90-585,  is  reappropriated from the Capital Development
28    Fund to the Capital Development Board for a  fish  processing
29    center at Pinckneyville Correctional Center.

30        Section  35.  The  sum of $175,500, or so much thereof as
 
                            -120-           BOB-CDBnew-re2000
 1    may be necessary and  remains  unexpended  at  the  close  of
 2    business  on  June 30, 1999, from an appropriation heretofore
 3    made for such purposes in Article 90, Section  43  of  Public
 4    Act  90-585,  is reappropriated from the General Revenue Fund
 5    to the Capital Development Board for a grant to Prairie State
 6    College for planning for Outreach/Adult Training Center.

 7        Section 36.  The sum of $1,000,000, or so much thereof as
 8    may be necessary and  remains  unexpended  at  the  close  of
 9    business  on  June 30, 1999, from an appropriation heretofore
10    made for such purposes in Article 90, Section  44  of  Public
11    Act  90-585,  is  reappropriated from the Capital Development
12    Fund to  the  Capital  Development  Board  for  planning  for
13    expansion at McHenry County College at Crystal Lake.

14        Section  37.  The  sum of $500,000, or so much thereof as
15    may be necessary and  remains  unexpended  at  the  close  of
16    business  on  June 30, 1999, from an appropriation heretofore
17    made for such purposes in Article 90, Section  45  of  Public
18    Act  90-585,  is reappropriated from the General Revenue Fund
19    to the Capital Development Board for a grant to  Spoon  River
20    College   for   Macomb   Campus   renovation   and  classroom
21    enhancements.

22        Section 38.  The sum of $250,000, or so much  thereof  as
23    may  be  necessary  and  remains  unexpended  at the close of
24    business on June 30, 1999, from an  appropriation  heretofore
25    made  for  such  purposes in Article 90, Section 46 of Public
26    Act 90-585, is reappropriated from  the  Capital  Development
27    Fund  to  the  Capital  Development Board for a grant to Rock
28    Valley College for planning for a new instructional building.

29        Section 39.  The sum of $50,000, or so  much  thereof  as
30    may  be  necessary  and  remains  unexpended  at the close of
 
                            -121-           BOB-CDBnew-re2000
 1    business on June 30, 1999, from an  appropriation  heretofore
 2    made  for  such  purposes in Article 90, Section 49 of Public
 3    Act 90-585, as amended by Section 8 of House Bill 871 of  the
 4    90th  General  Assembly,  is  reappropriated from the Capital
 5    Development Fund to the Capital  Development  Board  for  all
 6    costs  associated  with  construction of the Silvis Community
 7    Center in the City of Silvas.

 8        Section  40.  No  contract  shall  be  entered  into   or
 9    obligation  incurred for any expenditures from appropriations
10    made in this Article until after  the  purposes  and  amounts
11    have been approved in writing by the Governor.

12        Section  99.   Effective  date.  This Act takes effect on
13    July 1, 1999.

[ Top ]