[ Search ] [ Legislation ]
[ Home ] [ Back ] [ Bottom ]
[ Introduced ] | [ Engrossed ] |
91_HB2647ham001 LRB9100291ACtmam01 1 AMENDMENT TO HOUSE BILL 2647 2 AMENDMENT NO. . Amend House Bill 2647 on page 9, 3 line 4, after "his", by inserting "or her"; and 4 on page 11, line 2, after "his", by inserting "or her"; and 5 on page 12, by replacing lines 7 through 22 with the 6 following: 7 "(a) pre-design (environmental analysis, 8 architectural programming, and application of principles 9 of project management and coordination), environmental10analysis and programming; 11 (b) site planning (site analysis, design and 12 development, parking, and application of zoning 13 requirements)design; 14 (c) building planning (conceptual planning of 15 functional and space relationships, building design, 16 interior space layout, barrier-free design, and the 17 application of the life safety code requirements and 18 principles of energy efficient design)design; 19 (d) building technology (application of structural 20 systems, building components, and mechanical and 21 electrical systems)structural technology (general, long22span, and lateral); 23 (e) general structures (identification, resolution, -2- LRB9100291ACtmam01 1 and incorporation of structural systems and the long span 2 design on the technical aspects of the design of 3 buildings and the process and construction)life safety4codes and technology, and energy efficient design; 5 (f) lateral forces (identification and resolution 6 of the effects of lateral forces on the technical aspects 7 of the design of buildings and the process of 8 construction)barrier free design; 9 (g) mechanical, plumbing,and electrical systems 10 (as applied to the design of buildings, including 11 plumbing and acoustical systems)(principles of12sanitation and ventilation as applied to buildings); 13 (h) materials and methods (as related to the design 14 of buildings and the technical aspects of construction); 15 and 16 (i) construction documents and services (conduct of 17 architectural practice as it relates to construction 18 documents, bidding, and construction administration and 19 contractual documents from beginning to end of a building 20 project)., technical submissions, and professional21practice, including the contractual duties of an22architect; and"; and 23 on page 21, line 15, after "his", by inserting "or her"; and 24 on page 49, line 3, by replacing "impression" with "print 25impression"; and 26 on page 49, line 7, by replacing "seal or" with "reproducible 27seal or"; and 28 on page 56, line 24, after "his", by inserting "or her"; and 29 on page 66, line 6, after "his", by inserting "or her"; and 30 on page 69, line 15, after "his", by inserting "or her"; and 31 on page 70, line 19, after "his", by inserting "or her"; and -3- LRB9100291ACtmam01 1 on page 72, line 19, after "his", by inserting "or her"; and 2 on page 79, line 9, after "his", by inserting "or her"; and 3 on page 86, line 14, after "his", by inserting "or her"; and 4 on page 90, line 31, after "his", by inserting "or her"; and 5 on page 96, line 9, after "his", by inserting "or her".