1 | AN ACT concerning employment.
| ||||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||||
4 | Section 5. The Prevailing Wage Act is amended by changing | ||||||||||||||||||||||||||||
5 | Sections 2, 4, and 11a as follows:
| ||||||||||||||||||||||||||||
6 | (820 ILCS 130/2) (from Ch. 48, par. 39s-2)
| ||||||||||||||||||||||||||||
7 | Sec. 2. This Act applies to the wages of laborers, | ||||||||||||||||||||||||||||
8 | mechanics and
other workers employed in any public works, as | ||||||||||||||||||||||||||||
9 | hereinafter defined, by
any public body and to anyone under | ||||||||||||||||||||||||||||
10 | contracts for public works. This includes any maintenance, | ||||||||||||||||||||||||||||
11 | repair, assembly, or disassembly work performed on equipment | ||||||||||||||||||||||||||||
12 | whether owned, leased, or rented.
| ||||||||||||||||||||||||||||
13 | As used in this Act, unless the context indicates | ||||||||||||||||||||||||||||
14 | otherwise:
| ||||||||||||||||||||||||||||
15 | "Public works" means all fixed works constructed or | ||||||||||||||||||||||||||||
16 | demolished by
any public body,
or paid for wholly or in part | ||||||||||||||||||||||||||||
17 | out of public funds. "Public works" as
defined herein includes | ||||||||||||||||||||||||||||
18 | all projects financed in whole
or in part with bonds, grants, | ||||||||||||||||||||||||||||
19 | loans, or other funds made available by or through the State or | ||||||||||||||||||||||||||||
20 | any of its political subdivisions, including but not limited | ||||||||||||||||||||||||||||
21 | to: bonds issued under the Industrial Project Revenue Bond
Act | ||||||||||||||||||||||||||||
22 | (Article 11, Division 74 of the Illinois Municipal Code), the | ||||||||||||||||||||||||||||
23 | Industrial
Building Revenue Bond Act, the Illinois Finance |
| |||||||
| |||||||
1 | Authority Act,
the Illinois Sports Facilities Authority Act, or | ||||||
2 | the Build Illinois Bond Act; loans or other funds made
| ||||||
3 | available pursuant to the Build Illinois Act; or funds from the | ||||||
4 | Fund for
Illinois' Future under Section 6z-47 of the State | ||||||
5 | Finance Act, funds for school
construction under Section 5 of | ||||||
6 | the General Obligation Bond Act, funds
authorized under Section | ||||||
7 | 3 of the School Construction Bond Act, funds for
school | ||||||
8 | infrastructure under Section 6z-45 of the State Finance Act, | ||||||
9 | and funds
for transportation purposes under Section 4 of the | ||||||
10 | General Obligation Bond
Act. "Public works" also includes (i) | ||||||
11 | all projects financed in whole or in part
with funds from the | ||||||
12 | Department of Commerce and Economic Opportunity under the | ||||||
13 | Illinois Renewable Fuels Development Program
Act for which | ||||||
14 | there is no project labor agreement; (ii) all work performed | ||||||
15 | pursuant to a public private agreement under the Public Private | ||||||
16 | Agreements for the Illiana Expressway Act; and (iii) all | ||||||
17 | projects undertaken under a public-private agreement under the | ||||||
18 | Public-Private Partnerships for Transportation Act. "Public | ||||||
19 | works" also includes all projects at leased facility property | ||||||
20 | used for airport purposes under Section 35 of the Local | ||||||
21 | Government Facility Lease Act. "Public works" also includes the | ||||||
22 | construction of a new wind power facility by a business | ||||||
23 | designated as a High Impact Business under Section 5.5(a)(3)(E) | ||||||
24 | of the Illinois Enterprise Zone Act.
"Public works" does not | ||||||
25 | include work done directly by any public utility company, | ||||||
26 | whether or not done under public supervision or direction, or |
| |||||||
| |||||||
1 | paid for wholly or in part out of public funds. "Public works" | ||||||
2 | does not include projects undertaken by the owner at an | ||||||
3 | owner-occupied single-family residence or at an owner-occupied | ||||||
4 | unit of a multi-family residence.
| ||||||
5 | "Compensatory damages" means the sum of economic and | ||||||
6 | non-economic damages. | ||||||
7 | "Construction" means all work on public works involving | ||||||
8 | laborers,
workers or mechanics. This includes any maintenance, | ||||||
9 | repair, assembly, or disassembly work performed on equipment | ||||||
10 | whether owned, leased, or rented.
| ||||||
11 | "Locality" means the county where the physical work upon | ||||||
12 | public works
is performed, except (1) that if there is not | ||||||
13 | available in the county a
sufficient number of competent | ||||||
14 | skilled laborers, workers and mechanics
to construct the public | ||||||
15 | works efficiently and properly, "locality"
includes any other | ||||||
16 | county nearest the one in which the work or
construction is to | ||||||
17 | be performed and from which such persons may be
obtained in | ||||||
18 | sufficient numbers to perform the work and (2) that, with
| ||||||
19 | respect to contracts for highway work with the Department of
| ||||||
20 | Transportation of this State, "locality" may at the discretion | ||||||
21 | of the
Secretary of the Department of Transportation be | ||||||
22 | construed to include
two or more adjacent counties from which | ||||||
23 | workers may be accessible for
work on such construction.
| ||||||
24 | "Public body" means the State or any officer, board or | ||||||
25 | commission of
the State or any political subdivision or | ||||||
26 | department thereof, or any
institution supported in whole or in |
| |||||||
| |||||||
1 | part by public funds,
and includes every county, city, town,
| ||||||
2 | village, township, school district, irrigation, utility, | ||||||
3 | reclamation
improvement or other district and every other | ||||||
4 | political subdivision,
district or municipality of the state | ||||||
5 | whether such political
subdivision, municipality or district | ||||||
6 | operates under a special charter
or not.
| ||||||
7 | The terms "general prevailing rate of hourly wages", | ||||||
8 | "general
prevailing rate of wages" or "prevailing rate of | ||||||
9 | wages" when used in
this Act mean the hourly cash wages plus | ||||||
10 | fringe benefits for training and
apprenticeship programs | ||||||
11 | approved by the U.S. Department of Labor, Bureau of
| ||||||
12 | Apprenticeship and Training, health and welfare, insurance, | ||||||
13 | vacations and
pensions paid generally, in the
locality in which | ||||||
14 | the work is being performed, to employees engaged in
work of a | ||||||
15 | similar character on public works.
| ||||||
16 | (Source: P.A. 96-28, eff. 7-1-09; 96-58, eff. 1-1-10; 96-186, | ||||||
17 | eff. 1-1-10; 96-913, eff. 6-9-10; 96-1000, eff. 7-2-10; 97-502, | ||||||
18 | eff. 8-23-11.)
| ||||||
19 | (820 ILCS 130/4) (from Ch. 48, par. 39s-4)
| ||||||
20 | Sec. 4. Ascertaining prevailing wage. | ||||||
21 | (a) The public body awarding any contract for public work | ||||||
22 | or
otherwise undertaking any public works, shall ascertain the | ||||||
23 | general
prevailing rate of hourly wages in the locality in | ||||||
24 | which the work is to
be performed, for each craft or type of | ||||||
25 | worker or mechanic needed to
execute the contract, and where |
| |||||||
| |||||||
1 | the public body performs the work
without letting a contract | ||||||
2 | therefor, shall ascertain the prevailing rate
of wages on a per | ||||||
3 | hour basis in the locality, and such public body shall
specify | ||||||
4 | in the resolution or ordinance and in the call for bids for the
| ||||||
5 | contract, that the general prevailing rate of wages in the | ||||||
6 | locality for
each craft or type of worker or mechanic needed to | ||||||
7 | execute the contract
or perform such work, also the general | ||||||
8 | prevailing rate for legal holiday
and overtime work, as | ||||||
9 | ascertained by the public body or by the
Department of Labor | ||||||
10 | shall be paid for each craft or type of worker
needed to | ||||||
11 | execute the contract or to perform such work, and it shall be
| ||||||
12 | mandatory upon the contractor to whom the contract is awarded | ||||||
13 | and upon
any subcontractor under him, and where the public body | ||||||
14 | performs the
work, upon the public body, to pay not less than | ||||||
15 | the specified rates to
all laborers, workers and mechanics | ||||||
16 | employed by them in the execution of
the contract or such work; | ||||||
17 | provided, however, that if the public body
desires that the | ||||||
18 | Department of Labor ascertain the prevailing rate of
wages, it | ||||||
19 | shall notify the Department of Labor to ascertain the general
| ||||||
20 | prevailing rate of hourly wages for work under contract, or for | ||||||
21 | work
performed by a public body without letting a contract as | ||||||
22 | required in the
locality in which the work is to be performed, | ||||||
23 | for each craft or type of
worker or mechanic needed to execute | ||||||
24 | the contract or project or work to
be performed. Upon such | ||||||
25 | notification the Department of Labor shall
ascertain such | ||||||
26 | general prevailing rate of wages, and certify the
prevailing |
| |||||||
| |||||||
1 | wage to such public body. | ||||||
2 | (a-1) The public body or other entity awarding the
contract | ||||||
3 | shall cause to be inserted in the project specifications and | ||||||
4 | the
contract a stipulation to the
effect that not less than the | ||||||
5 | prevailing rate of wages as found by the
public body or | ||||||
6 | Department of Labor or determined by the court on review
shall | ||||||
7 | be paid to all laborers, workers and mechanics performing work
| ||||||
8 | under the contract.
| ||||||
9 | (a-2) When a public body or other entity covered by this | ||||||
10 | Act has awarded work to a contractor without a public bid, | ||||||
11 | contract or project specification, such public body or other | ||||||
12 | entity shall comply with subsection (a-1) by providing the | ||||||
13 | contractor with written notice on the purchase order related to | ||||||
14 | the work to be done or on a separate document indicating that | ||||||
15 | not less than the prevailing rate of wages as found by the | ||||||
16 | public body or Department of Labor or determined by the court | ||||||
17 | on review shall be paid to all laborers, workers, and mechanics | ||||||
18 | performing work on the project. | ||||||
19 | (a-3) Where a complaint is made and the Department of Labor | ||||||
20 | determines that a violation occurred, the Department of Labor | ||||||
21 | shall determine if proper written notice under this Section 4 | ||||||
22 | was given. If proper written notice was not provided to the | ||||||
23 | contractor by the public body or other entity, the Department | ||||||
24 | of Labor shall order the public body or other entity to pay any | ||||||
25 | interest, penalties or fines that would have been owed by the | ||||||
26 | contractor if proper written notice were provided. The failure |
| |||||||
| |||||||
1 | by a public body or other entity to provide written notice does | ||||||
2 | not relieve the contractor of the duty to comply with the | ||||||
3 | prevailing wage rate, nor of the obligation to pay any back | ||||||
4 | wages, as determined under this Act. For the purposes of this | ||||||
5 | subsection, back wages shall be limited to the difference | ||||||
6 | between the actual amount paid and the prevailing rate of wages | ||||||
7 | required to be paid for the project. The failure of a public | ||||||
8 | body or other entity to provide written notice under this | ||||||
9 | Section 4 does not diminish the right of a laborer, worker, or | ||||||
10 | mechanic to the prevailing rate of wages as determined under | ||||||
11 | this Act. | ||||||
12 | (a-4) Any individual, contractor, or subcontractor who has | ||||||
13 | been aggrieved by a falsely filed complaint may institute a | ||||||
14 | civil action for damages, including, but not limited to, | ||||||
15 | compensatory damages, legal fees, administrative fees, | ||||||
16 | penalties assessed by the Department of Labor pursuant to the | ||||||
17 | complaint, injunctive relief, and other appropriate equitable | ||||||
18 | relief. Any person found to knowingly file a false complaint | ||||||
19 | shall be liable to the individual, contractor, or subcontractor | ||||||
20 | who was falsely accused for damages as provided in this | ||||||
21 | subsection. | ||||||
22 | (b) It shall also be mandatory upon the contractor to whom | ||||||
23 | the contract is
awarded
to insert into each subcontract and | ||||||
24 | into the project specifications for each
subcontract a written | ||||||
25 | stipulation to the effect that not less than the
prevailing
| ||||||
26 | rate of wages shall be paid to all laborers, workers, and |
| |||||||
| |||||||
1 | mechanics performing
work under the contract. It shall also be | ||||||
2 | mandatory upon each subcontractor to
cause to be inserted into | ||||||
3 | each lower tiered subcontract
and into the project | ||||||
4 | specifications for each lower tiered subcontract a
stipulation | ||||||
5 | to the effect that not less
than the prevailing rate of wages | ||||||
6 | shall be paid to all laborers, workers, and
mechanics | ||||||
7 | performing work under the contract. A contractor or | ||||||
8 | subcontractor who
fails to comply with this subsection (b) is | ||||||
9 | in violation of this Act.
| ||||||
10 | (b-1) When a contractor has awarded work to a subcontractor | ||||||
11 | without a contract or contract specification, the contractor | ||||||
12 | shall comply with subsection (b) by providing a subcontractor | ||||||
13 | with a written statement indicating that not less than the | ||||||
14 | prevailing rate of wages shall be paid to all laborers, | ||||||
15 | workers, and mechanics performing work on the project. A | ||||||
16 | contractor or subcontractor who fails to comply with this | ||||||
17 | subsection (b-1) is in violation of this Act. | ||||||
18 | (b-2) Where a complaint is made and the Department of Labor | ||||||
19 | determines that a violation has occurred, the Department of | ||||||
20 | Labor shall determine if proper written notice under this | ||||||
21 | Section 4 was given. If proper written notice was not provided | ||||||
22 | to the subcontractor by the contractor, the Department of Labor | ||||||
23 | shall order the contractor to pay any interest, penalties, or | ||||||
24 | fines that would have been owed by the subcontractor if proper | ||||||
25 | written notice were provided. The failure by a contractor to | ||||||
26 | provide written notice to a subcontractor does not relieve the |
| |||||||
| |||||||
1 | subcontractor of the duty to comply with the prevailing wage | ||||||
2 | rate, nor of the obligation to pay any back wages, as | ||||||
3 | determined under this Act. For the purposes of this subsection, | ||||||
4 | back wages shall be limited to the difference between the | ||||||
5 | actual amount paid and the prevailing rate of wages required | ||||||
6 | for the project. However, if proper written notice was not | ||||||
7 | provided to the contractor by the public body or other entity | ||||||
8 | under this Section 4, the Department of Labor shall order the | ||||||
9 | public body or other entity to pay any interest, penalties, or | ||||||
10 | fines that would have been owed by the subcontractor if proper | ||||||
11 | written notice were provided. The failure by a public body or | ||||||
12 | other entity to provide written notice does not relieve the | ||||||
13 | subcontractor of the duty to comply with the prevailing wage | ||||||
14 | rate, nor of the obligation to pay any back wages, as | ||||||
15 | determined under this Act. For the purposes of this subsection, | ||||||
16 | back wages shall be limited to the difference between the | ||||||
17 | actual amount paid and the prevailing rate of wages required | ||||||
18 | for the project. The failure to provide written notice by a | ||||||
19 | public body, other entity, or contractor does not diminish the | ||||||
20 | right of a laborer, worker, or mechanic to the prevailing rate | ||||||
21 | of wages as determined under this Act. | ||||||
22 | (c) A public body or other entity shall also require in all | ||||||
23 | contractor's and subcontractor's bonds
that the contractor or | ||||||
24 | subcontractor include such provision as will guarantee the
| ||||||
25 | faithful performance of such prevailing wage clause as provided | ||||||
26 | by
contract or other written instrument. All bid specifications |
| |||||||
| |||||||
1 | shall list the specified rates to all
laborers, workers and | ||||||
2 | mechanics in the locality for each craft or type of
worker or | ||||||
3 | mechanic needed to execute the contract.
| ||||||
4 | (d) If the Department of Labor
revises the prevailing rate | ||||||
5 | of hourly wages to be paid by the public body, the
revised rate | ||||||
6 | shall apply to such contract, and the public body shall be
| ||||||
7 | responsible to notify the contractor and each subcontractor, of | ||||||
8 | the revised
rate.
| ||||||
9 | (e) Two or more investigatory hearings under this Section | ||||||
10 | on the issue
of establishing a new prevailing wage | ||||||
11 | classification for a particular craft
or type of worker shall | ||||||
12 | be consolidated in a single hearing before the
Department. Such | ||||||
13 | consolidation shall occur whether each separate investigatory
| ||||||
14 | hearing is conducted by a public body or the Department. The | ||||||
15 | party requesting
a consolidated investigatory hearing shall | ||||||
16 | have the burden of establishing that
there is no existing | ||||||
17 | prevailing wage classification for the particular craft or
type | ||||||
18 | of worker in any of the localities under consideration.
| ||||||
19 | (f) It shall be mandatory upon the contractor or | ||||||
20 | construction manager
to whom a contract for public works is | ||||||
21 | awarded to post, at a
location on the project site of the | ||||||
22 | public works that is
easily accessible to the workers engaged | ||||||
23 | on the project,
the prevailing wage rates for each craft or | ||||||
24 | type of worker
or mechanic needed to execute the contract or | ||||||
25 | project or
work to be performed. In lieu of posting on the | ||||||
26 | project site of the public works, a contractor which has a |
| |||||||
| |||||||
1 | business location where laborers, workers, and mechanics | ||||||
2 | regularly visit may: (1) post in a conspicuous location at that | ||||||
3 | business the current prevailing wage rates for each county in | ||||||
4 | which the contractor is performing work; or (2) provide such | ||||||
5 | laborer, worker, or mechanic engaged on the public works | ||||||
6 | project a written notice indicating the prevailing wage rates | ||||||
7 | for the public works project. A failure to post or provide a | ||||||
8 | prevailing wage
rate as required by this Section is a violation | ||||||
9 | of this Act.
| ||||||
10 | (Source: P.A. 95-331, eff. 8-21-07; 96-437, eff. 1-1-10.)
| ||||||
11 | (820 ILCS 130/11a) (from Ch. 48, par. 39s-11a)
| ||||||
12 | Sec. 11a. (a) The Director of the Department of Labor shall | ||||||
13 | publish in the
Illinois Register no less often than once each | ||||||
14 | calendar quarter a list of
contractors or subcontractors found | ||||||
15 | to have disregarded their obligations
to employees under this | ||||||
16 | Act. The Department of Labor shall determine the
contractors or | ||||||
17 | subcontractors who, on 2 separate occasions within 5 years, | ||||||
18 | have been
determined to have violated the provisions of this | ||||||
19 | Act. Upon such
determination the Department shall notify the | ||||||
20 | violating
contractor or subcontractor. Such contractor or | ||||||
21 | subcontractor shall then
have 10 working days to request a | ||||||
22 | hearing by the Department on the alleged
violations. Failure to | ||||||
23 | respond within the 10 working day period shall
result in | ||||||
24 | automatic and immediate placement and publication on the list.
| ||||||
25 | If the contractor or subcontractor requests a hearing within |
| |||||||
| |||||||
1 | the 10 working
day period, the Director shall set a hearing on | ||||||
2 | the alleged violations.
Such hearing shall take place no later | ||||||
3 | than 45 calendar days after the
receipt by the Department of | ||||||
4 | Labor of the request for a hearing.
The Department of Labor is | ||||||
5 | empowered to promulgate, adopt, amend and rescind
rules and | ||||||
6 | regulations to govern the hearing procedure. No contract shall
| ||||||
7 | be awarded to a contractor or subcontractor appearing on the | ||||||
8 | list, or to
any firm, corporation, partnership or association | ||||||
9 | in which such contractor
or subcontractor has an interest until | ||||||
10 | 4 years have elapsed from the date
of publication of the list | ||||||
11 | containing the name of such contractor or
subcontractor. | ||||||
12 | (b) A contractor or subcontractor convicted or found guilty | ||||||
13 | under Section 5 or 6 of this Act shall be subject to an | ||||||
14 | automatic and immediate debarment, thereafter prohibited from | ||||||
15 | participating in any public works project for 4 years, with no | ||||||
16 | right to a hearing.
| ||||||
17 | (c) No public body, including a home rule unit, is | ||||||
18 | authorized to use, as a basis for denying a contract to a | ||||||
19 | contractor or subcontractor, any complaint filed with the | ||||||
20 | Department or any determination by the Department that the | ||||||
21 | contractor or subcontractor has committed a violation under | ||||||
22 | this Act, unless the contractor or subcontractor is debarred at | ||||||
23 | the time of the bid as provided under this Section. This | ||||||
24 | subsection is a limitation under subsection (i) of Section 6 of | ||||||
25 | Article VII of the Illinois Constitution on the concurrent | ||||||
26 | exercise by home rule units of powers and functions exercised |
| |||||||
| |||||||
1 | by the State. | ||||||
2 | (Source: P.A. 97-571, eff. 1-1-12.)
|