(415 ILCS 50/3) (from Ch. 111 1/2, par. 583)
Sec. 3.
An applicant for a wastewater land treatment site located
inside of the county in which the waste was produced shall submit its
engineering report for concept approval, including proof of financial
capability to operate and maintain such a system on a continuing basis,
concurrently to the Illinois Environmental Protection Agency and any
designated management agency in the facility planning area within which the
system is located, and to any designated area-wide water quality planning
agency within which the system is located. A designated management agency
may review and comment to the Illinois Environmental Protection Agency
regarding such engineering report. Such review and comment must be
submitted to the Illinois Environmental Protection Agency within 45 days of
submission of the engineering report. The Illinois Environmental
Protection Agency shall consider such review and comment in its permit issuance process.
(Source: P.A. 85-1041.)
|