[ Search ] [ Legislation ] [ Bill Summary ]
[ Home ] [ Back ] [ Bottom ]
90_SB1167 Makes appropriations and reappropriations to the Capital Development Board for permanent improvements, minor capital improvements, repair and maintenance, and related purposes for the fiscal year beginning July 1, 1997. Makes reappropriations to various state agencies for continuing Build Illinois projects for the fiscal year beginning July 1, 1997. CAPITAL PROJECTS - TO CDB FUND NEW APPROPS. REAPPROPS. TOTAL General Revenue $20,000.0 $37,527.2 $57,527.2 School Construction 0 1,972.2 1,972.2 Capital Development 318,613.9 814,161.3 1,132,775.2 Asbestos Abatement 0 318.7 318.7 Historic Sites Fund 0 2,300.0 2,300.0 TOTAL 338,613.9 856,279.4 1,194,893.3 CAPITAL PROJECTS - TO AGENCIES CAPITAL DEVELOPMENT FUND Sec. of St. $0 $6.8 $6.8 Space Needs Comm. 0 5.7 5.7 Bd. of Higher Ed. 0 3,636.7 3,636.7 SIU 0 102.5 102.5 U of I 0 301.1 301.1 TOTAL 0 4,052.8 4,052.8 BUILD ILLINOIS PROJECTS FUND REAPPROPRIATIONS Build Illinois Purposes $5,355.2 Build Illinois Bond 173,505.7 TOTAL $178,860.9 BOB-CAPITAL98 BOB-CAPITAL98 1 AN ACT making appropriations and reappropriations. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 ARTICLE 1 5 Section 1. The following named amounts, or so much 6 thereof as may be necessary, are appropriated from the 7 Capital Development Fund to the Capital Development Board for 8 the Department of Agriculture for the projects hereinafter 9 enumerated: 10 ILLINOIS STATE FAIRGROUNDS - DUQUOIN 11 For planning the renovation of the 12 Round Houses ................................. $ 40,000 13 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD 14 For replacing the HVAC system in the 15 Administration Building ...................... 929,000 16 Total, Section 1 $969,000 17 Section 2. The following named amounts, or so much 18 thereof as may be necessary, are appropriated from the 19 Capital Development Fund to the Capital Development Board for 20 the Department of Central Management Services for the 21 projects hereinafter enumerated: 22 ILLINOIS REHABILITATION AND 23 EDUCATION CENTER (WOOD) - CHICAGO 24 For replacing the skylight system 25 and roof flashing ............................ $ 45,000 26 For installing security system and 27 perimeter lighting ........................... 375,000 28 ELGIN REGIONAL OFFICE BUILDING 29 For replacing the utility system ............... 2,625,000 30 CENTRAL STATE GARAGE - SPRINGFIELD -2- BOB-CAPITAL98 1 For replacing the roof and drainage system ..... 425,000 2 Total, Section 2 $3,470,000 3 Section 2a. The following named amounts, or so much 4 thereof as may be necessary, are appropriated from the 5 General Revenue Fund to the Capital Development Board for the 6 Department of Central Management Services for the projects 7 hereinafter enumerated: 8 JAMES R. THOMPSON CENTER - CHICAGO 9 For restoring the exterior plaza ............... $ 890,000 10 EAST ST. LOUIS - REGIONAL OFFICE 11 For replacing windows .......................... 65,500 12 Total, Section 2a $955,500 13 Section 3. The following named amounts, or so much 14 thereof as may be necessary, are appropriated from the 15 Capital Development Fund to the Capital Development Board for 16 the Department of Corrections for the projects hereinafter 17 enumerated: 18 DWIGHT CORRECTIONAL CENTER 19 For upgrading water and sewer systems .......... $ 1,000,000 20 For renovating buildings, in addition 21 funds previously appropriated ................ 600,000 22 For constructing a gatehouse and 23 sallyport and upgrading the 24 security system .............................. 2,375,000 25 EAST MOLINE CORRECTIONAL CENTER 26 For upgrading the electrical 27 system ....................................... 2,300,000 28 JOLIET CORRECTIONAL CENTER 29 For correcting erosion and 30 stabilizing the masonry wall ................. 1,800,000 31 MENARD CORRECTIONAL CENTER - CHESTER 32 For renovating the Old Hospital -3- BOB-CAPITAL98 1 Building, in addition to funds 2 previously appropriated ...................... 4,700,000 3 For replacing and installing 4 water storage tank ........................... 1,200,000 5 For replacing Boiler #2, in addition 6 to funds previously appropriated ............. 800,000 7 For converting a room into a shower room ....... 395,000 8 STATEWIDE 9 For replacing roofing systems at the 10 following locations at the approximate 11 costs set forth below: ....................... $2,100,000 12 Big Muddy Correctional Center, Ina 13 Two buildings ......................$425,000 14 East Moline Correctional Center, 15 Three buildings .....................500,000 16 Graham Correctional Center, Hillsboro 17 Seven buildings .....................600,000 18 Sheridan Correctional Center, LaSalle 19 Three buildings .....................410,000 20 Stateville Correctional Center, Joliet 21 One building ........................165,000 22 For replacing doors and locks at the 23 following locations at the approximate 24 costs set forth below: ....................... 2,575,000 25 IYC - St. Charles ...................$585,000 26 Lincoln Correctional Center ...........50,000 27 Jacksonville Correctional Center .....975,000 28 Sheridan Correctional Center .........965,000 29 For upgrading fire safety systems at the 30 following locations at the approximate 31 costs set forth below, in addition to 32 funds previously appropriated : .............. 6,500,000 33 Menard Correctional Center .........2,000,000 34 Pontiac Correctional Center ........3,000,000 -4- BOB-CAPITAL98 1 Stateville Correctional Center .....1,500,000 2 For upgrading water and wastewater 3 systems at the following locations 4 at the approximate costs set forth below:..... 4,465,000 5 Big Muddy Correctional Center 6 for installing mechanical 7 bar screen ..........................300,000 8 Centralia Correctional Center 9 for upgrading water 10 treatment plant ...................1,500,000 11 East Moline Correctional Center 12 for upgrading sewage system .........655,000 13 Ed Jenison Work Camp (Paris) 14 for installing mechanical 15 bar screen ..........................120,000 16 IYC - Harrisburg for upgrading 17 water distribution system ...........500,000 18 Kankakee MSU for constructing 19 well #2 .............................300,000 20 IYC - St. Charles for upgrading 21 sewage/storm system .................850,000 22 IYC - Valley View for installing 23 mechanical bar screen ...............240,000 24 For planning, design, construction, 25 equipment and other necessary costs 26 for a Maximum Security Correctional 27 Center, in addition to funds previously 28 appropriated ................................. 95,000,000 29 VIENNA CORRECTIONAL CENTER 30 For renovating the kitchen ..................... 2,000,000 31 Total, Section 3 $127,810,000 32 Section 3a. The following named amounts, or so much 33 thereof as may be necessary, are appropriated from the -5- BOB-CAPITAL98 1 General Revenue Fund to the Capital Development Board for the 2 Department of Corrections for the projects hereinafter 3 numerated: 4 MENARD CORRECTIONAL CENTER - CHESTER 5 For stabilizing dams ........................... $ 100,000 6 For repairing masonry and 7 waterproofing exterior ....................... 245,000 8 STATEVILLE CORRECTIONAL CENTER - JOLIET 9 For tuckpointing buildings ..................... 200,000 10 VANDALIA CORRECTIONAL CENTER 11 For tuckpointing, waterproofing and 12 replacing facade ............................. 165,000 13 Total, Section 3a $710,000 14 Section 4. The following named amounts, or so much 15 thereof as may be necessary, are appropriated from the 16 Capital Development Fund to the Capital Development Board for 17 the Historic Preservation Agency for the projects hereinafter 18 enumerated: 19 FORT DE CHARTRES - RANDOLPH COUNTY 20 For replacing Maintenance Building ............. $ 264,000 21 OLD STATE CAPITOL - SPRINGFIELD 22 For renovating garage ramp ..................... 419,000 23 STATEWIDE 24 For replacing roofing systems at the 25 following locations at the approximate 26 costs set forth below: ....................... 462,000 27 Fort De Chartres, Randolph County .....93,000 28 Washburne House, Galena ...............50,000 29 David Davis Mansion, Bloomington ......25,000 30 Bishop Hill House, Henry County ......294,000 31 VANDALIA STATE HOUSE 32 For rehabilitating HVAC and electrical 33 systems and interior ........................ 378,000 -6- BOB-CAPITAL98 1 Total, Section 4 $1,523,000 2 Section 4a. The following named amounts, or so much 3 thereof as may be necessary, are appropriated from the 4 General Revenue Fund to the Capital Development Board for the 5 Historic Preservation Agency for the projects hereinafter 6 enumerated: 7 JOURNAL REGISTER BUILDING - SPRINGFIELD 8 For renovating building ........................ $ 702,000 9 DANA-THOMAS HOUSE - SPRINGFIELD 10 For restoring the exterior and interior ........ 417,000 11 Total, Section 4a $1,119,000 12 Section 5. The following named amounts, or so much thereof 13 as may be necessary, are appropriated from the Capital 14 Development Fund to the Capital Development Board for the 15 Department of Human Services (formerly the Department of 16 Mental Health and Developmental Disabilities) for the 17 projects hereinafter enumerated: 18 ALTON MENTAL HEALTH CENTER 19 For constructing two building additions 20 at the Forensic Complex ...................... $ 11,924,000 21 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA 22 For completing HVAC system upgrade, 23 in addition to funds previously 24 appropriated ................................. 1,433,000 25 MURRAY DEVELOPMENTAL CENTER - CENTRALIA 26 For rehabilitating the emergency 27 electrical system ............................ 314,000 28 For renovating Elm Cottage ..................... 3,082,000 29 CHESTER MENTAL HEALTH CENTER 30 For replacing fencing and upgrading 31 recreational yard ............................ 1,400,000 32 For renovating support and residential -7- BOB-CAPITAL98 1 area ......................................... 3,910,000 2 ELGIN MENTAL HEALTH CENTER 3 For renovating the central dietary 4 and kitchen .................................. 3,994,000 5 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER 6 For extending chilled water line ............... 327,000 7 KILEY DEVELOPMENTAL CENTER - WAUKEGAN 8 For renovating homes ........................... 741,000 9 MADDEN MENTAL HEALTH CENTER - HINES 10 For renovating dietary ......................... 930,000 11 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 12 For replacing cooling towers and 13 rehabilitating absorbers ..................... 1,040,000 14 SINGER MENTAL HEALTH CENTER - ROCKFORD 15 For renovating mechanicals and 16 residential areas ............................ 2,736,000 17 STATEWIDE 18 For replacing roofing systems at the 19 following locations at the approximate 20 costs set forth below: ....................... 392,000 21 Elgin Mental Health Center, 22 five buildings ......................256,000 23 Jacksonville Mental Health and 24 Developmental Center, two buildings .136,000 ____________ 25 Total, Section 5 $32,223,000 26 Section 5.1. The following named amounts, or so much 27 thereof as may be necessary, are appropriated from the 28 Capital Development Fund to the Capital Development Board for 29 the Department of Human Services (formerly the Department of 30 Rehabilitation Services) for the projects hereinafter 31 enumerated: 32 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 33 For completing the HVAC system upgrade, -8- BOB-CAPITAL98 1 in addition to funds previously 2 appropriated ................................. $ 300,000 3 For replacing the storm and sanitary 4 system ....................................... 2,000,000 5 For renovating Unit 5 .......................... 215,000 6 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE 7 For rehabilitating the power house ............. 275,000 8 Total, Section 5.1 $2,790,000 9 Section 5a. The following named amounts, or so much 10 thereof as may be necessary, are appropriated from the 11 General Revenue Fund to the Capital Development Board for the 12 Department of Human Services (formerly the Department of 13 Mental Health and Developmental Disabilities) for the 14 projects hereinafter enumerated: 15 ALTON MENTAL HEALTH CENTER 16 For replacing windows in four buildings ........ $1,181,000 17 CHESTER MENTAL HEALTH CENTER 18 For replacing backflow prevention 19 devices ...................................... 160,000 20 LINCOLN DEVELOPMENTAL CENTER 21 For replacing windows .......................... 756,000 22 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 23 For replacing windows in complex 24 buildings .................................... 486,000 25 HOWE DEVELOPMENTAL CENTER - TINLEY PARK 26 For installing windows in residential 27 buildings .................................... 775,000 28 ZELLER MENTAL HEALTH CENTER - PEORIA 29 For replacing windows .......................... 1,499,000 30 Total, Section 5a $4,857,000 31 Section 5a.1. The following named amounts, or so much 32 thereof as may be necessary, are appropriated from the -9- BOB-CAPITAL98 1 General Revenue Fund to the Capital Development Board for the 2 Department of Human Services (formerly the Department of 3 Rehabilitation Services) for the projects hereinafter 4 enumerated: 5 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 6 For installing an emergency generator .......... $ 550,000 7 For installing security systems in 8 three buildings .............................. 50,000 9 Total, Section 5a.1 $600,000 10 Section 6. The following named amount, or so much 11 thereof as may be necessary, is appropriated from the Capital 12 Development Fund to the Capital Development Board for the 13 Department of Military Affairs for the project hereinafter 14 enumerated: 15 CARBONDALE ARMORY 16 For upgrading mechanical systems ............... $ 1,440,000 17 Total, Section 6 $1,440,000 18 Section 6a. The following named amount, or so much 19 thereof as may be necessary, is appropriated from the General 20 Revenue Fund to the Capital Development Board for the 21 Department of Military Affairs for the project hereinafter 22 enumerated: 23 LAWRENCEVILLE ARMORY 24 For renovating interior ........................ $ 180,000 25 Total, Section 6a $180,000 26 Section 7. The following named amounts, or so much 27 thereof as may be necessary, are appropriated from the 28 Capital Development Fund to the Capital Development Board for 29 the Department of Natural Resources for the projects 30 hereinafter enumerated: 31 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA -10- BOB-CAPITAL98 1 For stabilizing the feeder canal bank .......... $ 500,000 2 KANKAKEE RIVER STATE PARK - KANKAKEE COUNTY 3 For planning and constructing a 4 sanitary sewer system ........................ 200,000 5 DICKSON MOUNDS - LEWISTOWN 6 For renovating Canton Liverpool 7 Toll Booth ................................... 73,000 8 MERMET LAKE CONSERVATION AREA - MASSAC COUNTY 9 For rehabilitating the levee system ............ 225,000 10 RED HILLS STATE PARK - LAWRENCE COUNTY 11 For replacing the sewage treatment system, 12 in addition to funds previously appropriated . 510,000 13 For rehabilitating the dam ..................... 90,000 14 SANGANOIS CONSERVATION AREA - 15 CASS, MASON AND SCHUYLER COUNTIES 16 For rehabilitating the levee system ............ 315,000 17 STATEWIDE 18 For replacing concession buildings and 19 upgrading support facilities at the following 20 locations at the approximate costs set 21 forth below: ................................. 2,895,000 22 Kickapoo State Park ..................538,000 23 Rock Cut State Park ..................525,000 24 Stephen A. Forbes State Park .......1,832,000 25 STATEWIDE 26 For constructing vault toilets at the 27 following locations at the approximate 28 costs set forth below: ...................... 1,593,000 29 Apple River Canyon State Park .......285,000 30 Des Plaines Conservation Area .......240,000 31 Kankakee River State Park ...........410,000 32 Lake Le-Aqua-Na State Park ..........295,000 33 Marshall County Conservation Area ....83,000 34 Morrison-Rockwood State Park ........195,000 -11- BOB-CAPITAL98 1 Rice Lake Conservation Area ..........85,000 2 STATEWIDE 3 For replacing roofing systems and structural 4 repairs at the following locations at the 5 approximate costs set forth below: ........... 452,000 6 Mine Rescue Station, One building .....36,000 7 Castle Rock State Park, 8 One building .........................37,000 9 Dixon Springs State Park, 10 Three buildings ......................49,000 11 Cave-In-Rock State Park, 12 Two buildings ........................30,000 13 Ferne Clyffe State Park, 14 One building .........................30,000 15 Hamilton County Conservation 16 Area, One building ...................30,000 17 Lake Murphysboro State Park, 18 Two buildings ........................54,000 19 Red Hills State Park, Two 20 buildings ............................34,000 21 Fox Ridge State Park, Six 22 buildings ............................73,000 23 Shelbyville Fish and Wildlife 24 Area, Two buildings ..................49,000 25 Newton Lake Fish and Wildlife 26 Area, One building ...................30,000 ____________ 27 Total, Section 7 $6,853,000 28 Section 7a. The following named amounts, or so much 29 thereof as may be necessary, are appropriated from the 30 General Revenue Fund to the Capital Development Board for the 31 Department of Natural Resources for the projects hereinafter 32 enumerated: 33 ILLINOIS BEACH STATE PARK -12- BOB-CAPITAL98 1 For stabilizing the shoreline .................. $ 400,000 2 STATEWIDE 3 For maintaining lodge and concession 4 facilities at various DNR locations .......... 400,000 5 For rehabilitating or replacing 6 playground equipment, in addition 7 to funds previously appropriated ............. 300,000 8 Total, Section 7a $1,100,000 9 Section 8. The following named amounts, or so much 10 thereof as may be necessary, are appropriated from the 11 Capital Development Fund to the Capital Development Board for 12 the Department of Revenue for the projects hereinafter 13 enumerated: 14 WILLARD ICE BUILDING - SPRINGFIELD 15 For upgrading the uninterruptible power 16 system, in addition to funds previously 17 appropriated ................................. $ 1,200,000 18 For replacing the halon fire suppression 19 system ....................................... 344,000 20 Total, Section 8 $1,544,000 21 Section 9. The following named amounts, or so much 22 thereof as may be necessary, are appropriated from the 23 Capital Development Fund to the Capital Development Board for 24 the Department of State Police for the projects hereinafter 25 enumerated: 26 STATEWIDE 27 For replacing the roofs and roof 28 drainage systems at various locations, 29 at the approximate costs 30 set forth below:.............................. $ 182,000 31 DuQuoin, District #13 .................85,000 32 Springfield, District #9 and -13- BOB-CAPITAL98 1 Supply Building ......................97,000 2 For replacing radio communication 3 towers and equipment buildings and 4 installing emergency power 5 generators at Andover, Eaton, 6 Pecatonica, and Cypress ...................... 1,150,000 7 Total, Section 9 $1,332,000 8 Section 10. The following named amount, or so much 9 thereof as may be necessary, is appropriated from the Capital 10 Development Fund to the Capital Development Board for the 11 Department of Veterans' Affairs for the project hereinafter 12 enumerated: 13 ILLINOIS VETERANS' HOME - QUINCY 14 For renovating Lippincott Hall ................. $ 215,000 15 Total, Section 10 $215,000 16 Section 10a. The following named amounts, or so much 17 thereof as may be necessary, are appropriated from the 18 General Revenue Fund to the Capital Development Board for the 19 Department of Veterans' Affairs for the projects hereinafter 20 enumerated: 21 ILLINOIS VETERANS' HOME - LASALLE 22 For relocating security alarm 23 system ....................................... $ 37,800 24 For installing an exit door 25 alarm system ................................. 52,500 26 ILLINOIS VETERANS' HOME - MANTENO 27 For replacing wiring in light poles ............ 153,900 28 For replacing exterior doors and frames ........ 200,000 29 Total, Section 10a $444,200 30 Section 11.01. The following named amounts, or so much 31 thereof as may be necessary, are appropriated from the -14- BOB-CAPITAL98 1 Capital Development Fund to the Capital Development Board for 2 the projects hereinafter enumerated: 3 SECOND DISTRICT APPELLATE COURT BUILDING - ELGIN 4 For replacing the roof ......................... $ 104,000 5 SUPREME COURT BUILDING - SPRINGFIELD 6 For planning the library upgrade ............... 127,000 7 Total, Section 11.01 $231,000 8 Section 11.01a. The following named amount, or so much 9 thereof as may be necessary, is appropriated from the General 10 Revenue Fund to the Capital Development Board for the project 11 hereinafter enumerated: 12 SUPREME COURT BUILDING - SPRINGFIELD 13 For tuckpointing and cleaning exterior ......... $ 220,000 14 Total, Section 11.01a $220,000 15 Section 11.02. The following named amounts, or so much 16 thereof as may be necessary, are appropriated from the 17 Capital Development Fund to the Capital Development Board for 18 the projects hereinafter enumerated: 19 STATE CAPITOL BUILDING - SPRINGFIELD 20 For upgrading the life/safety and 21 security systems, in addition to 22 funds previously appropriated ................ $ 2,600,000 23 CAPITOL COMPLEX - SPRINGFIELD 24 For stabilizing the parking ramp ............... 3,000,000 25 For installing fire/security alarm 26 system ....................................... 1,100,000 27 STRATTON OFFICE BUILDING - SPRINGFIELD 28 For installing fire alarm system ............... 400,000 29 Total, Section 11.02 $7,100,000 30 Section 11.03. The following named amounts, or so much 31 thereof as may be necessary, are appropriated from the -15- BOB-CAPITAL98 1 Capital Development Fund to the Capital Development Board for 2 the projects hereinafter enumerated: 3 STATEWIDE 4 For surveys and modifications to 5 buildings to meet requirements of the 6 federal Americans with Disabilities Act ...... $ 5,000,000 7 For abatement of hazardous materials ........... 5,000,000 8 For upgrading/retrofitting mechanized 9 refrigeration equipment (CFC's) .............. 5,000,000 10 For upgrade and remediation of underground 11 storage tanks ................................ 5,000,000 12 Total, Section 11.03 $20,000,000 13 Section 11.03a. The following named amounts, or so much 14 thereof as may be necessary, are appropriated from the 15 General Revenue Fund to the Capital Development Board for the 16 projects hereinafter enumerated: 17 STATEWIDE 18 For repair of minor problems and 19 emergencies .................................. $ 3,614,300 20 For construction site archaeological 21 studies ...................................... 200,000 22 For surveys for and abatement of 23 asbestos-containing material ................. 1,000,000 24 For demolition of buildings .................... 5,000,000 25 Total, Section 11.03a $9,814,300 26 Section 12. The following named amounts, or so much 27 thereof as may be necessary, are appropriated from the 28 Capital Development Fund to the Capital Development Board for 29 the Illinois Community College Board for the projects 30 hereinafter enumerated: 31 WILLIAM RAINEY HARPER COLLEGE - PALATINE 32 For constructing a Multi-purpose -16- BOB-CAPITAL98 1 Instructional Center and renovating 2 Building A Cafeteria ......................... $ 6,823,200 3 HEARTLAND COMMUNITY COLLEGE - NORMAL 4 For constructing buildings and making 5 site improvements, including equipment ....... 21,015,900 6 SHAWNEE COMMUNITY COLLEGE - ULLIN 7 For constructing additions, parking 8 facilities, and renovating buildings, 9 including equipment .......................... 7,403,200 10 Total, Section 12 $35,242,300 11 Section 13. The following named amounts, or so much 12 thereof as may be necessary, are appropriated from the 13 Capital Development Fund to the Capital Development Board for 14 the Board of Higher Education for the projects hereinafter 15 enumerated: 16 CHICAGO STATE UNIVERSITY - CHICAGO 17 For renovating buildings and upgrading 18 mechanical systems ........................... $ 3,300,000 19 EASTERN ILLINOIS UNIVERSITY - CHARLESTON 20 For constructing an addition and 21 renovating Booth Library ..................... 16,764,500 22 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 23 For renovating the auditorium in 24 Building E ................................... 7,156,700 25 NORTHERN ILLINOIS UNIVERSITY - DEKALB 26 For renovating Altgeld Hall and 27 purchasing equipment ......................... 19,150,400 28 UNIVERSITY OF ILLINOIS - URBANA-CHAMPAIGN 29 For constructing an Agricultural 30 Library ...................................... 9,500,000 31 Total, Section 13 $55,871,600 32 Section 14. The sum of $14,992,000, or so much thereof -17- BOB-CAPITAL98 1 as may be necessary, is appropriated from the Capital 2 Development Fund to the Capital Development Board for the 3 Board of Higher Education for miscellaneous capital 4 improvements including construction, capital facilities, cost 5 of planning, supplies, equipment, materials, services and all 6 other expenses required to complete the work at the various 7 universities set forth below. This appropriation shall be in 8 addition to any other appropriated amounts which can be 9 expended for these purposes. 10 For Chicago State University ..........301,400 11 For Eastern Illinois University .......564,100 12 For Governors State University ........181,600 13 For Illinois State University .......1,150,600 14 For Northeastern Illinois University ..423,700 15 For Northern Illinois University ....1,287,700 16 For Western Illinois University .......862,400 17 For Southern Illinois University - 18 Carbondale ........................1,991,500 19 For Southern Illinois University - 20 Edwardsville ........................751,500 21 For University of Illinois - 22 Chicago ...........................3,280,400 23 For University of Illinois - 24 Springfield .........................216,800 25 For University of Illinois - 26 Urbana-Champaign ..................3,980,300 27 Section 15. The sum of $5,008,000, or so much thereof as 28 may be necessary, is appropriated from the Capital 29 Development Fund to the Capital Development Board for the 30 Illinois Community College Board for miscellaneous capital 31 improvements including construction, reconstruction, 32 remodeling, improvement, repair and installation of capital 33 facilities, cost of planning, supplies, equipment, materials, -18- BOB-CAPITAL98 1 services and all other expenses required to complete the work 2 at the various community colleges. This appropriation shall 3 be in addition to any other appropriated amounts which can be 4 expended for these purposes. 5 Section 16. No contract shall be entered into or 6 obligation incurred for any expenditures from appropriations 7 made in this Article until after the purposes and amounts 8 have been approved in writing by the Governor. 9 ARTICLE 2 10 Section 1. The following named amounts, or so much 11 thereof as may be necessary and remain unexpended at the 12 close of business on June 30, 1997, from reappropriations 13 heretofore made for such purposes in Article 77, Section 1 14 and Article 78, Section 1 of Public Act 89-0501, are 15 reappropriated from the Capital Development Fund to the 16 Capital Development Board for the Department of Agriculture 17 for the projects hereinafter enumerated: 18 (From Article 78, Section 1 of Public Act 89-0501): 19 CENTRALIA ANIMAL DISEASE LABORATORY 20 For purchasing and upgrading diagnostic 21 laboratory ................................... $ 909,666 22 DUQUOIN STATE FAIRGROUNDS 23 (From Article 77, Section 1 of Public Act 89-0501): 24 For replacement of the grandstand 25 bleachers .................................... 1,716,000 26 (From Article 78, Section 1 of Public Act 89-0501): 27 For planning and construction of 28 a livestock complex .......................... 171,655 29 For rehabilitation of the Grandstand ........... 13,403 30 For construction of an All-Purpose Building .... 2,621,797 31 ILLINOIS STATE FAIRGROUNDS -19- BOB-CAPITAL98 1 For renovation of the laboratory and print 2 shop - Phase II, in addition to funds 3 previously appropriated ...................... 22,299 4 For installation of the ventilation system, in 5 addition to funds previously appropriated .... 11,692 6 For repairing the exterior and replacing the 7 roofing system ............................... 62,625 8 For planning and upgrading the storm/ 9 sanitary and water systems ................... 13,634 10 For renovation of the comfort stations- 11 Phase I ...................................... 102,537 12 For upgrading the Administration Building ...... 159,822 13 For upgrading Building #13 ..................... 84,984 14 For renovation of the Coliseum ................. 17,122 15 For renovation of the Emmerson Building ....... 18,598 16 For construction of a volumetric calibration 17 laboratory ................................... 7,469 18 For renovation of the Jr. Livestock Building, 19 including the cover over the outdoor 20 arena, roof, HVAC, plumbing and electrical 21 systems and installation of an elevator 22 for accessibility, and for upgrading 23 the sewer system ............................. 404,709 24 For rehabilitation of the Administration 25 Building, including planning & upgrading 26 laboratories ................................. 55,114 27 For planning the renovation of the show 28 horse barns .................................. 257,229 29 For rehabilitation of six racehorse barns- 30 Phase I ...................................... 217,318 31 For planning the rehabilitation of sidewalks, 32 curbs, gutters and streets ................... 173,371 33 For renovation of Building #33, including the 34 roofing system ............................... 10,810 -20- BOB-CAPITAL98 1 Total, Section 1 $7,051,854 2 Section 1A. The following named amounts, or so much 3 thereof as may be necessary, and remain unexpended at the 4 close of business on June 30, 1997, from appropriations 5 heretofore made for such purposes in Article 77, Section 1A 6 of Public Act 89-0501, as amended, are reappropriated from 7 the Capital Development Fund to the Capital Development Board 8 for the Department of Agriculture for the projects 9 hereinafter enumerated: 10 ANIMAL DISEASE LABORATORY - CENTRALIA 11 For upgrading the diagnostic laboratory 12 facility, in addition to funds previously 13 appropriated ................................. $ 200,000 14 ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD 15 For replacing and/or repairing sidewalks, 16 curbs, gutters and streets, in addition 17 to funds previously appropriated ............. 1,050,000 18 For completing the installation of fiber 19 optics system, in addition to funds 20 previously appropriated ...................... 25,000 21 For upgrading the storm/sanitary and water 22 systems, in addition to funds previously 23 appropriated ................................. 1,600,000 24 For renovation or replacement of 25 comfort stations, in addition 26 to funds previously appropriated ............. 1,273,000 27 For upgrading Building 13, in addition to 28 funds previously appropriated ................ 733,000 29 Total, Section 1A $4,881,000 30 Section 2. The following named amounts, or so much 31 thereof as may be necessary and remain unexpended at the 32 close of business on June 30, 1997, from reappropriations 33 heretofore made for such purposes in Article 78, Section 2 of -21- BOB-CAPITAL98 1 Public Act 89-0501, are reappropriated from the Capital 2 Development Fund to the Capital Development Board for the 3 Courts of Illinois for the projects hereinafter enumerated: 4 SPRINGFIELD - SUPREME COURT BUILDING 5 For installation of an elevator and 6 replacement of the exterior lights ........... $ 53,764 7 For repairing the ramp, drainage system, 8 retaining wall and landscaping ............... 55,960 9 Total, Section 2 $109,724 10 Section 3. The following named amounts, or so much 11 thereof as may be necessary and remain unexpended at the 12 close of business on June 30, 1997, from reappropriations 13 heretofore made for such purposes in Article 77, Section 2 14 and Article 78, Section 3 of Public Act 89-0501, are 15 reappropriated from the Capital Development Fund to the 16 Capital Development Board for the Department of Central 17 Management Services for the projects hereinafter enumerated: 18 (From Article 78, Section 3 of Public Act 89-0501): 19 CHICAGO - STATE OF ILLINOIS CENTER 20 For completing the installation of elevators, in 21 addition to funds previously 22 appropriated ................................. $ 650,760 23 For the correction of design/construction 24 deficiencies, including remedial work in 25 the heating, refrigeration, temperature 26 control and ventilation systems at the 27 State of Illinois Center at Chicago .......... 355,645 28 CHICAGO - STATE OF ILLINOIS BUILDING 29 For planning, renovation, equipment and all 30 other costs associated with the renovation 31 of the State of Illinois Building located 32 at 160 North LaSalle in Chicago, in addition 33 to any other amounts heretofore -22- BOB-CAPITAL98 1 appropriated for such purpose ................ 53,345 2 For planning for renovation of the building 3 at 160 North LaSalle ......................... 48,170 4 CHICAGO MEDICAL CENTER 5 ILLINOIS REHABILITATION AND EDUCATION CENTER 6 For completing the upgrade of HVAC system, in 7 addition to funds previously appropriated .... 97,303 8 For construction of an independent living 9 apartment building ........................... 457,593 10 For rehabilitation of the parking lot, 11 driveway and installation of fencing ......... 13,464 12 For rehabilitation of the air conditioning 13 system, installation of a sprinkler system 14 and improvements for handicapped 15 accessibility ................................ 105,913 16 CHICAGO MEDICAL CENTER 17 EVELYN EDWARDS CENTER 18 For replacement of the heating system .......... 25,274 19 CHICAGO MEDICAL CENTER 20 LAWNDALE DAY CARE 21 For renovation of the Lawndale Day Care 22 Center ....................................... 111,394 23 CHICAGO MEDICAL CENTER 24 OFFICE AND LABORATORY FACILITY 25 For replacement of the electric autoclave 26 boilers ...................................... 13,222 27 CHICAGO MEDICAL CENTER 28 VISUALLY HANDICAPPED INSTITUTE 29 For completing heating and cooling systems 30 renovation, in addition to funds 31 previously appropriated ...................... 17,088 32 For renovation of the loading dock ............. 89,573 33 For rehabilitation of the chiller and 34 replacement of the cooling tower ............. 7,288 -23- BOB-CAPITAL98 1 CHAMPAIGN STATE GARAGE 2 For replacement of the electrical system and 3 windows and installation of restrooms ........ 74,303 4 (From Article 77, Section 2 of Public Act 89-0501): 5 REGIONAL OFFICE BUILDING - CHAMPAIGN 6 For replacement of roofing system and 7 rooftop heating and cooling unit ............. 381,112 8 (From Article 78, Section 3 of Public Act 89-0501): 9 SUBURBAN NORTH REGIONAL 10 OFFICE - 11 DES PLAINES 12 For designing the renovation, phase III ........ 726,169 13 For the purchase and renovation of the high 14 school ....................................... 57,995 15 OTTAWA STATE GARAGE 16 For rehabilitation of the lighting and 17 electrical systems ........................... 106,694 18 PEORIA STATE GARAGE 19 For planning, design, land acquisition, 20 construction, equipment, and all costs 21 related to the relocation of the Peoria 22 State Garage ................................. 38,663 23 SPRINGFIELD - CAPITOL COMPLEX 24 For construction of a day care center, in 25 addition to funds previously appropriated 26 for such purpose ............................. 950,000 27 For construction of a day care center in the 28 Capitol Complex in Springfield ............... 244,348 29 SPRINGFIELD COMPUTER FACILITY 30 For replacement of the uninterruptible 31 power system ................................. 18,838 32 (From Article 77, Section 2 of Public Act 89-0501): 33 ASH STREET COMPLEX- 34 MUSEUM AND COLLECTION CENTER - -24- BOB-CAPITAL98 1 SPRINGFIELD 2 For replacement of the roofing system .......... 850,036 3 (From Article 78, Section 3 of Public Act 89-0501): 4 11TH AND ASH STREET - SPRINGFIELD 5 For improving the Warehouse Complex ............ 25,146 6 Total, Section 3 $5,519,336 7 Section 3A. The following named amounts, or so much 8 thereof as may be necessary, and remain unexpended at the 9 close of business on June 30, 1997, from appropriations 10 heretofore made for such purposes in Article 77, Section 2A 11 of Public Act 89-0501, as amended, are reappropriated from 12 the Capital Development Fund to the Capital Development Board 13 for the Department of Central Management Services for the 14 projects hereinafter enumerated: 15 ILLINOIS REHABILITATION AND 16 EDUCATION CENTER (ROOSEVELT) - CHICAGO 17 For upgrading the HVAC system .................. $ 2,250,000 18 SUBURBAN NORTH REGIONAL OFFICE BUILDING - DES PLAINES 19 For renovation of Suburban North Regional 20 Office Building (formerly Maine Township 21 North High School building), in addition 22 to funds previously appropriated for such 23 purpose, Phase III ........................... 5,400,000 24 For renovation and expansion of garage ......... 375,000 25 MARION REGIONAL OFFICE BUILDING 26 For construction of a Regional Office 27 Building Addition ............................ 2,000,000 28 COMPUTER FACILITY - SPRINGFIELD 29 For replacement of the halon fire 30 suppression system ........................... 875,000 31 Total, Section 3A $10,900,000 32 Section 3.1. The following named amounts, or so much 33 thereof as may be necessary and remain unexpended at the -25- BOB-CAPITAL98 1 close of business on June 30, 1997, from reappropriations 2 heretofore made for such purposes in Article 78, Section 3.1 3 of Public Act 89-0501, are reappropriated from the General 4 Revenue Fund to the Capital Development Board for the 5 Department of Central Management Services for the projects 6 hereinafter enumerated: 7 CHICAGO MEDICAL CENTER 8 ILLINOIS REHABILITATION AND EDUCATION CENTER 9 For rehabilitation for fire safety and 10 accessibility ................................ $ 11,086 11 CHICAGO MEDICAL CENTER 12 OFFICE AND LABORATORY BUILDING 13 For rehabilitation of the electrical vault 14 ceiling and exterior concrete deck ........... 3,373 15 CHICAGO MEDICAL CENTER 16 JUVENILE RESEARCH INSTITUTE 17 For rehabilitation of the interior and 18 exterior walls, planning the rehabilitation 19 of the HVAC system and renovation of 20 the elevator ................................. 23,433 21 CHICAGO MEDICAL CENTER 22 VISUALLY HANDICAPPED INSTITUTE 23 For upgrading the fire alarm and safety 24 system ....................................... 31,209 25 Total, Section 3.1 $69,101 26 Section 4. The following named amounts, or so much 27 thereof as may be necessary and remain unexpended at the 28 close of business on June 30, 1997, from appropriations 29 heretofore made for such purposes in Article 77, Section 6 30 and Article 78, Section 4 of Public Act 89-0501, are 31 reappropriated from the Capital Development Fund to the 32 Capital Development Board for the Department of Natural 33 Resources for the projects hereinafter enumerated: -26- BOB-CAPITAL98 1 (From Article 78, Section 4 of Public Act 89-0501): 2 For Beall Woods Conservation Area for 3 construction of a bridge and Class C 4 campground ................................... $ 42,488 5 For Chain O'Lakes State Park for replacement 6 of overhead power lines ...................... 153,810 7 For Chain O'Lakes State Park for planning 8 the replacement of concession buildings ...... 46,107 9 For Clinton Lake for construction of a 10 sewage treatment system ...................... 93,209 11 For Eagle Creek State Park for planning and 12 rehabilitation of the sewage treatment 13 system ....................................... 309,769 14 For Eagle Creek State Park for construction 15 of restrooms and providing playground 16 equipment .................................... 137,537 17 For Fort Massac State Park for planning the 18 reconstruction of the fort .................. 150,000 19 For Hennepin Canal Parkway State Park for 20 rehabilitation of Lock 33 Taintor 21 gates ........................................ 13,619 22 For Hennepin Canal Parkway State Park for 23 rehabilitation of canal ...................... 2,860 24 For Heron Pond-Little Black Slough for 25 improvements for erosion control ............. 219,876 26 For Horseshoe Lake Conservation Area for 27 dam rehabilitation and land acquisition ...... 858,655 28 For Horseshoe Lake State Fish and Wildlife 29 Area for construction of a pole building 30 and hunter check station ..................... 83,816 31 For Illinois Beach State Park for 32 stabilization of the shoreline ............... 177,565 33 For Illinois Beach State Park for renovation 34 of the lodge basement floor and drainage -27- BOB-CAPITAL98 1 system ....................................... 152,973 2 For Illinois-Michigan Canal State Park for 3 stabilization of the aqueduct ................ 887,585 4 For Jake Wolf Memorial Fish Hatchery for 5 installation of expansion joints ............. 7,727 6 For Jake Wolf Memorial Fish Hatchery for 7 upgrading the water supply ................... 39,105 8 For Johnson Sauk Trail State Park for 9 rehabilitation of the concession building .... 87,975 10 For Kickapoo State Park for planning 11 construction of a sewage treatment plant ..... 41,706 12 For Lake Murphysboro State Park for 13 rehabilitation of the concession/shower 14 building ..................................... 31,309 15 For Lake Murphysboro State Park for 16 upgrading the sewage system .................. 14,053 17 For Little Grassy Hatchery for the 18 construction of a storage building ........... 8,610 19 For Mason State Forest Tree Nursery for 20 installation of an emergency power system 21 and upgrading the irrigation system .......... 305,099 22 For Matthiessen State Park for rehabilitation 23 of five buildings ............................ 15,402 24 For Moraine Hills State Park for replacement 25 of restrooms and upgrading the 26 water system ................................. 909,000 27 For North Point Marina for construction of 28 a breakwater structure ....................... 3,057,696 29 For North Point Marina for modifying 30 the marina's docking system .................. 2,161,721 31 For Pere Marquette State Park for rehabilitation 32 of the water and sewer ....................... 72,532 33 For Pere Marquette State Park for upgrading 34 the water and electrical systems ............. 10,229 -28- BOB-CAPITAL98 1 For Region V Office for replacement of roofs ... 30,112 2 For Sam Dale Lake Conservation Area for 3 construction of a sewage disposal system ..... 78,363 4 For Springfield Illinois State Fairgrounds 5 for the upgrade of access roads, 6 parking lots, and visitor trails at 7 Conservation World and the Conservation 8 Service Center ............................... 55,173 9 For Starved Rock State Park for planning the 10 rehabilitation of the trails ................. 71,900 11 For Starved Rock State Park for planning the 12 reconstruction of the seawall ................ 68,348 13 For Stephen A. Forbes State Park for extending 14 water and electrical services ................ 271,391 15 For Trail of Tears State Forest for 16 replacement of a bridge ...................... 36,238 17 For Tri-County Park for planning 18 a park ....................................... 300,000 19 For Volo Bog Natural Area for rehabilitation 20 of the visitors' center ...................... 408,887 21 For Wayne Fitzgerrell State Park for 22 rehabilitation of the sewage treatment 23 plant ........................................ 323,100 24 For Wayne Fitzgerrell State Park for 25 planning and construction of a marina, 26 installation of additional sewage lines, 27 recreational development and overnight 28 accommodations to be located on Rend 29 Lake ......................................... 14,599 30 GEOLOGICAL SURVEY - CHAMPAIGN 31 For upgrading the Applied Research Laboratory 32 previously appropriated ...................... 47,088 33 For planning and upgrading the Research 34 Laboratory ................................... 22,670 -29- BOB-CAPITAL98 1 NATURAL HISTORY SURVEY - NATURAL HISTORY RESEARCH CENTER 2 (FORMERLY BURNHAM HOSPITAL) 3 For planning and initiating the renovation of the 4 Natural History Research Center (formerly 5 Burnham Hospital) ............................ 3,173,451 6 For acquisition, planning, construction, 7 reconstruction, rehabilitation, and all 8 costs for the conversion of the Natural 9 History Research Center (formerly Burnham 10 Hospital) to a laboratory facility 11 for the Natural History Survey ............... 75,385 12 HAZARDOUS WASTE R & I CENTER - CHAMPAIGN 13 For upgrading the decontamination facilities 14 to improve operating efficiency and 15 life/safety .................................. 78,184 16 NATURAL HISTORY SURVEY - CHAMPAIGN 17 For completing the the Pesticide Storage 18 and Mixing facility .......................... 237,094 19 For upgrading laboratories and installation 20 of storage units ............................. 863,084 21 For renovation of the Natural Resources 22 Building ..................................... 43,067 23 For planning the chemical storage 24 building ..................................... 2,005 25 STATE WATER SURVEY - CHAMPAIGN 26 For planning replacement of vehicle 27 storage/shop facilities ...................... 21,150 28 DICKSON MOUNDS - LEWISTOWN 29 For renovation and expansion of the building, 30 including exhibits ........................... 228,902 31 For replacement of the cooling tower ........... 6,756 32 SPRINGFIELD - STATE MUSEUM 33 For planning renovation of main museum 34 exhibits and For renovation of basement -30- BOB-CAPITAL98 1 galleries .................................... 36,266 2 For renovation of the lobby and gift shop ...... 12,567 3 SPRINGFIELD - STATE MUSEUM COLLECTIONS CENTER 4 For installation of a boiler ................... 60,053 5 BENTON - SOUTHERN ILLINOIS MINING OFFICE 6 (FORMERLY MINE RESCUE STATION) 7 (From Article 77, Section 6 of Public Act 89-0501): 8 For upgrading the roofing and HVAC systems 9 and replacing exterior doors ................. 72,520 10 (From Article 78, Section 4 of Public Act 89-0501): 11 For upgrading the parking areas ................ 50,574 12 For renovation of the laboratory and purchase 13 equipment and for supplementing funds 14 previously appropriated to construct an 15 addition ..................................... 16,460 16 For acquiring property and construction of 17 a parking area ............................... 15,819 18 STATEWIDE 19 (From Article 77, Section 6 of Public Act 89-0501): 20 For repair or replacement of roofs and 21 parapet walls and and reconstruction 22 of chimneys at the following locations 23 at the approximate costs set forth below ..... 1,595,542 24 Geological Survey - Applied Lab ......234,000 25 Water Survey - Eight Buildings .......227,259 26 Natural History Survey - Natural 27 Resources Studies Annex .............330,630 28 Geological Survey - Natural 29 Resources Building ..................295,000 30 Water Survey - Parapet walls at 31 Buildings No. 4, 5 and 6 .............24,000 32 Dickson Mounds - Exterior restroom 33 and picnic shelter ...................14,530 34 Jake Wolf Fish Hatchery - -31- BOB-CAPITAL98 1 one building ........................470,123 2 (From Article 78, Section 4 of Public Act 89-0501): 3 For land acquisition ........................... 983,755 4 For maintaining the lodge and concession 5 facilities ................................... 227,707 6 For repairing and maintaining facilities ....... 271,713 7 For replacement of vault toilets at the 8 following locations at the 9 approximate costs set forth below: ........... 60,955 10 Delabar State Park ....................9,153 11 Illini State Park ....................51,138 12 Johnson Sauk Trail State Park ...........264 13 For construction of hazardous material 14 storage buildings ............................ 430,807 15 For abating hazards caused by the presence 16 of asbestos-containing materials ............. 76,445 17 For planning, construction, reconstruction, 18 land acquisition and related costs, 19 utilities, site improvements, and all other 20 expenses necessary for various capital 21 improvements at parks, conservation areas, 22 and other facilities under the jurisdiction 23 of the Department of Natural Resources ....... 22,129,889 24 For replacing roofs at the following locations 25 at the approximate costs set forth below: .... 13,608 26 Mason State Forest Tree 27 Nursery-Two buildings ...............4,098 28 Starved Rock State Park- 29 Nine buildings ........................613 30 Illini State Park-Five 31 buildings ...........................8,897 32 For rehabilitation of the recreational 33 vehicle campground electrical systems at 34 the following locations at the approximate -32- BOB-CAPITAL98 1 costs set forth below: ....................... 178,146 2 Kankakee River State Park ...........178,146 3 For planning, construction, reconstruction, 4 land, utilities, site improvements, and 5 all other expenses necessary for various 6 capital improvements at parks and 7 conservation areas ........................... 14,269 8 For construction and development of 9 multiple use facilities on lands owned 10 or managed by the Department of 11 Natural Resources, including all costs 12 for supplies, materials, labor, and 13 services required for the completion 14 of the following projects at the 15 approximate costs set forth below: ........... 137,610 16 For Volo Bog Natural Area 17 for replacement of a roof 18 and rehabilitation of the 19 emergency exit stairs at the 20 visitor center ....................108,220 21 For Volo Bog Natural Area for 22 the upgrading of the 23 Interpretive Center, including 24 the heating, ventilation, and 25 air conditioning system ............29,390 ____________ 26 Total, Section 4 $42,933,685 27 Section 4A. The following named amounts, or so much 28 thereof as may be necessary, and remain unexpended at the 29 close of business on June 30, 1997, from appropriations 30 heretofore made for such purposes in Article 77, Section 6B 31 of Public Act 89-0501, as amended, are reappropriated from 32 the Capital Development Fund to the Capital Development Board 33 for the Department of Natural Resources for the projects -33- BOB-CAPITAL98 1 hereinafter enumerated: 2 CHAIN O' LAKES STATE PARK - MCHENRY COUNTY 3 For construction of a concession building 4 and upgrading the horse concession, in 5 addition to funds previously appropriated .... 500,000 6 CHAMPAIGN - STATE WATER SURVEY 7 For planning the renovation of the central 8 utilities plant .............................. 30,000 9 For renovation of office and 10 laboratory buildings ......................... 793,000 11 For replacement and upgrade of the exterior 12 lighting system .............................. 146,000 13 CHAMPAIGN - STATE NATURAL HISTORY SURVEY 14 For renovation of Natural History 15 Research Center (formerly Burnham 16 Hospital) in Champaign ....................... 6,000,000 17 DELABAR STATE PARK - HENDERSON COUNTY 18 For replacement of waterlines and 19 fountains .................................... 110,000 20 EAGLE CREEK STATE PARK - SHELBY COUNTY 21 For rehabilitation of the sewage treatment 22 system, in addition to funds previously 23 appropriated ................................. 312,000 24 HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA 25 For replacement and rehabilitation 26 of arch culverts and canal ................... 600,000 27 JOHNSON SAUK TRAIL STATE PARK - HENRY COUNTY 28 For rehabilitation of the concession 29 building, in addition to funds 30 previously appropriated ...................... 140,000 31 KICKAPOO STATE PARK - VERMILION COUNTY 32 For construction of a sewage treatment 33 plant, in addition to funds 34 previously appropriated ...................... 1,110,000 -34- BOB-CAPITAL98 1 MORAINE HILLS STATE PARK - MCHENRY COUNTY 2 For renovation of the trail .................... 345,000 3 MORAINE VIEW STATE PARK - MCLEAN COUNTY 4 For construction of a sewage treatment 5 system and plant ............................. 1,625,000 6 PERE MARQUETTE STATE PARK - JERSEY COUNTY 7 For renovation of two buildings and 8 replacement of a storage building ............ 180,000 9 STARVED ROCK STATE PARK - LASALLE COUNTY 10 For construction of a visitors' 11 center, in addition to funds 12 previously appropriated ...................... 365,000 13 For rehabilitation of trails, in addition 14 to funds previously appropriated ............ 1,000,000 15 For reconstruction of the seawall, in 16 addition to funds previously 17 appropriated ................................. 500,000 18 For rehabilitation of the sewer 19 system - Phase I ............................. 180,000 20 STATE MUSEUM RESEARCH AND COLLECTION CENTER - SPRINGFIELD 21 For the completion of site improvements ........ 559,000 22 STATE MUSEUM - SPRINGFIELD 23 For planning and replacement of the main 24 museum exhibits, in addition to funds 25 previously appropriated ...................... 700,000 26 Total, Section 4A $15,195,000 27 Section 4.1. The following named amounts, or so much 28 thereof as may be necessary and remain unexpended at the 29 close of business on June 30, 1997, from appropriations and 30 reappropriations heretofore made for such purposes in Article 31 77, Section 6A and Article 78, Section 4.1 of Public Act 32 89-0501 are reappropriated from the General Revenue Fund to 33 the Capital Development Board for the Department of Natural -35- BOB-CAPITAL98 1 Resources for the projects hereinafter enumerated: 2 (From Article 77, Section 6A of Public Act 89-0501): 3 STATEWIDE 4 For maintenance of lodge and 5 concession facilities ........................ $ 260,000 6 For rehabilitation or replacement 7 of playground equipment ...................... 250,000 8 For rehabilitation of trail systems ............ 140,000 9 ILLINOIS BEACH STATE PARK 10 For stabilization of the shoreline.............. 400,000 11 STATEWIDE 12 (From Article 78, Section 4.1 of Public Act 89-0501): 13 For maintenance of the lodge and 14 concession facilities ........................ 29,981 15 For rehabilitation and replacement of 16 playground equipment ......................... 323,000 17 For Chain O'Lakes State Park for replacement 18 of windows and floor tile in Region 2 19 headquarters ................................. 87,000 20 For Illinois Beach State Park for 21 stabilization of the shoreline ............... 75,990 22 For Spring Grove Hatchery for upgrading the 23 septic system ................................ 30,000 24 Total, Section 4.1 $1,595,971 25 Section 5. The following named amounts, or so much 26 thereof as may be necessary and remain unexpended at the 27 close of business on June 30, 1997, from reappropriations 28 heretofore made for such purposes in Article 78, Section 5, 29 of Public Act 89-0501, as amended by Public Act 90-0002, are 30 reappropriated from the Capital Development Fund to the 31 Capital Development Board for the Department of Corrections 32 for the projects hereinafter enumerated: 33 CENTRALIA CORRECTIONAL CENTER -36- BOB-CAPITAL98 1 For renovation of the Dietary .................. $ 19,379 2 DANVILLE CORRECTIONAL CENTER 3 For installation of a water softener system ... 17,341 4 For renovation of interior walls and 5 exterior masonry walls ....................... 113,131 6 For correction of construction defects ......... 362,252 7 For planning, utilities, site improvements, 8 and other expenses necessary for the 9 construction of a correctional facility ...... 32,511 10 DIXON CORRECTIONAL CENTER 11 For completing the upgrade of Sewage Treatment 12 Plant, in addition to funds previously 13 appropriated ................................. 27,163 14 For upgrading the steam distribution system 15 and replacement of the boiler system 16 including asbestos abatement ................. 111,140 17 DWIGHT CORRECTIONAL CENTER 18 For renovation of buildings ................... 715,322 19 EAST MOLINE CORRECTIONAL CENTER 20 For planning the upgrade of locking 21 systems in nine buildings .................... 34,995 22 For upgrading the steam distribution system 23 and replacement of boilers, including 24 asbestos abatement ........................... 23,764 25 SOUTHWESTERN ILL. CORRECTIONAL FACILITY 26 For providing equipment and telecom, 27 constructing a warehouse and upgrading 28 a parking lot, in addition to funds 29 previously appropriated ...................... 130,007 30 For completing the conversion of existing 31 buildings into a minimum security 32 correctional facility, in addition to funds 33 previously appropriated ...................... 19,776 34 ILLINOIS YOUTH CENTER - HARRISBURG -37- BOB-CAPITAL98 1 For purchasing and installation of equipment 2 to complete the dietary expansion ........... 25,607 3 For replacement of absorption chiller units 4 and boiler systems in three buildings ........ 13,978 5 JOLIET CORRECTIONAL CENTER 6 For completing the west cellhouse renovation, 7 including asbestos abatement, in addition 8 to funds previously appropriated ............. 3,495,065 9 For renovation of the west cellhouse, in 10 addition to funds previously appropriated .... 27,575 11 For renovation of steam, water, sewage and 12 electrical systems ........................... 1,306 13 For planning the rehabilitation of the 14 West Cellhouse ............................... 172,011 15 ILLINOIS YOUTH CENTER - JOLIET 16 For completing the upgrade of electrical 17 systems, in addition to funds 18 previously appropriated ...................... 1,805,650 19 For upgrading the fire alarm system ............ 275,557 20 For upgrading the storm and sanitary sewers .... 353,627 21 For completing the upgrade of the utilities, in 22 addition to funds previously appropriated .... 40,647 23 For completion of the steam system upgrade 24 and initiation of the electrical 25 system upgrade ............................... 6,239 26 KANKAKEE MSU 27 For providing equipment, telecom, lighting 28 and freezer units, in addition to funds 29 previously appropriated ...................... 53,468 30 For planning, construction, utilities, 31 renovation, site improvements, and 32 other expenses necessary for a minimum 33 security women's prison ...................... 4,133 34 For rehabilitation of the heating and air -38- BOB-CAPITAL98 1 handling system in the resident buildings .... 2,737 2 LINCOLN CORRECTIONAL CENTER 3 For upgrading the locking systems and doors ... 77,700 4 For upgrading the water supply ................. 356,077 5 For renovation of the Dietary, construction 6 of a cooler addition and installation 7 of blast chillers ........................... 487,520 8 LOGAN CORRECTIONAL CENTER 9 For renovation of sewer system ................. 854,229 10 For renovation of the water tower .............. 124,144 11 For rehabilitation of the roof ventilation 12 systems ...................................... 77,948 13 MENARD CORRECTIONAL CENTER 14 For planning, completion and rehabilitation 15 or replacement of the MSU "C" Building ....... 91,994 16 For replacement of East and West 17 Cellhouse windows and boilers................. 276,442 18 For improving the south yard for outdoor 19 recreation ................................... 32,606 20 For repairs due to the Great Flood of 21 1993 and projects to protect the facility 22 from future floods ........................... 250,362 23 For upgrading the steam and water distribution 24 systems and replacement of the MSU 25 "C" Building ................................. 183,254 26 For replacement of the chimney stack and 27 boilers, in addition to funds previously 28 appropriated ................................. 400,000 29 For replacement of hot water heaters and 30 deairing tanks ............................... 110,000 31 For planning the renovation of the old 32 hospital building ............................ 207,540 33 For renovation of elements of the power 34 plant, including the main generator .......... 22,982 -39- BOB-CAPITAL98 1 For planning for renovation of the 2 Administration Building ...................... 15,604 3 For completing the renovation of the 4 Psychiatric Cellhouse ........................ 5,247 5 ILLINOIS YOUTH CENTER - PERE MARQUETTE 6 For completing the renovation of control 7 center and construction of a confinement 8 addition, in addition to funds previously 9 appropriated ................................. 39,691 10 For upgrading the dormitory restrooms ......... 31,814 11 SHAWNEE CORRECTIONAL CENTER 12 For upgrading the heating and hot 13 water system ................................. 581,309 14 SHERIDAN CORRECTIONAL CENTER 15 For completion of water and sewer systems 16 upgrade, in addition to funds previously 17 appropriated ................................. 2,699 18 For planning the upgrade of sewer and 19 water utilities .............................. 6,954 20 STATEVILLE CORRECTIONAL CENTER 21 For upgrading the the gatehouse ................ 100,117 22 For completing the upgrade of the security 23 system, in addition to funds previously 24 appropriated ................................. 23,650 25 For rehabilitation of plumbing in Dietary ..... 27,593 26 For upgrading the doors, locks and hardware 27 in B Cellhouse ............................... 59,940 28 For upgrading the water supply to B house ..... 187,633 29 For upgrade of the utility system .............. 7,177 30 ILLINOIS YOUTH CENTER - ST. CHARLES 31 For completing the upgrade of the water 32 distribution system, in addition to funds 33 previously appropriated ...................... 192,872 34 For replacement of Madison Cottage ............. 136,527 -40- BOB-CAPITAL98 1 ILLINOIS YOUTH CENTER - VALLEY VIEW 2 For planning the upgrade of dormitory restrooms 3 and fixtures ................................. 68,560 4 VIENNA CORRECTIONAL CENTER 5 For completing the rehabilitation of duct 6 system and walls, in addition to 7 funds previously appropriated ................ 1,300,592 8 For upgrading the electrical system ............ 80,094 9 For planning the upgrade of the steam 10 distribution system .......................... 190,881 11 For planning the replacement of the 12 absorption chiller and cooling tower ......... 40,848 13 For upgrading the library and school 14 buildings .................................... 107,592 15 For planning the rehabilitation of the 16 duct system and walls ........................ 15,910 17 For upgrading the water and sewer 18 utilities .................................... 187,609 19 STATEWIDE 20 For planning, design, construction, 21 equipment and all other necessary 22 costs for a youth boot camp at a 23 site to be chosen from the list of 24 finalists not selected for the 25 super maximum security prison ............... 322,891 26 For completion of planning, site improvements, 27 utility upgrade, equipment and construction 28 of three housing units to add 672 cells 29 to the adult correctional system ............. 73,354 30 For planning, construction, utilities, site 31 improvements, equipment and other expenses 32 necessary for the construction of a close 33 supervision super maximum security prison .... 18,904,536 34 For upgrading for fire safety at five -41- BOB-CAPITAL98 1 locations and replacing boilers............... 1,767,333 2 For correcting defects in the food preparation 3 areas, including roofs ....................... 128,591 4 For planning, construction, utilities, 5 site improvements, and other expenses 6 necessary for the construction of two 7 minimum and one medium security 8 prisons ...................................... 29,224 9 For utilities, construction, planning, 10 design, site improvements, rehabilitation, 11 equipment, or any other means of acquiring 12 community correctional centers, adult work 13 camps, and boot camps ........................ 9,078 14 For renovation and improvements at various 15 correctional facilities at the approximate 16 costs set forth below: ....................... 117,693 17 Roof Replacement .....................70,000 18 Road Repavement ......................47,693 19 For replacement of cell doors and locks 20 and rehabilitation of locking systems at 21 the following locations at the approximate 22 costs set forth below: ....................... 118,902 23 Kankakee MSU 24 For rehabilitation of locking 25 systems ...........................118,902 26 For renovation of roads and parking lots 27 and replacement of boilers at the 28 following locations at the approximate 29 costs set forth below ........................ 119,503 30 Dixon Correctional Center 31 For roads and parking ..............30,000 32 Hanna City Work Camp 33 For roads and parking ..............37,000 34 Logan Correctional Center -42- BOB-CAPITAL98 1 For roads and parking ..............10,000 2 Menard Correctional Center 3 For roads and parking and 4 replacement of boilers............168,832 5 Vienna Correctional Center 6 For roads ..........................30,000 7 For replacement of roofs at various Department of 8 Corrections locations ........................ 415,977 9 For roof replacement at the following 10 locations at the approximate costs 11 set forth below: ............................. 670,404 12 Dixon Correctional Center 13 Five Buildings .....................25,000 14 Dwight Correctional Center 15 Three buildings ...................122,000 16 Dwight Correctional Center 17 Multi-Purpose Building .............85,000 18 Graham Correctional Center 19 Five buildings ....................125,000 20 Graham Correctional Center 21 Thirty-two buildings ..............150,000 22 Hanna City Work Camp 23 Thirteen buildings .................7,000 24 Joliet Correctional Center 25 Five buildings ....................160,000 26 Logan Correctional Center 27 Two buildings .....................200,000 28 Menard Psychiatric Center 29 Six buildings .....................485,000 30 Menard Correctional Center 31 Warehouse Building .................70,000 32 Menard Correctional Center 33 Five buildings ....................700,000 34 Pontiac Correctional Center -43- BOB-CAPITAL98 1 Nine buildings .....................40,000 2 Pontiac Correctional Center 3 Eight buildings ....................75,000 4 Illinois Youth Center-St. Charles 5 Three buildings ...................175,000 6 Sheridan Correctional Center 7 Six buildings ......................50,000 8 Stateville Correctional Center 9 Sixteen buildings .................50,000 10 Stateville Correctional Center 11 Seven buildings ...................135,000 12 Ill Youth Center-Valley View 13 Administration Building and 14 Kitchen Addition ..................100,688 15 Illinois Youth Center-Warrenville 16 One residential building ..........150,000 ____________ 17 Total, Section 5 $37,525,578 18 Section 5A. The following named amounts, or so much 19 thereof as may be necessary, and remain unexpended at the 20 close of business on June 30, 1997, from appropriations 21 heretofore made for such purposes in Article 77, Section 3B 22 of Public Act 89-0501, as amended, are reappropriated from 23 the Capital Development Fund to the Capital Development Board 24 for the Department of Corrections for the projects 25 hereinafter enumerated: 26 STATEWIDE 27 For correction of deficiencies in 28 water systems at three correctional 29 facilities ................................... $ 100,000 30 For replacement of locks, windows and 31 doors at the following locations 32 as set forth below: .......................... 4,000,000 33 Dwight ...............................291,400 -44- BOB-CAPITAL98 1 IYC Harrisburg .......................943,000 2 IYC Joliet ...........................367,500 3 Menard .............................1,350,000 4 Pontiac ...............................77,100 5 IYC Valley View ......................500,000 6 Vienna ...............................471,000 7 For planning, design, construction, 8 equipment and other necessary costs 9 for a Correctional Facility for 10 juveniles .................................... 42,750,000 11 For planning, design, construction, 12 equipment and other necessary costs 13 for a Medium Security Correctional 14 Facility ..................................... 69,000,000 15 DANVILLE CORRECTIONAL CENTER 16 For renovation of interior and 17 exterior walls, in addition to 18 funds previously appropriated ................ 4,000,000 19 DECATUR WOMEN'S CORRECTIONAL CENTER 20 For the planning and conversion of 21 Meyer Mental Health Center into a 22 correctional facility ........................ 23,000,000 23 DIXON CORRECTIONAL CENTER 24 For renovation of the groundwater 25 storage tank and abatement of crawl- 26 space pipes in Bldgs. 26, 27 and 29 .......... 700,000 27 DWIGHT CORRECTIONAL CENTER 28 For completion of medical unit, 29 in addition to funds previously 30 appropriated ................................. 3,500,000 31 For expansion of the Education Building 32 and Dietary and construction of 33 a warehouse .................................. 4,700,000 34 EAST MOLINE CORRECTIONAL CENTER -45- BOB-CAPITAL98 1 For upgrading locking system, in addition 2 to funds previously appropriated ............. 800,000 3 ILLINOIS YOUTH CENTER - HARRISBURG 4 For upgrading the domestic water system ........ 675,000 5 For upgrading the HVAC system .................. 532,000 6 ILLINOIS YOUTH CENTER - JOLIET 7 For planning, site improvements, 8 utility upgrade, equipment and all 9 costs necessary to construct a 10 housing unit and dietary facility............. 7,000,000 11 ILLINOIS YOUTH CENTER - PERE MARQUETTE 12 For upgrading the electrical 13 distribution system .......................... 215,000 14 ILLINOIS YOUTH CENTER - VALLEY VIEW 15 For upgrading dormitory restrooms 16 and fixtures, in addition to 17 funds previously appropriated ................ 550,000 18 JOLIET CORRECTIONAL CENTER 19 For upgrading the power house and 20 installation of a generator .................. 407,000 21 STATEVILLE CORRECTIONAL CENTER - JOLIET 22 For replacement of the MSU ..................... 6,500,000 23 LINCOLN CORRECTIONAL CENTER 24 For upgrading the water softener system ........ 150,000 25 MENARD CORRECTIONAL CENTER - CHESTER 26 For upgrading roads and sidewalks .............. 310,000 27 For upgrading the plumbing systems in 28 two buildings ................................ 400,000 29 For upgrading the coal handling system 30 and repair or replace boiler system .......... 950,000 31 For conversion of the Maintenance Building 32 to an inmate dormitory ....................... 250,000 33 For conversion of the Administration 34 Building basement to a courtroom and -46- BOB-CAPITAL98 1 attorney offices ............................. 100,000 2 For upgrading the steam and water distribution 3 systems, in addition to funds previously 4 appropriated ................................. 2,400,000 5 PONTIAC CORRECTIONAL CENTER 6 For renovation of main sally port .............. 300,000 7 VANDALIA CORRECTIONAL CENTER 8 For renovation of dormitory shower rooms ....... 450,000 9 VIENNA CORRECTIONAL CENTER 10 For upgrading the steam distribution system 11 and renovation of Powerhouse, in addition 12 to funds previously appropriated ............. 4,000,000 13 For installation of security fencing ........... 1,000,000 14 For upgrading air conditioning system 15 and replacement of cooling tower ............. 1,100,000 16 For upgrading the electrical, plumbing and 17 HVAC systems in four buildings ............... 850,000 18 Total, Section 5A $180,689,000 19 Section 5.1. The following named amounts, or so much 20 thereof as may be necessary and remain unexpended at the 21 close of business on June 30, 1997, from appropriations and 22 reappropriations heretofore made for such purposes in Article 23 78, Section 5.1 of Public Act 89-0501 are reappropriated from 24 the General Revenue Fund to the Capital Development Board for 25 the Department of Corrections for the projects hereinafter 26 enumerated: 27 DIXON CORRECTIONAL CENTER 28 For replacement of two freezer compressors 29 and motors ................................... $ 150,757 30 EAST MOLINE CORRECTIONAL CENTER 31 For retubing boiler #3 ......................... 345,650 32 STATEVILLE CORRECTIONAL CENTER 33 For upgrading the security system .............. 9,907 -47- BOB-CAPITAL98 1 STATEWIDE 2 For energy conservation improvements at the 3 following locations at the approximate 4 costs set forth below: ....................... 56,018 5 Dwight Correctional Center ............7,000 6 Joliet Correctional Center 7 School Building .....................4,500 8 Menard Psychiatric Center 9 Randolph Hall .......................7,500 10 Stateville Correctional Center 11 Law Library .........................7,400 12 Pontiac Correctional Center ..........35,394 13 Vienna Correctional Center ............1,725 14 For upgrading doors and locking systems at 15 the following locations at the approximate 16 costs set forth below: ....................... 577,182 17 Illinois Youth Center-Warrenville 18 For replacement of doors 19 and locking systems ...............577,182 ____________ 20 Total, Section 5.1 $1,139,514 21 Section 5.2. The sum of $2,666,667, or so much thereof 22 as may be necessary and remains unexpended at the close of 23 business on June 30, 1997, from a reappropriation heretofore 24 made for such purposes in Article 78, Section 5.2 of Public 25 Act 89-0501, is reappropriated from the Capital Development 26 Fund to the Capital Development Board for the State's 27 one-third share of land acquisition, equipment and 28 construction of a boot camp in the Cook County area. 29 Section 5.3. The amount of $21,874, or so much thereof 30 as may be necessary and remains unexpended at the close of 31 business on June 30, 1997, from a reappropriation heretofore 32 made for such purposes in Article 78, Section 5.3 of Public -48- BOB-CAPITAL98 1 Act 89-0501, is reappropriated from the Capital Development 2 Fund to the Capital Development Board for the Department of 3 Corrections for planning and other expenses necessary for a 4 medical unit facility at Dwight Correctional Center. 5 Section 5.4. The amount of $11,898,037, or so much 6 thereof as may be necessary and remains unexpended from the 7 General Revenue Fund at the close of business on June 30, 8 1997, from an appropriation heretofore made for such purposes 9 in Article 78, Section 5.5 of Public Act 89-0501, is 10 reappropriated to the Capital Development Board for the 11 Department of Corrections for all costs associated with the 12 completion of the super maximum security prison at Tamms, 13 Illinois. 14 Section 5.5. The amount of $11,110,948, or so much 15 thereof as may be necessary and remains unexpended at the 16 close of business on June 30, 1997, from an appropriation 17 heretofore made for such purposes in Article 77, Section 3 of 18 Public Act 89-0501, is reappropriated from the General 19 Revenue Fund to the Capital Development Board for the 20 Department of Corrections for the projects hereinafter 21 enumerated at the approximate costs set forth below: 22 Danville Correctional Center - 23 For upgrading the hot water 24 distribution system ................$2,227,613 25 Joliet Correctional Center - 26 For replacement of the deep well ........350,000 27 Stateville Correctional Center- 28 For upgrading the plumbing systems in 29 four buildings ......................5,178,740 30 Menard Correctional Center - 31 For planning and to begin upgrading 32 the plumbing systems in two -49- BOB-CAPITAL98 1 buildings .............................189,100 2 Pontiac Correctional Center - 3 For upgrading the mechanical systems 4 and renovation of shower rooms ........995,000 5 Shawnee Correctional Center - 6 For upgrading the hot water 7 distribution system .................2,170,495 8 Section 5.6. The following named amounts, or so much 9 thereof as may be necessary and remain unexpended at the 10 close of business on June 30, 1997, from appropriations 11 heretofore made for such purposes in Article 77, Section 3A 12 of Public Act 89-0501, are reappropriated from the General 13 Revenue Fund to the Capital Development Board for the 14 Department of Corrections for the projects hereinafter 15 enumerated: 16 DIXON CORRECTIONAL CENTER 17 For tuckpointing two buildings ................. $ 65,000 18 STATEVILLE CORRECTIONAL CENTER - JOLIET 19 For tuckpointing seven buildings ............... 300,000 20 Total $365,000 21 Section 6. The following named amounts, or so much 22 thereof as may be necessary and remain unexpended at the 23 close of business on June 30, 1997, from reappropriations 24 heretofore made for such purposes in Article 78, Section 6 25 of Public Act 89-0501, are reappropriated from the Capital 26 Development Fund to the Capital Development Board for the 27 Historic Preservation Agency for the projects hereinafter 28 enumerated: 29 CAHOKIA MOUNDS HISTORIC SITE 30 To extend a water line for providing 31 reliable water service ....................... $ 284,094 32 For purchasing private land within historic -50- BOB-CAPITAL98 1 site boundary ................................ 280,600 2 For replacement of Monk's Mounds stairs ........ 243,148 3 DAVID DAVIS HOME 4 To acquire a residence to be 5 converted to a Visitors' Center .............. 250,000 6 FT. KASKASKIA HISTORIC SITE 7 For providing a new water supply ............... 138,463 8 GALENA COMPLEX - JO DAVIESS COUNTY 9 For providing handicapped accessibility and 10 site improvements ............................ 5,610 11 LEWIS AND CLARK STATE HISTORIC SITE 12 For the construction of an interpretive 13 center ....................................... 440,000 14 LINCOLN LOG CABIN HISTORIC SITE - CAMPBELL 15 For rehabilitation of historic structures ...... 57,491 16 For construction of a visitor center and 17 museum, Phase I .............................. 134,909 18 For the stabilization of the Moore House ....... 27,981 19 LINCOLN NEW SALEM HISTORIC SITE - PETERSBURG 20 For completing the restoration of the 21 outdoor theater .............................. 3,431 22 For construction of a day use area ............. 207,767 23 For replacement of a barn and site 24 improvements ................................. 106,526 25 For rehabilitation of the sewage treatment 26 plant ........................................ 92,668 27 For rehabilitation of the bridge ............... 2,021 28 For rehabilitation of the outdoor theater ...... 8,083 29 LINCOLN'S TOMB HISTORIC SITE - SPRINGFIELD 30 For stabilization of storm water penetration 31 and repairing water damage ................... 28,707 32 For planning the correction of Lincoln's 33 Tomb exterior and repair the interior ........ 32,052 34 For rehabilitation of three buildings .......... 6,449 -51- BOB-CAPITAL98 1 MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY 2 For restoration of the exterior, replacement 3 of the windows, restoration of damaged 4 areas and the HVAC system .................... 72,264 5 PULLMAN FACTORY HISTORIC SITE - CHICAGO 6 For stabilization of the structure and for planning 7 and beginning restoration .................... 824,316 8 For stabilization of critical areas of the 9 structure .................................... 7,031 10 SPRINGFIELD - OLD STATE CAPITOL 11 For replacement of the heating and cooling 12 system ....................................... 130,943 13 For remodeling and rehabilitation of the 14 mechanical, electrical and security 15 systems, fire-safety improvements, other 16 interior modifications and repairs to 17 the garage ................................... 23,305 18 VACHEL LINDSAY HOME 19 For mechanical/system replacement, 20 restoration of the foundation and other 21 structural improvements ...................... 191,637 22 STATEWIDE 23 For land acquisition and related costs ......... 19,411 24 Total, Section 6 $3,618,907 25 Section 6A. The following named amounts, or so much 26 thereof as may be necessary, and remain unexpended at the 27 close of business on June 30, 1997, from appropriations 28 heretofore made for such purposes in Article 77, Section 11A 29 of Public Act 89-0501, as amended, are reappropriated from 30 the Capital Development Fund to the Capital Development Board 31 for the Historic Preservation Agency for the projects 32 hereinafter enumerated: 33 STATEWIDE HISTORIC SITE -52- BOB-CAPITAL98 1 For matching ISTEA federal grant funds ......... $ 500,000 2 DAVID DAVIS MANSION - BLOOMINGTON 3 For renovation of the David Davis Mansion 4 to eliminate basement leakage ................ 231,000 5 CAHOKIA COURTHOUSE STATE MEMORIAL - CAHOKIA 6 For renovation of the Cahokia Courthouse 7 and the Jarrot House ......................... 387,000 8 CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE 9 For replacement of Monk's Mound stairs ......... 465,000 10 For restoration of Monk's Mound ................ 1,800,000 11 LINCOLN LOG CABIN HISTORIC SITE - COLES COUNTY 12 For construction of a visitors' center ......... 1,625,000 13 For replacement of bridges ..................... 180,000 14 LINCOLN'S NEW SALEM - PETERSBURG 15 For renovation of the River Ridge 16 Restaurant and improvements to the 17 domestic water system ........................ 273,000 18 OLD STATE CAPITOL - SPRINGFIELD 19 For renovation of the Old State 20 Capitol to eliminate basement 21 leakage ...................................... 620,000 22 Total, Section 6A $6,081,000 23 Section 6.1. The amount of $54,510, or so much thereof 24 as may be necessary and remains unexpended at the close of 25 business on June 30, 1997, from a reappropriation heretofore 26 made for such purpose in Article 78, Section 6.1 of Public 27 Act 89-0501, is reappropriated from the Capital Development 28 Fund to the Capital Development Board for the Historic 29 Preservation Agency for the purchase and rehabilitation of 30 the State Journal Register Building in Springfield. 31 Section 6.2. The amount of $52,705, or so much thereof 32 as may be necessary and remains unexpended at the close of -53- BOB-CAPITAL98 1 business on June 30, 1997, from a reappropriation heretofore 2 made for such purpose in Article 78, Section 6.2 of Public 3 Act 89-0501, is reappropriated from the Capital Development 4 Fund to the Capital Development Board for the Historic 5 Preservation Agency for acquiring the Zimmerman 6 archaeological site in LaSalle County and for associated 7 costs, planning, stabilization, restoration and all other 8 expenses necessary to comply with the intent of this 9 appropriation. 10 Section 6.3. The amount of $2,300,000, or so much 11 thereof as may be necessary and remains unexpended at the 12 close of business on June 30, 1997, from appropriations 13 heretofore made for such purposes in Article 77, Section 11 14 of Public Act 89-0501, is reappropriated from the Capital 15 Development Fund to the Capital Development Board and the 16 amount of $2,300,000, or so much thereof as may be necessary 17 and remains unexpended from the Illinois Historic Sites Fund 18 at the close of business on June 30, 1997, from 19 appropriations heretofore made for such purposes in Article 20 78, Section 6.3 of Public Act 89-0501, is reappropriated to 21 the Capital Development Board for planning a new historical 22 library and Lincoln Center. The moneys from the Capital 23 Development Fund may be spent only if matched by moneys from 24 the Illinois Historic Sites Fund resulting from private 25 donations. 26 Section 6.4. The amount of $2,300,000, or so much 27 thereof as may be necessary and remains unexpended from the 28 General Revenue Fund, less $1,900,000, from the 29 appropriations heretofore made for such purposes in Article 30 78, Section 6.3 of Public Act 89-0501, is reappropriated to 31 the Capital Development Board for the Historic Preservation 32 Agency for planning a new historical library and Lincoln -54- BOB-CAPITAL98 1 Center. 2 Section 7. The amount of $3,183, or so much thereof as 3 may be necessary and remains unexpended at the close of 4 business on June 30, 1997, from a reappropriation heretofore 5 made for such purpose in Article 78, Section 7 of Public Act 6 89-0501, is reappropriated from the Capital Development Fund 7 to the Capital Development Board for the Legislative Space 8 Needs Commission for planning, construction, land 9 acquisition, site development and other related expenses as 10 may be necessary to construct a Parking and Visitor Center in 11 the Capitol Complex Area. 12 Section 8. The sum of $132,500, or so much thereof as 13 may be necessary and remains unexpended at the close of 14 business on June 30, 1997, from a reappropriation heretofore 15 made for such purposes in Article 78, Section 8 of Public Act 16 89-0501, is reappropriated from the Capital Development Fund 17 to the Capital Development Board for the Legislative Space 18 Needs Commission for architectural/engineering fees, 19 planning, construction, reconstruction, rehabilitation, and 20 all other necessary costs for remodeling and relocation of 21 various legislative services agencies located in the Capitol 22 and Stratton Office buildings at the approximate costs set 23 forth below: 24 For the Joint Committee on 25 Administrative Rules .......................$ 132,500 26 Section 9. The following named amounts, or so much 27 thereof as may be necessary and remain unexpended at the 28 close of business on June 30, 1997, from reappropriations 29 heretofore made for such purposes in Article 78, Section 9, 30 as amended by Public Act 90-0002, and Article 77, Section 4 31 of Public Act 89-0501, are reappropriated from the Capital -55- BOB-CAPITAL98 1 Development Fund to the Capital Development Board for the 2 Department of Human Services (formerly the Department of 3 Mental Health and Developmental Disabilities) for the 4 projects hereinafter enumerated: 5 (From Article 78, Section 9 of Public Act 89-0501): 6 ALTON MENTAL HEALTH CENTER 7 For rehabilitation of storm and sanitary 8 sewers, in addition to funds previously 9 appropriated ................................ $ 121,432 10 For rehabilitation of storm and sanitary 11 sewers, in addition to funds previously 12 appropriated ................................. 11,194 13 For installation of security screens ........... 75,000 14 For replacement of domestic hot water 15 lines in seven buildings ..................... 4,859 16 For upgrading fire safety systems in 17 eight buildings ............................ 43,900 18 For renovation of ceilings in Holly, Maple, 19 Locust and Elm ............................... 42,444 20 For replacement of the chiller and 21 connection of the HVAC to the energy 22 management system ............................ 19,280 23 For replacement of two cooling towers in 24 the Willow Building .......................... 45,463 25 For rehabilitation of bathrooms for 26 handicapped accessibility .................... 21,605 27 For rehabilitation of the electrical 28 distribution system .......................... 77,957 29 CHESTER MENTAL HEALTH CENTER 30 For construction of a storage building ........ 803,585 31 For renovation of the HVAC system .............. 38,887 32 For upgrading the security system .............. 44,083 33 For construction of a Rehabilitative 34 Services building ............................ 78,900 -56- BOB-CAPITAL98 1 For replacement of the emergency generator ..... 73,040 2 CHICAGO METRO C&A 3 For renovation of ISPI building ................ 4,500,000 4 For planning and renovation of residential 5 and program units for children and 6 adolescent services .......................... 872,648 7 CHICAGO READ MENTAL HEALTH CENTER 8 For renovation of utility rooms and installation 9 of drinking fountains ........................ 218,000 10 For renovation of the West Campus Nurses' 11 Stations ..................................... 1,304,000 12 For renovation of Henry Horner Children's 13 Center and West Campus for fire and 14 life safety codes ............................ 1,384,273 15 For renovation of the West Campus shower 16 and toilet rooms ............................. 643,488 17 For replacement of penthouse louvers at 18 the West Campus .............................. 63,696 19 For rehabilitation of the bathroom shower 20 walls in ten buildings ....................... 96,690 21 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER 22 For upgrading the mechanical equipment, 23 in addition to funds previously 24 appropriated ................................. 522,080 25 For planning and beginning the renovation of a 26 residential building ......................... 70,714 27 For renovation of the kitchen and residential 28 units for rethermalization and air 29 condition the kitchen, in addition to 30 funds previously appropriated ............... 25,044 31 For separating and upgrading of the combined 32 sewer system, in addition to funds 33 previously appropriated ...................... 154,660 34 For rehabilitation of resident buildings -57- BOB-CAPITAL98 1 and upgrading of temperature controls ........ 620,501 2 ELGIN MENTAL HEALTH CENTER 3 (From Article 77, Section 4 of Public Act 89-0501): 4 For construction of a forensic services 5 complex, in addition to funds previously 6 appropriated ................................. 1,784,500 7 (From Article 78, Section 9 of Public Act 89-0501): 8 For upgrading and expanding the mechanical 9 infrastructure, in addition to funds 10 previously appropriated ...................... 1,245,921 11 For renovation of the HVAC systems, 12 replacement of windows and installation 13 of security screens, in addition 14 to funds previously appropriated ............. 2,092,543 15 For construction of a Forensic Services 16 Facility, in addition to funds 17 previously appropriated ..................... 13,346,590 18 For upgrading and expanding mechanical 19 infrastructure, in addition to funds 20 previously appropriated ...................... 772,051 21 For upgrading for fire and life safety ......... 880,849 22 For planning the renovation of the Forensic 23 Building and abating asbestos ................ 251,946 24 For renovation of the Central Stores 25 Building ..................................... 114,914 26 For upgrading the Medical Building HVAC 27 system and replacement of the cooling 28 towers ....................................... 2,501 29 For upgrading the security systems and 30 constructing a multi-purpose building 31 for the Forensic Complex ..................... 64,550 32 For the demolition of the Old Main Building 33 and construction of an Adult 34 Psychiatric Center ........................... 3,221,865 -58- BOB-CAPITAL98 1 FOX DEVELOPMENTAL CENTER 2 For renovation of Building #8 and 3 window replacement of Building 4 #1, in addition to funds 5 previously appropriated ...................... 472,267 6 For renovation of the exterior of 7 Building #1, in addition to funds 8 previously appropriated ...................... 97,042 9 For planning the renovation of Building #8 ..... 8,276 10 For installation of an elevator and 11 rehabilitation of corridor exits ............. 8,712 12 HOWE DEVELOPMENTAL CENTER - TINLEY PARK 13 For renovation of residences ................... 159,398 14 For replacement of steam and 15 condensate lines ............................. 357,281 16 For renovation of the boilers in the power 17 plant ........................................ 29,856 18 For renovation of bathrooms and utility rooms 19 in ten residences ............................ 6,913 20 JACKSONVILLE MENTAL HEALTH AND DEVELOPMENTAL CENTER 21 For replacement of code compliance 22 generators ................................... 25,273 23 For planning and beginning electrical 24 distribution renovation ...................... 21,950 25 For replacement of piping and heating units .... 144,665 26 For rehabilitation of bathrooms and replacement 27 of doors ..................................... 159,297 28 For rehabilitation of the boilers, turbine 29 generator and switchgear ..................... 5,611 30 For installation of fire safety systems in 31 four buildings and replacement of a 32 code compliance generator .................... 274,259 33 KILEY DEVELOPMENTAL CENTER 34 For renovation of homes ........................ 587,735 -59- BOB-CAPITAL98 1 For renovation of bathrooms in homes ........... 309,992 2 LINCOLN DEVELOPMENTAL CENTER 3 For upgrading the architectural and mechanical 4 systems, in addition to funds 5 previously appropriated ...................... 1,447,272 6 For installation of a code compliance 7 generator .................................... 104,396 8 For rehabilitation of the coal bunker 9 in the Powerhouse ............................ 261,000 10 For installation of rethermalization food 11 service system ............................... 634,439 12 For expansion of the sprinkler system in 13 four buildings ............................... 185,080 14 For renovation of the boilers, replacement of 15 controls and tuckpointing the exterior ....... 131,945 16 For installation of air conditioning in 17 Coty and Dietary Buildings ................... 44,883 18 For upgrading the HVAC systems, including 19 chillers ..................................... 32,362 20 LUDEMAN DEVELOPMENTAL CENTER 21 For renovation of residences ................... 690,135 22 For renovation of residences ................... 783,000 23 For renovation of restrooms for accessibility 24 in two buildings ............................. 114,608 25 For renovation of bathrooms in 15 residences ... 157,589 26 For installation of automatic sprinkler 27 and fire alarm system ........................ 9,133 28 MADDEN MENTAL HEALTH CENTER - HINES 29 For renovation of pavilions .................... 370,000 30 For upgrading residences for safety and 31 security ..................................... 296,744 32 For replacement of a cooling tower and 33 chiller ...................................... 247,435 34 For installation of return air fan systems ..... 10,095 -60- BOB-CAPITAL98 1 For replacement of hot water heaters ........... 121,899 2 For upgrade of the central kitchen and 3 renovation of eight pavilions ................ 1,949 4 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD 5 For renovation of a residential building ....... 481,890 6 For replacement of the HVAC control panel ...... 183,612 7 MURRAY DEVELOPMENTAL CENTER - CENTRALIA 8 For replacement of cooling towers .............. 21,161 9 For installation of fire safety systems ........ 803,861 10 For replacement of the boiler shell and 11 controls ..................................... 5,747 12 For rehabilitation of the hot water 13 distribution system .......................... 48,665 14 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 15 For replacement of the roof and masonry repair, 16 in addition to funds previously 17 appropriated ................................. 62,953 18 For replacement of valves in the powerhouse .... 110,208 19 For replacement of electrical feeder cable ..... 167,385 20 For planning and beginning sewer and 21 manhole renovation ........................... 57,645 22 For rehabilitation of the boilers .............. 556,100 23 For planning and replacement of windows ........ 234,721 24 For installation of an emergency generator ..... 190,421 25 For upgrading fire safety systems in the 26 support buildings ............................ 240,671 27 For upgrading the HVAC system and installation 28 air conditioning in the Dietary Building ..... 36,733 29 For replacement of expansion joints in the 30 utility tunnels .............................. 86,267 31 For installation of air conditioning in 32 Building #704, in addition to funds 33 previously appropriated ...................... 108,049 34 For replacement of hot water tanks in the -61- BOB-CAPITAL98 1 Laundry Building ............................. 89,146 2 For replacement of switches and switchgear, 3 in addition to funds previously 4 appropriated ................................. 29,460 5 For replacement of the water softener 6 system in the powerhouse ..................... 82,093 7 For replacement of cooling towers in 8 Buildings #100A and #100B .................... 107,298 9 For replacement of roofing systems and 10 renovation of the exterior in two 11 buildings .................................... 39,711 12 For replacement of the electrical switchgear 13 in the Power Plant ........................... 7,563 14 For planning the installation of an air 15 conditioning system for Building #704 ........ 45,376 16 For upgrading the HVAC system in the 17 Administration building and other 18 buildings .................................... 31,424 19 For installation of air conditioning in 20 Buildings #502 and #514 ...................... 186,259 21 For upgrading the electrical system ............ 15,706 22 For upgrade of the electrical distribution 23 system ....................................... 62,102 24 SINGER MENTAL HEALTH CENTER 25 For replacement of cooling tower, expansion 26 tanks and test absorbers ..................... 37,311 27 For replacement of the water main .............. 281,938 28 TINLEY PARK MENTAL HEALTH CENTER/ 29 HOWE DEVELOPMENTAL CENTER 30 For renovating and making mechanical 31 improvements to Spruce Hall and Maple Hall ... 160,218 32 For planning the rehabilitation of the 33 electrical distribution system ............... 62,378 34 For installation of security screens, in -62- BOB-CAPITAL98 1 addition to funds previously appropriated .... 59,414 2 For renovation for accessibility in four 3 buildings .................................... 559,415 4 For planning the sewer system renovation and 5 replacement of the rag catcher ............... 290,032 6 For renovation for fire and life safety in 7 three residences ............................. 460,646 8 For replacement of piping in Maple Hall ........ 28,576 9 For renovation of nursing stations and 10 medication rooms in three residences ......... 164,829 11 For replacement of the windows in nine 12 buildings .................................... 70,125 13 ZELLER MENTAL HEALTH CENTER 14 For renovation of Nurses' Stations and 15 seclusion rooms .............................. 872,540 16 For replacement of the heating and cooling 17 pumps ........................................ 10,803 18 STATEWIDE 19 ALTON/ELGIN 20 For construction of a forensic services complex 21 at Alton Mental Health Center and Elgin 22 Mental Health Center, in addition to funds 23 previously appropriated ...................... 433,152 24 For conducting the preliminary design to 25 construct, convert and/or rehabilitate 26 a forensic facility .......................... 94,918 27 STATEWIDE 28 For upgrading and rehabilitation of roads, 29 parking lots and drainage systems at the 30 following locations at the approximate 31 costs set forth below: ....................... 59,885 32 Chester Mental Health Center 33 For rehabilitation of the 34 drainage system and upgrading -63- BOB-CAPITAL98 1 parking lots .......................59,885 2 For upgrading roads and parking lots at 3 the following locations at the 4 approximate costs set forth below: ........... 40,544 5 McFarland Mental Health Ctr ...........5,544 6 Shapiro Developmental Center .........35,000 7 For rehabilitation of water towers - 8 Murray and Chester ........................... 454,813 9 For replacement of roofs at the following 10 locations at the approximate costs set 11 forth below: ................................. 1,985,151 12 Alton Mental Health Center - 13 Five buildings ....................342,687 14 Choate Mental Health Center - 15 Three buildings ....................17,479 16 Choate Mental Health and 17 Developmental Center - 18 Five buildings .....................15,034 19 Chester Mental Health Center - 20 21 buildings .......................39,775 21 Elgin Mental Health Center - 22 Three buildings ....................52,000 23 Elgin Mental Health Center - 24 Six Buildings .....................115,000 25 Lincoln Developmental Center - 26 Three buildings ...................240,613 27 Lincoln Developmental Center - 28 Four buildings ......................6,601 29 Ludeman Developmental Center - 30 Support buildings ..................91,447 31 Ludeman Developmental Center- 32 Residences .........................22,158 33 Mabley Developmental Center - 34 One building ......................103,517 -64- BOB-CAPITAL98 1 Madden Mental Health Center - 2 Buildings and covered walkways .....72,822 3 McFarland Mental Health Center - 4 Three buildings ...................144,240 5 Meyer Mental Health Center - 6 One building ......................315,514 7 Shapiro Developmental Center - 8 Three buildings ...................187,000 9 Shapiro Developmental Center - 10 Two buildings ......................16,351 11 Shapiro Developmental Center - 12 Five buildings .....................67,831 13 Tinley Park Mental Health Center - 14 One building .......................26,048 15 Tinley Park Mental Health Center - 16 Oak Hall ..........................109,034 17 STATEWIDE - FIRE SAFETY 18 To renovate fire safety systems, including 19 installation of sprinklers, at the following 20 locations at the approximate costs set 21 forth below: ................................. 354,529 22 Anna Mental Health and 23 Developmental Center ...............12,318 24 Singer Mental Health and 25 Developmental Center ..............335,021 26 For fire safety and other work necessary to meet 27 state and federal certification standards for 28 the following projects: 29 For installation of sprinkler systems at 30 Chicago-Read Mental Health Center ............ 125,209 31 For installation of sprinkler systems at 32 Murray Developmental Center .................. 2,000 33 For installation of sprinkler systems at 34 Waukegan Developmental Center ................ 15,448 -65- BOB-CAPITAL98 1 Total, Section 9 $54,784,245 2 Section 9A. The following named amounts, or so much 3 thereof as may be necessary, and remain unexpended at the 4 close of business on June 30, 1997, from appropriations 5 heretofore made for such purposes in Article 77, Section 4B 6 of Public Act 89-0501, as amended, are reappropriated from 7 the Capital Development Fund to the Capital Development Board 8 for the Department of Human Services (formerly the Department 9 of Mental Health and Developmental Disabilities) for the 10 projects hereinafter enumerated: 11 STATEWIDE 12 For replacement of roofing systems at the 13 following locations at the approximate costs 14 set forth below: ............................. $ 2,333,900 15 Alton Mental Health Center ..........217,000 16 Choate Mental Health Center .........134,900 17 Chester Mental Health Center ......1,350,000 18 Fox Developmental Center ............101,000 19 Howe Developmental Center ...........166,000 20 Jacksonville Developmental Center ....21,000 21 Lincoln Developmental Center ........344,000 22 ALTON MENTAL HEALTH CENTER - MADISON COUNTY 23 For rehabilitation of the central dietary ...... 1,950,000 24 For replacement of life/safety and 25 security system in a residential 26 building ..................................... 246,000 27 CHESTER MENTAL HEALTH CENTER - CHESTER 28 For installation of emergency generator 29 and upgrading EMS system ..................... 350,000 30 CHICAGO READ MENTAL HEALTH CENTER - CHICAGO 31 For renovating residential units, in 32 addition to funds previously 33 appropriated ................................. 2,171,000 -66- BOB-CAPITAL98 1 CHOATE MENTAL HEALTH CENTER - ANNA 2 For upgrading mechanical equipment, in 3 addition to funds previously 4 appropriated ................................... 837,000 5 For renovating a residential building, 6 in addition to funds previously 7 appropriated ................................. 2,334,000 8 ELGIN MENTAL HEALTH CENTER - KANE COUNTY 9 For construction of an Adult Psychiatric 10 Building, in addition to funds previously 11 appropriated ................................. 3,681,000 12 For construction of roads, parking lots 13 and street lights ............................ 2,500,000 14 For upgrading and expanding the mechanical 15 infrastructure, in addition to funds 16 previously appropriated ...................... 4,500,000 17 For construction of a forensic services complex 18 at Elgin Mental Health Center, in addition 19 to funds previously appropriated ............. 4,815,500 20 FOX DEVELOPMENTAL CENTER - DWIGHT 21 For replacement of absorbers and 22 upgrading HVAC system ........................ 738,000 23 For renovation of dietary ...................... 843,000 24 HOWE DEVELOPMENTAL CENTER - TINLEY PARK 25 For renovation of residential buildings ........ 2,561,000 26 JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY 27 For rehabilitation of bathrooms and 28 replacing doors .............................. 1,575,000 29 For rehabilitation of the electrical 30 distribution system, in addition to funds 31 previously appropriated ...................... 1,257,000 32 LINCOLN DEVELOPMENTAL CENTER - LOGAN COUNTY 33 For installation of a rethermalization food 34 service system, in addition to funds -67- BOB-CAPITAL98 1 previously appropriated ...................... 732,000 2 LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST 3 For renovation of residential buildings, 4 in addition to funds previously 5 appropriated ................................. 1,888,500 6 For rehabilitation of the roads and parking 7 areas and constructing walks ................. 800,000 8 MADDEN MENTAL HEALTH CENTER - HINES 9 For renovation of pavilions, in addition 10 to funds previously appropriated ............. 844,000 11 MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD 12 For replacement of the HVAC management 13 control panel, in addition to funds 14 previously appropriated ...................... 150,000 15 For rehabilitation of the dietary facility ..... 413,000 16 MURRAY DEVELOPMENTAL CENTER - CENTRALIA 17 For replacement of the boiler 18 shells and controls, in addition 19 to funds previously appropriated ............. 132,000 20 For rehabilitation of the hot water 21 distribution system, in addition to 22 funds previously appropriated ................ 514,000 23 For replacement of cooling towers and 24 support beams, in addition to funds 25 previously appropriated ...................... 335,000 26 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 27 For completion of the HVAC system, in 28 addition to funds previously 29 appropriated ................................. 598,000 30 For replacement of boiler, in 31 addition to funds previously 32 appropriated ................................. 765,000 33 For replacement of electrical feeder 34 cable, in addition to the funds -68- BOB-CAPITAL98 1 previously appropriated ...................... 586,000 2 For rehabilitation of sewers and 3 manholes, in addition to funds 4 previously appropriated ...................... 777,000 5 For replacement of water mains 6 and valves ................................... 1,826,000 7 SINGER MENTAL HEALTH CENTER - ROCKFORD 8 For replacement of absorbers ................... 746,000 9 TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY 10 For replacement of the bar screen and 11 renovating the sewer system, in 12 addition to funds previously appropriated .... 655,000 13 For rehabilitation of the electrical 14 distribution system, in addition to 15 funds previously appropriated ................ 2,250,000 16 ZELLER MENTAL HEALTH CENTER - PEORIA 17 For renovation of the nurses' stations, 18 in addition to funds previously 19 appropriated ................................. 1,720,000 20 Total, Section 9A $48,423,900 21 Section 9.1. The following named amounts, or so much 22 thereof as may be necessary and remain unexpended at the 23 close of business on June 30, 1997, from appropriations and 24 reappropriations heretofore made for such purposes in 25 Article 77, Section 4A and Article 78, Section 9.1 of Public 26 Act 89-0501, are reappropriated from the General Revenue Fund 27 to the Capital Development Board for the Department of Human 28 Services (formerly the Department of Mental Health and 29 Developmental Disabilities) for the projects hereinafter 30 enumerated: 31 (From Article 77, Section 4A of Public Act 89-0501): 32 STATEWIDE 33 For repair of the exterior masonry -69- BOB-CAPITAL98 1 walls, in addition to funds previously 2 appropriated ................................. $ 677,000 3 TINLEY PARK MENTAL HEALTH CENTER - COOK COUNTY 4 For rehabilitating exterior of 5 residential building at Tinley ............... 215,000 6 (From Article 78, Section 9.1 of Public Act 89-0501): 7 ALTON MENTAL HEALTH AND DEVELOPMENTAL CENTER 8 For upgrading the security system and 9 replacement of exit signs .................... 102,765 10 CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER 11 For renovation of turbines in the powerhouse ... 38,781 12 ELGIN MENTAL HEALTH CENTER 13 For repairing the exterior in five 14 buildings .................................... 42,287 15 JACKSONVILLE MENTAL HEALTH 16 AND DEVELOPMENTAL CENTER 17 For the demolition of Carriel Hall, 18 rerouting utility lines, 19 providing parking lot, and planning 20 the demolition of Building 41 ................ 136,050 21 LUDEMAN DEVELOPMENTAL CENTER 22 For renovation of 15 residences ................ 4,539 23 SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE 24 For replacement of the windows, 25 in addition to funds previously 26 appropriated ................................. 200,631 27 MCFARLAND MENTAL HEALTH CENTER 28 For replacement of doors, floor tile and 29 water pumps .................................. 15,749 30 TINLEY PARK MENTAL HEALTH 31 For repairing the exterior of Spruce Hall ...... 56,521 32 For installation of security screens in 33 Maple Hall ................................... 29,623 34 For replacement of windows in Spruce Hall -70- BOB-CAPITAL98 1 (Building #28) ............................... 40,774 2 STATEWIDE 3 For repair of the exterior masonry walls 4 at Fox, Shapiro and Tinley Park/Howe ......... 288,920 5 For the following projects at the approximate 6 costs set forth below: ....................... 40,733 7 Elgin Mental Health Center 8 For improvements to roads and 9 parking areas ......................14,658 10 Madden Mental Health Center 11 For handicapped accessibility 12 improvements in the 13 Administration Building ............42,000 14 STATEWIDE 15 For road resurfacing and parking lots at 16 the following locations at the approximate 17 costs set forth below: ....................... 27,891 18 Meyer Mental Health and 19 Developmental Center ...............27,891 20 STATEWIDE - FIRE SAFETY 21 For renovation of fire safety systems at the 22 following locations at the approximate 23 costs set forth below: ....................... 144,170 24 Choate Mental Health and 25 Developmental Center ................1,547 26 Chicago Read Mental Health Ctr .......83,125 27 Madden Mental Health Center ..........39,977 28 Murray Developmental Center ..........17,400 29 Singer Mental Health and 30 Developmental Center ..................200 31 Kiley Developmental Center ............1,921 32 For fire safety and other work necessary to meet 33 state and federal certification standards for 34 the following projects: -71- BOB-CAPITAL98 1 For installation of smoke detection systems, 2 fire doors, and other fire safety and 3 certification improvements at Chicago 4 Read Mental Health Center .................... 9,574 5 For installation of smoke detection systems, 6 smoke compartmentation, and other fire 7 safety and certification improvements at 8 Murray Developmental Center .................. 324,774 9 For installation of smoke detection systems, 10 extension of corridor walls to roof deck, 11 and certification improvements at Kiley 12 Developmental Center ......................... 1,894 13 Total, Section 9.1 $2,397,676 14 Section 10. The following named amounts, or so much 15 thereof as may be necessary and remain unexpended at the 16 close of business on June 30, 1997, from reappropriations 17 heretofore made for such purposes in Article 77, Section 5, 18 and Article 78, Section 10 of Public Act 89-0501, are 19 reappropriated from the Capital Development Fund to the 20 Capital Development Board for the Department of Military 21 Affairs for the projects hereinafter enumerated: 22 (From Article 78, Section 10 of Public Act 89-0501): 23 AURORA ARMORY 24 For planning an armory ......................... $ 85,528 25 BLOOMINGTON ARMORY 26 For rehabilitation of the exterior and 27 upgrading interior ........................... 40,179 28 BROADWAY AVENUE ARMORY 29 For replacement of the steam distribution 30 system, including two boilers ................ 154,256 31 CAMP LINCOLN - SPRINGFIELD 32 For site improvements and construction for 33 a military academy facility, including -72- BOB-CAPITAL98 1 repair and reconstruction of access 2 roads and drives at Camp Lincoln ............. 24,062 3 For planning, design, site improvements, and 4 other costs associated with the conversion 5 of the old "Castle" or Commissary Building 6 for use as a military museum ................. 160,013 7 DANVILLE ARMORY 8 For planning and construction of a new armory .. 1,070,000 9 DECATUR ARMORY 10 For the state's share for additional planning 11 and construction of a new armory and 12 Organizational Maintenance Shop .............. 18,890 13 DIXON ARMORY 14 For rehabilitation of the parking lot, 15 including the drive and walks ................ 128,007 16 DONNELLEY BUILDING 17 For the rehabilitation and renovation of 18 the Donnelley Building and purchase of 19 land for parking ............................. 582,894 20 GENERAL JONES ARMORY 21 For renovation of the exterior and interior, 22 mechanical areas and expansion of the 23 parking lot, in addition to amounts 24 previously appropriated ...................... 3,087,903 25 For renovation of the exterior, including 26 windows ...................................... 139,856 27 For replacement of the Assembly Hall 28 roofing system including its structural 29 system ....................................... 606,528 30 For renovation of the armory, including 31 equipment, in addition to amounts 32 previously appropriated ...................... 51,216 33 For renovation of the armory, including 34 equipment, in addition to amounts -73- BOB-CAPITAL98 1 previously appropriated for this purpose ..... 13,655 2 For the state's share for renovation ........... 11,964 3 KANKAKEE ARMORY 4 For providing the State's share for 5 construction of an Armory and Army 6 Reserve Center, including equipment .......... 14,752 7 For the state's share for planning an 8 armory and Army Reserve Center ............... 2,064 9 KEWANEE ARMORY 10 For replacement of windows ..................... 4,091 11 LITCHFIELD ARMORY 12 For rehabilitation of exterior and upgrading 13 the interior ................................. 253,930 14 MACHESNEY PARK ARMORY (ROCKFORD) 15 For moveable equipment for the new armory ...... 12,864 16 For the state's share for additional planning 17 and construction of an armory and 18 Organizational Maintenance Shop .............. 226,706 19 MARSEILLES ARMORY 20 For planning four buildings and 21 wastewater facilities ........................ 8,403 22 NORTHWEST ARMORY - CHICAGO 23 For planning interior and exterior renovation .. 3,000 24 PARIS ARMORY 25 For rehabilitation of the exterior and 26 upgrading the interior ....................... 393,000 27 PEORIA ARMORY 28 For providing the State's share for 29 construction of an armory and Army 30 Reserve Center, including equipment .......... 5,596 31 ROCK FALLS ARMORY 32 For replacement of windows and exterior 33 doors ........................................ 5,693 34 ROCK ISLAND ARMORY -74- BOB-CAPITAL98 1 For construction of an armory and 2 maintenance shop ............................. 230,028 3 SAUK AREA CAREER SCHOOL - CRESTWOOD 4 For the purchase and renovation of the 5 former Sauk Area Career School, converting 6 to an armory and upgrading the parking 7 lot .......................................... 262,752 8 SPRINGFIELD - CAMP LINCOLN 9 For construction of a military academy 10 facility ..................................... 642,870 11 For rehabilitation of the mechanical systems 12 and interior ................................. 101,210 13 STREATOR ARMORY 14 For renovation of mechanical systems ........... 288,776 15 SYCAMORE ARMORY 16 For rehabilitation of the mechanical systems ... 60,374 17 URBANA ARMORY 18 For the state's share for rehabilitation 19 of the armory, including asbestos 20 abatement, in addition to amounts 21 previously appropriated for such 22 purpose ...................................... 2,630 23 WAUKEGAN ARMORY 24 For renovation of exterior walls, and 25 replacement of doors and windows ............. 445,263 26 WEST FRANKFORT ARMORY 27 For remodeling and installation of a kitchen ... 73,678 28 WILLIAMSON COUNTY ARMORY 29 For providing the State's share for planning 30 and construction of a new armory, in 31 addition to amounts previously 32 appropriated ................................. 15,686 33 WOODSTOCK ARMORY 34 For construction of an armory and purchase -75- BOB-CAPITAL98 1 of equipment ................................. 46,019 2 For the state's share for additional planning 3 and construction of an armory ................ 7,940 4 STATEWIDE 5 (From Article 77, Section 5 of Public Act 89-0501): 6 For replacement of roofs at the 7 following locations at the 8 approximate costs set forth below: ........... 477,000 9 Paris Armory ........................101,000 10 Joliet Armory .......................103,000 11 Litchfield Armory ...................102,000 12 Springfield Military Academy ........171,000 13 (From Article 78, Section 10 of Public Act 89-0501): 14 For replacement of roofs at the following 15 locations at the approximate costs set 16 forth below .................................. 219,462 17 Camp Lincoln - AGO Building .......100,000 18 Mt. Vernon Armory .................125,485 19 For installation of kitchens and renovation 20 of the interiors at the following locations 21 at the approximate costs set forth below: .... 175,008 22 Carbondale Armory ..................29,756 23 Dixon Armory ......................120,000 24 Elgin Armory .......................50,000 ____________ 25 Total, Section 10 $10,153,746 26 Section 10A. The following named amounts, or so much 27 thereof as may be necessary, and remain unexpended at the 28 close of business on June 30, 1997, from appropriations 29 heretofore made for such purposes in Article 77, Section 5A 30 of Public Act 89-0501, as amended, are reappropriated from 31 the Capital Development Fund to the Capital Development Board 32 for the Department of Military Affairs for the projects 33 hereinafter enumerated: -76- BOB-CAPITAL98 1 NORTHWEST ARMORY - CHICAGO 2 For renovation of interior and exterior, 3 in addition to funds previously 4 appropriated for such purposes ............... 1,200,000 5 DIXON ARMORY - LEE COUNTY 6 For construction of an addition, 7 remodeling, extending utilities and 8 installing a kitchen ......................... 280,000 9 SALEM ARMORY - MARION COUNTY 10 For replacement of the boiler and 11 all domestic plumbing, piping and 12 fixtures ..................................... 800,000 13 STREATOR ARMORY - LASALLE COUNTY 14 For renovation of the mechanical 15 systems, in addition to funds 16 previously appropriated ...................... 450,000 17 Total, Section 10A $2,730,000 18 Section 10.1. The following named amounts, or so much 19 thereof as may be necessary and remain unexpended at the 20 close of business on June 30, 1997, from reappropriations 21 heretofore made for such purposes in Article 78, Section 10.1 22 of Public Act 89-0501, are reappropriated from the General 23 Revenue Fund to the Capital Development Board for the 24 Department of Military Affairs for the projects hereinafter 25 enumerated: 26 STATEWIDE 27 For the following projects at the approximate 28 costs set forth below: ....................... $ 86,000 29 Broadway Armory - Chicago 30 For repair of the heating 31 system .............................50,000 32 Freeport Armory 33 For renovation of the armory -77- BOB-CAPITAL98 1 and parking area, including 2 installation of a security 3 fence ..............................36,000 ____________ 4 Total, Section 10.1 $86,000 5 Section 11. The following named amounts, or so much 6 thereof as may be necessary and remain unexpended at the 7 close of business on June 30, 1997, from reappropriations 8 heretofore made for such purposes in Article 78, Section 11 9 of Public Act 89-0501, are reappropriated from the Capital 10 Development Fund to the Capital Development Board for the 11 Department of Human Services (formerly the Department of 12 Rehabilitation Services for the projects hereinafter 13 enumerated: 14 ILLINOIS SCHOOL FOR THE DEAF 15 JACKSONVILLE 16 For retubing boilers ........................... $ 30,978 17 For construction of a Vocational Auto Body 18 and Service Facility ......................... 403,161 19 For replacement of the HVAC system ............. 430,111 20 For replacement of water lines and fire 21 hydrants ..................................... 325,962 22 For replacement of HVAC system in 23 Building #6 .................................. 167,900 24 For construction of an addition to Unit #5 ..... 2,009,319 25 For rehabilitation of the domestic hot and 26 cold water piping in six buildings ........... 653,705 27 For replacement of domestic hot water tanks 28 in seven buildings ........................... 34,157 29 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED 30 JACKSONVILLE 31 For completion of the boiler system 32 conversion, in addition to funds 33 previously appropriated ...................... 8,222 -78- BOB-CAPITAL98 1 For replacement of Buildings 5 and 6 for 2 an Independent Living Center ................. 1,322,023 3 Total, Section 11 $5,385,538 4 Section 11A. The following named amounts, or so much 5 thereof as may be necessary, and remain unexpended at the 6 close of business on June 30, 1997, from appropriations 7 heretofore made for such purposes in Article 77, Section 7A 8 of Public Act 89-0501, as amended, are reappropriated from 9 the Capital Development Fund to the Capital Development Board 10 for the Department of Human Services (formerly the Department 11 of Rehabilitation Services) for the projects hereinafter 12 enumerated: 13 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE 14 For upgrading campus lighting .................. $ 150,000 15 For the renovation of Building No. 4 ........... 700,000 16 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 17 For replacement of roofing systems ............. 535,000 18 For planning the upgrade of the heat 19 and smoke detection system ................... 100,000 20 For the renovation of Cullom Hall .............. 2,100,000 21 Total, Section 11A $3,585,000 22 Section 11.1. The following named amounts, or so much 23 thereof as may be necessary and remain unexpended at the 24 close of business on June 30, 1997, from appropriations in 25 Article 77, Section 7, and Article 78, Section 11.1 of Public 26 Act 89-0501, are reappropriated from the General Revenue Fund 27 to the Capital Development Board for the Department of Human 28 Services (formerly the Department of Rehabilitation Services) 29 for the project hereinafter enumerated: 30 (From Article 77, Section 7 of Public Act 89-0501): 31 ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE 32 For replacing gutters and downspouts -79- BOB-CAPITAL98 1 and tuckpointing at the Gym/Pool 2 Building ..................................... $ 25,000 3 ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE 4 For retubing boiler, in addition 5 to funds previously appropriated ............. 250,000 6 For renovation of buildings and lead 7 paint abatement .............................. 700,000 8 (From Article 78, Section 11.1 of Public Act 89-0501): 9 STATEWIDE 10 For energy conservation improvements 11 for the Illinois School for the Deaf, 12 Jacksonville and the Illinois School 13 for the Visually Impaired, Jacksonville ...... 150,000 14 Total, Section 11.1 $1,125,000 15 Section 12. The following named amount, or so much 16 thereof as may be necessary and remain unexpended at the 17 close of business on June 30, 1997, from a reappropriation 18 heretofore made for such purposes in Article 78, Section 12 19 of Public Act 89-0501, is reappropriated from the Capital 20 Development Fund to the Capital Development Board for the 21 Department of Revenue for the project hereinafter enumerated: 22 REVENUE BUILDING - SPRINGFIELD 23 For planning for UPS upgrade and for renovation 24 of an interior landscape structure ........... $ 16,336 25 Total, Section 12 $16,336 26 Section 12A. The following named amounts, or so much 27 thereof as may be necessary, and remain unexpended at the 28 close of business on June 30, 1997, from appropriations 29 heretofore made for such purposes in Article 77, Section 8A 30 of Public Act 89-0501, as amended, are reappropriated from 31 the Capital Development Fund to the Capital Development Board 32 for the Department of Revenue for the project hereinafter -80- BOB-CAPITAL98 1 enumerated: 2 WILLARD ICE BUILDING - SPRINGFIELD 3 For completion of the replacement of the 4 fire alarm and security system ............... $ 70,000 5 For upgrade of the uninterruptible 6 power system ................................. 1,300,000 7 For completion of the renovation of 8 the atrium landscaping ....................... 100,000 9 Total, Section 12A $1,470,000 10 Section 12.1. The following named amount, or so much 11 thereof as may be necessary and remains unexpended at the 12 close of business on June 30, 1997, from a reappropriation 13 heretofore made for such purposes in Article 77, Section 8 of 14 Public Act 89-0501, is reappropriated from the General 15 Revenue Fund to the Capital Development Board for the 16 Department of Revenue for the project hereinafter enumerated: 17 WILLARD ICE BUILDING - SPRINGFIELD 18 For planning to eliminate atrium 19 window leakage ............................... $ 15,000 20 Total, Section 12.1 $15,000 21 Section 13. The following named amount, or so much 22 thereof as may be necessary and remain unexpended at the 23 close of business on June 30, 1997, from reappropriations 24 heretofore made for such purposes in Article 77, Section 29 25 and Article 78, Section 13 of Public Act 89-0501, is 26 reappropriated from the Capital Development Fund to the 27 Capital Development Board for the Secretary of State for the 28 project hereinafter enumerated: 29 (From Article 78, Section 13 of Public Act 89-0501): 30 SPRINGFIELD - RECORDS CENTER 31 For correcting water infiltration in the 32 basement ..................................... $ 7,012 -81- BOB-CAPITAL98 1 Total, Section 13 $7,012 2 Section 14. The following named amounts, or so much 3 thereof as may be necessary and remain unexpended at the 4 close of business on June 30, 1997, from reappropriations 5 heretofore made for such purposes in Article 77, Section 9 6 and Article 78, Section 14 of Public Act 89-0501, are 7 reappropriated from the Capital Development Fund to the 8 Capital Development Board for the Department of State Police 9 for the projects hereinafter enumerated: 10 (From Article 77, Section 9 of Public Act 89-0501): 11 STATEWIDE 12 For replacing the roofing and roof 13 drainage systems at various facilities 14 at the approximate costs set forth 15 below ........................................ $ 198,000 16 District #8, Metamora ................105,000 17 District #10, Pesotum .................93,000 18 DISTRICT 1, HEADQUARTERS - STERLING 19 For planning, construction, reconstruction, 20 demolition of existing buildings, and 21 all costs related to the relocation of 22 the headquarters, in addition to funds 23 previously appropriated ...................... 3,811,000 24 (From Article 78, Section 14 of Public Act 89-0501): 25 CAIRO (ULLIN) - DISTRICT 22 26 For construction of a firing range and radio 27 tower ........................................ 537,480 28 For planning, land acquisition, construction 29 and equipment for a new headquarters ......... 10,031 30 CARMI - DISTRICT 19 HEADQUARTERS 31 (From Article 77, Section 9 of Public Act 89-0501): 32 For rehabilitation of headquarters 33 facilities ................................... 350,000 -82- BOB-CAPITAL98 1 (From Article 78, Section 14 of Public Act 89-0501): 2 For planning rehabilitation of 3 Headquarters facilities ...................... 60,000 4 CHICAGO FORENSIC LABORATORY 5 For construction of a laboratory and 6 parking facilities ........................... 567,408 7 DU QUOIN - DISTRICT 13 8 For planning the rehabilitation of the 9 headquarters, including the parking 10 lot and range ................................ 66,901 11 EAST MOLINE - DISTRICT 7 12 For rehabilitation of the headquarters 13 facilities and replacement of the 14 radio garage ................................. 112,873 15 JOLIET - DISTRICT 5 16 For rehabilitation of the headquarters 17 facilities .................................. 18,188 18 LITCHFIELD - DISTRICT 18 HEADQUARTERS 19 For planning rehabilitation of 20 Headquarters facilities ...................... 38,218 21 SPRINGFIELD - STATE POLICE TRAINING ACADEMY 22 For rehabilitation of the facility, including 23 replacement of the HVAC system and 24 installation of an elevator .................. 257,022 25 STERLING - DISTRICT 1 26 For land acquisition, planning, construction, 27 reconstruction, demolition of existing 28 buildings, and all costs related to the 29 relocation of the District 1 Police 30 Headquarters in Sterling ..................... 335,755 31 Total, Section 14 $6,362,876 32 Section 14A. The following named amounts, or so much 33 thereof as may be necessary, and remain unexpended at the -83- BOB-CAPITAL98 1 close of business on June 30, 1997, from appropriations 2 heretofore made for such purposes in Article 77, Section 9A 3 of Public Act 89-0501, as amended, are reappropriated from 4 the Capital Development Fund to the Capital Development Board 5 for the Department of State Police for the projects 6 hereinafter enumerated: 7 For replacing radio communication 8 towers, equipment, buildings and 9 installing emergency power 10 generators at various locations .............. $ 1,150,000 11 District #22, Effingham (Mason site) 12 District #10, Pesotum 13 District #21, Askum 14 District #6, Pontiac 15 DISTRICT 18 HEADQUARTERS - LITCHFIELD 16 For rehabilitation of headquarters facilities .. 377,000 17 Total, Section 14A $1,527,000 18 Section 15. The following named amounts, or so much 19 thereof as may be necessary and remain unexpended at the 20 close of business on June 30, 1997, from reappropriations 21 heretofore made for such purposes in Article 78, Section 15 22 of Public Act 89-0501, are reappropriated from the Capital 23 Development Fund to the Capital Development Board for the 24 Department of Veterans' Affairs for the projects hereinafter 25 enumerated: 26 ANNA CENTER 27 For purchasing equipment, in addition to funds 28 previously appropriated ...................... $ 56,160 29 For renovating or constructing new facilities 30 to serve as a Veterans' Center at the Anna 31 Mental Health and Developmental Center ....... 4,825 32 LASALLE VETERANS CARE FACILITY 33 For weatherproofing the building and providing -84- BOB-CAPITAL98 1 storage space ................................ 178,380 2 For installation of a medical gas system 3 and for additional funding for a 4 Special Care Unit ............................ 74,237 5 For installation of door alarm systems ......... 40,000 6 ILLINOIS VETERANS' HOME - MANTENO 7 For planning the construction of a special 8 care facility ................................ 99,845 9 For replacement of roofs and upgrade 10 of sewer system, in addition to funds 11 previously appropriated ...................... 516,685 12 For rehabilitation of the fire alarm system .... 21,752 13 For reinforcement and sealing off of sections 14 of utility tunnels ........................... 126,884 15 For air conditioning the interconnects ......... 45,280 16 For replacement of the roof on Kilbourne, 17 Meyers and Billings and upgrade 18 of sewer system, in addition to 19 funds previously appropriated ................ 88,363 20 ILLINOIS VETERANS' HOME - QUINCY 21 For repairing streets and a bridge ............. 147,163 22 For renovation and replacement of power plant 23 equipment .................................... 489,162 24 For providing a chilled water cooling system 25 loop ......................................... 18,898 26 For installation of humidification in two 27 buildings .................................... 25,000 28 For construction of a Therapy Building and 29 renovation of the Kent Building entrance, 30 in addition to funds previously 31 appropriated ................................. 28,536 32 Total, Section 15 $1,961,170 33 Section 15A. The following named amounts, or so much -85- BOB-CAPITAL98 1 thereof as may be necessary, and remain unexpended at the 2 close of business on June 30, 1997, 0rom appropriations 3 heretofore made for such purposes in Article 77, Section 24A 4 of Public Act 89-0501, as amended, are reappropriated from 5 the Capital Development Fund to the Capital Development Board 6 for the Department of Veterans' Affairs for the project 7 hereinafter enumerated: 8 ILLINOIS VETERANS' HOME - MANTENO 9 For construction of a special care facility .... $5,550,000 10 ILLINOIS VETERANS' HOME - QUINCY 11 For upgrading HVAC system ...................... 254,000 12 For replacing steam lines ...................... 83,000 13 For replacing the domestic hot water loop ...... 305,000 14 For renovating the elevator .................... 197,000 15 Total, Section 15A $6,389,000 16 Section 15.1. The following named amounts, or so much 17 thereof as may be necessary and remains unexpended at the 18 close of business on June 30, 1997, from reappropriations 19 heretofore made for such purpose in Article 78, Section 15.1 20 of Public Act 89-0501, are reappropriated from the General 21 Revenue Fund to the Capital Development Board for the 22 Department of Veterans' Affairs for the project hereinafter 23 enumerated: 24 ILLINOIS VETERANS' HOME - MANTENO 25 For stabilization of the Billings, Kilbourne, 26 and Meyers Buildings and upgrade of 27 sewer system, in addition to funds 28 previously appropriated ...................... $ 40,231 29 For replacement of sewer lines, repair and 30 replacement of bar screens, and 31 rehabilitation of the water tower and 32 reservoir .................................... 292,000 33 Total, Section 15.1 $332,231 -86- BOB-CAPITAL98 1 Section 16. The following named amounts, or so much 2 thereof as may be necessary and remain unexpended at the 3 close of business on June 30, 1997, from appropriations and 4 reappropriations heretofore made for such purposes in Article 5 77, Section 10 and Article 78, Section 16 of Public Act 6 89-0501, are reappropriated from the Capital Development Fund 7 to the Capital Development Board for the projects hereinafter 8 enumerated: 9 (From Article 78, Section 16 of Public Act 89-0501): 10 ATTORNEY GENERAL BUILDING - SPRINGFIELD 11 For planning energy improvements and upgrading 12 HVAC and electrical systems .................. $ 76,535 13 CHICAGO 14 For public library construction, acquisition, 15 development, reconstruction and improvements 16 to the Logan Square Branch Library ........... 41,477 17 For the planning, construction, and 18 improvement of the Hegewish Branch 19 Library ...................................... 43,051 20 For the planning, construction, and 21 improvement of the Legler Branch 22 Library ...................................... 16,129 23 ELGIN APPELLATE COURT BUILDING 24 For upgrading the HVAC system .................. 27,532 25 MT. VERNON APPELLATE COURT BUILDING 26 For installation of a security system .......... 27,284 27 For rehabilitation of the exterior, in addition 28 to funds previously appropriated ............. 19,193 29 SPRINGFIELD - SUPREME COURT BUILDING 30 For replacement of side walls and steps, in addition 31 to funds previously appropriated ............. 203,495 32 For rehabilitation of the facility ............. 208,208 33 SPRINGFIELD - EXECUTIVE MANSION 34 For renovation of the interior, exterior -87- BOB-CAPITAL98 1 and site ..................................... 12,337 2 SPRINGFIELD - CAPITOL COMPLEX 3 (From Article 77, Section 10 of Public Act 89-0501): 4 For upgrading the life/safety and security 5 systems - Capitol Building ................... 2,200,000 6 For upgrading the refrigeration equipment - 7 Capitol Complex .............................. 3,466,000 8 For renovating mechanical system - 9 Capitol Complex, in addition to funds 10 previously appropriated ...................... 3,473,000 11 (From Article 78, Section 16 of Public Act 89-0501): 12 For planning the upgrade of environmental 13 equipment and HVAC ........................... 67,380 14 For renovation of mechanical systems, in 15 addition to funds previously appropriated .... 1,078,236 16 For upgrading the elevators .................... 1,090,105 17 For planning and beginning sewer 18 rehabilitation ............................... 34,625 19 For planning the mechanical system 20 renovation ................................... 56,705 21 For upgrading the refrigeration equipment ...... 90,117 22 For renovation of the second floor of the 23 Old Powerhouse for the Emergency Manage- 24 ment Agency .................................. 30,861 25 For completion of an emission control system 26 at the Power Plant, in addition to funds 27 previously appropriated ...................... 23,913 28 For providing a parking facility for the 29 Bloom and Harris Buildings, including 30 land acquisition ............................. 280,975 31 For all costs associated with the design 32 and planning for asbestos abatement, 33 window replacement, energy conservation 34 improvements, replacement of carpeting and -88- BOB-CAPITAL98 1 ceiling tiles, handicap accessibility 2 improvements, and rehabilitation of the 3 water and air distribution systems in the 4 Stratton Office Building ..................... 3,933,020 5 For planning and design of the rehabilitation 6 of the Springfield Armory .................... 1,056,638 7 For renovation of the Waterways Building for 8 the Fourth District of the Appellate Court ... 3,701,859 9 SPRINGFIELD - SIU CONSOLIDATED LABORATORIES 10 For construction of an addition to the 11 laboratory facility for Southern Illinois 12 University, Environmental Protection Agency 13 and Department of Public Health .............. 727,459 14 STATEWIDE 15 (From Article 77, Section 10 of Public Act 89-0501): 16 For abatement of hazardous materials ........... 5,935,894 17 For upgrade and remediation of 18 underground storage tanks .................... 9,888,330 19 For survey for and abatement of 20 asbestos-containing materials ................ 2,000,000 21 For upgrade/retrofit of mechanized 22 refrigeration equipment (CFC's) .............. 7,000,000 23 (From Article 78, Section 16 of Public Act 89-0501): 24 For abatement of hazardous conditions, 25 including underground storage tanks, 26 in addition to funds previously 27 appropriated ................................. 2,750,560 28 For surveys and modifications to buildings 29 to meet requirements of the federal 30 Americans with Disabilities Act .............. 54,507,413 31 For demolition of buildings .................... 4,884,914 32 For retrofitting/upgrading mechanical 33 refrigeration equipment ...................... 3,283,653 34 For planning quick chill food factories ........ 154,678 -89- BOB-CAPITAL98 1 STATEWIDE - UNDERGROUND STORAGE TANKS 2 For abating hazardous conditions, including 3 underground storage tanks, in addition to 4 funds previously appropriated ................ 220,563 5 For the planning, upgrade and replacement of 6 potentially hazardous underground storage 7 tanks ........................................ 1,325,572 8 STATEWIDE - ASBESTOS SURVEY 9 For surveys and abatement of asbestos- 10 containing materials ......................... 1,518,716 11 STATEWIDE - ASBESTOS ABATEMENT 12 For asbestos abatement located during 13 Asbestos Abatement Authority and other 14 surveys to eliminate significant health 15 hazards ...................................... 520,795 16 For planning and abatement of asbestos, and 17 replenishment of initial project 18 construction costs in bondable projects 19 at various state owned facilities ............ 627,492 20 Total, Section 16 $116,604,714 21 Section 16A. The following named amounts, or so much 22 thereof as may be necessary, and remain unexpended at the 23 close of business on June 30, 1997, from appropriations 24 heretofore made for such purposes in Article 77, Section 10B 25 of Public Act 89-0501, as amended, are reappropriated from 26 the Capital Development Fund to the Capital Development Board 27 for the Capital Development Board for the projects 28 hereinafter enumerated: 29 STATEWIDE 30 For renovation to meet the requirements 31 of the Americans with Disabilities Act ....... $ 3,000,000 32 CAPITOL COMPLEX - SPRINGFIELD 33 For energy improvements and upgrading the -90- BOB-CAPITAL98 1 HVAC, security and electrical systems, 2 in addition to funds previously 3 appropriated - Attorney General's 4 Building ..................................... 225,000 5 To renovate the interior, exterior and 6 site improvements, in addition to 7 funds previously appropriated - 8 Executive Mansion ............................ 190,000 9 For upgrading environmental equipment 10 and HVAC, in addition to funds previously 11 appropriated - Archives Building ............. 2,150,000 12 For planning and beginning the rehabilitation 13 of the Power Plant ........................... 3,805,000 14 For upgrading sewer system - Capitol Complex, 15 in addition to funds previously 16 appropriated ................................. 2,100,000 17 For renovation of the lower level and 18 ground floor, in addition to funds 19 previously appropriated - Old Power Plant .... 2,180,000 20 Total, Section 16A $13,650,000 21 Section 16.1. The amount of $14,122, or so much thereof 22 as may be necessary and remains unexpended at the close of 23 business on June 30, 1997, from a reappropriation heretofore 24 made for such purpose in Article 78, Section 16.1 of Public 25 Act 89-0501, is reappropriated from the Capital Development 26 Fund to the Capital Development Board for a grant to the 27 Village of Bath for costs associated with sewer development. 28 Section 16.2. The amount of $51,193, or so much thereof 29 as may be necessary and remains unexpended at the close of 30 business on June 30, 1997, from a reappropriation heretofore 31 made for such purpose in Article 78, Section 16.2 of Public 32 Act 89-0501, is reappropriated from the Capital Development -91- BOB-CAPITAL98 1 Fund to the Capital Development Board for planning, 2 construction and equipment for a joint laboratory facility 3 for the Illinois Environmental Protection Agency, the 4 Department of Public Health, and the Southern Illinois 5 University School of Medicine at the SIU Medical Facility in 6 Springfield. 7 Section 16.3. The amount of $35,153, or so much thereof 8 as may be necessary and remains unexpended at the close of 9 business on June 30, 1997, from a reappropriation heretofore 10 made for such purpose in Article 78, Section 16.3 of Public 11 Act 89-0501, is reappropriated from the Capital Development 12 Fund to the Capital Development Board for miscellaneous 13 capital improvements at any state supported university and 14 community college including construction, reconstruction, 15 remodeling, improvement, repair and installation of capital 16 facilities, costs of planning, supplies, equipment, 17 materials, services, and all other expenses required to 18 complete the work. This appropriation shall be in addition to 19 any other appropriated amounts which can be expended for 20 these purposes. 21 Section 17. The following named amounts, or so much 22 thereof as may be necessary and remain unexpended at the 23 close of business on June 30, 1997, from appropriations and 24 reappropriations heretofore made for such purposes in Article 25 77, Section 10A and Article 78, Section 17 of Public Act 26 89-0501, are reappropriated from the General Revenue Fund to 27 the Capital Development Board for the projects hereinafter 28 enumerated: 29 STATEWIDE 30 (From Article 77, Section 10A of Public Act 89-0501): 31 For repair of minor problems and 32 emergencies .................................. $ 3,484,742 -92- BOB-CAPITAL98 1 For tuckpointing and exterior repair 2 of state buildings ........................... 613,000 3 For surveys for asbestos containing 4 material ..................................... 500,000 5 For construction site archaeological 6 studies ...................................... 140,822 7 (From Article 78, Section 17 of Public Act 89-0501): 8 For survey of asbestos-containing 9 materials .................................... $ 473,014 10 For repairing minor problems and for 11 emergencies, in addition to funds 12 previously appropriated ...................... 518,013 13 For repairing minor problems and emergencies 14 for agencies ................................. 405,604 15 For the planning and abatement of asbestos 16 hazards, and replenishment of initial 17 project construction costs in 18 non-bondable projects at various 19 state owned facilities ....................... 579,194 20 Total, Section 17 $6,714,389 21 Section 17.4. The sum of $244,925, or so much of that 22 amount as may be necessary and remains unexpended at the 23 close of business on June 30, 1997, from an appropriation 24 heretofore made for such purposes in Article 77, Section 24 25 of Public Act 89-0501, is reappropriated to the Capital 26 Development Board from the General Revenue Fund for the 27 planning and construction of the Anna Veterans Home visitor 28 center. 29 Section 18. The following named amounts, or so much 30 thereof as may be necessary and remain unexpended at the 31 close of business on June 30, 1997, from reappropriations 32 heretofore made for such purposes in Article 78, Section 18 -93- BOB-CAPITAL98 1 of Public Act 89-0501, are reappropriated from the School 2 Construction Fund to the Capital Development Board for school 3 construction: 4 For school districts having a population 5 exceeding 500,000 ............................ $ 541,156 6 For school districts having a population 7 of less than 500,000 ......................... 72,093 8 Total, Section 18 $613,249 9 Section 18.1 The amount of $1,358,950, or so much 10 thereof as may be necessary and remains unexpended at the 11 close of business on June 30, 1997 from a reappropriation 12 heretofore made for such purposes in Article 78, Section 18.1 13 of Public Act 89-0501, is reappropriated from the School 14 Construction Fund to the Capital Development Board for the 15 State Board of Education for grants to Chicago School 16 District 299 for planning, purchase and construction of 17 additions to schools and all other expenses associated with 18 such, at overcrowded subdistricts. 19 Section 19. The sum of $318,675, or so much thereof as 20 may be necessary and remains unexpended at the close of 21 business on June 30, 1997, from a reappropriation heretofore 22 made for such purposes in Article 78, Section 19 of Public 23 Act 89-0501, is reappropriated from the Asbestos Abatement 24 Fund to the Capital Development Board for asbestos surveys in 25 relation to the asbestos abatement of State Governmental 26 Buildings. 27 Section 20. The following named amounts, or so much 28 thereof as may be necessary and remain unexpended at the 29 close of business on June 30, 1997, from reappropriations 30 heretofore made for such purposes in Article 78, Section 20 31 of Public Act 89-0501, are reappropriated from the Capital -94- BOB-CAPITAL98 1 Development Fund to the Capital Development Board for the 2 Board of Higher Education for the projects hereinafter 3 enumerated: 4 ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA 5 For remodeling the Information Resource 6 Technology Center ............................ $ 144,327 7 For renovation of the laboratory areas, 8 including a greenhouse ....................... 88,700 9 For the purchase, renovation and improvement 10 of the North Campus High School site of 11 the Aurora West School District 129, 12 including construction of four dormitories, 13 equipment purchases and other expenses for 14 use by the Illinois Mathematics and Science 15 Academy ...................................... 2,512,863 16 For planning, renovation and improvements, 17 correction of defects, construction of 18 dormitories including equipment and all 19 other expenses necessary to upgrade and 20 develop the North Campus High School 21 site of the Aurora West School District 22 for use by the Math Science Academy .......... 1,355 23 Total, Section 20 $2,747,245 24 Section 21. The following named amounts, or so much 25 thereof as may be necessary and remain unexpended at the 26 close of business on June 30, 1997, from reappropriations 27 heretofore made for such purposes in Article 78, Section 21 28 of Public Act 89-0501, as amended by Public Act 90-0002, are 29 reappropriated from the Capital Development Fund to the 30 Capital Development Board for the Illinois Community College 31 Board for the projects hereinafter enumerated: 32 BELLEVILLE AREA COLLEGE 33 For planning buildings, additions and -95- BOB-CAPITAL98 1 site improvements ............................ $ 1,726,574 2 DANVILLE AREA COMMUNITY COLLEGE 3 For rehabilitation of infrastructure 4 and beginning construction of a 5 classroom facility ........................... 1,876,784 6 For rehabilitation of the infrastructure and 7 planning campus buildings .................... 1,045,091 8 COLLEGE OF DUPAGE 9 For completing the addition to 10 the Student Resource Center .................. 2,081,818 11 ILLINOIS EASTERN COMMUNITY COLLEGE 12 For replacement of the roofing system .......... 27,612 13 ELGIN COMMUNITY COLLEGE 14 For construction of addition, site improvements, 15 remodeling and purchasing equipment .......... 2,626,162 16 For planning, design, site improvements, utility 17 adjustments, and any other costs associated 18 with construction of a new Instructional 19 Building at Elgin Community College .......... 223,121 20 JOHN A. LOGAN COMMUNITY COLLEGE 21 For planning an addition and site 22 improvements ................................. 44,620 23 For construction of classroom additions 24 and remodeling the existing facility, 25 including utilities and site improvements .... 33,745 26 JOHN WOOD COMMUNITY COLLEGE 27 For construction of a science and technology 28 center and access road ....................... 1,533,085 29 JOLIET JUNIOR COLLEGE 30 For construction of a business and technology 31 center and remodeling the main campus 32 building ..................................... 871,558 33 For planning, design and site preparation of 34 a Business Technology Center ................. 10,746 -96- BOB-CAPITAL98 1 KISHWAUKEE COMMUNITY COLLEGE 2 For construction and reconstruction at 3 the library .................................. 100,055 4 COLLEGE OF LAKE COUNTY 5 For construction of a multi-use Instructional 6 Center, including acquisition of equipment 7 and remodeling of existing facilities ........ 109,008 8 For initial costs associated with planning, 9 design, construction, site improvements, 10 utilities, remodeling and equipment for 11 a multi-use instructional facility ........... 107,293 12 LEWIS AND CLARK COMMUNITY COLLEGE 13 For renovation of buildings, construction of an 14 addition and site improvements ............... 750,205 15 For construction of health, mathematics and 16 science laboratory facilities and 17 remodeling Fobes Hall ........................ 2,801,529 18 For renovation of the main complex ............. 40,809 19 For planning, design, and site preparation, 20 and construction of a multi-purpose 21 building ..................................... 22,932 22 MCHENRY COUNTY COLLEGE 23 For construction of an addition, including 24 equipment, a parking area and 25 site improvements ............................ 133,774 26 For expansion of existing library facilities 27 and construction of classrooms at McHenry 28 County College ............................... 17,024 29 MORAINE VALLEY COMMUNITY COLLEGE 30 For planning and constructing a new classroom 31 facility ..................................... 434,212 32 For providing for an architectural engineering 33 study, renovations, construction, 34 reconstruction and remodeling of Buildings -97- BOB-CAPITAL98 1 A, B and L ................................... 417,365 2 MORTON COMMUNITY COLLEGE - COOK COUNTY 3 For construction of an addition and 4 site improvements ............................ 121,130 5 PRAIRIE STATE COMMUNITY COLLEGE 6 For construction of a Learning Resource 7 Center addition .............................. 175,444 8 REND LAKE COLLEGE 9 For construction of an aquatic and 10 rehabilitation center ........................ 1,602,193 11 For replacement of the roof .................... 19,952 12 SOUTHEASTERN ILLINOIS COLLEGE 13 For construction of humanities, 14 administration, and child care facilities 15 and remodeling campus buildings .............. 1,543,815 16 TRITON COMMUNITY COLLEGE - RIVER GROVE 17 For planning, site improvements, construction 18 and other expenses necessary for the 19 construction of an addition to the Learning 20 Resource Center .............................. 135,091 21 WILLIAM RAINEY HARPER COMMUNITY COLLEGE -PALATINE 22 For planning, developing, and designing a multi- 23 purpose telecommunications 24 instructional delivery center ................ 339,200 25 STATEWIDE - CONSTRUCTION DEFECTS 26 For planning, construction and renovation 27 to correct defectively designed or 28 constructed community college facilities, 29 provided that monies recovered based upon 30 claims arising out of such defective design 31 or construction shall be paid to the state 32 as required by Section 105.12 of the Public 33 Community College Act as reimbursement for 34 monies expended pursuant to this -98- BOB-CAPITAL98 1 appropriation ................................ 4,187,752 2 Total, Section 21 $25,159,699 3 Section 21A. The following named amounts, or so much 4 thereof as may be necessary, and remain unexpended at the 5 close of business on June 30, 1997, from appropriations 6 heretofore made for such purposes in Article 77, Section 28A 7 of Public Act 89-0501, as amended, are reappropriated from 8 the Capital Development Fund to the Capital Development Board 9 for the Illinois Community College Board for the projects 10 hereinafter enumerated: 11 BELLEVILLE AREA COLLEGE 12 For constructing a building, additions 13 and site improvements at the 14 Belleville and Red Bud campuses, 15 in addition to funds previously 16 appropriated ................................. $ 10,797,100 17 DANVILLE COMMUNITY COLLEGE - VERMILION COUNTY 18 To rehabilitate infrastructure, 19 construct a classroom facility 20 and a day care center, in addition 21 to funds previously appropriated ............. 4,770,200 22 HEARTLAND COMMUNITY COLLEGE - BLOOMINGTON 23 For planning buildings, parking areas, 24 utilities, and site development and 25 preliminary site preparation 26 required to establish permanent 27 campus facilities ............................ 2,500,000 28 JOHN A. LOGAN COMMUNITY COLLEGE 29 For constructing additions and site 30 improvements, in addition to funds 31 previously appropriated ...................... 12,315,900 32 SHAWNEE COMMUNITY COLLEGE - ULLIN 33 For planning additions to the main -99- BOB-CAPITAL98 1 building, parking areas, site 2 improvements and roofing 3 replacements ................................. 310,000 4 Total, Section 21A $30,693,200 5 Section 21B. The sum of $8,750,000, or so much thereof 6 as may be necessary, and remain unexpended at the close of 7 business on June 30, 1997, from appropriations heretofore 8 made for such purposes in Article 77, Section 28D of Public 9 Act 89-0501, as amended, are reappropriated from the Capital 10 Development Fund to the Capital Development Board for the 11 Illinois Community College Board for miscellaneous capital 12 improvements including construction, reconstruction, 13 remodeling, improvement, repair and installation of capital 14 facilities, cost of planning, supplies, equipment, materials, 15 services and all other expenses required to complete the work 16 at the various community colleges. This appropriation shall 17 be in addition to any other appropriated amounts which can be 18 expended for these purposes. 19 Section 21.1. The sum of $4,853,437, or so much thereof 20 as may be necessary and remains unexpended at the close of 21 business on June 30, 1997, from reappropriations heretofore 22 made for such purposes in Article 78, Section 21.1 of Public 23 Act 89-0501, is reappropriated from the Capital Development 24 Fund to the Capital Development Board for the Illinois 25 Community College Board for grants to community colleges for 26 miscellaneous capital improvements including construction, 27 reconstruction, remodeling, improvements, repair and 28 installation of capital facilities, cost of planning, 29 supplies, equipment, materials, services, and all other 30 expenses required to complete the work. This appropriation 31 shall be in addition to any other appropriated amounts which 32 can be expended for these purposes. -100- BOB-CAPITAL98 1 Section 22. The following named amounts, or so much 2 thereof as may be necessary and remain unexpended at the 3 close of business on June 30, 1997, from reappropriations 4 heretofore made for such purposes in Article 78, Section 22 5 of Public Act 89-0501, as amended, are reappropriated from 6 the Capital Development Fund to the Capital Development Board 7 for the Board of Higher Education for the projects 8 hereinafter enumerated: 9 CHICAGO STATE UNIVERSITY 10 For providing campus health and safety 11 improvements ................................. $ 805,254 12 For upgrading fire alarm systems ............... 10,458 13 For remodeling the Cook Administration 14 Building ..................................... 12,128 15 EASTERN ILLINOIS UNIVERSITY 16 For construction of an addition and 17 remodeling Buzzard Building .................. 4,104,381 18 For upgrading the energy management system 19 and HVAC systems and installation of a chilled 20 water loop between various buildings ......... 1,937,912 21 For completing conversion to a coal-fired 22 power plant .................................. 244,911 23 For completion of the construction and 24 renovation of the heating system ............. 37,703 25 For planning, equipment, site improvements, 26 construction and renovation of the heating 27 system to restore coal burning capability .... 30,429 28 GOVERNORS STATE UNIVERSITY - PARK FOREST 29 For renovation of the main building ............ 462,500 30 For remodeling Main Building ................... 346,063 31 For replacement of the main building roof 32 and renovation of the interior of the 33 main building ................................ 541,923 34 For renovation of the main building ............ 237,761 -101- BOB-CAPITAL98 1 For planning, design, construction, 2 reconstruction, remodeling, and any other 3 necessary costs for the Governors State 4 University Center for the Performing Arts .... 4,244 5 For remodeling the main building ............... 310,682 6 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 7 For upgrading the boilers and related 8 control systems .............................. 91,582 9 For fire safety modifications at the 10 facility ..................................... 1,401,761 11 For renovation of Buildings E, F, and 12 the auditorium, and demolition and 13 replacement of Buildings G, J and M, 14 in addition to amounts previously 15 appropriated ................................. 17,287,896 16 For renovation of Building D in addition to 17 funds previously appropriated for such 18 purpose ...................................... 3,551 19 For remodeling the library ..................... 176,018 20 WESTERN ILLINOIS UNIVERSITY - MACOMB 21 For planning and constructing a ram testing 22 facility ..................................... 282,908 23 For upgrading the power house equipment ........ 4,725 24 For remodeling Memorial and Sallee Halls ....... 35,785 25 For planning and beginning the completion 26 of the conversion to a coal-fired power 27 plant ........................................ 5,000 28 For renovation of Knoblauch Hall ............... 420,163 29 For construction of a steam and electrical 30 utility tunnel ............................... 307,108 31 WESTERN ILLINOIS UNIVERSITY - ROCK ISLAND COUNTY 32 For purchasing land and a building and 33 converting to an educational center .......... 1,195,419 34 Total, Section 22 $30,298,265 -102- BOB-CAPITAL98 1 Section 22A. The following named amounts, or so much 2 thereof as may be necessary, and remain unexpended at the 3 close of business on June 30, 1997, from appropriations 4 heretofore made for such purposes in Article 77, Section 28B 5 of Public Act 89-0501, as amended, are reappropriated from 6 the Capital Development Fund to the Capital Development Board 7 for the Board of Higher Education for the projects 8 hereinafter enumerated: 9 MATH AND SCIENCE ACADEMY 10 For replacing air conditioning units, 11 controls and upgrading the energy 12 management system ............................ $ 2,370,000 13 CHICAGO STATE UNIVERSITY 14 For renovating campus buildings and 15 upgrading mechanical systems.................. 2,432,200 16 EASTERN ILLINOIS UNIVERSITY - CHARLESTON 17 For planning an addition and renovation 18 of Booth Library ............................. 1,000,000 19 GOVERNORS STATE UNIVERSITY 20 For upgrading and replacing cooling 21 and refrigeration systems and 22 equipment .................................... 2,299,400 23 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 24 For purchasing equipment 25 for the Fine Arts Complex .................... 4,000,000 26 WESTERN ILLINOIS UNIVERSITY - MACOMB 27 For converting Simpkins Hall 28 gymnasium and adjacent areas into 29 a performing arts facility ................... 2,309,300 30 ILLINOIS STATE UNIVERSITY - NORMAL 31 For purchasing equipment for 32 the Science Laboratory building .............. 4,000,000 33 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE 34 For site improvements and purchasing -103- BOB-CAPITAL98 1 equipment for the Engineering and 2 Technology Building .......................... 1,259,000 3 For planning addition, remodeling and 4 upgrading the HVAC system in Altgeld Hall ...... 574,000 5 SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE 6 For construction of the Engineering Facility 7 building and related site improvements ....... 21,256,200 8 UNIVERSITY OF ILLINOIS - SPRINGFIELD 9 For upgrading and completing the south 10 access roadway ............................... 451,600 11 UNIVERSITY OF ILLINOIS - CHICAGO 12 For the renovation of the court area and 13 Lecture Center, in addition to funds 14 previously appropriated ...................... 5,900,000 15 UNIVERSITY OF ILLINOIS - CHAMPAIGN 16 For completion of campus flood control ......... 6,000,000 17 Total, Section 22A $53,851,700 18 Section 22.1. The sum of $1,252,370, or so much thereof 19 as may be necessary and remains unexpended at the close of 20 business on June 30, 1997, from a reappropriation heretofore 21 made for such purposes in Article 78, Section 22.1 of Public 22 Act 89-0501, is reappropriated from the Capital Development 23 Fund to the Capital Development Board for the Board of Higher 24 Education for miscellaneous capital improvements including 25 construction, reconstruction, remodeling, improvement, repair 26 and installation of capital facilities, cost of planning, 27 supplies, equipment, materials, services and all other 28 expenses required for completing the the work at the colleges 29 and universities. This appropriation shall be in addition to 30 any other appropriated amounts which can be expended for 31 these purposes. 32 Section 22.2. The following named amounts, or so much -104- BOB-CAPITAL98 1 thereof as may be necessary and remain unexpended at the 2 close of business on June 30, 1997, from reappropriations 3 heretofore made for such purposes in Article 78, Section 22.2 4 of Public Act 89-0501, are reappropriated from the Capital 5 Development Fund to the Capital Development Board for the 6 Board of Higher Education for miscellaneous capital 7 improvements including construction, reconstruction, 8 remodeling, improvement, repair and installation of capital 9 facilities, cost of planning, supplies, equipment, materials, 10 services and all other expenses required to complete the work 11 at the colleges and universities hereinafter enumerated. This 12 appropriation shall be in addition to any other appropriated 13 amounts which can be expended for these purposes: 14 Chicago State University ..................... $ 8,021 15 Eastern Illinois University .................. 49,556 16 Governors State University ................... 26,748 17 Northeastern Illinois University ............. 345,895 18 Western Illinois University .................. 890,174 19 Total, Section 22.2 $1,320,394 20 Section 22.3. The following named amounts, or so much 21 thereof as may be necessary and remain unexpended at the 22 close of business on June 30, 1997, from reappropriations 23 heretofore made for such purposes in Article 78, Section 22 24 of Public Act 89-0501, are reappropriated from the Capital 25 Development Fund to the Board of Higher Education for the 26 projects hereinafter enumerated: 27 EASTERN ILLINOIS UNIVERSITY 28 For purchasing Buzzard Building equipment ...... $ 1,750,000 29 NORTHERN ILLINOIS UNIVERSITY 30 For purchasing Engineering 31 Building equipment ........................... 1,876,856 32 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD 33 For purchasing Rockford Center Building -105- BOB-CAPITAL98 1 equipment .................................... 9,867 2 Total, Section 22.3 $3,636,723 3 Section 23. The following named amounts, or so much 4 thereof as may be necessary and remain unexpended at the 5 close of business on June 30, 1997, from reappropriations 6 heretofore made for such purposes in Article 78, Section 23 7 and Article 78, Section 25 of Public Act 89-0501, are 8 reappropriated from the Capital Development Fund to the 9 Capital Development Board for the Board of Higher Education 10 for the projects hereinafter enumerated: 11 ILLINOIS STATE UNIVERSITY - NORMAL 12 For construction of science laboratory 13 facilities ................................... $ 3,553,531 14 NORTHERN ILLINOIS UNIVERSITY 15 For upgrading the storm waterway controls 16 and campus drives ............................ 1,221,456 17 For construction of tunnels and installation 18 of utility piping ............................ 65,648 19 For renovation of heating plants and the 20 HVAC system .................................. 404,067 21 NORTHERN ILLINOIS UNIVERSITY - ROCKFORD 22 For construction of the Rockford Center 23 facilities ................................... 37,128 24 UNIVERSITY OF ILLINOIS AT SPRINGFIELD 25 For upgrading the chillers, energy management 26 system and exterior lighting ................. 115,939 27 For campus improvements, including 28 remodeling of Brookens Library, the Public 29 Affairs Center, and rooftop HVAC systems ..... 30,720 30 Total, Section 23 $5,428,489 31 Section 23.1. The sum of $2,509,407, or so much thereof 32 as may be necessary and remains unexpended at the close of -106- BOB-CAPITAL98 1 business on June 30, 1997, from a reappropriation heretofore 2 made for such purposes in Article 78, Section 23.1 of Public 3 Act 89-0501, is reappropriated from the Capital Development 4 Fund to the Capital Development Board for the Board of Higher 5 Education for miscellaneous capital improvements including 6 construction, reconstruction, remodeling, improvement, repair 7 and installation of capital facilities, cost of planning, 8 supplies, equipment, materials, services and all other 9 expenses required for completing the the work at the colleges 10 and universities. This appropriation shall be in addition to 11 any other appropriated amounts which can be expended for 12 these purposes. 13 Section 23.2. The following named amounts, or so much 14 thereof as may be necessary and remain unexpended at the 15 close of business on June 30, 1997, from reappropriations 16 heretofore made for such purposes in Article 78, Section 23.2 17 of Public Act 89-0501, are reappropriated from the Capital 18 Development Fund to the Capital Development Board for the 19 Board of Higher Education for miscellaneous capital 20 improvements including construction, reconstruction, 21 remodeling, improvements, repair and installation of capital 22 facilities, cost of planning, supplies, equipment, materials, 23 services, and all other expenses required to complete the 24 work at the colleges and universities hereinafter enumerated. 25 This appropriation shall be in addition to any other 26 appropriated amounts which can be expended for these 27 purposes: 28 Illinois State University ...................... $ 87,560 29 Northern Illinois University ................... 1,485,800 30 Total, Section 23.2 $1,573,360 31 Section 23.3. The sum of $22,215, or so much thereof as 32 may be necessary and remains unexpended at the close of -107- BOB-CAPITAL98 1 business on June 30, 1997, from a reappropriation heretofore 2 made for such purposes in Article 78, Section 23.3 of Public 3 Act 89-0501, is reappropriated from the Capital Development 4 Fund to the Capital Development Board for the Board of Higher 5 Education for Northern Illinois University, for the planning, 6 architectural engineering, purchase, site improvements and 7 construction or remodeling of a site in Rockford for use as a 8 campus. 9 Section 23.4. The following named amounts, or so much 10 thereof as may be necessary, and remain unexpended at the 11 close of business on June 30, 1997, from appropriations 12 heretofore made for such purposes in Article 77, Section 28C 13 of Public Act 89-0501, as amended, are reappropriated from 14 the Capital Development Fund to the Capital Development Board 15 for the Board of Higher Education for miscellaneous capital 16 improvements including construction, capital facilities, cost 17 of planning, supplies, equipment, materials, services and all 18 other expenses required to complete the work at the various 19 universities set forth below. This appropriation shall be in 20 addition to any other appropriated amounts which can be 21 expended for these purposes. 22 For Chicago State University ..........525,000 23 For Eastern Illinois University .......980,000 24 For Governors State University ........315,000 25 For Illinois State University .......2,030,000 26 For Northeastern Illinois University ..735,000 27 For Northern Illinois University ....2,240,000 28 For Southern Illinois University ....4,830,000 29 For University of Illinois .........13,090,000 30 For Western Illinois University .....1,505,000 31 Section 24. The following named amounts, or so much 32 thereof as may be necessary and remain unexpended at the -108- BOB-CAPITAL98 1 close of business on June 30, 1997, from reappropriations 2 heretofore made for such purposes in Article 78, Section 24 3 of Public Act 89-0501, are reappropriated from the Capital 4 Development Fund to the Capital Development Board for the 5 Board of Trustees of Southern Illinois University for the 6 projects hereinafter enumerated: 7 CARBONDALE CAMPUS 8 For construction of an engineering building 9 annex ........................................ $ 1,675,283 10 For construction of an environmental control 11 and hazardous waste management facility ...... 105,917 12 For remodeling the Communications Building ..... 24,729 13 EDWARDSVILLE CAMPUS 14 For replacement of the high temperature water 15 distribution system .......................... 188,842 16 For planning an engineering facility ........... 120,282 17 For infrastructure, site development, and 18 other necessary costs associated with 19 the development of University Park ........... 35,013 20 For costs associated with the consolidation 21 of the music facilities ...................... 26,652 22 For planning and construction of an Art and 23 Design Facility .............................. 25,089 24 Total, Section 24 $2,201,807 25 Section 24.1. The sum of $3,722,389, or so much thereof 26 as may be necessary and remains unexpended at the close of 27 business on June 30, 1997, from reappropriations heretofore 28 made for such purposes in Article 78, Section 24.1 of Public 29 Act 89-0501, is reappropriated from the Capital Development 30 Fund to the Capital Development Board for Southern Illinois 31 University for miscellaneous capital improvements including 32 construction, reconstruction, remodeling, improvements, 33 repair and installation of capital facilities, cost of -109- BOB-CAPITAL98 1 planning, supplies, equipment, materials, services, and all 2 other expenses required to complete the work. This 3 appropriation shall be in addition to any other appropriated 4 amounts which can be expended for these purposes. 5 Section 24.2. The following named amount, or so much 6 thereof as may be necessary and remains unexpended at the 7 close of business on June 30, 1997, from a reappropriation 8 heretofore made for such purposes in Article 78, Section 24 9 of Public Act 89-0501, is reappropriated from the Capital 10 Development Fund to the Board of Trustees of Southern 11 Illinois University for the projects hereinafter enumerated: 12 CARBONDALE CAMPUS 13 For purchasing Bio-Science building 14 equipment ........................................$ 102,532 15 Section 25. The following named amounts, or so much 16 thereof as may be necessary and remain unexpended at the 17 close of business on June 30, 1997, from reappropriations 18 heretofore made for such purposes in Article 78, Section 25 19 of Public Act 89-0501, are reappropriated from the Capital 20 Development Fund to the Capital Development Board for the 21 Board of Trustees of the University of Illinois for the 22 projects hereinafter enumerated: 23 UNIVERSITY CENTER - CHICAGO 24 For construction and all other costs 25 necessary for site development and 26 utilities systems extensions, upgrades and 27 modifications for a new Molecular Biology 28 Building in addition to any other amounts 29 previously appropriated ...................... $ 103,529 30 For renovation of the court area and Lecture 31 Center ....................................... 96 32 For remodeling Alumni Hall, Phase II, -110- BOB-CAPITAL98 1 including utilities .......................... 4,360,633 2 For construction of an instruction and 3 research facility for the College of 4 Engineering .................................. 21,270 5 HEALTH SCIENCE CENTER 6 For remodeling the Neuropsychiatric 7 Institute .................................... 2,839,129 8 For remodeling the Clinical Sciences 9 Building ..................................... 130,546 10 For planning the upgrade of the ventilating 11 and air conditioning systems in the 12 Pharmacy Building ............................ 23,605 13 For upgrading the ventilating and air 14 conditioning system in the Pharmacy 15 Building ..................................... 3,985 16 URBANA-CHAMPAIGN CAMPUS 17 For initiating a campus flood 18 control project .............................. 2,814,645 19 For construction of a special materials 20 storage facility, including equipment ........ 128,552 21 Total, Section 25 $10,425,990 22 Section 25.1. The sum of $10,213,774, or so much thereof 23 as may be necessary and remains unexpended at the close of 24 business on June 30, 1997, from a reappropriation heretofore 25 made for such purposes in Article 78, Section 25.1 of Public 26 Act 89-0501, is reappropriated from the Capital Development 27 Fund to the Capital Development Board for the Board of 28 Trustees of the University of Illinois for miscellaneous 29 capital improvements including construction, reconstruction, 30 remodeling, improvement, repair and installation of capital 31 facilities, cost of planning, supplies, equipment, materials, 32 services and all other expenses required for completing the 33 the work at the colleges and universities. This -111- BOB-CAPITAL98 1 appropriation shall be in addition to any other appropriated 2 amounts which can be expended for these purposes. 3 Section 25.2. The following named amounts, or so much 4 thereof as may be necessary and remain unexpended at the 5 close of business on June 30, 1997, from reappropriations 6 heretofore made for such purposes in Article 78, Section 25.2 7 of Public Act 89-0501, are reappropriated from the General 8 Revenue Fund to the Capital Development Board for the Board 9 of Trustees of the University of Illinois for the projects 10 hereinafter enumerated: 11 HEALTH SCIENCE CENTER - CHICAGO 12 For energy conservation improvements ........... $ 8,592 13 For energy conservation improvements at 14 Taylor Street Hospital, the College of 15 Pharmacy Building, and the Clinical 16 Science Building ............................. 24,780 17 Total, Section 25.2 $33,372 18 Section 25.3. The following named amount, or so much 19 thereof as may be necessary and remains unexpended at the 20 close of business on June 30, 1997, from a reappropriation 21 heretofore made for such purposes in Article 78, Section 25 22 of Public Act 89-0501, is reappropriated from the Capital 23 Development Fund to the Board of Trustees of the University 24 of Illinois for the projects hereinafter enumerated: 25 URBANA - CHAMPAIGN CAMPUS 26 For purchasing equipment for Temple 27 Hoyne Buell Hall ..............................$ 301,072 28 Section 26. In addition to any amounts heretofore 29 appropriated for such purposes, the sum of $6,803, or so much 30 thereof as may be necessary and remains unexpended at the 31 close of business on June 30, 1997 from a reappropriation -112- BOB-CAPITAL98 1 heretofore made for such purposes in Article 78, Section 27 2 of Public Act 89-0501, is reappropriated from the Capital 3 Development Fund to the Secretary of State for planning, 4 remodeling, relocation, permanent equipment, and any other 5 related expenses, including architectural and engineering 6 fees associated with construction and remodeling of office 7 space and other support areas under the jurisdiction of the 8 House of Representatives, and to various legislative services 9 agencies in both the Capitol and Stratton Office Buildings. 10 Section 27. In addition to any amounts heretofore 11 appropriated for such purposes, the sum of $5,737, or so much 12 thereof as may be necessary and remains unexpended at the 13 close of business on June 30, 1997 from a reappropriation 14 heretofore made for such purposes in Article 78, Section 28 15 of Public Act 89-0501, is reappropriated from the Capital 16 Development Fund to the Space Needs Commission for planning, 17 remodeling, relocation, permanent equipment, and any other 18 related expenses, including architectural and engineering 19 fees associated with construction of a non-sectarian 20 meditation room in the Capitol Office Building. 21 Section 28. No contract shall be entered into or 22 obligation incurred for any expenditures from appropriations 23 made in this Article until after the purposes and amounts 24 have been approved in writing by the Governor. 25 ARTICLE 3 26 Division A. The reappropriations in this Division 27 continue certain appropriations initially made for the fiscal 28 year beginning July 1, 1996, for the purposes of the Build 29 Illinois Program as set forth below. -113- BOB-CAPITAL98 1 Section 4. The sum of $250,000, or so much thereof as 2 may be necessary and remains unexpended on June 30, 1997, 3 from appropriations heretofore made for such purposes in 4 Section 4 of Public Act 89-0501, Article 79, is 5 reappropriated to the Illinois Department of Natural 6 Resources from the Build Illinois Fund for a grant to Lincoln 7 Park Zoo. 8 Section 5. The sum of $1,000,000, or so much thereof as 9 may be necessary and remains unexpended on June 30, 1997, 10 from appropriations heretofore made for such purposes in 11 Section 5 of Public Act 89-0501, Article 79, is 12 reappropriated to the Department of Natural Resources from 13 the Build Illinois Bond Fund for expenditure by the Division 14 of Water Resources for infrastructure improvements to the 15 Wood Dale/Itasca Reservoir. 16 Section 7. The sum of $500,000, or so much thereof as 17 may be necessary and remains unexpended on June 30, 1997 from 18 appropriations made for such purposes in Section 7 of Public 19 Act 89-0501, Article 79, is reappropriated to the Department 20 of Natural Resources from the Build Illinois Bond Fund for 21 expenditure by the Division of Water Resources for 22 infrastructure repairs of the Batavia Dam in Batavia, 23 Illinois. 24 Section 8. The sum of $250,000, or so much thereof as 25 may be necessary and remains unexpended on June 30, 1997, 26 from appropriations heretofore made for such purposes in 27 Section 8 of Public Act 89-0501, Article 79, is 28 reappropriated to the Illinois Department of Natural 29 Resources from the Build Illinois Bond Fund for access road 30 improvements at Eagle Creek State Park. -114- BOB-CAPITAL98 1 Section 14. The sum of $600,000, or so much thereof as 2 may be necessary and remains unexpended on June 30, 1997, 3 from appropriations heretofore made for such purposes in 4 Section 14 of Public Act 89-0501, Article 79, is 5 reappropriated to the Environmental Protection Agency from 6 the Build Illinois Bond Fund for a grant to the Village of 7 Pecatonica for a water tower. 8 Section 15. The sum of $488,000, or so much thereof as 9 may be necessary and remains unexpended on June 30, 1997, 10 from appropriations heretofore made for such purposes in 11 Section 15 of Public Act 89-0501, Article 79, is 12 reappropriated to the Environmental Protection Agency from 13 the Build Illinois Bond Fund for a grant to the Village of 14 Maple Park for infrastructure improvements. 15 Section 16. The sum of $200,000, or so much thereof as 16 may be necessary and remains unexpended on June 30, 1997, 17 from the appropriations heretofore made for such purposed in 18 Section 16 of Public Act 89-0501, Article 79, is 19 reappropriated to the Environmental Protection Agency from 20 the Build Illinois Bond Fund for a grant to the Village of 21 Homer for infrastructure improvements. 22 Section 18. The sum of $120,000, or so much thereof as 23 may be necessary and remains unexpended on June 30, 1997, 24 from appropriations heretofore made for such purposes in 25 Section 18 of Public Act 89-0501, Article 79, as amended by 26 Public Act 90-0003, is reappropriated from the Build Illinois 27 Bond Fund to the Department of Transportation for all the 28 costs associated with the signalization improvements at Des 29 Plaines Avenue and Country Club Lane in North Riverside. 30 Section 19. The sum of $150,000, or so much thereof as -115- BOB-CAPITAL98 1 may be necessary and remains unexpended on June 30, 1997, 2 from appropriations heretofore made for such purposes in 3 Section 19 of Public Act 89-0501, Article 79, is 4 reappropriated from the Build Illinois Bond Fund to the 5 Department of Transportation for all costs associated with 6 signalization improvements at 26th Street and 50th Avenue in 7 Cicero. 8 Section 21. The sum of $250,000, or so much thereof as 9 may be necessary and remains unexpended on June 30, 1997, 10 from appropriations heretofore made for such purposes in 11 Section 21 of Public Act 89-0501, Article 79, as amended by 12 Public Act 90-0003, is reappropriated from the Build Illinois 13 Bond Fund to the Department of Natural Resources for 14 rehabilitation of the concession building and other park 15 improvements at Johnson Sauk Trail State Park in Henry 16 County. 17 Section 22. The sum of $300,000, or so much thereof as 18 may be necessary and remains unexpended on June 30, 1997 from 19 appropriations heretofore made for such purposes in Section 20 22 of Public Act 89-0501, Article 79, as amended by Public 21 Act 90-0003, is reappropriated from the Build Illinois Bond 22 Fund to the Department of Transportation for all costs 23 associated with installing signalization of U.S. 34 and 24 Eleventh Street in the City of Monmouth. 25 Section 32. The sum of $1,500,000, or 26 so much thereof as may be necessary and remains unexpended on 27 June 30, 1997, from appropriations heretofore made for such 28 purposes in Section 32 of Public Act 89-0501, Article 79, is 29 reappropriated from the Build Illinois Bond Fund to the 30 Department of Natural Resources for all costs associated with 31 flood control projects for the DuPage County Forest Preserve 32 District. -116- BOB-CAPITAL98 1 Section 34. The sum of $150,000, or so much thereof as 2 may be necessary and remains unexpended on June 30, 1997, 3 from appropriations heretofore made for such purposes in 4 Section 34 of Public Act 89-0501, Article 79, as amended by 5 Public Act 90-0003, is reappropriated from the Build Illinois 6 Bond Fund to the Illinois Environmental Protection Agency for 7 all costs associated with waste water and drinking water 8 systems development and improvements in the Village of 9 LaGrange Park. 10 Section 36. The sum of $1,100,000, or so much thereof as 11 may be necessary and remains unexpended on June 30, 1997, 12 from appropriations heretofore made for such purposes in 13 Section 36 of Public Act 89-0501, Article 79, is 14 reappropriated from the Build Illinois Bond Fund to the 15 Illinois Environmental Protection Agency for a grant to the 16 Fox River Water Reclamation District for improvements for the 17 South Plant, the Skyline Treatment Plant and the Skyline 18 Water Plant. 19 Division II. The reappropriations in this Division 20 continue certain appropriations initially made for the fiscal 21 year beginning July 1, 1995, for the purpose of the Build 22 Illinois program set forth below. 23 Section 1-2. The amount of $450,000, or so much thereof 24 as may be necessary and remains unexpended on June 30, 1997, 25 from appropriations heretofore made for such purposes in 26 Article 79, Section 1-2 of Public Act 89-0501, is 27 reappropriated from the Build Illinois Bond Fund to the 28 Department of Natural Resources for a grant to the DuPage 29 County Forest Preserve District for dredging the Salt Creek 30 at the Fullersburg Dam. -117- BOB-CAPITAL98 1 Section 1-4. The amount of $150,000, or so much thereof 2 as may be necessary and remains unexpended on June 30, 1997, 3 from appropriations heretofore made for such purposes in 4 Article 79, Section 1-4 of Public Act 89-0501, is 5 reappropriated from the Build Illinois Bond Fund to the 6 Historic Preservation Agency for planning, design, 7 construction and all other necessary costs associated with 8 the construction of an Information Center at the Old Market 9 House in Galena. 10 Section 1-5. The amount of $50,000, or so much thereof 11 as may be necessary and remains unexpended on June 30, 1997, 12 from appropriations heretofore made for such purposes in 13 Article 79, Section 1-5 of Public Act 89-0501, is 14 reappropriated from the Build Illinois Bond Fund to the 15 Capital Development Board for planning, design, construction 16 and all other necessary costs for construction of a Porcine 17 Nursery at Western Illinois University. 18 Section 1-8. The amount $125,000, or so much thereof as 19 may be necessary and remains unexpended on June 30, 1997, 20 from appropriations heretofore made for such purposes in 21 Article 79, Section 1-8 of Public Act 89-0501, is 22 reappropriated from the Build Illinois Bond Fund to the 23 Department of Commerce and Community Affairs for a grant to 24 Northwestern University for programs supporting small 25 business. 26 Section 1-9. The amount of $500,000, or so much thereof 27 as may be necessary and remains unexpended on June 30, 1997, 28 from appropriations heretofore made for such purposes in 29 Article 79, Section 1-9 of Public Act 89-0501, is 30 reappropriated from the Build Illinois Bond Fund to the 31 Environmental Protection Agency for a grant to the Fox River -118- BOB-CAPITAL98 1 Water Reclamation District for improvements for the South 2 Plant, the Skyline Treatment Plant and the Skyline Water 3 Plant. 4 Section 1-10. The amount of $500,000, or so much thereof 5 as may be necessary and remains unexpended on June 30, 1997, 6 from appropriations heretofore made for such purposes in 7 Article 79, Section 1-10 of Public Act 89-0501, is 8 reappropriated from the Build Illinois Bond Fund to the 9 Department of Natural Resources for phase one construction of 10 a Visitors' Center at Kline Creek Farms in conjunction with 11 the DuPage County Forest Preserve District 12 Division III. The reappropriations in this Division 13 continue certain appropriations initially made for the fiscal 14 year beginning July 1, 1990, for the purposes of the Build 15 Illinois Program as set forth below. 16 Section 2-6. The following named amounts, or so much 17 thereof as may be necessary, and remain unexpended on June 18 30, 1997 from appropriations heretofore made for such 19 purposes in Article 79, Section 2-6 of Public Act 89-0501, 20 are reappropriated from the Build Illinois Bond Fund to the 21 Capital Development Board for the Board of Higher Education 22 for the projects hereinafter enumerated: 23 NORTHERN ILLINOIS UNIVERSITY - DEKALB 24 To construct and equip the Engineering 25 Building ..................................... $ 307,395 26 To purchase equipment and complete 27 construction for Faraday Hall Addition ....... 629,044 28 Total, Build Illinois Bond Fund $936,439 29 Section 2-7. The following named amounts, or so much 30 thereof as may be necessary, and remain unexpended on June -119- BOB-CAPITAL98 1 30, 1997 from appropriations heretofore made for such 2 purposes in Article 79, Section 2-7 of Public Act 89-0501, 3 are reappropriated from the Build Illinois Bond Fund to the 4 Capital Development Board for Southern Illinois University 5 for the projects hereinafter enumerated: 6 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE 7 To construct an addition and remodel the 8 existing Steam Plant ......................... $ 953,174 9 To construct and equip the Biological 10 Sciences Facilities .......................... 1,149,556 11 Total, Build Illinois Bond Fund $2,102,730 12 Section 2-8. The following named amounts, or so much 13 thereof as may be necessary, and remain unexpended on June 14 30, 1997 from appropriations heretofore made for such 15 purposes in Article 79, Section 2-8 of Public Act 89-0501, 16 are reappropriated from the Build Illinois Bond Fund to the 17 Capital Development Board for the University of Illinois for 18 the projects hereinafter enumerated: 19 UNIVERSITY OF ILLINOIS URBANA-CHAMPAIGN 20 To construct and equip the Chemical and Life 21 Sciences Building ............................ $ 1,585,255 22 Total, Build Illinois Bond Fund $1,585,255 23 Section 2-18H. The amount of $31,194, or so much thereof 24 as may be necessary, and remains unexpended on June 30, 1997 25 from appropriations heretofore made for such purposes in 26 Article 79, Section 2-18H of Public Act 89-0501, is 27 reappropriated from the Build Illinois Bond Fund to the 28 Capital Development Board for the Illinois Community College 29 Board for the remodeling and reconstruction of a building for 30 a Vocational Technology Center at the Belleville Area College 31 Granite City Campus. -120- BOB-CAPITAL98 1 Section 2-19B. The following named amount, or so much 2 thereof as may be necessary, and remains unexpended on June 3 30, 1997 from an appropriation heretofore made for such 4 purposes in Article 79, Section 2-19B of Public Act 89-0501, 5 is reappropriated from the Build Illinois Bond Fund to the 6 Capital Development Board for the Board of Higher Education 7 for the project hereinafter enumerated: 8 NORTHEASTERN ILLINOIS UNIVERSITY - CHICAGO 9 For repair of exterior masonry walls and 10 replacement of the roof on the Science 11 Building .........................................$ 290,884 12 Section 2-20.1. The following named amounts, or so much 13 thereof as may be necessary, and remain unexpended on June 14 30, 1997 from appropriations heretofore made for such 15 purposes in Article 79, Section 2-20.1 of Public Act 89-0501, 16 are reappropriated from the Build Illinois Bond Fund to the 17 Capital Development Board for the Board of Higher Education 18 for the projects hereinafter enumerated: 19 NORTHERN ILLINOIS UNIVERSITY - DE KALB 20 For construction of the Engineering Building 21 including extension of utilities, in 22 addition to funds previously appropriated 23 for such purpose ...................................100,619 24 Section 2-21A. The following named amounts, or so much 25 thereof as may be necessary, and remain unexpended on June 26 30, 1997 from appropriations heretofore made for such 27 purposes in Article 79, Section 2-21A of Public Act 89-0501, 28 are reappropriated from the Build Illinois Bond Fund to the 29 Capital Development Board for Southern Illinois University 30 for the projects hereinafter enumerated: 31 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE 32 For construction and all other costs -121- BOB-CAPITAL98 1 necessary for an addition and remodeling 2 of the existing steam plant, in addition to 3 funds previously appropriated for such 4 purpose ..........................................$ 703,203 5 Division IV. The reappropriations in this Division 6 continue certain appropriations initially made for the fiscal 7 year beginning July 1, 1989, for the purpose of the Build 8 Illinois Program set forth below. 9 Section 3-1.2a. The amount of $1,000,000, or so much 10 thereof as may be necessary and remains unexpended on June 11 30, 1997, from appropriations heretofore made for such 12 purposes in Article 79, Section 3-1.2a of Public Act 89-0501, 13 is reappropriated from the Build Illinois Purposes Fund to 14 the Department of Commerce and Community Affairs for loans 15 and grants to units of local government for infrastructure 16 improvements. 17 Section 3-1.3. The following named amounts, or so much 18 thereof as may be necessary and remain unexpended on June 30, 19 1997, from appropriations heretofore made for such purposes 20 in Article 79, Section 3-1.3 of Public Act 89-0501, are 21 reappropriated from the Build Illinois Bond Fund to the 22 Department of Transportation for land acquisition, 23 engineering, and contract costs for construction, 24 reconstruction, extension, and improvement of State highways. 25 FAP 412 (U.S. 51)........................... $ 564,189 26 FAP 426 (Thorndale Avenue).................. 45,150 27 Total $609,339 28 Section 3-1.12b. The following named amounts, or so much 29 thereof as may be necessary, and remain unexpended on June 30 30, 1997 from appropriations heretofore made for such -122- BOB-CAPITAL98 1 purposes in Article 79, Section 3-1.12b of Public Act 2 89-0501, are reappropriated from the Build Illinois Bond Fund 3 to the Capital Development Board for the Board of Higher 4 Education for the projects hereinafter enumerated: 5 NORTHERN ILLINOIS UNIVERSITY - DE KALB 6 To construct an addition to Faraday Hall ....... $ 810,628 7 SANGAMON STATE UNIVERSITY 8 To construct a Health Sciences Building, 9 including utilities .......................... 56,765 10 Total, Build Illinois Bond Fund $867,393 11 Section 3-1.12c. The following named amounts, or so much 12 thereof as may be necessary, and remain unexpended on June 13 30, 1997 from appropriations heretofore made for such 14 purposes in Article 79, Section 3-1.12c of Public Act 15 89-0501, are reappropriated from the Build Illinois Bond Fund 16 to the Capital Development Board for Southern Illinois 17 University for the projects hereinafter enumerated: 18 SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE 19 To renovate Wheeler Hall, including equipment .....$ 12,745 20 Section 3-1.13. The following named amounts, or so much 21 thereof as may be necessary, and remain unexpended on June 22 30, 1997 from appropriations heretofore made for such 23 purposes in Article 79, Section 3-1.13 of Public Act 89-0501, 24 are reappropriated from the Build Illinois Bond Fund to the 25 Capital Development Board for University of Illinois for the 26 project hereinafter enumerated: 27 UNIVERSITY OF ILLINOIS - URBANA 28 To remodel Noyes Laboratory ......................$ 46,533 29 Section 3-6.2a. The amount of $500,000, or so much 30 thereof as may be necessary and remains unexpended on June 31 30, 1997, from appropriations heretofore made for such -123- BOB-CAPITAL98 1 purposes in Section 3-6.2a of Public Act 89-0501, Article 79, 2 is reappropriated from the Build Illinois Purposes Fund to 3 the Department of Commerce and Community Affairs for a grant 4 to the City of Chicago for infrastructure improvements and 5 large equipment purchase at the Crawford Industrial Park 6 located at 47th Street and Pulaski Road. 7 Section 3-6.2c. The amount of $486,699, or so much 8 thereof as may be necessary and remains unexpended on June 9 30, 1997, from appropriations heretofore made for such 10 purposes in Section 3-6.2c of Public Act 89-0501, Article 79, 11 is reappropriated from the Build Illinois Bond Fund to the 12 Department of Natural Resources for grants to the City of 13 Chicago Park District for all costs associated with the 14 development and improvement of park field houses and site 15 improvements to related structures, at the following 16 locations: 17 Garfield Park at 100 North Central Park, 18 Humboldt Park at 1400 North Sacramento, 19 Douglas Park at West 14th Street and South Albany, 20 Washington Park at 5531 South King Drive, 21 Grant Park from East Randolph Street to East 22 McFetridge Drive at Lake Michigan, 23 Columbus Park at 500 South Central Avenue, 24 Eckhart Park at 1330 West Chicago Avenue, 25 Sherman Park at 1301 West 52nd Street, 26 Fuller Park at 331 West 45th Street, 27 Hamilton Park at 513 West 72nd Street, 28 McKinley Park at 2210 West Pershing Road, 29 Palmer Park at East 111th Street and South Indiana, 30 Marquette Park at 6700 South Kedzie Avenue, 31 Dvorek Park at 1119 West Cullerton Street, 32 Union Park at 1501 West Randolph Street. -124- BOB-CAPITAL98 1 Section 3-6.2e. The amount of $20,400, or so much 2 thereof as may be necessary and remains unexpended on June 3 30, 1997, from appropriations heretofore made for such 4 purposes in Section 3-6.2e of Public Act 89-0501, Article 79, 5 is reappropriated from the Build Illinois Bond Fund to the 6 Secretary of State for making grants to the City of Chicago 7 for planning, construction, reconstruction, rehabilitation, 8 and all necessary costs for the following branches of the 9 Chicago Public Library at the approximate costs set forth 10 below: 11 North Austin Branch Library ................ $ 1,150,025 12 Legler Library ............................. 26,886 13 Auburn/Hamilton Park Library ............... 879,056 14 Near West Side Branch Library .............. 1,136,419 15 Carter G. Woodson Regional Library ......... 68,696 16 Clearing Branch Library .................... 258,398 17 McKinley Park Branch Library ............... 829,124 18 South Chicago Branch Library ............... 551,657 19 North Pulaski/Humboldt Library ............. 2,753,474 20 Roosevelt Branch ........................... 204,000 21 Rockwell Gardens Reading & 22 Study Center ............................. 0 23 Pullman Branch Library ..................... 632,063 24 Total $8,489,798 25 Section 3-6.2g. The amount of $3,840,215, or so much 26 thereof as may be necessary and remains unexpended on June 27 30, 1997, from appropriations heretofore made for such 28 purposes in Section 3-6.2g of Public Act 89-0501, Article 79, 29 is reappropriated from the Build Illinois Bond Fund to the 30 Department of Natural Resources for a grant to the City of 31 Chicago Park District for development and improvements at the 32 Lincoln Park Zoo. -125- BOB-CAPITAL98 1 Section 3-6.2h. The amount of $159,563, or so much 2 thereof as may be necessary and remains unexpended on June 3 30, 1997, from appropriations heretofore made for such 4 purposes in Section 3-6.2h of Public Act 89-0501, Article 79, 5 is reappropriated from the Build Illinois Bond Fund to the 6 Department of Natural Resources for grants to units of local 7 governments as provided in the "Open Space Lands Acquisition 8 and Development Act." 9 Division V. The reappropriations in this Division 10 continue certain appropriations initially made for the fiscal 11 year beginning July 1, 1988, for the purposes of the Build 12 Illinois Program set forth below. 13 Section 4-1.4. The amount of $104,000, or so much 14 thereof as may be necessary and remains unexpended on June 15 30, 1997, from appropriations heretofore made for such 16 purposes in Section 4-1.4 of Public Act 89-0501, Article 79, 17 is reappropriated from the Build Illinois Purposes Fund to 18 the Department of Commerce and Community Affairs for loans 19 and grants to units of local government for infrastructure 20 improvements. 21 Section 4-1.11. The following named amounts, or so much 22 thereof as may be necessary and remain unexpended on June 30, 23 1997, from appropriations heretofore made for such purposes 24 in Section 4-1.11 of Public Act 89-0501, Article 79, are 25 reappropriated from the Build Illinois Bond Fund to the 26 Department of Transportation for land acquisition, 27 engineering, and contract costs for construction, 28 reconstruction, extension, and improvement of State highways, 29 including bridges, structures separating highways and 30 railroads, rest areas, interchanges, and access roads to and 31 from any State or local highway and such other necessary or -126- BOB-CAPITAL98 1 appropriate purposes as provided by the "Illinois Highway 2 Code" as follows: 3 FAP 412 (U.S. 51)........................... $ 216,008 4 FAP 426 (Thorndale Avenue).................. 1,872 5 Access roads and interchanges .............. 1,093,282 6 Total $1,311,162 7 Section 4-1.13. The amount of $627,858, or so much 8 thereof as may be necessary and remains unexpended on June 9 30, 1997, from appropriations heretofore made for such 10 purposes in Section 4-1.13 of Public Act 89-0501, Article 79, 11 is reappropriated from the Build Illinois Bond Fund to the 12 Department of Natural Resources for the following projects at 13 the approximate costs set forth below: 14 Des Plaines Watershed Mitigation - Cook, 15 DuPage, and Lake Counties - For 16 implementation of flood hazard mitigation 17 plans, developed in cooperation with units 18 of local government in the Des Plaines 19 Watershed, filed in accordance with Section 20 5 of the Flood Control Act of 1945, as 21 amended (Ill. Rev. Stat., Ch. 19, par. 22 126e) ..................................... $ 100,000 23 Indian Creek - Kane County - For implementation 24 of the Indian Creek flood control project 25 in Kane County in cooperation with the City 26 of Aurora ................................. 48,089 27 Midlothian Creek - Cook County - Improvement of 28 Midlothian Creek channel to provide flood 29 damage reduction for Fernway Subdivision in 30 cooperation with the Villages of Orland 31 Park and Tinley Park ...................... 479,769 32 Total $627,858 -127- BOB-CAPITAL98 1 Division VI. The reappropriations in this Division 2 continue certain appropriations initially made for the fiscal 3 year beginning July 1, 1987, for the purposes of the Build 4 Illinois Program set forth below. 5 Section 5-1.10. The amount of $139,149, or so much 6 thereof as may be necessary and remains unexpended on June 7 30, 1997, from appropriations heretofore made for such 8 purposes in Section 5-1.10 of Public Act 89-0501, Article 79, 9 is reappropriated from the Build Illinois Purposes Fund to 10 the Department of Commerce and Community Affairs for loans 11 and grants to units of local government for infrastructure 12 improvements. 13 Section 5-1.11. The amount of $116,045, or so much 14 thereof as may be necessary and remains unexpended on June 15 30, 1997, from appropriations heretofore made for such 16 purposes in Section 5-1.11 of Public Act 89-0501, Article 79, 17 is reappropriated from the Build Illinois Purposes Fund to 18 the Department of Commerce and Community Affairs for grants 19 and loans to establish and operate small business incubators 20 under the Small Business Incubator Program. 21 Section 5-1.16. The following named amounts, or so much 22 thereof as may be necessary and remain unexpended on June 30, 23 1997, from appropriations heretofore made for such purposes 24 in Section 5-1.16 of Public Act 89-0501, Article 79, are 25 reappropriated from the Build Illinois Bond Fund to the 26 Department of Transportation for land acquisition, 27 engineering and contract costs for construction, 28 reconstruction, extension and improvement of state highways, 29 including bridges, structures separating highways and 30 railroads, rest areas, interchanges, and access roads to and 31 from any state or local highway and such other necessary or -128- BOB-CAPITAL98 1 appropriate purposes as provided by the "Illinois Highway 2 Code" as follows: 3 FAP 426 (Thorndale Avenue).................. 3,416 4 Access roads, interchanges, and 5 rest areas................................ 426,953 6 Total $430,369 7 Division VII. The Reappropriations in this Division 8 continue certain appropriations initially made for the fiscal 9 year beginning July 1, 1986, for the purposes of the Build 10 Illinois Program set forth below. 11 Section 6-1.13. The amount of $144,887, or so much 12 thereof as may be necessary and remains unexpended on June 13 30, 1997, from appropriations heretofore made for such 14 purposes in Section 6-1.13 of Public Act 89-0501, Article 79, 15 is reappropriated from the Build Illinois Bond Fund to the 16 Environmental Protection Agency for making grants to units of 17 local government for the planning, design, construction, 18 rehabilitation and any other necessary costs for wastewater 19 treatment facilities and for plans, construction, repairs, 20 improvements and any other necessary costs for sewer and 21 water supply systems, at the locations listed below: 22 Elgin S.D. 23 East Peoria 24 Livingston 25 Section 6-1.16. The following named amounts, or so much 26 thereof as may be necessary and remain unexpended on June 30, 27 1997, from appropriations heretofore made for such purposes 28 in Section 6-1.16 of Public Act 89-0501, Article 79, are 29 reappropriated from the Build Illinois Bond Fund to the 30 Department of Transportation for land acquisition, 31 engineering and contract costs for construction, -129- BOB-CAPITAL98 1 reconstruction, extension and improvement of state highways, 2 including bridges, structures separating highways and 3 railroads, rest areas, interchanges, and access roads to and 4 from any state or local highway and such other necessary or 5 appropriate purposes as provided by the "Illinois Highway 6 Code" as follows: 7 FAP 412 (U.S. 51) .......................... $ 293,775 8 Total $293,775 9 Section 6-1.21. The amount of $20,058, or so much 10 thereof as may be necessary and remains unexpended on June 11 30, 1997, from appropriations heretofore made for such 12 purposes in Section 6-1.21 of Public Act 89-0501, Article 79, 13 is reappropriated from the Build Illinois Bond Fund to the 14 Department of Natural Resources for costs associated with 15 drainage, flood control and related improvements. 16 Section 6-2.7. The amount of $425,000, or so much 17 thereof as may be necessary and remains unexpended on June 18 30, 1997, from appropriations heretofore made for such 19 purposes in Section 6-2.7 of Public Act 89-0501, Article 79, 20 is reappropriated from the Build Illinois Bond Fund to the 21 Environmental Protection Agency for the planning and 22 improvement of a water system in Edinburg. 23 Section 6-2.8. The amount of $50,000, or so much thereof 24 as may be necessary and remains unexpended on June 30, 1997, 25 from appropriations heretofore made for such purposes in 26 Section 6-2.8 of Public Act 89-0501, Article 79, is 27 reappropriated from the Build Illinois Bond Fund to the 28 Environmental Protection Agency for the planning and 29 construction of a waterworks components system in the Village 30 of Elburn. -130- BOB-CAPITAL98 1 Section 6-2.14. The amount of $100,000, or so much 2 thereof as may be necessary and remains unexpended on June 3 30, 1997, from appropriations heretofore made for such 4 purposes in Section 6-2.14 of Public Act 89-0501, Article 79, 5 is reappropriated from the Build Illinois Bond Fund to the 6 Environmental Protection Agency for planning, design and 7 construction of Crystal Lake sewer. 8 Section 6-2.25. The amount of $310,000, or so much 9 thereof as may be necessary and remains unexpended on June 10 30, 1997, from appropriations heretofore made for such 11 purposes in Section 6-2.25 of Public Act 89-0501, Article 79, 12 is reappropriated from the Build Illinois Bond Fund to the 13 Environmental Protection Agency for a grant to the 14 Brookfield-North Riverside Water Commission, serving the 15 towns of Brookfield, North Riverside, La Grange Park, Lyons 16 and Riverside for water supply system improvements. 17 Section 6-2.27. The amount of $136,000, or so much 18 thereof as may be necessary and remains unexpended on June 19 30, 1997, from appropriations heretofore made for such 20 purposes in Section 6-2.27 of Public Act 89-0501, Article 79, 21 is reappropriated from the Build Illinois Bond Fund to the 22 Department of Natural Resources for the design, construction 23 and land acquisition of a retention basin in East Chicago 24 Heights. 25 Section 6-3.22. The amount of $50,000, or so much 26 thereof as may be necessary and remains unexpended on June 27 30, 1997, from appropriations heretofore made for such 28 purposes in Section 6-3.22 of Public Act 89-0501, Article 79, 29 is reappropriated from the Build Illinois Bond Fund to the 30 Department of Natural Resources for the purpose of a grant to 31 the Rockford Park District for land acquisition and -131- BOB-CAPITAL98 1 development of a park near the Illinois Central train depot 2 in downtown Rockford. 3 Section 6-3.32. The amount of $140,000, or so much 4 thereof as may be necessary and remains unexpended on June 5 30, 1997, from appropriations heretofore made for such 6 purposes in Section 6-3.32 of Public Act 89-0501, Article 79, 7 is reappropriated from the Build Illinois Bond Fund to the 8 Department of Commerce and Community Affairs for the purpose 9 of a grant to the City of Elgin for extension of sewer lines 10 to the Northeast Subarea. 11 Section 6-3.104. The amount of $47,000, or so much 12 thereof as may be necessary and remains unexpended on June 13 30, 1997, from appropriations heretofore made for such 14 purposes in Section 6-3.104 of Public Act 89-0501, Article 15 79, is reappropriated from the Build Illinois Bond Fund to 16 the Environmental Protection Agency for the purpose of a 17 grant to the Village of Roselle for expansion of the 18 Botterman Sewage Treatment Plant. 19 Section 6-4.3. The amount of $175,000, or so much 20 thereof as may be necessary and remains unexpended on June 21 30, 1997, from appropriations heretofore made for such 22 purposes in Section 6-4.3 of Public Act 89-0501, Article 79, 23 is reappropriated from the Build Illinois Bond Fund to the 24 Department of Commerce and Community Affairs for grants to 25 local governments for use in economic development, 26 revitalization and community development at the approximate 27 costs as set forth below: 28 Melrose..................................... $ 50,000 29 Franklin Park............................... 50,000 30 Hillside.................................... 75,000 31 Total $175,000 -132- BOB-CAPITAL98 1 Section 6-4.4. The amount of $49,500, or so much thereof 2 as may be necessary and remains unexpended on June 30, 1997, 3 from appropriations heretofore made for such purposes in 4 Section 6-4.4 of Public Act 89-0501, Article 79, is 5 reappropriated from the Build Illinois Purposes Fund to the 6 Department of Transportation for a grant to Canteen Township 7 in St. Clair County for road repairs. 8 Section 6-4.8. The amount of $198,000, or so much 9 thereof as may be necessary and remains unexpended on June 10 30, 1997, from appropriations heretofore made for such 11 purposes in Section 6-4.8 of Public Act 89-0501, Article 79, 12 is reappropriated from the Build Illinois Purposes Fund to 13 the Department of Natural Resources for a recreational and 14 flood control project and retention basin in the City of 15 Sycamore. 16 Section 6-4.18. The amount of $99,000, or so much 17 thereof as may be necessary and remains unexpended on June 18 30, 1997, from appropriations heretofore made for such 19 purposes in Section 6-4.18 of Public Act 89-0501, Article 79, 20 is reappropriated from the Build Illinois Purposes Fund to 21 the Department of Transportation for a grant to the Village 22 of Swansea to resurface local roads and repair and replace 23 gutters and curbs. 24 Section 6-4.28. The amount of $49,500, or so much 25 thereof as may be necessary and remains unexpended on June 26 30, 1997, from appropriations heretofore made for such 27 purposes in Section 6-4.28 of Public Act 89-0501, Article 79, 28 is reappropriated from the Build Illinois Purposes Fund to 29 the Department of Transportation for a study to determine the 30 feasibility of establishing an airport in Kankakee County. -133- BOB-CAPITAL98 1 Section 6-4.33. The amount of $91,802, or so much 2 thereof as may be necessary and remains unexpended on June 3 30, 1997, from appropriations heretofore made for such 4 purposes in Section 6-4.33 of Public Act 89-0501, Article 79, 5 is reappropriated from the Build Illinois Bond Fund to the 6 Department of Transportation for the costs associated with 7 construction, reconstruction and rehabilitation of Eagle 8 Creek Road and Findlay Road. 9 Section 6-5.24. The amount of $25,000, or so much 10 thereof as may be necessary and remains unexpended on June 11 30, 1997, from appropriations heretofore made for such 12 purposes in Section 6-5.24 of Public Act 89-0501, Article 79, 13 is reappropriated from the Build Illinois Bond Fund to the 14 Department of Natural Resources for a grant to the City of 15 Benld for recreation and park facilities. 16 Section 6-5.39. The amount of $127,000, or so much 17 thereof as may be necessary and remains unexpended on June 18 30, 1997, from appropriations heretofore made for such 19 purposes in Section 6-5.39 of Public Act 89-0501, Article 79, 20 is reappropriated from the Build Illinois Bond Fund to the 21 Department of Natural Resources for the Village of Midlothian 22 for flood control and drainage improvements. 23 Section 6-5.44a. The amount of $144,937, or so much 24 thereof as may be necessary and remains unexpended on June 25 30, 1997, from appropriations heretofore made for such 26 purposes in Section 6-5.44a of Public Act 89-0501, Article 27 79, is reappropriated from the Build Illinois Bond Fund to 28 the Environmental Protection Agency for grants to units of 29 local government for the planning, design, construction, 30 rehabilitation, repair, improvement, expansion, and any other 31 necessary costs for storm water, sewer, sewage treatment and -134- BOB-CAPITAL98 1 water supply systems, at the approximate cost set forth 2 below: 3 La Grange Highlands Sanitary District...........$ 127,053 4 Section 6-5.44b. The amount of $40,000, or so much 5 thereof as may be necessary and remains unexpended on June 6 30, 1997, from appropriations heretofore made for such 7 purposes in Section 6-5.44b of Public Act 89-0501, Article 8 79, is reappropriated from the Build Illinois Bond Fund to 9 the Department of Natural Resources for units of local 10 government for storm drainage at the approximate cost set 11 forth below: 12 Bonnie ........................................$ 40,000 13 Section 6-5.44f. The amount of $300,000, or so much 14 thereof as may be necessary and remains unexpended on June 15 30, 1997, from appropriations heretofore made for such 16 purposes in Section 6-5.44f of Public Act 89-0501, Article 17 79, is reappropriated from the Build Illinois Bond Fund to 18 the Department of Natural Resources for a grant to the 19 Village of Summit for planning, design, construction and any 20 other necessary costs for flood control. 21 Section 6-6.6. The amount of $3,000,000, or so much 22 thereof as may be necessary and remains unexpended on June 23 30, 1997, from appropriations heretofore made for such 24 purposes in Section 6-6.6 of Public Act 89-0501, Article 79, 25 is reappropriated from the Build Illinois Purposes Fund to 26 the Illinois Community College Board for the City Colleges of 27 Chicago for costs associated with planning, utilities, site 28 improvements, repairs, renovation, remodeling, and 29 construction of Job Training Centers. 30 Section 6-6.10. The amount of $1,338,800, or so much -135- BOB-CAPITAL98 1 thereof as may be necessary and remains unexpended on June 2 30, 1997, from appropriations heretofore made for such 3 purposes in Section 6-6.10 of Public Act 89-0501, Article 79, 4 is reappropriated from the Build Illinois Bond Fund to the 5 Department of Transportation for a grant to the City of 6 Chicago for the viaduct and roadway improvement program. 7 Section 6-6.14. The amount of $1,227,028, or so much 8 thereof as may be necessary and remains unexpended on June 9 30, 1997, from appropriations heretofore made for such 10 purposes in Section 6-6.14 of Public Act 89-0501, Article 79, 11 is reappropriated to the Department of Transportation from 12 the Build Illinois Bond Fund for the paving, upgrading or 13 construction: 14 (a) of streets and curbs at the following locations 15 within the City of Chicago: 16 1. The 4300 block of West Wrightwood; 17 2. The 3600 block of West Byron; 18 3. The 3200 block of West Waveland; 19 4. The 4200 block of North Hamlin; 20 5. The 4200 block of West Grace; 21 6. The 4200 block of North Springfield; 22 7. The 3200 block of North Lawndale; 23 8. East 117th from Avenue O to Avenue H; 24 9. Avenue N from 131st to 132nd; 25 10. State Line Road from 106th to 112th; 26 11. Princeton Street from 30th Street to 31st Street; 27 12. South Wells from 27th Street through 29th Street; 28 13. 23rd Place from Princeton to Wentworth; 29 14. Sayre Avenue between Higgins and Kennedy Expressway; 30 15. Keystone Avenue from North Avenue to Armitage 31 Avenue; 32 16. Harding Avenue from North Avenue to Armitage Avenue; 33 17. Lawndale Avenue from North Avenue to Armitage -136- BOB-CAPITAL98 1 Avenue; and 2 18. The 1300 block of Monticello Avenue. 3 (b) of curbs at the following locations within 4 the City of Chicago: 5 1. The 3000 and 3100 blocks of North Elbridge Street; 6 2. The 2800, 2900 and 3000 blocks of West 7 Fletcher Street; 8 3. The 2800, 2900 and 3000 blocks of West 9 Wellington Street; 10 4. The 2800, 2900 and 3000 blocks of West 11 Nelson Street; 12 5. The 5600 and 5700 blocks of West Henderson; 13 6. The 5600 and 5700 blocks of West Cornelia; 14 7. The 3300 block of North Major; 15 8. The 3300, 3400 and 3500 blocks of North Linder; 16 9. The 3300 and 3500 blocks of North Lockwood; 17 10. The 2000, 2100 and 2200 blocks of Leland Avenue; 18 11. The 2000, 2100, 2200 and 2300 blocks of Giddings; 19 12. The 6100 block of North Artesian; 20 13. The 4400 block of North Francisco; 21 14. The 2500 block of West Hollywood; 22 15. The 6100 block of North Rockwell; 23 16. The 2400 block of West Winona; 24 17. The 2300 block of West Superior; 25 18. The 2000, 2100 and 2200 blocks of West Thomas; 26 19. The 2200 block of West Cortez; 27 20. The 2000 and 2100 blocks of West Iowa; 28 21. The 1200 block of North Noble; 29 22. The 700 block of North Campbell; 30 23. The 5600, 5700 and 5800 blocks of Kostner 31 from Bryn Mawr to Rodgers; 32 24. North Kostner from Hollywood to Rodgers; 33 25. North Kedvale from Leland to Lawrence; 34 26. Leland from Kedvale to Kildare; -137- BOB-CAPITAL98 1 27. Leland from Kimball to Pulaski; 2 28. Monticello from Wilson to Lawrence; 3 29. St. Louis from Wilson to Lawrence; 4 30. Bernard from Leland to Lawrence; 5 31. Kasson from Kennicott to Keystone; 6 32. West Ainslie from Kimball to Bernard; 7 33. The west side of the 1800 block of North Austin; 8 34. The west side of the 2300 block of North Austin; 9 35. The 3000 and 3100 blocks of North Marmora; 10 36. The north side of the 7100 block of West Cornelia; 11 37. The 5600 block of West Barry; 12 38. The east side of the 3000 block of Norragansett; 13 39. The 6100 block of Diversey; 14 40. The west side of the 2500 block of Neva; 15 41. The 3300 and 3400 blocks of Neva; 16 42. The 6200 and 6300 blocks of West Barry; 17 43. The 6600 block of West Barry; 18 44. The west side of the 3100 block of North Mobile; 19 45. The south side of 17th Street from Ashland to 20 Paulina; 21 46. 17th Street from Paulina to Damen; 22 47. 3600 to 3800 block of Cumberland; 23 48. Sacramento Avenue from Addison to Cornelia; 24 49. Cornelia Avenue from Sacramento to Albany; 25 50. The 8300, 8400 and 8500 blocks of South 26 Francisco Avenue; 27 51. The 8300, 8400 and 8500 blocks of South 28 Whipple Avenue; 29 52. 82nd Street from Western Avenue to California 30 Avenue; 31 53. 85th Street from Kenneth Avenue to Cicero Avenue; 32 54. The 8500, 8600 and 8700 blocks of South Ramsey Road; 33 55. The 4300, 4400, 4500, 4600 and 4700 blocks of South 34 Normal Avenue; -138- BOB-CAPITAL98 1 56. The 3500, 3600, 3700 and 3800 blocks of South 2 Lituanica Avenue; 3 57. Eleanor Street from Throop to Loomis Avenue; and 4 58. Pershing Road from Wentworth to Wood. 5 Section 6-6.18. The amount of $350,000, or so much 6 thereof as may be necessary and remains unexpended on June 7 30, 1997, from appropriations heretofore made for such 8 purposes in Section 6-6.18 of Public Act 89-0501, Article 79, 9 is reappropriated from the Build Illinois Bond Fund to the 10 Environmental Protection Agency for a grant to the Central 11 Stickney Sanitary District of Cook County for improvements to 12 the sewer system and the water system. 13 Section 6-6.19. The amount of $559,250, or so much 14 thereof as may be necessary and remains unexpended on June 15 30, 1997, from appropriations heretofore made for such 16 purposes in Section 6-6.19 of Public Act 89-0501, Article 79, 17 is reappropriated from the Build Illinois Bond Fund to the 18 Department of Natural Resources to pay for a portion of the 19 costs associated with the planning and construction of Lake 20 Michigan shoreline erosion controls in the City of Chicago. 21 Section 6-6.20. The amount of $250,000, or so much 22 thereof as may be necessary and remains unexpended on June 23 30, 1997, from appropriations heretofore made for such 24 purposes in Section 6-6.20 of Public Act 89-0501, Article 79, 25 is reappropriated from the Build Illinois Bond Fund to the 26 Department of Transportation for a grant to the City of 27 Chicago for the preliminary engineering for road improvements 28 on St. Louis Avenue, from 51st Street to 59th Street. 29 Section 6-6.21. The amount of $50,000, or so much 30 thereof as may be necessary and remains unexpended on June -139- BOB-CAPITAL98 1 30, 1997, from appropriations heretofore made for such 2 purposes in Section 6-6.21 of Public Act 89-0501, Article 79, 3 is reappropriated from the Build Illinois Bond Fund to the 4 Department of Transportation to study the straightening of 5 Ogden Avenue, from First Street to Harlem Avenue. 6 Section 6-6.22. The amount of $500,000, or so much 7 thereof as may be necessary and remains unexpended on June 8 30, 1997, from appropriations heretofore made for such 9 purposes in Section 6-6.22 of Public Act 89-0501, Article 79, 10 is reappropriated from the Build Illinois Bond Fund to the 11 Department of Transportation for a grant to the City of 12 Chicago for the repair and replacement of roadway curbs in 13 the area bounded by Cicero Avenue, Central Avenue, Armitage 14 Avenue and Diversey Avenue, and the area bounded by Central 15 Avenue, Austin Avenue, Fullerton Avenue, and Grand Avenue. 16 Section 6-6.23. The amount of $500,000, or so much 17 thereof as may be necessary and remains unexpended on June 18 30, 1997, from appropriations heretofore made for such 19 purposes in Section 6-6.23 of Public Act 89-0501, Article 79, 20 is reappropriated from the Build Illinois Bond Fund to the 21 Department of Transportation for a grant to the City of 22 Chicago for the following roadway resurfacing improvements: 23 Francisco St. - 5100 S. to 5500 S. 24 Francisco St. - 5700 S. to 5900 S. 25 Mozart St. - 5100 S. to 5900 S. 26 54th Place - 3000 W. to 3200 W. 27 Carpenter St. - 3230 S. to 3400 S. 28 Wood St. - Stevenson Expressway to 3900 S. 29 Keeley St. - Archer Ave. to 3100 S. 30 Section 6-6.24. The amount of $450,000, or so much 31 thereof as may be necessary and remains unexpended on June -140- BOB-CAPITAL98 1 30, 1997, from appropriations heretofore made for such 2 purposes in Section 6-6.24 of Public Act 89-0501, Article 79, 3 is reappropriated from the Build Illinois Bond Fund to the 4 Department of Transportation for a grant to the City of 5 Chicago for the following roadway resurfacing improvements: 6 For Drake Ave. - 1600 N. to 2400 N. 7 Hamlin Ave. - 2000 N. to 2200 N. 8 Dickens Ave. - 3200 W. to 4000 W. 9 Belden Ave. - 3200 W. to 3600 W. 10 Medill Ave. - 3400 W. to 3600 W. 11 Avers Ave. - 2000 N. to 2200 N. 12 Section 6-6.25. The amount of $558,719, or so much 13 thereof as may be necessary and remains unexpended on June 14 30, 1997, from appropriations heretofore made for such 15 purposes in Section 6-6.25 of Public Act 89-0501, Article 79, 16 is reappropriated from the Build Illinois Bond Fund to the 17 Department of Transportation for a grant to the City of 18 Chicago for roadway resurfacing improvements: 19 Farwell Ave. - Ridge Ave. to Western Ave. 20 Morse Ave. - Ridge Ave. to Western Ave. 21 Greenleaf Ave. - Ridge to Western Ave. 22 Estes Ave. - Ridge Ave. to Western Ave. 23 Rosemont - Western to Kedzie 24 Leavitt - Norwood to Granville 25 Granville Ave. from Western Ave. to Kedzie 26 Section 6-6.31. The amount of $400,000, or so much 27 thereof as may be necessary and remains unexpended on June 28 30, 1997, from appropriations heretofore made for such 29 purposes in Section 6-6.31 of Public Act 89-0501, Article 79, 30 is reappropriated from the Build Illinois Bond Fund to the 31 Department of Natural Resources for a grant to the Chicago 32 Park District for planning, site improvements and -141- BOB-CAPITAL98 1 construction of a swimming pool in Fernwood Park at 10438 2 South Lowe Street in the City of Chicago. 3 Division VIII. The reappropriations in this Division 4 continue certain appropriations initially made for the 5 purpose of the renewal of the rural areas of Illinois for the 6 fiscal year beginning July 1, 1986. 7 Section 7-2.3. The amount of $62,621, or so much thereof 8 as may be necessary and remains unexpended on June 30, 1997, 9 from appropriations heretofore made for such purposes in 10 Section 7-2.3 of Public Act 89-0501, Article 79, is 11 reappropriated from the Build Illinois Bond Fund to the 12 Environmental Protection Agency for a grant to the City of 13 DuQuoin for planning, design and construction of a sanitary 14 sewer extension to the DuQuoin State Fair and nearby areas. 15 Section 7-3.1a. The amount of $296,840, or so much 16 thereof as may be necessary and remains unexpended on June 17 30, 1997, from appropriations heretofore made for such 18 purposes in Section 7-3.1a of Public Act 89-0501, Article 79, 19 is reappropriated from the Build Illinois Bond Fund to the 20 Environmental Protection Agency for making grants to units of 21 local government for the planning, design, construction, 22 rehabilitation and any other necessary costs for wastewater 23 treatment facilities and for plans, construction, repairs, 24 improvements and any other necessary costs for sewer and 25 water supply systems, at the approximate costs as set forth 26 below: 27 Old Shawneetown............................. $ 3,750 28 East Cape Girardeau......................... 8,750 29 Equality.................................... 50,000 30 Benton...................................... 81,538 31 Sims........................................ 45,000 -142- BOB-CAPITAL98 1 Belle Rive.................................. 20,000 2 New Lenox................................... 67,588 3 Fairmont City............................... 75,000 4 Washington Park............................. 75,000 5 Brooklyn.................................... 50,000 6 Carmi....................................... 385,778 7 Section 7-3.1b. The amount of $50,000, or so much 8 thereof as may be necessary and remains unexpended on June 9 30, 1997, from appropriations heretofore made for such 10 purposes in Section 7-3.1b of Public Act 89-0501, Article 79, 11 is reappropriated from the Build Illinois Bond Fund to the 12 Department of Natural Resources for plans, construction, 13 repairs, improvements and any other necessary costs for storm 14 drainage, at the approximate costs set forth below: 15 East Carondelet ............................ $ 50,000 16 Section 6-3.110. The amount of $70,000, or so much 17 thereof as may be necessary and remains unexpended on June 18 30, 1997, from appropriations heretofore made for such 19 purposes in Section 6-3.110 of Public Act 89-0501, Article 20 79, is reappropriated from the Build Illinois Bond Fund to 21 the Environmental Protection Agency for the purpose of a 22 grant to the City of Bloomington for extension and expansion 23 of sewers. 24 Division IX. The reappropriations in this Division 25 continue certain appropriations initially made for the fiscal 26 years beginning July 1, 1985, for the purpose of the Build 27 Illinois Program set forth below. 28 Section 8-1.11. The following named amounts, or so much 29 thereof as may be necessary and remain unexpended on June 30, 30 1997, from appropriations heretofore made for such purposes -143- BOB-CAPITAL98 1 in Section 8-1.11 of Public Act 89-0501, Article 79, are 2 reappropriated from the Build Illinois Bond Fund to the 3 Department of Natural Resources for the purposes hereinafter 4 enumerated: 5 For grants to units of local government 6 as provided in the "Open Space Lands 7 Acquisition and Development Act" ...............$ 110,000 8 Section 8-1.19. The following named amounts, or so much 9 thereof as may be necessary and remain unexpended on June 30, 10 1997, from appropriations heretofore made for such purposes 11 in Section 8-1.19 of Public Act 89-0501, Article 79, are 12 reappropriated from the Build Illinois Bond Fund to the 13 Department of Transportation for land acquisition, 14 engineering and contract costs for construction, 15 reconstruction, extension and improvement of State highways, 16 including bridges, structures separating highways and 17 railroads, rest areas, interchanges, and access roads to and 18 from any State or local highway and such other necessary or 19 appropriate purposes as provided by the "Illinois Highway 20 Code" as follows: 21 Access Roads, interchanges, and rest areas.......$ 95,191 22 Section 8-1.21. The amount of $189,520, or so much 23 thereof as may be necessary and remains unexpended on June 24 30, 1997, from appropriations heretofore made for such 25 purposes in Section 8-1.21 of Public Act 89-0501, Article 79, 26 is reappropriated from the Build Illinois Bond Fund to the 27 Department of Natural Resources for the completion of the 28 following projects at the approximate costs set forth below: 29 Lower Des Plaines River at Tributaries Watershed 30 - Cook and DuPage Counties - For 31 construction of drainage, flood control, 32 recreation and related improvements and -144- BOB-CAPITAL98 1 facilities in the Lower Des Plaines 2 Watershed; and for necessary land 3 acquisition, relocation, and related 4 expenses, all in general conformance with 5 the Lower Des Plaines River and Tributaries 6 Watershed Work plan in cooperation with the 7 U.S. Soil Conservation Service and local 8 governments sponsoring this Federal 9 Flood Control project ...........................$189,520 10 Section 8-1.22. The amount of $33,311, or so much 11 thereof as may be necessary and remains unexpended on June 12 30, 1997, from appropriations heretofore made for such 13 purposes in Section 8-1.22 of Public Act 89-0501, Article 79, 14 is reappropriated from the Build Illinois Bond Fund to the 15 Department of Natural Resources for costs associated with 16 drainage, flood control and related improvements. 17 Section 8-2.18. The amount of $552,048, or so much 18 thereof as may be necessary and remains unexpended on June 19 30, 1997, from appropriations heretofore made for such 20 purposes in Section 8-2.18 of Public Act 89-0501, Article 79, 21 is reappropriated from the Build Illinois Bond Fund to the 22 Environmental Protection Agency for the purpose of a grant to 23 the Village of Palos Park for the design, engineering and 24 construction of sewers. 25 Section 8-2.28. The amount of $500,000, or so much 26 thereof as may be necessary and remains unexpended on June 27 30, 1997, from appropriations heretofore made for such 28 purposes in Section 8-2.28 of Public Act 89-0501, Article 79, 29 is reappropriated from the Build Illinois Bond Fund to the 30 Department of Natural Resources to assist in planning and 31 construction of a water retention project on Tyler Creek. -145- BOB-CAPITAL98 1 Section 8-2.29. The amount of $198, or so much thereof 2 as may be necessary and remains unexpended on June 30, 1997, 3 from appropriations heretofore made for such purposes in 4 Section 8-2.29 of Public Act 89-0501, Article 79, is 5 reappropriated from the Build Illinois Bond Fund to the 6 Department of Transportation for planning and engineering and 7 construction of an interchange at Interstate 80 and Houbolt 8 Road in Will County. 9 Section 8-2.33. The amount of $50,000, or so much 10 thereof as may be necessary and remains unexpended on June 11 30, 1997, from appropriations heretofore made for such 12 purposes in Section 8-2.33 of Public Act 89-0501, Article 79, 13 is reappropriated from the Build Illinois Bond Fund to the 14 Department of Natural Resources for feasibility, engineering, 15 and economic and environmental studies on the LaMoine Lake 16 Project. 17 Section 8-4.5. The amount of $500,000, or so much 18 thereof as may be necessary and remains unexpended on June 19 30, 1997, from appropriations heretofore made for such 20 purposes in Section 8-4.5 of Public Act 89-0501, Article 79, 21 is reappropriated from the Build Illinois Bond Fund to the 22 Department of Commerce and Community Affairs for a grant to 23 the City of North Chicago for all costs associated with the 24 planning and construction of a building and parking facility 25 to house a Community Cultural Art Center. 26 Section 8-4.6. The amount of $100,000, or so much 27 thereof as may be necessary and remains unexpended on June 28 30, 1997, from appropriations heretofore made for such 29 purposes in Section 8-4.6 of Public Act 89-0501, Article 79, 30 is reappropriated from the Build Illinois Purposes Fund to 31 the Department of Commerce and Community Affairs for a grant -146- BOB-CAPITAL98 1 to the Metro East Solid Waste Disposal and Energy Producing 2 Service for its ordinary and contingent expenses. 3 Section 8-5.3. The amount of $2,000,000, or so much 4 thereof as may be necessary and remains unexpended on June 5 30, 1997, from appropriations heretofore made for such 6 purposes in Section 8-5.3 of Public Act 89-0501, Article 79, 7 is reappropriated from the Build Illinois Bond Fund to the 8 Illinois Community College Board for the City Colleges of 9 Chicago for costs associated with planning, utilities, site 10 improvements, repairs, renovation, remodeling, and 11 construction of Job Training Centers. 12 Section 8-5.6. The amount of $658,241, or so much 13 thereof as may be necessary and remains unexpended on June 14 30, 1997, from appropriations heretofore made for such 15 purposes in Section 8-5.6 of Public Act 89-0501, Article 79, 16 is reappropriated from the Build Illinois Bond Fund to the 17 Department of Transportation as a grant to the City of 18 Chicago for a viaduct and roadway improvement program. 19 Division X. The reappropriations in this Division 20 continue certain appropriations initially made for the fiscal 21 years beginning July 1, 1985 through 1992, combined for the 22 purpose of the Build Illinois Program set forth below. 23 Section 10A. The amount of $11,295,368, or so much 24 thereof as may be necessary and remains unexpended on June 25 30, 1997, from appropriations heretofore made for such 26 purposes in Section 10A of Public Act 89-0501, Article 79, is 27 reappropriated from the Build Illinois Bond Fund to the 28 Environmental Protection Agency for grants to units of local 29 government for sewer systems and wastewater treatment 30 facilities pursuant to rules and procedures established under -147- BOB-CAPITAL98 1 the Anti-Pollution Bond Act. 2 Section 10B. The amount of $120,094,975, or so much 3 thereof as may be necessary, and remains unexpended on June 4 30, 1997, from appropriations heretofore made for such 5 purposes in Section 10B of Public Act 89-0501, Article 79, is 6 reappropriated from the Build Illinois Bond Fund to the 7 Environmental Protection Agency for wastewater compliance 8 grants to units of local government for sewer systems and 9 wastewater treatment facilities pursuant to procedures and 10 rules established under the Anti-Pollution Bond Act. These 11 grants are limited to projects for which the local government 12 provides at least 30% of the project cost. There is an 13 approved project compliance plan, and there is an enforceable 14 compliance schedule prior to the grant award. The grant 15 award will be based on eligible project cost contained in the 16 approved compliance plan. 17 Section 10C. The following named amounts, or so much 18 thereof as may be necessary, and remain unexpended on June 19 30, 1997 from appropriations heretofore made for such 20 purposes in Article 79, Section 10C of Public Act 89-0501, 21 are reappropriated from the Build Illinois Bond Fund to the 22 Capital Development Board for the Board of Higher Education 23 for miscellaneous capital improvements including 24 construction, reconstruction, remodeling, improvement, repair 25 and installation of capital facilities, costs of planning, 26 supplies, equipment, materials, services, and all other 27 expenses required to complete the work at the colleges and 28 universities hereinafter enumerated: 29 Chicago State University ....................... $ 51,160 30 Eastern Illinois University .................... 92,221 31 Western Illinois University .................... 15,152 32 Northeastern Illinois University ............... 7,454 -148- BOB-CAPITAL98 1 Total, Build Illinois Bond Fund $165,987 2 Section 10D. The following named amounts, or so much 3 thereof as may be necessary, and remain unexpended on June 4 30, 1997 from appropriations heretofore made for such 5 purposes in Article 79, Section 10D of Public Act 89-0501, 6 are reappropriated from the Build Illinois Bond Fund to the 7 Capital Development Board for the Board of Higher Education 8 for miscellaneous capital improvements including 9 construction, reconstruction, remodeling, improvement, repair 10 and installation of capital facilities, costs of planning, 11 supplies, equipment, materials, services, and all other 12 expenses required to complete the work at the colleges and 13 universities hereinafter enumerated: 14 Illinois State University ...................... $ 156,024 15 Northern Illinois University ................... 121,871 16 University of Illinois at Springfield .......... 1,698 17 Total, Build Illinois Bond Fund $279,593 18 Section 10E. The amount of $2,720,095, or so much 19 thereof as may be necessary, and remains unexpended on June 20 30, 1997 from appropriations heretofore made for such 21 purposes in Article 79, Section 10E of Public Act 89-0501, is 22 reappropriated from the Build Illinois Bond Fund to the 23 Capital Development Board for the University of Illinois for 24 miscellaneous capital improvements including construction, 25 reconstruction, remodeling, improvement, repair and 26 installation of capital facilities, costs of planning, 27 supplies, equipment, materials, services, and all other 28 expenses required to complete the work. This appropriation 29 shall be in addition to any other appropriated amounts which 30 can be expended for these purposes. 31 Section 10F. The amount of $480,964, or so much thereof -149- BOB-CAPITAL98 1 as may be necessary, and remains unexpended on June 30, 1997 2 from appropriations heretofore made for such purposes in 3 Article 79, Section 10F of Public Act 89-0501, is 4 reappropriated from the Build Illinois Bond Fund to the 5 Capital Development Board for Southern Illinois University 6 for miscellaneous capital improvements including 7 construction, reconstruction, remodeling, improvement, repair 8 and installation of capital facilities, costs of planning, 9 supplies, equipment, materials, services, and all other 10 expenses required to complete the work. This appropriation 11 shall be in addition to any other appropriated amounts which 12 can be expended for these purposes. 13 Section 10G. The amount of $1,700,920, or so much 14 thereof as may be necessary, and remains unexpended on June 15 30, 1997 from appropriations heretofore made for such 16 purposes in Article 79, Section 10G of Public Act 89-0501, is 17 reappropriated from the Build Illinois Bond Fund to the 18 Capital Development Board for the Illinois Community College 19 Board for grants to community colleges repair, renovation, 20 and miscellaneous capital improvements including 21 construction, reconstruction, remodeling, improvement, repair 22 and installation of capital facilities, costs of planning, 23 supplies, equipment, materials, services, and all other 24 expenses required to complete the work. This appropriation 25 shall be in addition to any other appropriated amounts which 26 can be expended for these purposes. 27 Division XI. This Division contains provisions governing 28 the expenditure of funds appropriated in this Article. 29 Section 10-1.1. No contract shall be entered into or 30 obligation incurred for any expenditures from the 31 appropriations made in this Article until after the purposes -150- BOB-CAPITAL98 1 and amounts have been approved in writing by the Governor. 2 ARTICLE 4 3 Section 99.This Act takes effect on July 1, 1997.