| | 09700SB1533ham001 | - 2 - | LRB097 09938 ASK 56357 a |
|
|
1 | | project. |
2 | | "Authority" means the Illinois Finance Authority. |
3 | | "Clean coal facility" means an electric generating |
4 | | facility that uses primarily coal as a feedstock and that |
5 | | captures and sequesters carbon dioxide emissions at the |
6 | | following levels: at least 50% of the total carbon dioxide |
7 | | emissions that the facility would otherwise emit if, at the |
8 | | time construction commences, the facility is scheduled to |
9 | | commence operation before 2016, at least 70% of the total |
10 | | carbon dioxide emissions that the facility would otherwise emit |
11 | | if, at the time construction commences, the facility is |
12 | | scheduled to commence operation during 2016 or 2017, and at |
13 | | least 90% of the total carbon dioxide emissions that the |
14 | | facility would otherwise emit if, at the time construction |
15 | | commences, the facility is scheduled to commence operation |
16 | | after 2017. The power block of the clean coal facility shall |
17 | | not exceed allowable emission rates for sulfur dioxide, |
18 | | nitrogen oxides, carbon monoxide, particulates and mercury for |
19 | | a natural gas-fired combined-cycle facility the same size as |
20 | | and in the same location as the clean coal facility at the time |
21 | | the clean coal facility obtains an approved air permit. All |
22 | | coal used by a clean coal facility shall have high volatile |
23 | | bituminous rank and greater than 1.7 pounds of sulfur per |
24 | | million btu content, unless the clean coal facility does not |
25 | | use gasification technology and was operating as a conventional |
26 | | coal-fired electric generating facility on June 1, 2009 (the |
|
| | 09700SB1533ham001 | - 3 - | LRB097 09938 ASK 56357 a |
|
|
1 | | effective date of Public Act 95-1027). |
2 | | "Clean coal SNG brownfield facility" means a facility that |
3 | | (1) has commenced construction by July 1, 2015 on an urban |
4 | | brownfield site in a municipality with at least 1,000,000 |
5 | | residents; (2) uses a gasification process to produce |
6 | | substitute natural gas; (3) uses coal as at least 50% of the |
7 | | total feedstock over the term of any sourcing agreement with a |
8 | | utility and the remainder of the feedstock may be either |
9 | | petroleum coke or coal, with all such coal having a high |
10 | | bituminous rank and greater than 1.7 pounds of sulfur per |
11 | | million Btu content unless the facility reasonably determines
|
12 | | that it is necessary to use additional petroleum coke to
|
13 | | deliver additional consumer savings, in which case the
facility |
14 | | shall use coal for at least 35% of the total
feedstock over the |
15 | | term of any sourcing agreement; and (4) captures and sequesters |
16 | | at least 85% of the total carbon dioxide emissions that the |
17 | | facility would otherwise emit. |
18 | | "Clean coal SNG facility" means a facility that uses a |
19 | | gasification process to produce substitute natural gas, that |
20 | | sequesters at least 90% of the total carbon dioxide emissions |
21 | | that the facility would otherwise emit and that uses petroleum |
22 | | coke or coal as a feedstock, with all such coal having a high |
23 | | bituminous rank and greater than 1.7 pounds of sulfur per |
24 | | million btu content ; provided, however, a clean coal SNG |
25 | | brownfield facility shall not be a clean coal SNG facility . |
26 | | "Commission" means the Illinois Commerce Commission. |
|
| | 09700SB1533ham001 | - 4 - | LRB097 09938 ASK 56357 a |
|
|
1 | | "Costs incurred in connection with the development and |
2 | | construction of a facility" means: |
3 | | (1) the cost of acquisition of all real property , |
4 | | fixtures, and improvements in connection therewith and |
5 | | equipment , personal property, and other property, rights, |
6 | | and easements acquired that are deemed necessary for the |
7 | | operation and maintenance of the facility; |
8 | | (2) financing costs with respect to bonds, notes, and |
9 | | other evidences of indebtedness of the Agency; |
10 | | (3) all origination, commitment, utilization, |
11 | | facility, placement, underwriting, syndication, credit |
12 | | enhancement, and rating agency fees; |
13 | | (4) engineering, design, procurement, consulting, |
14 | | legal, accounting, title insurance, survey, appraisal, |
15 | | escrow, trustee, collateral agency, interest rate hedging, |
16 | | interest rate swap, capitalized interest , contingency, as |
17 | | required by lenders, and other financing costs, and other |
18 | | expenses for professional services; and |
19 | | (5) the costs of plans, specifications, site study and |
20 | | investigation, installation, surveys, other Agency costs |
21 | | and estimates of costs, and other expenses necessary or |
22 | | incidental to determining the feasibility of any project, |
23 | | together with such other expenses as may be necessary or |
24 | | incidental to the financing, insuring, acquisition, and |
25 | | construction of a specific project and starting up, |
26 | | commissioning, and placing that project in operation. |
|
| | 09700SB1533ham001 | - 5 - | LRB097 09938 ASK 56357 a |
|
|
1 | | "Department" means the Department of Commerce and Economic |
2 | | Opportunity. |
3 | | "Director" means the Director of the Illinois Power Agency. |
4 | | "Demand-response" means measures that decrease peak |
5 | | electricity demand or shift demand from peak to off-peak |
6 | | periods. |
7 | | "Energy efficiency" means measures that reduce the amount |
8 | | of electricity or natural gas required to achieve a given end |
9 | | use. |
10 | | "Electric utility" has the same definition as found in |
11 | | Section 16-102 of the Public Utilities Act. |
12 | | "Facility" means an electric generating unit or a |
13 | | co-generating unit that produces electricity along with |
14 | | related equipment necessary to connect the facility to an |
15 | | electric transmission or distribution system. |
16 | | "Governmental aggregator" means one or more units of local |
17 | | government that individually or collectively procure |
18 | | electricity to serve residential retail electrical loads |
19 | | located within its or their jurisdiction. |
20 | | "Local government" means a unit of local government as |
21 | | defined in Article VII of Section 1 of the Illinois |
22 | | Constitution. |
23 | | "Municipality" means a city, village, or incorporated |
24 | | town. |
25 | | "Person" means any natural person, firm, partnership, |
26 | | corporation, either domestic or foreign, company, association, |
|
| | 09700SB1533ham001 | - 6 - | LRB097 09938 ASK 56357 a |
|
|
1 | | limited liability company, joint stock company, or association |
2 | | and includes any trustee, receiver, assignee, or personal |
3 | | representative thereof. |
4 | | "Project" means the planning, bidding, and construction of |
5 | | a facility. |
6 | | "Public utility" has the same definition as found in |
7 | | Section 3-105 of the Public Utilities Act. |
8 | | "Real property" means any interest in land together with |
9 | | all structures, fixtures, and improvements thereon, including |
10 | | lands under water and riparian rights, any easements, |
11 | | covenants, licenses, leases, rights-of-way, uses, and other |
12 | | interests, together with any liens, judgments, mortgages, or |
13 | | other claims or security interests related to real property. |
14 | | "Renewable energy credit" means a tradable credit that |
15 | | represents the environmental attributes of a certain amount of |
16 | | energy produced from a renewable energy resource. |
17 | | "Renewable energy resources" includes energy and its |
18 | | associated renewable energy credit or renewable energy credits |
19 | | from wind, solar thermal energy, photovoltaic cells and panels, |
20 | | biodiesel, crops and untreated and unadulterated organic waste |
21 | | biomass, tree waste, hydropower that does not involve new |
22 | | construction or significant expansion of hydropower dams, and |
23 | | other alternative sources of environmentally preferable |
24 | | energy. For purposes of this Act, landfill gas produced in the |
25 | | State is considered a renewable energy resource. "Renewable |
26 | | energy resources" does not include the incineration or burning |
|
| | 09700SB1533ham001 | - 7 - | LRB097 09938 ASK 56357 a |
|
|
1 | | of tires, garbage, general household, institutional, and |
2 | | commercial waste, industrial lunchroom or office waste, |
3 | | landscape waste other than tree waste, railroad crossties, |
4 | | utility poles, or construction or demolition debris, other than |
5 | | untreated and unadulterated waste wood. |
6 | | "Revenue bond" means any bond, note, or other evidence of |
7 | | indebtedness issued by the Authority, the principal and |
8 | | interest of which is payable solely from revenues or income |
9 | | derived from any project or activity of the Agency. |
10 | | "Sequester" means permanent storage of carbon dioxide by |
11 | | injecting it into a saline aquifer, a depleted gas reservoir, |
12 | | or an oil reservoir, directly or through an enhanced oil |
13 | | recovery process that may involve intermediate storage , |
14 | | regardless of whether these activities are conducted by a clean |
15 | | coal facility, clean coal SNG facility, clean coal SNG |
16 | | brownfield facility, or a party with which a clean coal |
17 | | facility, clean coal SNG facility, or clean coal SNG brownfield |
18 | | facility has contracted for such purposes in a salt dome . |
19 | | " Sourcing Servicing agreement" means (i) in the case of an |
20 | | electric utility, an agreement between the owner of a clean |
21 | | coal facility and such electric utility, which agreement shall |
22 | | have terms and conditions meeting the requirements of paragraph |
23 | | (3) of subsection (d) of Section 1-75, and (ii) in the case of |
24 | | an alternative retail electric supplier, an agreement between |
25 | | the owner of a clean coal facility and such alternative retail |
26 | | electric supplier, which agreement shall have terms and |
|
| | 09700SB1533ham001 | - 8 - | LRB097 09938 ASK 56357 a |
|
|
1 | | conditions meeting the requirements of Section 16-115(d)(5) of |
2 | | the Public Utilities Act , and (iii) in case of a gas utility, |
3 | | an agreement between the owner of a clean coal SNG brownfield |
4 | | facility and the gas utility, which agreement shall have the |
5 | | terms and conditions meeting the requirements of subsection |
6 | | (h-1) of Section 9-220 of the Public Utilities Act . |
7 | | "Substitute natural gas" or "SNG" means a gas manufactured |
8 | | by gasification of hydrocarbon feedstock, which is |
9 | | substantially interchangeable in use and distribution with |
10 | | conventional natural gas. |
11 | | "Total resource cost test" or "TRC test" means a standard |
12 | | that is met if, for an investment in energy efficiency or |
13 | | demand-response measures, the benefit-cost ratio is greater |
14 | | than one. The benefit-cost ratio is the ratio of the net |
15 | | present value of the total benefits of the program to the net |
16 | | present value of the total costs as calculated over the |
17 | | lifetime of the measures. A total resource cost test compares |
18 | | the sum of avoided electric utility costs, representing the |
19 | | benefits that accrue to the system and the participant in the |
20 | | delivery of those efficiency measures, as well as other |
21 | | quantifiable societal benefits, including avoided natural gas |
22 | | utility costs, to the sum of all incremental costs of end-use |
23 | | measures that are implemented due to the program (including |
24 | | both utility and participant contributions), plus costs to |
25 | | administer, deliver, and evaluate each demand-side program, to |
26 | | quantify the net savings obtained by substituting the |
|
| | 09700SB1533ham001 | - 9 - | LRB097 09938 ASK 56357 a |
|
|
1 | | demand-side program for supply resources. In calculating |
2 | | avoided costs of power and energy that an electric utility |
3 | | would otherwise have had to acquire, reasonable estimates shall |
4 | | be included of financial costs likely to be imposed by future |
5 | | regulations and legislation on emissions of greenhouse gases.
|
6 | | (Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09; |
7 | | 95-1027, eff. 6-1-09; 96-33, eff. 7-10-09; 96-159, eff. |
8 | | 8-10-09; 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10.)
|
9 | | (20 ILCS 3855/1-20)
|
10 | | Sec. 1-20. General powers of the Agency. |
11 | | (a) The Agency is authorized to do each of the following: |
12 | | (1) Develop electricity procurement plans to ensure |
13 | | adequate, reliable, affordable, efficient, and |
14 | | environmentally sustainable electric service at the lowest |
15 | | total cost over time, taking into account any benefits of |
16 | | price stability, for electric utilities that on December |
17 | | 31, 2005 provided electric service to at least 100,000 |
18 | | customers in Illinois. The procurement plans shall be |
19 | | updated on an annual basis and shall include electricity |
20 | | generated from renewable resources sufficient to achieve |
21 | | the standards specified in this Act. |
22 | | (2) Conduct competitive procurement processes to |
23 | | procure the supply resources identified in the procurement |
24 | | plan, pursuant to Section 16-111.5 of the Public Utilities |
25 | | Act. |
|
| | 09700SB1533ham001 | - 10 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (3) Develop electric generation and co-generation |
2 | | facilities that use indigenous coal or renewable |
3 | | resources, or both, financed with bonds issued by the |
4 | | Illinois Finance Authority. |
5 | | (4) Supply electricity from the Agency's facilities at |
6 | | cost to one or more of the following: municipal electric |
7 | | systems, governmental aggregators, or rural electric |
8 | | cooperatives in Illinois. |
9 | | (b) Except as otherwise limited by this Act, the Agency has |
10 | | all of the powers necessary or convenient to carry out the |
11 | | purposes and provisions of this Act, including without |
12 | | limitation, each of the following: |
13 | | (1) To have a corporate seal, and to alter that seal at |
14 | | pleasure, and to use it by causing it or a facsimile to be |
15 | | affixed or impressed or reproduced in any other manner. |
16 | | (2) To use the services of the Illinois Finance |
17 | | Authority necessary to carry out the Agency's purposes. |
18 | | (3) To negotiate and enter into loan agreements and |
19 | | other agreements with the Illinois Finance Authority. |
20 | | (4) To obtain and employ personnel and hire consultants |
21 | | that are necessary to fulfill the Agency's purposes, and to |
22 | | make expenditures for that purpose within the |
23 | | appropriations for that purpose. |
24 | | (5) To purchase, receive, take by grant, gift, devise, |
25 | | bequest, or otherwise, lease, or otherwise acquire, own, |
26 | | hold, improve, employ, use, and otherwise deal in and with, |
|
| | 09700SB1533ham001 | - 11 - | LRB097 09938 ASK 56357 a |
|
|
1 | | real or personal property whether tangible or intangible, |
2 | | or any interest therein, within the State. |
3 | | (6) To acquire real or personal property, whether |
4 | | tangible or intangible, including without limitation |
5 | | property rights, interests in property, franchises, |
6 | | obligations, contracts, and debt and equity securities, |
7 | | and to do so by the exercise of the power of eminent domain |
8 | | in accordance with Section 1-21; except that any real |
9 | | property acquired by the exercise of the power of eminent |
10 | | domain must be located within the State. |
11 | | (7) To sell, convey, lease, exchange, transfer, |
12 | | abandon, or otherwise dispose of, or mortgage, pledge, or |
13 | | create a security interest in, any of its assets, |
14 | | properties, or any interest therein, wherever situated. |
15 | | (8) To purchase, take, receive, subscribe for, or |
16 | | otherwise acquire, hold, make a tender offer for, vote, |
17 | | employ, sell, lend, lease, exchange, transfer, or |
18 | | otherwise dispose of, mortgage, pledge, or grant a security |
19 | | interest in, use, and otherwise deal in and with, bonds and |
20 | | other obligations, shares, or other securities (or |
21 | | interests therein) issued by others, whether engaged in a |
22 | | similar or different business or activity. |
23 | | (9) To make and execute agreements, contracts, and |
24 | | other instruments necessary or convenient in the exercise |
25 | | of the powers and functions of the Agency under this Act, |
26 | | including contracts with any person, local government, |
|
| | 09700SB1533ham001 | - 12 - | LRB097 09938 ASK 56357 a |
|
|
1 | | State agency, or other entity; and all State agencies and |
2 | | all local governments are authorized to enter into and do |
3 | | all things necessary to perform any such agreement, |
4 | | contract, or other instrument with the Agency. No such |
5 | | agreement, contract, or other instrument shall exceed 40 |
6 | | years. |
7 | | (10) To lend money, invest and reinvest its funds in |
8 | | accordance with the Public Funds Investment Act, and take |
9 | | and hold real and personal property as security for the |
10 | | payment of funds loaned or invested. |
11 | | (11) To borrow money at such rate or rates of interest |
12 | | as the Agency may determine, issue its notes, bonds, or |
13 | | other obligations to evidence that indebtedness, and |
14 | | secure any of its obligations by mortgage or pledge of its |
15 | | real or personal property, machinery, equipment, |
16 | | structures, fixtures, inventories, revenues, grants, and |
17 | | other funds as provided or any interest therein, wherever |
18 | | situated. |
19 | | (12) To enter into agreements with the Illinois Finance |
20 | | Authority to issue bonds whether or not the income |
21 | | therefrom is exempt from federal taxation. |
22 | | (13) To procure insurance against any loss in |
23 | | connection with its properties or operations in such amount |
24 | | or amounts and from such insurers, including the federal |
25 | | government, as it may deem necessary or desirable, and to |
26 | | pay any premiums therefor. |
|
| | 09700SB1533ham001 | - 13 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (14) To negotiate and enter into agreements with |
2 | | trustees or receivers appointed by United States |
3 | | bankruptcy courts or federal district courts or in other |
4 | | proceedings involving adjustment of debts and authorize |
5 | | proceedings involving adjustment of debts and authorize |
6 | | legal counsel for the Agency to appear in any such |
7 | | proceedings. |
8 | | (15) To file a petition under Chapter 9 of Title 11 of |
9 | | the United States Bankruptcy Code or take other similar |
10 | | action for the adjustment of its debts. |
11 | | (16) To enter into management agreements for the |
12 | | operation of any of the property or facilities owned by the |
13 | | Agency. |
14 | | (17) To enter into an agreement to transfer and to |
15 | | transfer any land, facilities, fixtures, or equipment of |
16 | | the Agency to one or more municipal electric systems, |
17 | | governmental aggregators, or rural electric agencies or |
18 | | cooperatives, for such consideration and upon such terms as |
19 | | the Agency may determine to be in the best interest of the |
20 | | citizens of Illinois. |
21 | | (18) To enter upon any lands and within any building |
22 | | whenever in its judgment it may be necessary for the |
23 | | purpose of making surveys and examinations to accomplish |
24 | | any purpose authorized by this Act. |
25 | | (19) To maintain an office or offices at such place or |
26 | | places in the State as it may determine. |
|
| | 09700SB1533ham001 | - 14 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (20) To request information, and to make any inquiry, |
2 | | investigation, survey, or study that the Agency may deem |
3 | | necessary to enable it effectively to carry out the |
4 | | provisions of this Act. |
5 | | (21) To accept and expend appropriations. |
6 | | (22) To engage in any activity or operation that is |
7 | | incidental to and in furtherance of efficient operation to |
8 | | accomplish the Agency's purposes. |
9 | | (23) To adopt, revise, amend, and repeal rules with |
10 | | respect to its operations, properties, and facilities as |
11 | | may be necessary or convenient to carry out the purposes of |
12 | | this Act, subject to the provisions of the Illinois |
13 | | Administrative Procedure Act and Sections 1-22 and 1-35 of |
14 | | this Act. |
15 | | (24) To establish and collect charges and fees as |
16 | | described in this Act.
|
17 | | (25) To conduct competitive gasification feedstock |
18 | | procurement processes to procure the feedstocks for the |
19 | | clean coal SNG brownfield facility in accordance with the |
20 | | requirements of Section 1-78 of this Act To manage |
21 | | procurement of substitute natural gas from a facility that |
22 | | meets the criteria specified in subsection (a) of Section |
23 | | 1-58 of this Act, on terms and conditions that may be |
24 | | approved by the Agency pursuant to subsection (d) of |
25 | | Section 1-58 of this Act, to support the operations of |
26 | | State agencies and local governments that agree to such |
|
| | 09700SB1533ham001 | - 15 - | LRB097 09938 ASK 56357 a |
|
|
1 | | terms and conditions. This procurement process is not |
2 | | subject to the Procurement Code . |
3 | | (26) To review, revise, and approve sourcing |
4 | | agreements and mediate and resolve disputes between gas |
5 | | utilities and the clean coal SNG brownfield facility |
6 | | pursuant to subsection (h-1) of Section 9-220 of the Public |
7 | | Utilities Act. |
8 | | (Source: P.A. 95-481, eff. 8-28-07; 96-784, eff. 8-28-09; |
9 | | 96-1000, eff. 7-2-10.) |
10 | | (20 ILCS 3855/1-77 new) |
11 | | Sec. 1-77. The Planning and Procurement Bureau; feedstock |
12 | | procurement administrator; qualified expert or expert |
13 | | consulting firm. |
14 | | (a) The Planning and Procurement Bureau shall at least |
15 | | every 5
years beginning in 2015 develop feedstock procurement |
16 | | plans and conduct competitive feedstock procurement processes |
17 | | in accordance with the requirements of Section 1-78 of this |
18 | | Act. |
19 | | (1) The Agency shall at least every 5 years beginning |
20 | | in
2015 issue a request for qualifications for experts or |
21 | | expert consulting firms to develop the feedstock |
22 | | procurement plans in accordance with Section 1-78 of this |
23 | | Act. In order to qualify, an expert or expert consulting |
24 | | firm must have: |
25 | | (A) direct previous experience assembling
large |
|
| | 09700SB1533ham001 | - 16 - | LRB097 09938 ASK 56357 a |
|
|
1 | | scale feedstock supply plans or portfolios for |
2 | | industrial customers; |
3 | | (B) an advanced degree in economics,
mathematics, |
4 | | engineering, risk management, or a related area of |
5 | | study; |
6 | | (C) ten years of experience in the energy
sector, |
7 | | including managing supply risk; |
8 | | (D) expertise in wholesale feedstock markets, |
9 | | which may be particularized to the specific type of |
10 | | feedstock to be purchased in that procurement event; |
11 | | (E) expertise in credit protocols and
familiarity |
12 | | with contract protocols; |
13 | | (F) adequate resources to perform and fulfill
the |
14 | | required functions and responsibilities; and |
15 | | (G) the absence of a conflict of interest and
|
16 | | inappropriate bias for or against potential bidders or |
17 | | the affected clean coal SNG brownfield facility. |
18 | | (2) The Agency shall at least every 5 years beginning |
19 | | in 2015 issue
a request for qualifications for a feedstock |
20 | | procurement administrator to conduct the competitive |
21 | | feedstock procurement processes in accordance with Section |
22 | | 1-78 of this Act. In order to qualify, an expert or expert |
23 | | consulting firm must have: |
24 | | (A) direct previous experience administering
a |
25 | | large scale competitive feedstock procurement process; |
26 | | (B) an advanced degree in economics,
mathematics, |
|
| | 09700SB1533ham001 | - 17 - | LRB097 09938 ASK 56357 a |
|
|
1 | | engineering, or a related area of study; |
2 | | (C) ten years of experience in the energy
sector, |
3 | | including risk management experience; |
4 | | (D) expertise in wholesale feedstock market
rules, |
5 | | which may be particularized to the specific type of |
6 | | feedstock to be purchased in that procurement event; |
7 | | (E) expertise in credit and contract
protocols; |
8 | | (F) adequate resources to perform and fulfill
the |
9 | | required functions and responsibilities; and |
10 | | (G) the absence of a conflict of interest and
|
11 | | inappropriate bias for or against potential bidders or |
12 | | the affected clean coal SNG brownfield facility. |
13 | | (3) The Agency shall provide the clean coal SNG |
14 | | brownfield facility
and other interested parties with the |
15 | | lists of qualified experts or expert consulting firms |
16 | | identified through the request for qualifications |
17 | | processes that are under consideration to develop the |
18 | | feedstock procurement plans and to serve as the feedstock |
19 | | procurement administrator. The Agency shall also provide |
20 | | the clean coal SNG brownfield facility
and other interested |
21 | | parties with each qualified expert's or expert consulting |
22 | | firm's response to the request for qualifications. All |
23 | | information provided under this subparagraph (3) shall |
24 | | also be provided to the Commission. The Agency may provide |
25 | | by rule for fees associated with supplying the information |
26 | | to the clean coal SNG brownfield facility and other |
|
| | 09700SB1533ham001 | - 18 - | LRB097 09938 ASK 56357 a |
|
|
1 | | interested parties. The clean coal SNG brownfield facility
|
2 | | and other interested parties must, within 5 business days |
3 | | after receiving the lists and information, notify the |
4 | | Agency in writing if they object to any experts or expert |
5 | | consulting firms on the lists. Objections shall be based |
6 | | on: |
7 | | (A) failure to satisfy qualification
criteria; |
8 | | (B) identification of a conflict of interest;
or |
9 | | (C) evidence of inappropriate bias for or
against |
10 | | potential bidders or the clean coal SNG brownfield |
11 | | facility. |
12 | | The Agency shall remove an expert or expert
consulting |
13 | | firm from the list within 10 days if there is a reasonable |
14 | | basis for an objection and provide the updated list to the |
15 | | clean coal SNG brownfield facility and other interested |
16 | | parties. If the Agency fails to remove an expert or expert |
17 | | consulting firm from a list, then an objecting party may |
18 | | seek review by the Commission within 5 days thereafter by |
19 | | filing a petition, and the Commission shall render a ruling |
20 | | on the petition within 10 days after the filing. There is |
21 | | no right of appeal of the Commission's ruling. |
22 | | (4) The Agency shall, as needed, issue requests for |
23 | | proposals
to the qualified experts or expert consulting |
24 | | firms to develop a feedstock procurement plan for the clean |
25 | | coal SNG brownfield facility and to serve as feedstock |
26 | | procurement administrator. |
|
| | 09700SB1533ham001 | - 19 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (5) The Agency shall select an expert or expert
|
2 | | consulting firm to develop feedstock procurement plans |
3 | | based on the proposals submitted and shall award one-year |
4 | | contracts to those selected with an option for the Agency |
5 | | for a one-year renewal. |
6 | | (6) The Agency shall select, with the approval of the |
7 | | Commission, an expert or expert
consulting firm to serve as |
8 | | feedstock procurement administrator based on the proposals |
9 | | submitted. If the Commission rejects the Agency's |
10 | | selection within 5 days after being notified of the |
11 | | Agency's selection, then the Agency shall submit another |
12 | | recommendation within 3 days after the Commission's |
13 | | rejection based on the proposals submitted. The Agency |
14 | | shall award at least a one-year contract to the expert or |
15 | | expert consulting firm selected with the Commission's |
16 | | approval with an option for the Agency for renewal for a |
17 | | term equal to the term of the contract. |
18 | | (b) The experts or expert consulting firms retained
by the |
19 | | Agency shall, as appropriate, prepare feedstock procurement |
20 | | plans and conduct a competitive feedstock procurement process |
21 | | as prescribed in Section 1-78 of this Act to ensure adequate, |
22 | | reliable, affordable feedstocks, taking into account any |
23 | | benefits of price stability, for the clean coal SNG brownfield |
24 | | facility. |
25 | | (c) The draft procurement plans are subject to public |
26 | | comment pursuant to Section 1-78 of this Act. |
|
| | 09700SB1533ham001 | - 20 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (d) The Agency shall assess fees to each bidder to recover |
2 | | the costs incurred in connection with the competitive |
3 | | procurement process. |
4 | | (20 ILCS 3855/1-78 new) |
5 | | Sec. 1-78. Feedstock procurement plan; feedstock |
6 | | procurement process. |
7 | | (a) A feedstock procurement plan shall at least every 5 |
8 | | years beginning in 2015 be prepared for the clean coal SNG |
9 | | brownfield facility based on the clean coal SNG brownfield |
10 | | facility's projection of feedstock usage and ratios, and |
11 | | consistent with the applicable requirements of the Public |
12 | | Utilities Act and this Act. The plan shall specifically |
13 | | identify the wholesale feedstock products to be procured |
14 | | following plan approval and shall follow all the requirements |
15 | | set forth in this Act, the Public Utilities Act, and all |
16 | | applicable State and federal laws, statutes, rules, or |
17 | | regulations, as well as Commission orders. Nothing in this |
18 | | Section precludes consideration of contracts longer than 5 |
19 | | years and related forecast data. Any feedstock procurement |
20 | | occurring in accordance with this plan shall be competitively |
21 | | bid through a request for proposals process. Approval and |
22 | | implementation of the feedstock procurement plan shall be |
23 | | subject to review and approval by the Commission according to |
24 | | the provisions set forth in this Section. A feedstock |
25 | | procurement plan shall include each of the following |
|
| | 09700SB1533ham001 | - 21 - | LRB097 09938 ASK 56357 a |
|
|
1 | | components: |
2 | | (1) Daily load analysis. This analysis shall
include: |
3 | | (A) multi-year historical analysis of hourly
|
4 | | loads; and |
5 | | (B) known or projected changes to future loads. |
6 | | (2) Determination of the fuel specifications required |
7 | | for the clean coal SNG brownfield facility, including: |
8 | | (A) coal and petroleum coke mix, as set by the |
9 | | clean coal SNG brownfield facility with coal |
10 | | comprising at least 50% of the total feedstock over the |
11 | | term of any sourcing agreement unless the facility
|
12 | | reasonably determines that it is necessary to use
|
13 | | additional petroleum coke to deliver additional
|
14 | | consumer savings, in which case the facility shall
use |
15 | | coal for at least 35% of the total feedstock
over the |
16 | | term of any sourcing agreement; |
17 | | (B) volume of each feedstock required; |
18 | | (C) quality standards of each feedstock; |
19 | | (D) delivery requirements, including cost |
20 | | implications; and |
21 | | (E) technical specifications of the clean coal SNG |
22 | | brownfield facility for its feedstocks. |
23 | | (b) The feedstock procurement process shall be |
24 | | administered by a feedstock procurement administrator and |
25 | | monitored by a feedstock procurement monitor. |
26 | | (1) The feedstock procurement administrator shall: |
|
| | 09700SB1533ham001 | - 22 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (A) design the final feedstock procurement process |
2 | | in
accordance with subsection (d) of this Section |
3 | | following Commission approval of the feedstock |
4 | | procurement plan; |
5 | | (B) develop feedstock benchmarks in accordance |
6 | | with
subsection (d)(3) to be used to evaluate bids; |
7 | | these benchmarks shall be submitted to the Commission |
8 | | for review and approval on a confidential basis prior |
9 | | to the feedstock procurement event; |
10 | | (C) serve as the interface between the clean coal |
11 | | SNG brownfield facility
and coal and petroleum coke |
12 | | suppliers; |
13 | | (D) manage the bidder prequalification and
|
14 | | registration process; |
15 | | (E) obtain the facility's agreement to
the final |
16 | | form of all supply contracts and credit collateral |
17 | | agreements; |
18 | | (F) administer the request for feedstock proposals |
19 | | process; |
20 | | (G) have the discretion to negotiate to
determine |
21 | | whether bidders are willing to lower the price of bids |
22 | | that meet the benchmarks approved by the Commission; |
23 | | any post-bid negotiations with bidders shall be |
24 | | limited to price only and shall be completed within 24 |
25 | | hours after opening the sealed bids and shall be |
26 | | conducted in a fair and unbiased manner; in conducting |
|
| | 09700SB1533ham001 | - 23 - | LRB097 09938 ASK 56357 a |
|
|
1 | | the negotiations, there shall be no disclosure of any |
2 | | information derived from proposals submitted by |
3 | | competing bidders; if information is disclosed to any |
4 | | bidder, it shall be provided to all competing bidders; |
5 | | (H) maintain confidentiality of supplier and
|
6 | | bidding information in a manner consistent with all |
7 | | applicable laws, rules, regulations, and tariffs; |
8 | | (I) submit a confidential report to the
Commission |
9 | | recommending acceptance or rejection of bids; |
10 | | (J) notify the facility of contract counterparties
|
11 | | and contract specifics; and |
12 | | (K) administer related contingency feedstock |
13 | | procurement
events. |
14 | | (2) The feedstock procurement monitor, who shall be |
15 | | retained by
the Commission, shall: |
16 | | (A) monitor interactions among the feedstock |
17 | | procurement
administrator, suppliers, and the |
18 | | facility; |
19 | | (B) monitor and report to the Commission on the
|
20 | | progress of the feedstock procurement process; |
21 | | (C) provide an independent, confidential report
to |
22 | | the Commission regarding the results of the feedstock |
23 | | procurement event; |
24 | | (D) preserve the confidentiality of supplier and
|
25 | | bidding information in a manner consistent with all |
26 | | applicable laws, rules, regulations, and tariffs; |
|
| | 09700SB1533ham001 | - 24 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (E) provide expert advice to the Commission and
|
2 | | consult with the feedstock procurement administrator |
3 | | regarding issues related to feedstock procurement |
4 | | process design, rules, protocols, and policy-related |
5 | | matters; |
6 | | (F) consult with the feedstock procurement |
7 | | administrator
regarding the development and use of |
8 | | benchmark criteria, standard form contracts, credit |
9 | | policies, and bid documents; and |
10 | | (G) assess compliance with the procurement plans |
11 | | approved by the Commission. |
12 | | (c) The feedstock planning process shall be conducted as |
13 | | follows: |
14 | | (1) Beginning in 2015, the clean coal SNG brownfield |
15 | | facility
shall annually provide a range of feedstock |
16 | | requirement forecasts to the Agency by May 15 of each year, |
17 | | or such other date as may be required by the Commission or |
18 | | Agency. The feedstock requirement forecasts shall cover |
19 | | the 5-year feedstock procurement planning period for the |
20 | | next feedstock procurement plan, or such other longer |
21 | | period that the Agency or the Commission may require and |
22 | | shall include daily data representing a high-load, |
23 | | low-load, and expected-load scenario for the load of the |
24 | | utilities required to enter into sourcing agreements with |
25 | | the clean coal SNG brownfield facility. The utility shall |
26 | | provide supporting data and assumptions for each of the |
|
| | 09700SB1533ham001 | - 25 - | LRB097 09938 ASK 56357 a |
|
|
1 | | scenarios. |
2 | | (2) Beginning in 2015, the Agency
shall at least every |
3 | | 5 years prepare a feedstock procurement plan by June 15, or |
4 | | such other date as may be required by the Commission. The
|
5 | | clean coal SNG brownfield facility also may submit a
|
6 | | feedstock procurement plan. Each feedstock procurement |
7 | | plan shall identify the portfolio of feedstocks to be |
8 | | procured. Copies of each feedstock procurement plan shall |
9 | | be posted and made publicly available on the Agency's and |
10 | | Commission's websites, and copies of the
Agency's |
11 | | feedstock procurement plan shall also be provided to the |
12 | | clean coal SNG brownfield facility. The clean coal SNG |
13 | | brownfield facility shall have 30 days following the date |
14 | | of posting to provide comment to the Agency on the |
15 | | feedstock procurement plan. Other interested entities also |
16 | | may comment on each feedstock procurement plan. All |
17 | | comments submitted to the Agency shall be specific, |
18 | | supported by data or other detailed analyses, and, if |
19 | | objecting to all or a portion of the feedstock procurement |
20 | | plan, accompanied by specific alternative wording or |
21 | | proposals. All comments shall be posted on the Agency's and |
22 | | Commission's websites. During this 30-day comment period, |
23 | | the Agency shall hold at least one public hearing for the |
24 | | purpose of receiving public comment on the procurement |
25 | | plan. Within 14 days following the end of the 30-day |
26 | | comment period, the clean
coal SNG brownfield facility may |
|
| | 09700SB1533ham001 | - 26 - | LRB097 09938 ASK 56357 a |
|
|
1 | | revise its feedstock
procurement plan, if any, and the |
2 | | Agency shall revise the feedstock procurement plan as |
3 | | necessary based on the comments received, and each shall |
4 | | file its feedstock procurement plan with the Commission, |
5 | | and post the feedstock procurement plan on the websites. |
6 | | (3) Within 5 days after the filing of a feedstock |
7 | | procurement
plan, any person objecting to the feedstock |
8 | | procurement plan shall file an objection with the |
9 | | Commission. Within 10 days after the filing, the Commission |
10 | | shall determine whether a hearing is necessary. The |
11 | | Commission shall enter its order confirming or modifying a |
12 | | feedstock procurement plan within 90 days after the filing |
13 | | of the feedstock procurement plan by the Agency. |
14 | | (4) The Commission shall approve a feedstock |
15 | | procurement
plan, including expressly the forecast used in |
16 | | the feedstock procurement plan, if the Commission |
17 | | determines that it will ensure adequate, reliable, and |
18 | | affordable feedstocks to the clean coal SNG brownfield |
19 | | facility at the lowest total cost over time, taking into |
20 | | account any benefits of price stability. |
21 | | (d) The feedstock procurement process shall include each of |
22 | | the following components: |
23 | | (1) Solicitation, prequalification, and registration
|
24 | | of bidders. The feedstock procurement administrator shall |
25 | | disseminate information to potential bidders to promote a |
26 | | feedstock procurement event, notify potential bidders that |
|
| | 09700SB1533ham001 | - 27 - | LRB097 09938 ASK 56357 a |
|
|
1 | | the feedstock procurement administrator may enter into a |
2 | | post-bid price negotiation with bidders that meet the |
3 | | applicable benchmarks, provide supply requirements, and |
4 | | otherwise explain the competitive feedstock procurement |
5 | | process. In addition to such other publication as the |
6 | | feedstock procurement administrator determines is |
7 | | appropriate, this information shall be posted on the |
8 | | Agency's and the Commission's websites. The feedstock |
9 | | procurement administrator shall also administer the |
10 | | prequalification process, including evaluation of credit |
11 | | worthiness, compliance with feedstock procurement rules, |
12 | | and agreement to the standard form contract developed |
13 | | pursuant to paragraph (2) of this subsection (d). The |
14 | | feedstock procurement administrator shall then identify |
15 | | and register bidders to participate in the feedstock |
16 | | procurement event. |
17 | | (2) Standard contract forms and credit terms and
|
18 | | instruments. The feedstock procurement administrator, in |
19 | | consultation with the clean coal SNG brownfield facility, |
20 | | gas utilities, the Commission, and other interested |
21 | | parties and subject to Commission oversight, shall develop |
22 | | and provide standard contract forms for the supplier |
23 | | contracts that meet generally accepted industry practices. |
24 | | Standard credit terms and instruments that meet generally |
25 | | accepted industry practices shall be similarly developed. |
26 | | The feedstock procurement administrator shall make |
|
| | 09700SB1533ham001 | - 28 - | LRB097 09938 ASK 56357 a |
|
|
1 | | available to the Commission all written comments it |
2 | | receives on the contract forms, credit terms, or |
3 | | instruments. If the feedstock procurement administrator |
4 | | cannot reach agreement with the applicable clean coal SNG |
5 | | brownfield facility as to the contract terms and |
6 | | conditions, then the feedstock procurement administrator |
7 | | must notify the Commission of any disputed terms and the |
8 | | Commission shall resolve the dispute. The terms of the |
9 | | contracts shall not be subject to negotiation by winning |
10 | | bidders and the bidders must agree to the terms of the |
11 | | contract in advance so that winning bids are selected |
12 | | solely on the basis of price. |
13 | | (3) Establishment of a market-based price benchmark.
|
14 | | As part of the development of the feedstock procurement |
15 | | process, the feedstock procurement administrator, in |
16 | | consultation with the Commission staff, Agency staff, and |
17 | | the feedstock procurement monitor, shall establish |
18 | | benchmarks for evaluating the final prices in the contracts |
19 | | for each of the feedstocks that will be procured through |
20 | | the feedstock procurement process. The benchmarks shall be |
21 | | based on price data for similar feedstocks for the same |
22 | | delivery period and same delivery hub or other delivery |
23 | | hubs after adjusting for that difference. The price |
24 | | benchmarks may also be adjusted to take into account |
25 | | differences between the information reflected in the |
26 | | underlying data sources and the specific feedstocks and |
|
| | 09700SB1533ham001 | - 29 - | LRB097 09938 ASK 56357 a |
|
|
1 | | gasification feedstock procurement process being used to |
2 | | procure for the clean coal SNG brownfield facility. The |
3 | | benchmarks shall be confidential but shall be provided to, |
4 | | and shall be subject to, the Commission's review and |
5 | | approval prior to a feedstock procurement event. |
6 | | (4) Request for proposals. The feedstock procurement |
7 | | administrator shall design and issue a request for |
8 | | proposals to supply coal or petroleum coke in accordance |
9 | | with the clean coal SNG brownfield facility's usage plan, |
10 | | as approved by the Commission. The request for proposals |
11 | | shall set forth a procedure for sealed, binding commitment |
12 | | bidding with pay-as-bid settlement, and provision for |
13 | | selection of bids on the basis of price. |
14 | | (5) A plan for implementing contingencies in the
event |
15 | | of supplier default or failure of the feedstock procurement |
16 | | process to fully meet the expected feedstock requirement |
17 | | due to insufficient supplier participation, Commission |
18 | | rejection of results, or any other cause. The plan must be |
19 | | specific to the clean coal SNG brownfield facility's |
20 | | feedstock specifications and requirements. |
21 | | The feedstock procurement process described in this
|
22 | | subsection (d) is exempt from the requirements of the Illinois |
23 | | Procurement Code, pursuant to Section 20-10 of that Code. |
24 | | (e) Within 2 business days after opening the sealed bids, |
25 | | the feedstock procurement administrator shall submit a |
26 | | confidential report to the Commission. The report shall contain |
|
| | 09700SB1533ham001 | - 30 - | LRB097 09938 ASK 56357 a |
|
|
1 | | the results of the bidding for each of the feedstock types |
2 | | along with the feedstock procurement administrator's |
3 | | recommendation for the acceptance and rejection of bids based |
4 | | on the price benchmark criteria and other factors observed in |
5 | | the process. The feedstock procurement monitor also shall |
6 | | submit a confidential report to the Commission within 2 |
7 | | business days after opening the sealed bids. The report shall |
8 | | contain the feedstock procurement monitor's assessment of |
9 | | bidder behavior in the process, as well as an assessment of the |
10 | | feedstock procurement administrator's compliance with the |
11 | | feedstock procurement process and rules. The Commission shall |
12 | | review the confidential reports submitted by the feedstock |
13 | | procurement administrator and feedstock procurement monitor |
14 | | and shall accept or reject the recommendations of the feedstock |
15 | | procurement administrator within 2 business days after receipt |
16 | | of the reports. |
17 | | (f) Within 3 business days after the Commission decision |
18 | | approving the results of a feedstock procurement event, the |
19 | | clean coal SNG brownfield facility shall enter into binding |
20 | | contractual arrangements with the winning suppliers using |
21 | | standard form contracts. |
22 | | (g) The names of the successful bidders and the amount of |
23 | | feedstock to be delivered for each contract type and for each |
24 | | contract term shall be made available to the public at the time |
25 | | of Commission approval of a feedstock procurement event. The |
26 | | Commission, the procurement monitor, the feedstock procurement |
|
| | 09700SB1533ham001 | - 31 - | LRB097 09938 ASK 56357 a |
|
|
1 | | administrator, the Agency, and all participants in the |
2 | | feedstock procurement process shall maintain the |
3 | | confidentiality of all other supplier and bidding information |
4 | | in a manner consistent with all applicable laws, rules, |
5 | | regulations, and tariffs. Confidential information, including |
6 | | the confidential reports submitted by the feedstock |
7 | | procurement administrator and feedstock procurement monitor |
8 | | pursuant to subsection (e) of this Section, shall not be |
9 | | publicly available or discoverable by any party in any |
10 | | proceeding absent a compelling demonstration of need. The |
11 | | reports shall not be admissible in any proceeding other than |
12 | | one for law enforcement purposes. |
13 | | (h) Within 2 business days after a Commission decision |
14 | | approving the results of a feedstock procurement event or such |
15 | | other date as may be required by the Commission from time to |
16 | | time, the clean coal SNG brownfield facility shall file for |
17 | | informational purposes with the Commission its actual or |
18 | | estimated feedstock costs by utility customer reflecting the |
19 | | costs associated with the feedstock procurement. |
20 | | (i) The clean coal SNG brownfield facility shall pay for |
21 | | reasonable costs incurred by the Agency in administering the |
22 | | feedstock procurement events, which costs shall be included in |
23 | | the actual delivered fuel costs of the clean coal SNG |
24 | | brownfield facility. The Agency shall determine the amount owed |
25 | | for each feedstock procurement event, and the clean coal SNG |
26 | | brownfield facility shall pay that amount to the Agency within |
|
| | 09700SB1533ham001 | - 32 - | LRB097 09938 ASK 56357 a |
|
|
1 | | 30 days after being informed by the Agency of the amount owed. |
2 | | Those funds shall be deposited into the Illinois Power Agency |
3 | | Operations Fund, pursuant to Section 1-55 of this Act, to be |
4 | | used to reimburse expenses related to the feedstock |
5 | | procurement. |
6 | | (j) The Commission has the authority to adopt rules to |
7 | | carry out the provisions of this Section. For the public |
8 | | interest, safety, and welfare, the Commission also has the |
9 | | authority to adopt rules to carry out the provisions of this |
10 | | Section on an emergency basis. |
11 | | (k) On or before April 1 of each year, the Commission may |
12 | | hold an informal hearing for the purpose of receiving comments |
13 | | on the prior year's feedstock procurement process and any |
14 | | recommendations for change. |
15 | | Section 7. The Illinois Procurement Code is amended by |
16 | | changing Sections 1-10 and 20-10 as follows:
|
17 | | (30 ILCS 500/1-10)
|
18 | | Sec. 1-10. Application.
|
19 | | (a) This Code applies only to procurements for which |
20 | | contractors were first
solicited on or after July 1, 1998. This |
21 | | Code shall not be construed to affect
or impair any contract, |
22 | | or any provision of a contract, entered into based on a
|
23 | | solicitation prior to the implementation date of this Code as |
24 | | described in
Article 99, including but not limited to any |
|
| | 09700SB1533ham001 | - 33 - | LRB097 09938 ASK 56357 a |
|
|
1 | | covenant entered into with respect
to any revenue bonds or |
2 | | similar instruments.
All procurements for which contracts are |
3 | | solicited between the effective date
of Articles 50 and 99 and |
4 | | July 1, 1998 shall be substantially in accordance
with this |
5 | | Code and its intent.
|
6 | | (b) This Code shall apply regardless of the source of the |
7 | | funds with which
the contracts are paid, including federal |
8 | | assistance moneys.
This Code shall
not apply to:
|
9 | | (1) Contracts between the State and its political |
10 | | subdivisions or other
governments, or between State |
11 | | governmental bodies except as specifically
provided in |
12 | | this Code.
|
13 | | (2) Grants, except for the filing requirements of |
14 | | Section 20-80.
|
15 | | (3) Purchase of care.
|
16 | | (4) Hiring of an individual as employee and not as an |
17 | | independent
contractor, whether pursuant to an employment |
18 | | code or policy or by contract
directly with that |
19 | | individual.
|
20 | | (5) Collective bargaining contracts.
|
21 | | (6) Purchase of real estate, except that notice of this |
22 | | type of contract with a value of more than $25,000 must be |
23 | | published in the Procurement Bulletin within 7 days after |
24 | | the deed is recorded in the county of jurisdiction. The |
25 | | notice shall identify the real estate purchased, the names |
26 | | of all parties to the contract, the value of the contract, |
|
| | 09700SB1533ham001 | - 34 - | LRB097 09938 ASK 56357 a |
|
|
1 | | and the effective date of the contract.
|
2 | | (7) Contracts necessary to prepare for anticipated |
3 | | litigation, enforcement
actions, or investigations, |
4 | | provided
that the chief legal counsel to the Governor shall |
5 | | give his or her prior
approval when the procuring agency is |
6 | | one subject to the jurisdiction of the
Governor, and |
7 | | provided that the chief legal counsel of any other |
8 | | procuring
entity
subject to this Code shall give his or her |
9 | | prior approval when the procuring
entity is not one subject |
10 | | to the jurisdiction of the Governor.
|
11 | | (8) Contracts for
services to Northern Illinois |
12 | | University by a person, acting as
an independent |
13 | | contractor, who is qualified by education, experience, and
|
14 | | technical ability and is selected by negotiation for the |
15 | | purpose of providing
non-credit educational service |
16 | | activities or products by means of specialized
programs |
17 | | offered by the university.
|
18 | | (9) Procurement expenditures by the Illinois |
19 | | Conservation Foundation
when only private funds are used.
|
20 | | (10) Procurement expenditures by the Illinois Health |
21 | | Information Exchange Authority involving private funds |
22 | | from the Health Information Exchange Fund. "Private funds" |
23 | | means gifts, donations, and private grants. |
24 | | (c) This Code does not apply to the electric power |
25 | | procurement process provided for under Section 1-75 of the |
26 | | Illinois Power Agency Act and Section 16-111.5 of the Public |
|
| | 09700SB1533ham001 | - 35 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Utilities Act. |
2 | | (d) Except for Section 20-160 and Article 50 of this Code, |
3 | | and as expressly required by Section 9.1 of the Illinois |
4 | | Lottery Law, the provisions of this Code do not apply to the |
5 | | procurement process provided for under Section 9.1 of the |
6 | | Illinois Lottery Law. |
7 | | (e) This Code does not apply to the process used by the |
8 | | Capital Development Board to retain a person or entity to |
9 | | assist the Capital Development Board with its duties related to |
10 | | the determination of costs of a clean coal SNG brownfield |
11 | | facility, as defined by Section 1-10 of the Illinois Power |
12 | | Agency Act, as required in subsection (h-3) of Section 9-220 of |
13 | | the Public Utilities Act, including calculating the range of |
14 | | capital costs, the range of operating and maintenance costs, or |
15 | | the sequestration costs or monitoring the construction of clean |
16 | | coal SNG brownfield facility for the full duration of |
17 | | construction. |
18 | | (f) This Code does not apply to the process used by the |
19 | | Illinois Power Agency to retain a mediator to mediate sourcing |
20 | | agreement disputes between gas utilities and the clean coal SNG |
21 | | brownfield facility, as defined in Section 1-10 of the Illinois |
22 | | Power Agency Act, as required under subsection (h-1) of Section |
23 | | 9-220 of the Public Utilities Act. |
24 | | (Source: P.A. 95-481, eff. 8-28-07; 95-615, eff. 9-11-07; |
25 | | 95-876, eff. 8-21-08; 96-840, eff. 12-23-09; 96-1331, eff. |
26 | | 7-27-10.)
|
|
| | 09700SB1533ham001 | - 36 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (30 ILCS 500/20-10)
|
2 | | (Text of Section from P.A. 96-159 and 96-588) |
3 | | Sec. 20-10. Competitive sealed bidding; reverse auction.
|
4 | | (a) Conditions for use. All contracts shall be awarded by
|
5 | | competitive sealed bidding
except as otherwise provided in |
6 | | Section 20-5.
|
7 | | (b) Invitation for bids. An invitation for bids shall be
|
8 | | issued and shall include a
purchase description and the |
9 | | material contractual terms and
conditions applicable to the
|
10 | | procurement.
|
11 | | (c) Public notice. Public notice of the invitation for bids |
12 | | shall be
published in the Illinois Procurement Bulletin at |
13 | | least 14 days before the date
set in the invitation for the |
14 | | opening of bids.
|
15 | | (d) Bid opening. Bids shall be opened publicly in the
|
16 | | presence of one or more witnesses
at the time and place |
17 | | designated in the invitation for bids. The
name of each bidder, |
18 | | the amount
of each bid, and other relevant information as may |
19 | | be specified by
rule shall be
recorded. After the award of the |
20 | | contract, the winning bid and the
record of each unsuccessful |
21 | | bid shall be open to
public inspection.
|
22 | | (e) Bid acceptance and bid evaluation. Bids shall be
|
23 | | unconditionally accepted without
alteration or correction, |
24 | | except as authorized in this Code. Bids
shall be evaluated |
25 | | based on the
requirements set forth in the invitation for bids, |
|
| | 09700SB1533ham001 | - 37 - | LRB097 09938 ASK 56357 a |
|
|
1 | | which may
include criteria to determine
acceptability such as |
2 | | inspection, testing, quality, workmanship,
delivery, and |
3 | | suitability for a
particular purpose. Those criteria that will |
4 | | affect the bid price
and be considered in evaluation
for award, |
5 | | such as discounts, transportation costs, and total or
life |
6 | | cycle costs, shall be
objectively measurable. The invitation |
7 | | for bids shall set forth
the evaluation criteria to be used.
|
8 | | (f) Correction or withdrawal of bids. Correction or
|
9 | | withdrawal of inadvertently
erroneous bids before or after |
10 | | award, or cancellation of awards of
contracts based on bid
|
11 | | mistakes, shall be permitted in accordance with rules.
After |
12 | | bid opening, no
changes in bid prices or other provisions of |
13 | | bids prejudicial to
the interest of the State or fair
|
14 | | competition shall be permitted. All decisions to permit the
|
15 | | correction or withdrawal of bids
based on bid mistakes shall be |
16 | | supported by written determination
made by a State purchasing |
17 | | officer.
|
18 | | (g) Award. The contract shall be awarded with reasonable
|
19 | | promptness by written notice
to the lowest responsible and |
20 | | responsive bidder whose bid meets
the requirements and criteria
|
21 | | set forth in the invitation for bids, except when a State |
22 | | purchasing officer
determines it is not in the best interest of |
23 | | the State and by written
explanation determines another bidder |
24 | | shall receive the award. The explanation
shall appear in the |
25 | | appropriate volume of the Illinois Procurement Bulletin.
|
26 | | (h) Multi-step sealed bidding. When it is considered
|
|
| | 09700SB1533ham001 | - 38 - | LRB097 09938 ASK 56357 a |
|
|
1 | | impracticable to initially prepare
a purchase description to |
2 | | support an award based on price, an
invitation for bids may be |
3 | | issued
requesting the submission of unpriced offers to be |
4 | | followed by an
invitation for bids limited to
those bidders |
5 | | whose offers have been qualified under the criteria
set forth |
6 | | in the first solicitation.
|
7 | | (i) Alternative procedures. Notwithstanding any other |
8 | | provision of this Act to the contrary, the Director of the |
9 | | Illinois Power Agency may create alternative bidding |
10 | | procedures to be used in procuring professional services under |
11 | | subsection (a) of Section 1-75 and subsection (d) of Section |
12 | | 1-78 1-75(a) of the Illinois Power Agency Act and Section |
13 | | 16-111.5(c) of the Public Utilities Act and to procure |
14 | | renewable energy resources under Section 1-56 of the Illinois |
15 | | Power Agency Act. These alternative procedures shall be set |
16 | | forth together with the other criteria contained in the |
17 | | invitation for bids, and shall appear in the appropriate volume |
18 | | of the Illinois Procurement Bulletin.
|
19 | | (j) Reverse auction. Notwithstanding any other provision |
20 | | of this Section and in accordance with rules adopted by the |
21 | | Director of Central Management Services as chief procurement |
22 | | officer, a State purchasing officer under that chief |
23 | | procurement officer's jurisdiction may procure supplies or |
24 | | services through a competitive electronic auction bidding |
25 | | process after the purchasing officer explains in writing to the |
26 | | chief procurement officer his or her determination that the use |
|
| | 09700SB1533ham001 | - 39 - | LRB097 09938 ASK 56357 a |
|
|
1 | | of such a process will be in the best interest of the State. |
2 | | The chief procurement officer shall publish that determination |
3 | | in his or her next volume of the Illinois Procurement Bulletin. |
4 | | An invitation for bids shall be issued and shall include |
5 | | (i) a procurement description, (ii) all contractual terms, |
6 | | whenever practical, and (iii) conditions applicable to the |
7 | | procurement, including a notice that bids will be received in |
8 | | an electronic auction manner. |
9 | | Public notice of the invitation for bids shall be given in |
10 | | the same manner as provided in subsection (c). |
11 | | Bids shall be accepted electronically at the time and in |
12 | | the manner designated in the invitation for bids. During the |
13 | | auction, a bidder's price shall be disclosed to other bidders. |
14 | | Bidders shall have the opportunity to reduce their bid prices |
15 | | during the auction. At the conclusion of the auction, the |
16 | | record of the bid prices received and the name of each bidder |
17 | | shall be open to public inspection. |
18 | | After the auction period has terminated, withdrawal of bids |
19 | | shall be permitted as provided in subsection (f). |
20 | | The contract shall be awarded within 60 days after the |
21 | | auction by written notice to the lowest responsible bidder, or |
22 | | all bids shall be rejected except as otherwise provided in this |
23 | | Code. Extensions of the date for the award may be made by |
24 | | mutual written consent of the State purchasing officer and the |
25 | | lowest responsible bidder. |
26 | | This subsection does not apply to (i) procurements of |
|
| | 09700SB1533ham001 | - 40 - | LRB097 09938 ASK 56357 a |
|
|
1 | | professional and artistic services, including but not limited |
2 | | to telecommunications services, communications services, |
3 | | Internet services, and information services, and (ii) |
4 | | contracts for construction projects. |
5 | | (Source: P.A. 95-481, eff. 8-28-07; 96-159, eff. 8-10-09; |
6 | | 96-588, eff. 8-18-09; revised 10-5-10 .)
|
7 | | (Text of Section from P.A. 96-159 and 96-795)
|
8 | | Sec. 20-10. Competitive sealed bidding; reverse auction.
|
9 | | (a) Conditions for use. All contracts shall be awarded by
|
10 | | competitive sealed bidding
except as otherwise provided in |
11 | | Section 20-5.
|
12 | | (b) Invitation for bids. An invitation for bids shall be
|
13 | | issued and shall include a
purchase description and the |
14 | | material contractual terms and
conditions applicable to the
|
15 | | procurement.
|
16 | | (c) Public notice. Public notice of the invitation for bids |
17 | | shall be
published in the Illinois Procurement Bulletin at |
18 | | least 14 days before the date
set in the invitation for the |
19 | | opening of bids.
|
20 | | (d) Bid opening. Bids shall be opened publicly in the
|
21 | | presence of one or more witnesses
at the time and place |
22 | | designated in the invitation for bids. The
name of each bidder, |
23 | | the amount
of each bid, and other relevant information as may |
24 | | be specified by
rule shall be
recorded. After the award of the |
25 | | contract, the winning bid and the
record of each unsuccessful |
|
| | 09700SB1533ham001 | - 41 - | LRB097 09938 ASK 56357 a |
|
|
1 | | bid shall be open to
public inspection.
|
2 | | (e) Bid acceptance and bid evaluation. Bids shall be
|
3 | | unconditionally accepted without
alteration or correction, |
4 | | except as authorized in this Code. Bids
shall be evaluated |
5 | | based on the
requirements set forth in the invitation for bids, |
6 | | which may
include criteria to determine
acceptability such as |
7 | | inspection, testing, quality, workmanship,
delivery, and |
8 | | suitability for a
particular purpose. Those criteria that will |
9 | | affect the bid price
and be considered in evaluation
for award, |
10 | | such as discounts, transportation costs, and total or
life |
11 | | cycle costs, shall be
objectively measurable. The invitation |
12 | | for bids shall set forth
the evaluation criteria to be used.
|
13 | | (f) Correction or withdrawal of bids. Correction or
|
14 | | withdrawal of inadvertently
erroneous bids before or after |
15 | | award, or cancellation of awards of
contracts based on bid
|
16 | | mistakes, shall be permitted in accordance with rules.
After |
17 | | bid opening, no
changes in bid prices or other provisions of |
18 | | bids prejudicial to
the interest of the State or fair
|
19 | | competition shall be permitted. All decisions to permit the
|
20 | | correction or withdrawal of bids
based on bid mistakes shall be |
21 | | supported by written determination
made by a State purchasing |
22 | | officer.
|
23 | | (g) Award. The contract shall be awarded with reasonable
|
24 | | promptness by written notice
to the lowest responsible and |
25 | | responsive bidder whose bid meets
the requirements and criteria
|
26 | | set forth in the invitation for bids, except when a State |
|
| | 09700SB1533ham001 | - 42 - | LRB097 09938 ASK 56357 a |
|
|
1 | | purchasing officer
determines it is not in the best interest of |
2 | | the State and by written
explanation determines another bidder |
3 | | shall receive the award. The explanation
shall appear in the |
4 | | appropriate volume of the Illinois Procurement Bulletin. The |
5 | | written explanation must include:
|
6 | | (1) a description of the agency's needs; |
7 | | (2) a determination that the anticipated cost will be |
8 | | fair and reasonable; |
9 | | (3) a listing of all responsible and responsive |
10 | | bidders; and |
11 | | (4) the name of the bidder selected, pricing, and the |
12 | | reasons for selecting that bidder. |
13 | | Each chief procurement officer may adopt guidelines to |
14 | | implement the requirements of this subsection (g). |
15 | | The written explanation shall be filed with the Legislative |
16 | | Audit Commission and the Procurement Policy Board and be made |
17 | | available for inspection by the public within 30 days after the |
18 | | agency's decision to award the contract. |
19 | | (h) Multi-step sealed bidding. When it is considered
|
20 | | impracticable to initially prepare
a purchase description to |
21 | | support an award based on price, an
invitation for bids may be |
22 | | issued
requesting the submission of unpriced offers to be |
23 | | followed by an
invitation for bids limited to
those bidders |
24 | | whose offers have been qualified under the criteria
set forth |
25 | | in the first solicitation.
|
26 | | (i) Alternative procedures. Notwithstanding any other |
|
| | 09700SB1533ham001 | - 43 - | LRB097 09938 ASK 56357 a |
|
|
1 | | provision of this Act to the contrary, the Director of the |
2 | | Illinois Power Agency may create alternative bidding |
3 | | procedures to be used in procuring professional services under |
4 | | subsection (a) of Section 1-75 and subsection (d) of Section |
5 | | 1-78 1-75(a) of the Illinois Power Agency Act and Section |
6 | | 16-111.5(c) of the Public Utilities Act and to procure |
7 | | renewable energy resources under Section 1-56 of the Illinois |
8 | | Power Agency Act. These alternative procedures shall be set |
9 | | forth together with the other criteria contained in the |
10 | | invitation for bids, and shall appear in the appropriate volume |
11 | | of the Illinois Procurement Bulletin.
|
12 | | (j) Reverse auction. Notwithstanding any other provision |
13 | | of this Section and in accordance with rules adopted by the |
14 | | chief procurement officer, that chief procurement officer may |
15 | | procure supplies or services through a competitive electronic |
16 | | auction bidding process after the chief procurement officer |
17 | | determines that the use of such a process will be in the best |
18 | | interest of the State. The chief procurement officer shall |
19 | | publish that determination in his or her next volume of the |
20 | | Illinois Procurement Bulletin. |
21 | | An invitation for bids shall be issued and shall include |
22 | | (i) a procurement description, (ii) all contractual terms, |
23 | | whenever practical, and (iii) conditions applicable to the |
24 | | procurement, including a notice that bids will be received in |
25 | | an electronic auction manner. |
26 | | Public notice of the invitation for bids shall be given in |
|
| | 09700SB1533ham001 | - 44 - | LRB097 09938 ASK 56357 a |
|
|
1 | | the same manner as provided in subsection (c). |
2 | | Bids shall be accepted electronically at the time and in |
3 | | the manner designated in the invitation for bids. During the |
4 | | auction, a bidder's price shall be disclosed to other bidders. |
5 | | Bidders shall have the opportunity to reduce their bid prices |
6 | | during the auction. At the conclusion of the auction, the |
7 | | record of the bid prices received and the name of each bidder |
8 | | shall be open to public inspection. |
9 | | After the auction period has terminated, withdrawal of bids |
10 | | shall be permitted as provided in subsection (f). |
11 | | The contract shall be awarded within 60 days after the |
12 | | auction by written notice to the lowest responsible bidder, or |
13 | | all bids shall be rejected except as otherwise provided in this |
14 | | Code. Extensions of the date for the award may be made by |
15 | | mutual written consent of the State purchasing officer and the |
16 | | lowest responsible bidder. |
17 | | This subsection does not apply to (i) procurements of |
18 | | professional and artistic services, (ii) telecommunications |
19 | | services, communication services, and information services,
|
20 | | and (iii) contracts for construction projects. |
21 | | (Source: P.A. 95-481, eff. 8-28-07; 96-159, eff. 8-10-09; |
22 | | 96-795, eff. 7-1-10 (see Section 5 of P.A. 96-793 for the |
23 | | effective date of changes made by P.A. 96-795); revised |
24 | | 10-5-10 .) |
25 | | Section 10. The Public Utilities Act is amended by changing |
|
| | 09700SB1533ham001 | - 45 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Sections 3-101 and 9-220 and by adding Section 3-123 as |
2 | | follows:
|
3 | | (220 ILCS 5/3-101) (from Ch. 111 2/3, par. 3-101)
|
4 | | Sec. 3-101. Definitions. Unless otherwise specified, the |
5 | | terms set forth
in Sections 3-102 through 3-123 3-121 are used |
6 | | in this Act as therein defined.
|
7 | | (Source: P.A. 84-617; 84-1118.)
|
8 | | (220 ILCS 5/3-123 new) |
9 | | Sec. 3-123. Clean coal SNG brownfield facility; sequester; |
10 | | SNG facility; sourcing agreement; substitute natural gas or |
11 | | SNG. As used in this Act: |
12 | | "Clean coal SNG brownfield facility" shall have the same |
13 | | meaning as provided in Section 1-10 of the Illinois Power |
14 | | Agency Act. |
15 | | "Sequester" shall have the same meaning as provided in |
16 | | Section 1-10 of the Illinois Power Agency Act. |
17 | | "SNG facility" means a facility that produces substitute |
18 | | natural gas from feedstock that includes coal through a |
19 | | gasification process, including a clean coal facility, the |
20 | | clean coal SNG brownfield facility, and the facility described |
21 | | in subsection (h) of Section 9-220 of this Act. |
22 | | "Sourcing agreement" means an agreement between the owner |
23 | | of a clean coal SNG brownfield facility and the gas utility |
24 | | that has the terms and conditions meeting the requirements of |
|
| | 09700SB1533ham001 | - 46 - | LRB097 09938 ASK 56357 a |
|
|
1 | | subsection (h-1) of Section 9-220 of this Act. |
2 | | "Substitute natural gas" or "SNG" shall have the same |
3 | | meaning as provided in Section 1-10 of the Illinois Power |
4 | | Agency Act. |
5 | | (220 ILCS 5/9-220) (from Ch. 111 2/3, par. 9-220) |
6 | | Sec. 9-220. Rate changes based on changes in fuel costs. |
7 | | (a) Notwithstanding the provisions of Section 9-201, the
|
8 | | Commission may authorize the increase or decrease of rates and |
9 | | charges
based upon changes in the cost of fuel used in the |
10 | | generation or production
of electric power, changes in the cost |
11 | | of purchased power, or changes in
the cost of purchased gas |
12 | | through the application of fuel adjustment
clauses or purchased |
13 | | gas adjustment clauses. The Commission may also
authorize the |
14 | | increase or decrease of rates and charges based upon |
15 | | expenditures
or revenues resulting from the purchase or sale of |
16 | | emission allowances created
under the federal Clean Air Act |
17 | | Amendments of 1990,
through such fuel adjustment clauses, as a |
18 | | cost of fuel. For the purposes of
this paragraph, cost of fuel |
19 | | used in the generation or production of electric
power shall |
20 | | include the amount of any fees paid by the utility for the
|
21 | | implementation and operation of a process for the |
22 | | desulfurization of the
flue gas when burning high sulfur coal |
23 | | at any location within the State of
Illinois irrespective of |
24 | | the attainment status designation of such
location; but shall |
25 | | not include transportation costs
of coal
(i) except to the |
|
| | 09700SB1533ham001 | - 47 - | LRB097 09938 ASK 56357 a |
|
|
1 | | extent that for contracts entered into on
and after the |
2 | | effective date of this amendatory Act of 1997,
the cost of the |
3 | | coal, including transportation costs,
constitutes the lowest |
4 | | cost for adequate and reliable fuel
supply reasonably available |
5 | | to the public utility in
comparison to the cost, including |
6 | | transportation costs, of
other adequate and reliable sources of |
7 | | fuel supply reasonably
available to the public utility, or (ii)
|
8 | | except as otherwise provided in the next 3 sentences of this |
9 | | paragraph.
Such costs of fuel
shall, when requested by a |
10 | | utility or at the conclusion of the utility's
next general |
11 | | electric rate proceeding, whichever shall first occur, include
|
12 | | transportation costs of coal purchased under existing coal |
13 | | purchase
contracts. For purposes of this paragraph "existing |
14 | | coal purchase
contracts" means contracts for the purchase of |
15 | | coal in effect on the
effective date of this amendatory Act of |
16 | | 1991, as such contracts may
thereafter be amended, but only to |
17 | | the extent that any such amendment does
not increase the |
18 | | aggregate quantity of coal to be purchased under such
contract.
|
19 | | Nothing herein shall authorize an electric utility
to recover |
20 | | through its fuel adjustment clause any amounts of
|
21 | | transportation costs of coal that were included in the revenue
|
22 | | requirement used to set base rates in its most recent general
|
23 | | rate proceeding.
Cost shall be based upon uniformly applied |
24 | | accounting
principles. Annually, the Commission shall initiate |
25 | | public hearings to
determine whether the clauses reflect actual |
26 | | costs of fuel, gas, power, or
coal transportation purchased to |
|
| | 09700SB1533ham001 | - 48 - | LRB097 09938 ASK 56357 a |
|
|
1 | | determine whether such purchases were
prudent, and to reconcile |
2 | | any amounts collected with the actual costs of
fuel, power, |
3 | | gas, or coal transportation prudently purchased. In each such
|
4 | | proceeding, the burden of proof shall be upon the utility to |
5 | | establish the
prudence of its cost of fuel, power, gas, or coal
|
6 | | transportation purchases
and costs.
The Commission shall
issue |
7 | | its final order in each such annual proceeding for an
electric |
8 | | utility by December 31 of the year immediately
following the |
9 | | year to which the proceeding pertains, provided,
that the |
10 | | Commission shall issue its final order with respect
to such |
11 | | annual proceeding for the years 1996 and earlier by December |
12 | | 31, 1998. |
13 | | (b) A public utility providing electric service, other than |
14 | | a public utility
described in subsections (e) or (f) of this |
15 | | Section, may at
any time during the mandatory transition period |
16 | | file with the
Commission proposed tariff sheets that eliminate |
17 | | the public
utility's fuel adjustment clause and adjust the |
18 | | public
utility's base rate tariffs by the amount necessary for |
19 | | the
base fuel component of the base rates to recover the public
|
20 | | utility's average fuel and power supply costs per kilowatt-hour |
21 | | for the 2
most recent years for which the Commission
has issued |
22 | | final orders in annual proceedings pursuant to
subsection (a), |
23 | | where the average fuel and power supply costs
per kilowatt-hour |
24 | | shall be calculated as the sum of the public
utility's prudent |
25 | | and allowable fuel and power supply costs as
found by the |
26 | | Commission in the 2 proceedings divided by the
public utility's |
|
| | 09700SB1533ham001 | - 49 - | LRB097 09938 ASK 56357 a |
|
|
1 | | actual jurisdictional kilowatt-hour sales for
those 2 years. |
2 | | Notwithstanding any contrary or inconsistent
provisions in |
3 | | Section 9-201 of this Act, in subsection (a) of
this Section or |
4 | | in any rules or regulations promulgated by the
Commission |
5 | | pursuant to subsection (g) of this Section, the
Commission |
6 | | shall review and shall by order approve, or approve
as |
7 | | modified, the proposed tariff sheets within 60 days after
the |
8 | | date of the public utility's filing. The Commission may
modify |
9 | | the public utility's proposed tariff sheets only to the
extent |
10 | | the Commission finds necessary to achieve conformance
to the |
11 | | requirements of this subsection (b). During the 5
years |
12 | | following the date of the Commission's order, but in any
event |
13 | | no earlier than January 1, 2007, a public utility whose
fuel |
14 | | adjustment clause has been eliminated pursuant to this
|
15 | | subsection shall not file proposed tariff sheets seeking, or
|
16 | | otherwise petition the Commission for, reinstatement of a fuel
|
17 | | adjustment clause. |
18 | | (c) Notwithstanding any contrary or inconsistent
|
19 | | provisions in Section 9-201 of this Act, in subsection (a) of
|
20 | | this Section or in any rules or regulations promulgated by the
|
21 | | Commission pursuant to subsection (g) of this Section, a
public |
22 | | utility providing electric service, other than a public utility
|
23 | | described
in subsection (e) or (f) of this Section, may at any |
24 | | time
during the mandatory transition period file with the
|
25 | | Commission proposed tariff sheets that establish the rate per
|
26 | | kilowatt-hour to be applied pursuant to the public utility's
|
|
| | 09700SB1533ham001 | - 50 - | LRB097 09938 ASK 56357 a |
|
|
1 | | fuel adjustment clause at the average value for such rate
|
2 | | during the preceding 24 months, provided that such average
rate |
3 | | results in a credit to customers' bills, without making
any |
4 | | revisions to the public utility's base rate tariffs. The
|
5 | | proposed tariff sheets shall establish the fuel adjustment
rate |
6 | | for a specific time period of at least 3 years but not
more |
7 | | than 5 years, provided that the terms and conditions for
any |
8 | | reinstatement earlier than 5 years shall be set forth in
the |
9 | | proposed tariff sheets and subject to modification or
approval |
10 | | by the Commission. The Commission shall review and
shall by |
11 | | order approve the proposed tariff sheets if it finds
that the |
12 | | requirements of this subsection are met. The
Commission shall |
13 | | not conduct the annual hearings specified in the
last 3 |
14 | | sentences of subsection (a) of this Section for the
utility for |
15 | | the period that the factor established pursuant to
this |
16 | | subsection is in effect. |
17 | | (d) A public utility providing electric service, or a |
18 | | public utility
providing gas service
may file with the |
19 | | Commission proposed tariff sheets that
eliminate the public |
20 | | utility's fuel or purchased gas
adjustment clause and adjust |
21 | | the public utility's base rate
tariffs to provide for recovery |
22 | | of power supply costs or gas
supply costs that would have been |
23 | | recovered through such
clause; provided, that the provisions of |
24 | | this subsection (d) shall not be
available to a public utility |
25 | | described in subsections (e) or (f) of this
Section to |
26 | | eliminate its fuel adjustment clause. Notwithstanding any |
|
| | 09700SB1533ham001 | - 51 - | LRB097 09938 ASK 56357 a |
|
|
1 | | contrary
or inconsistent
provisions in Section 9-201 of this |
2 | | Act, in subsection (a) of
this Section, or in any rules or |
3 | | regulations promulgated by
the Commission pursuant to |
4 | | subsection (g) of this Section, the
Commission shall review and |
5 | | shall by order approve, or approve
as modified in the |
6 | | Commission's order, the proposed tariff
sheets within 240 days |
7 | | after the date of the public utility's
filing. The Commission's |
8 | | order shall approve rates and
charges that the Commission, |
9 | | based on information in the
public utility's filing or on the |
10 | | record if a hearing is held
by the Commission, finds will |
11 | | recover the reasonable, prudent
and necessary jurisdictional |
12 | | power supply costs or gas supply
costs incurred or to be |
13 | | incurred by the public utility during
a 12 month period found |
14 | | by the Commission to be appropriate
for these purposes, |
15 | | provided, that such period shall be either
(i) a 12 month |
16 | | historical period occurring during the 15
months ending on the |
17 | | date of the public utility's filing, or
(ii) a 12 month future |
18 | | period ending no later than 15 months
following the date of the |
19 | | public utility's filing. The public
utility shall include with |
20 | | its tariff filing information
showing both (1) its actual |
21 | | jurisdictional power supply costs
or gas supply costs for a 12 |
22 | | month historical period
conforming to (i) above and (2) its |
23 | | projected jurisdictional
power supply costs or gas supply costs |
24 | | for a future 12 month
period conforming to (ii) above. If the |
25 | | Commission's order
requires modifications in the tariff sheets |
26 | | filed by the
public utility, the public utility shall have 7 |
|
| | 09700SB1533ham001 | - 52 - | LRB097 09938 ASK 56357 a |
|
|
1 | | days following
the date of the order to notify the Commission |
2 | | whether the
public utility will implement the modified tariffs |
3 | | or elect to
continue its fuel or purchased gas adjustment |
4 | | clause in force
as though no order had been entered. The |
5 | | Commission's order
shall provide for any reconciliation of |
6 | | power supply costs or
gas supply costs, as the case may be, and |
7 | | associated revenues
through the date that the public utility's |
8 | | fuel or purchased
gas adjustment clause is eliminated. During |
9 | | the 5 years
following the date of the Commission's order, a |
10 | | public utility
whose fuel or purchased gas adjustment clause |
11 | | has been
eliminated pursuant to this subsection shall not file |
12 | | proposed
tariff sheets seeking, or otherwise petition the |
13 | | Commission
for, reinstatement or adoption of a fuel or |
14 | | purchased gas
adjustment clause. Nothing in this subsection (d) |
15 | | shall be
construed as limiting the Commission's authority to |
16 | | eliminate
a public utility's fuel adjustment clause or |
17 | | purchased gas
adjustment clause in accordance with any other |
18 | | applicable
provisions of this Act. |
19 | | (e) Notwithstanding any contrary or inconsistent |
20 | | provisions in
Section 9-201 of this Act, in subsection (a) of |
21 | | this Section, or in
any rules promulgated by the Commission |
22 | | pursuant
to subsection (g) of this Section, a public utility |
23 | | providing
electric service to more than 1,000,000 customers in |
24 | | this State may, within the
first 6 months after the
effective |
25 | | date of this amendatory Act of 1997, file with the
Commission |
26 | | proposed tariff sheets that eliminate, effective
January 1, |
|
| | 09700SB1533ham001 | - 53 - | LRB097 09938 ASK 56357 a |
|
|
1 | | 1997, the public utility's fuel adjustment clause
without |
2 | | adjusting its base rates, and such tariff sheets shall be
|
3 | | effective upon filing. To the extent the application of the |
4 | | fuel
adjustment clause had resulted in net charges to customers |
5 | | after
January 1, 1997, the utility shall also file a tariff |
6 | | sheet that
provides for a refund stated on a per kilowatt-hour |
7 | | basis of such
charges over a period not to exceed 6 months; |
8 | | provided
however, that such refund shall not include the |
9 | | proportional
amounts of taxes paid under the Use Tax Act, |
10 | | Service Use Tax Act,
Service Occupation Tax Act, and Retailers' |
11 | | Occupation Tax Act on
fuel used in generation. The Commission |
12 | | shall issue an order
within 45 days after the date of the |
13 | | public utility's filing
approving or approving as modified such |
14 | | tariff sheet. If the fuel
adjustment clause is eliminated |
15 | | pursuant to this subsection, the
Commission shall not conduct |
16 | | the annual hearings specified in the
last 3 sentences of |
17 | | subsection (a) of this Section for the
utility for any period |
18 | | after December 31, 1996 and prior to any
reinstatement of such |
19 | | clause. A public utility whose fuel
adjustment clause has been |
20 | | eliminated pursuant to this subsection
shall not file a |
21 | | proposed tariff sheet seeking, or otherwise
petition the |
22 | | Commission for, reinstatement of the fuel adjustment
clause |
23 | | prior to January 1, 2007. |
24 | | (f) Notwithstanding any contrary or inconsistent |
25 | | provisions in Section
9-201 of this Act, in subsection (a) of |
26 | | this Section, or in any rules or
regulations promulgated by the |
|
| | 09700SB1533ham001 | - 54 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Commission pursuant to subsection (g) of this
Section, a public |
2 | | utility providing electric service to more than 500,000
|
3 | | customers but fewer than 1,000,000 customers in this State may, |
4 | | within the
first
6 months after the effective date of this |
5 | | amendatory Act of 1997, file with the
Commission proposed |
6 | | tariff sheets that eliminate, effective January 1, 1997,
the |
7 | | public utility's fuel adjustment clause and adjust its base |
8 | | rates by the
amount necessary for the base fuel component of |
9 | | the base rates to recover
91% of the public utility's average |
10 | | fuel and power supply costs for the 2 most
recent years for |
11 | | which the Commission, as of January 1, 1997, has issued final
|
12 | | orders in annual proceedings pursuant to subsection (a), where |
13 | | the average fuel
and power supply costs per kilowatt-hour shall |
14 | | be calculated as the sum of the
public utility's prudent and |
15 | | allowable fuel and power supply costs as found by
the |
16 | | Commission in the 2 proceedings divided by the public utility's |
17 | | actual
jurisdictional kilowatt-hour sales for those 2 years, |
18 | | provided, that such
tariff sheets shall be effective upon |
19 | | filing. To the extent the application of
the fuel adjustment |
20 | | clause had resulted in net charges to customers after
January |
21 | | 1, 1997, the utility shall also file a tariff sheet that |
22 | | provides for a
refund stated on a per kilowatt-hour basis of |
23 | | such charges over a period not to
exceed 6 months. Provided |
24 | | however, that such refund shall not include the
proportional |
25 | | amounts of taxes paid under the Use Tax Act, Service Use Tax |
26 | | Act,
Service Occupation Tax Act, and Retailers' Occupation Tax |
|
| | 09700SB1533ham001 | - 55 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Act on fuel used in
generation. The Commission shall issue an |
2 | | order within 45 days after the date
of the public utility's |
3 | | filing approving or approving as modified such tariff
sheet. If |
4 | | the fuel adjustment clause is eliminated pursuant to this
|
5 | | subsection, the Commission shall not conduct the annual |
6 | | hearings specified in
the last 3 sentences of subsection (a) of |
7 | | this Section for the utility for any
period after December 31, |
8 | | 1996 and prior to any reinstatement of such clause.
A public |
9 | | utility whose fuel adjustment clause has been eliminated |
10 | | pursuant to
this subsection shall not file a proposed tariff |
11 | | sheet seeking, or otherwise
petition the Commission for, |
12 | | reinstatement of the fuel adjustment clause prior
to January 1, |
13 | | 2007. |
14 | | (g) The Commission shall have authority to promulgate rules |
15 | | and
regulations to
carry out the provisions of this Section. |
16 | | (h) Any Illinois gas utility may enter into a contract on |
17 | | or before March 31, 2011 for up to 10 years of supply with any |
18 | | company for the purchase of substitute natural gas (SNG) |
19 | | produced from coal through the gasification process if the |
20 | | company has commenced construction of a coal gasification |
21 | | facility by July 1, 2012 in Jefferson County and commencement |
22 | | of construction shall mean that material physical site work has |
23 | | occurred, such as site clearing and excavation, water runoff |
24 | | prevention, water retention reservoir preparation, or |
25 | | foundation development. The contract shall contain the |
26 | | following provisions: (i) the only coal to be used in the |
|
| | 09700SB1533ham001 | - 56 - | LRB097 09938 ASK 56357 a |
|
|
1 | | gasification process has high volatile bituminous rank and |
2 | | greater than 1.7 pounds of sulfur per million Btu content; (ii) |
3 | | at the time the contract term commences, the price per million |
4 | | Btu may not exceed $7.95 in 2008 dollars, adjusted annually |
5 | | based on the change in the Annual Consumer Price Index for All |
6 | | Urban Consumers for the Midwest Region as published in April by |
7 | | the United States Department of Labor, Bureau of Labor |
8 | | Statistics (or a suitable Consumer Price Index calculation if |
9 | | this Consumer Price Index is not available) for the previous |
10 | | calendar year; provided that the price per million Btu shall |
11 | | not exceed $9.95 at any time during the contract; (iii) the |
12 | | utility's aggregate long-term supply contracts for the |
13 | | purchase of SNG does not exceed 25% of the annual system supply |
14 | | requirements of the utility as of 2008 and the quantity of SNG |
15 | | supplied to a utility may not exceed 16 million MMBtus; and |
16 | | (iv) contract costs pursuant to subsection (h-10) of this |
17 | | Section shall not include any lobbying expenses, charitable |
18 | | contributions, advertising, organizational memberships, or |
19 | | marketing expenses per year. |
20 | | (h-1) Any Illinois gas utility may enter into a sourcing |
21 | | agreement for up to 30 years of supply with the clean coal SNG |
22 | | brownfield facility if the clean coal SNG brownfield facility |
23 | | has commenced construction. Any gas utility that is providing |
24 | | service to more than 150,000 customers on the effective date of |
25 | | this amendatory Act of the 97th General Assembly shall either |
26 | | elect to file biennial rate proceedings before the Commission |
|
| | 09700SB1533ham001 | - 57 - | LRB097 09938 ASK 56357 a |
|
|
1 | | in the years 2012, 2014, and 2016 or enter into a sourcing |
2 | | agreement or sourcing agreements with a clean coal SNG |
3 | | brownfield facility with an initial term of 30 years for either |
4 | | (i) a percentage of 43,500,000,000 cubic feet per year, such |
5 | | that the utilities entering into sourcing agreements with the |
6 | | clean coal SNG brownfield facility purchase 100%,
allocated by |
7 | | total therms sold to ultimate customers by each
gas utility in |
8 | | 2008 or (ii) such lesser amount as may be available from the |
9 | | clean coal SNG brownfield facility. |
10 | | Provided, however, that no utility shall be required to |
11 | | purchase more than 42% of the projected annual output of the |
12 | | clean coal SNG brownfield facility, with the remainder of such |
13 | | utility's obligation to be divided proportionately between the |
14 | | other utilities. Additionally, the Illinois Power Agency shall
|
15 | | further adjust the allocation only as required to take into
|
16 | | account adverse consolidation, derivative, or lease impacts to
|
17 | | the balance sheet or income statement of any gas utility. |
18 | | A gas utility electing to file biennial rate proceedings |
19 | | before the Commission must file a notice of its election with |
20 | | the Commission within 60 days after the effective date of this |
21 | | amendatory Act of the 97th General Assembly or its right to |
22 | | make the election is irrevocably waived. A gas utility electing |
23 | | to file biennial rate proceedings shall make such filings no |
24 | | later than August 1 of the years 2012, 2014, and 2016, |
25 | | consistent with all requirements of 83 Ill. Adm. Code 255 and |
26 | | 285 as though the gas utility were filing for an increase in |
|
| | 09700SB1533ham001 | - 58 - | LRB097 09938 ASK 56357 a |
|
|
1 | | its rates, without regard to whether such filing would produce |
2 | | an increase, a decrease, or no change in the gas utility's |
3 | | rates, and notwithstanding any other provisions of this Act, |
4 | | the Commission shall fully review the gas utility's filing and |
5 | | shall issue its order in accordance with the provisions of |
6 | | Section 9-201 of this Act, regardless of whether the
Commission |
7 | | has approved a formula rate for the gas utility. |
8 | | Within 15 days after the effective date of this amendatory |
9 | | Act of the 97th General Assembly, the owner of the clean coal |
10 | | SNG brownfield facility shall submit to the Illinois Power |
11 | | Agency and each gas utility that is providing service to more |
12 | | than 150,000 customers on the effective date of this amendatory |
13 | | Act of the 97th General Assembly a copy of a draft sourcing |
14 | | agreement. Within 45 days after receipt of the draft sourcing |
15 | | agreement, each such gas utility shall provide the Illinois |
16 | | Power Agency and the owner of a clean coal SNG brownfield |
17 | | facility with its comments and recommended revisions to the |
18 | | draft sourcing agreement. Within 15 days after the receipt of |
19 | | the gas utility's comments and recommended revisions, the owner |
20 | | of the clean coal SNG brownfield facility shall submit its |
21 | | responsive comments and a further revised draft of the sourcing |
22 | | agreement to the Illinois Power Agency. The Illinois Power |
23 | | Agency shall review the draft sourcing agreement and comments. |
24 | | If the parties to the sourcing agreement do not agree on |
25 | | the terms therein, then the Illinois Power Agency shall retain |
26 | | an independent mediator to mediate the dispute between the |
|
| | 09700SB1533ham001 | - 59 - | LRB097 09938 ASK 56357 a |
|
|
1 | | parties. If the parties are in agreement on the terms of the |
2 | | sourcing agreement, the Illinois Power Agency shall approve the |
3 | | final draft sourcing agreement. If after mediation the parties |
4 | | have failed to come to agreement, then the Illinois Power |
5 | | Agency shall revise the draft sourcing agreement as necessary |
6 | | to confirm that the final draft sourcing agreement contains |
7 | | only terms that are reasonable and equitable. The Illinois |
8 | | Power Agency shall adopt and make public a policy detailing the |
9 | | process for retaining a mediator under this subsection (h-1). |
10 | | Any mediator retained to assist with mediating disputes between |
11 | | the parties regarding the sourcing agreement shall be retained |
12 | | no later than 60 days after the effective date of this |
13 | | amendatory Act of the 97th General Assembly. |
14 | | Upon approval of a final draft agreement, the Illinois |
15 | | Power Agency shall submit the final draft agreement to the |
16 | | Capital Development Board and the Commission no later than 90 |
17 | | days after the effective date of this amendatory Act of the |
18 | | 97th General Assembly. The gas utility and the clean coal SNG |
19 | | brownfield facility shall pay a reasonable fee as required by |
20 | | the Illinois Power Agency for its services under this |
21 | | subsection (h-1) and shall pay the mediator's reasonable fees, |
22 | | if any. The Illinois Power Agency shall adopt and make public a |
23 | | policy detailing the process for retaining a mediator under |
24 | | this Section. |
25 | | The sourcing agreement between a gas utility and the clean |
26 | | coal SNG brownfield facility shall contain the following |
|
| | 09700SB1533ham001 | - 60 - | LRB097 09938 ASK 56357 a |
|
|
1 | | provisions: |
2 | | (1) Any and all coal used in the gasification process |
3 | | must be coal that has high volatile bituminous rank and |
4 | | greater than 1.7 pounds of sulfur per million Btu content. |
5 | | (2) Coal and petroleum coke are feedstocks for the |
6 | | gasification process, with coal comprising at least 50% of |
7 | | the total feedstock over the term of the sourcing agreement |
8 | | unless the facility reasonably determines that it is
|
9 | | necessary to use additional petroleum coke to deliver net
|
10 | | consumer savings, in which case the facility shall use
coal |
11 | | for at least 35% of the total feedstock over the
term of |
12 | | any sourcing agreement and with the feedstocks to be |
13 | | procured in accordance with requirements of Section 1-78 of |
14 | | the Illinois Power Agency Act. |
15 | | (3) The sourcing agreement has an initial term that |
16 | | once entered into terminates no more than 30 years after |
17 | | the commencement of the commercial production of SNG at the |
18 | | clean coal SNG brownfield facility. |
19 | | (4) The clean coal SNG brownfield facility guarantees a |
20 | | minimum of $100,000,000 in consumer savings to customers of
|
21 | | the utilities that have entered into sourcing agreements
|
22 | | with the clean coal SNG brownfield facility, calculated in |
23 | | real 2010 dollars at the conclusion of the term of the |
24 | | sourcing agreement by comparing the delivered SNG price to |
25 | | the Chicago City-gate price on a weighted daily basis for |
26 | | each day over the entire term of the sourcing agreement, to |
|
| | 09700SB1533ham001 | - 61 - | LRB097 09938 ASK 56357 a |
|
|
1 | | be provided in accordance with subsection (h-2) of this |
2 | | Section. |
3 | | (5) Prior to the clean coal SNG brownfield facility |
4 | | issuing a notice to proceed to construction, the clean coal |
5 | | SNG brownfield facility shall establish a consumer |
6 | | protection reserve account for the benefit of the customers |
7 | | of the utilities that have entered into sourcing agreements |
8 | | with the clean coal SNG brownfield facility pursuant to |
9 | | this subsection (h-1), with cash principal in the amount of |
10 | | $150,000,000. This cash principal shall only be |
11 | | recoverable through the consumer protection reserve |
12 | | account and not as a cost to be recovered in the delivered |
13 | | SNG price pursuant to subsection (h-3) of this Section. The |
14 | | consumer protection reserve account shall be maintained |
15 | | and administered by an independent trustee that is mutually |
16 | | agreed upon by the clean coal SNG brownfield facility, the |
17 | | utilities, and the Commission in an interest-bearing |
18 | | account in accordance with subsection (h-2) of this |
19 | | Section. |
20 | | "Consumer protection reserve account principal maximum |
21 | | amount" shall mean the maximum amount of principal to be |
22 | | maintained in the consumer protection reserve account. |
23 | | During the first 2 years of operation of the facility, |
24 | | there shall be no consumer protection reserve account |
25 | | maximum amount. After the first 2 years of operation of the |
26 | | facility, the consumer protection reserve account maximum |
|
| | 09700SB1533ham001 | - 62 - | LRB097 09938 ASK 56357 a |
|
|
1 | | amount shall be $150,000,000. After 5 years of operation, |
2 | | and every 5 years thereafter, the trustee shall calculate |
3 | | the 5-year average balance of the consumer protection |
4 | | reserve account. If the trustee determines that during the |
5 | | prior 5 years the consumer protection reserve account has |
6 | | had an average account balance of less than $75,000,000, |
7 | | then the consumer protection reserve account principal |
8 | | maximum amount shall be increased by $5,000,000. If the |
9 | | trustee determines that during the prior 5 years the |
10 | | consumer protection reserve account has had an average |
11 | | account balance of more than $75,000,000, then the consumer |
12 | | protection reserve account principal maximum amount shall |
13 | | be decreased by $5,000,000. |
14 | | (6) The clean coal SNG brownfield facility shall |
15 | | identify and sell economically viable by-products produced |
16 | | by the facility. |
17 | | (7) Fifty percent of all additional net revenue, |
18 | | defined as miscellaneous net revenue from products |
19 | | produced by the
facility and delivered during the month |
20 | | after cost allowance for costs associated with additional |
21 | | net revenue that are not otherwise recoverable pursuant to |
22 | | subsection (h-3) of this Section, including net revenue |
23 | | from sales of substitute natural gas derived from the |
24 | | facility above the nameplate capacity of the facility and |
25 | | other by-products produced by the facility, shall be |
26 | | credited to the consumer protection reserve account |
|
| | 09700SB1533ham001 | - 63 - | LRB097 09938 ASK 56357 a |
|
|
1 | | pursuant to subsection (h-2) of this Section. |
2 | | (8) The delivered SNG price per million btu to be paid |
3 | | monthly by the utility to the clean coal SNG brownfield |
4 | | facility, which shall be based only upon the following: (A) |
5 | | a capital recovery charge, operations and maintenance |
6 | | costs, and sequestration costs, only to the extent approved |
7 | | by the Commission pursuant to paragraphs (1), (2), and (3) |
8 | | of subsection (h-3) of this Section; (B) the actual |
9 | | delivered and processed fuel costs pursuant to paragraph |
10 | | (4) of subsection (h-3) of this Section; (C) actual costs |
11 | | of SNG transportation pursuant to paragraph (6) of |
12 | | subsection (h-3) of this Section; (D) certain taxes and |
13 | | fees imposed by the federal government, the State, or any |
14 | | unit of local government as provided in paragraph (6) of |
15 | | subsection (h-3) of this Section; and (E) the credit, if |
16 | | any, from the consumer protection reserve account pursuant |
17 | | to subsection (h-2) of this Section. The delivered SNG |
18 | | price per million Btu shall proportionately reflect these |
19 | | elements over the term of the sourcing agreement. |
20 | | (9) A formula to translate the recoverable costs and |
21 | | charges under subsection (h-3) of this Section into the |
22 | | delivered SNG price per million btu. |
23 | | (10) Title to the SNG shall pass at a mutually |
24 | | agreeable point in Illinois, and may provide that, rather |
25 | | than the utility taking title to the SNG, a mutually agreed |
26 | | upon third-party gas marketer pursuant to a contract |
|
| | 09700SB1533ham001 | - 64 - | LRB097 09938 ASK 56357 a |
|
|
1 | | approved by the Illinois Power Agency or its designee, may |
2 | | take title to the SNG pursuant to an agreement between the |
3 | | utility, the owner of the clean coal SNG brownfield |
4 | | facility, and the third-party gas marketer. |
5 | | (11) A utility may exit the sourcing agreement without |
6 | | penalty if the clean coal SNG brownfield facility does not |
7 | | commence construction by July 1, 2015. |
8 | | (12) A utility is responsible to pay only the |
9 | | Commission determined unit price cost of SNG that is |
10 | | purchased by the utility. Nothing in the sourcing agreement |
11 | | will obligate a utility to invest capital in a clean coal |
12 | | SNG brownfield facility. |
13 | | (13) The quality of SNG must, at a minimum, be |
14 | | equivalent to the quality required for interstate pipeline |
15 | | gas before a utility is required to accept and pay for SNG |
16 | | gas. |
17 | | (14) Nothing in the sourcing agreement will require a |
18 | | utility to construct any facilities to accept delivery of |
19 | | SNG. Provided, however, if a utility is required by law or |
20 | | otherwise elects to connect the clean coal SNG brownfield |
21 | | facility to an interstate pipeline, then the utility shall |
22 | | be entitled to recover pursuant to its tariffs all just and |
23 | | reasonable costs that are prudently incurred. Any costs |
24 | | incurred by the utility to receive, deliver, manage, or |
25 | | otherwise accommodate purchases under the SNG sourcing |
26 | | agreement will be fully recoverable through a utility's |
|
| | 09700SB1533ham001 | - 65 - | LRB097 09938 ASK 56357 a |
|
|
1 | | purchased gas adjustment clause rider mechanism in
|
2 | | conjunction with a SNG brownfield facility rider
|
3 | | mechanism. The SNG brownfield facility rider mechanism
(A) |
4 | | shall be applicable to all customers who receive
|
5 | | transportation service from the utility, (B) shall be
|
6 | | designed to have an equal percent impact on the
|
7 | | transportation services rates of each class of the
|
8 | | utility's customers, and (C) shall accurately reflect the
|
9 | | net consumer savings, if any, and above-market costs, if
|
10 | | any, associated with the utility receiving, delivering,
|
11 | | managing, or otherwise accommodating purchases under the
|
12 | | SNG sourcing agreement. |
13 | | (15) Remedies for the clean coal SNG brownfield |
14 | | facility's failure to deliver a designated amount for a |
15 | | designated period. |
16 | | (16) The clean coal SNG brownfield facility shall
make |
17 | | a good faith effort to ensure that an amount equal
to not |
18 | | less than 15% of the value of its prime
construction |
19 | | contract for the facility shall be
established as a goal to |
20 | | be awarded to minority owned
businesses, female owned |
21 | | businesses, and businesses owned
by a person with a |
22 | | disability; provided that at least 75%
of the amount of |
23 | | such total goal shall be for minority
owned businesses. |
24 | | "Minority owned business", "female
owned business", and |
25 | | "business owned by a person with a
disability" shall have |
26 | | the meanings ascribed to them in
Section 2 of the Business |
|
| | 09700SB1533ham001 | - 66 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Enterprise for Minorities,
Females and Persons with |
2 | | Disabilities Act. |
3 | | (17) Prior to the clean coal SNG brownfield facility |
4 | | issuing a notice to proceed to construction, the clean coal |
5 | | SNG brownfield facility shall file with the Commission a |
6 | | certificate from an independent engineer that the clean |
7 | | coal SNG brownfield facility has (A) obtained all |
8 | | applicable State and federal environmental permits |
9 | | required for construction; (B) obtained approval from the |
10 | | Commission of a carbon capture and sequestration plan; and |
11 | | (C) obtained all necessary permits required for |
12 | | construction for the transportation and sequestration of |
13 | | carbon dioxide as set forth in the Commission-approved |
14 | | carbon capture and sequestration plan. |
15 | | (h-2) Consumer protection reserve account. The clean coal |
16 | | SNG brownfield facility shall guarantee a minimum of |
17 | | $100,000,000 in consumer savings to customers of the utilities
|
18 | | that have entered into sourcing agreements with the clean coal
|
19 | | SNG brownfield facility, calculated in real 2010 dollars at the |
20 | | conclusion of the term of the sourcing agreement by comparing |
21 | | the delivered SNG price to the Chicago City-gate price on a |
22 | | weighted daily basis for each day over the entire term of the |
23 | | sourcing agreement. Prior to the clean coal SNG brownfield |
24 | | facility issuing a notice to proceed to construction, the clean |
25 | | coal SNG brownfield facility shall establish a consumer |
26 | | protection reserve account for the benefit of the retail |
|
| | 09700SB1533ham001 | - 67 - | LRB097 09938 ASK 56357 a |
|
|
1 | | customers of the utilities that have entered into sourcing |
2 | | agreements with the clean coal SNG brownfield facility pursuant |
3 | | to subsection (h-1), with cash principal in the amount of |
4 | | $150,000,000. Such cash principal shall only be recovered |
5 | | through the consumer protection reserve account and not as a |
6 | | cost to be recovered in the delivered SNG price pursuant to |
7 | | subsection (h-3) of this Section. The consumer protection |
8 | | reserve account shall be maintained and administered by an |
9 | | independent trustee that is mutually agreed upon by the clean |
10 | | coal SNG brownfield facility, the utilities, and the Commission |
11 | | in an interest-bearing account in accordance with the |
12 | | following: |
13 | | (1) The clean coal SNG brownfield facility monthly |
14 | | shall calculate (A) the difference between the monthly |
15 | | delivered SNG price and the Chicago City-gate price, by |
16 | | comparing the delivered SNG price, which shall include the |
17 | | cost of transportation to the delivery point, if any, to |
18 | | the Chicago City-gate price on a weighted daily basis for |
19 | | each day of the prior month based upon a mutually agreed |
20 | | upon published index and (B) the overage amount, if any, by
|
21 | | calculating the annualized incremental additional cost,
if |
22 | | any, of the delivered SNG in excess of 2.015% of the
|
23 | | average annual inflation-adjusted amounts paid by all gas
|
24 | | distribution customers in connection with natural gas
|
25 | | service during the 5 years ending May 31, 2010. |
26 | | (2) During the first 2 years of operation of the |
|
| | 09700SB1533ham001 | - 68 - | LRB097 09938 ASK 56357 a |
|
|
1 | | facility: |
2 | | (A) to the extent there is an overage amount, the |
3 | | consumer protection reserve account shall be used to |
4 | | provide a credit to reduce the SNG price by an amount |
5 | | equal to the overage amount; and |
6 | | (B) to the extent the monthly delivered SNG price |
7 | | is less than or equal to the Chicago City-gate price, |
8 | | the utility shall credit the difference between the |
9 | | monthly delivered SNG price and the monthly Chicago |
10 | | City-gate price, if any, to the consumer protection |
11 | | reserve account. Such credit issued pursuant to this |
12 | | paragraph (B) shall be deemed prudent and reasonable |
13 | | and not subject to a Commission prudence review; |
14 | | (3) After 2 years of operation of the facility, and |
15 | | monthly, on an on-going basis, thereafter: |
16 | | (A) to the extent that the monthly delivered SNG |
17 | | price is less than or equal to the Chicago City-gate |
18 | | price, calculated using the weighted average of the |
19 | | daily Chicago City-gate price on a daily basis over the |
20 | | entire month, the utility shall credit the difference, |
21 | | if any, to the consumer protection reserve account. |
22 | | Such credit issued pursuant to this subparagraph (A) |
23 | | shall be deemed prudent and reasonable and not subject |
24 | | to a Commission prudence review; |
25 | | (B) any amounts in the consumer protection reserve |
26 | | account in excess of the consumer protection reserve |
|
| | 09700SB1533ham001 | - 69 - | LRB097 09938 ASK 56357 a |
|
|
1 | | account principal maximum amount shall be distributed |
2 | | as follows: (i) if retail customers have not realized
|
3 | | net consumer savings, calculated by comparing the
|
4 | | delivered SNG price to the weighted average of the
|
5 | | daily Chicago City-gate price on a daily basis over
the |
6 | | entire term of the sourcing agreement to date,
then 50% |
7 | | of any amounts in the consumer protection
reserve |
8 | | account in excess of the consumer protection reserve |
9 | | account principal maximum shall be
distributed to the |
10 | | clean coal SNG brownfield
facility, with the remaining |
11 | | 50% of any such
additional amounts being credited to |
12 | | retail
customers, and (ii) if retail customers have |
13 | | realized net
consumer savings, then 100% of any amounts |
14 | | in the
consumer protection reserve account in excess of
|
15 | | the consumer protection reserve account principal |
16 | | maximum shall be distributed to the clean coal
SNG |
17 | | brownfield facility; provided, however, that under no |
18 | | circumstances shall the total cumulative amount |
19 | | distributed to the clean coal SNG brownfield facility |
20 | | under this subparagraph (B) exceed $150,000,000; |
21 | | (C) to the extent there is an overage amount, after |
22 | | distributing the amounts pursuant to subparagraph (B) |
23 | | of this paragraph (3), if any, the consumer protection |
24 | | reserve account shall be used to provide a credit to |
25 | | reduce the SNG price by an amount equal to the overage |
26 | | amount; |
|
| | 09700SB1533ham001 | - 70 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (D) if retail customers have realized net consumer |
2 | | savings, calculated by comparing the delivered SNG |
3 | | price to the weighted average of the daily Chicago |
4 | | City-gate price on a daily basis over the entire term |
5 | | of the sourcing agreement to date, then after |
6 | | distributing the amounts pursuant to subparagraphs (B) |
7 | | and (C) of this paragraph (3), 50% of any additional |
8 | | amounts in the consumer protection reserve account in |
9 | | excess of the consumer protection reserve account |
10 | | principal maximum shall be distributed to the clean |
11 | | coal SNG brownfield facility, with the remaining 50% of |
12 | | any such additional amounts being credited to retail |
13 | | customers; provided, however, that if retail customers |
14 | | have not realized such net consumer savings, no such |
15 | | distribution shall be made to the clean coal SNG |
16 | | brownfield facility, and 100% of such additional |
17 | | amounts shall be credited to the retail customers to |
18 | | the extent the consumer protection reserve account |
19 | | exceeds the consumer protection reserve account |
20 | | principal maximum amount. |
21 | | (4) Fifty percent of all additional net revenue, |
22 | | defined as miscellaneous net revenue after cost allowance |
23 | | for costs associated with additional net revenue that are |
24 | | not otherwise recoverable pursuant to subsection (h-3) of |
25 | | this Section, including net revenue from sales of |
26 | | substitute natural gas derived from the facility above the |
|
| | 09700SB1533ham001 | - 71 - | LRB097 09938 ASK 56357 a |
|
|
1 | | nameplate capacity of the facility and other by-products |
2 | | produced by the facility, shall be credited to the consumer |
3 | | protection reserve account. |
4 | | (5) At the conclusion of the term of the sourcing |
5 | | agreement, to the extent retail customers have not saved |
6 | | the minimum of $100,000,000 in consumer savings as |
7 | | guaranteed in this subsection (h-2), amounts in the |
8 | | consumer protection reserve account shall be credited to |
9 | | retail customers to the extent the retail customers have |
10 | | saved the minimum of $100,000,000; 50% of any additional |
11 | | amounts in the consumer protection reserve account shall be |
12 | | distributed to the company, and the remaining 50% shall be |
13 | | distributed to retail customers. |
14 | | (6) If, at the conclusion of the term of the sourcing |
15 | | agreement, the customers have not saved the minimum |
16 | | $100,000,000 in savings as guaranteed in this subsection |
17 | | (h-2) and the consumer protection reserve account has been |
18 | | depleted, then the clean coal SNG brownfield facility shall |
19 | | be liable for any remaining amount owed to the retail |
20 | | customers to the extent that the customers are provided |
21 | | with the $100,000,000 in savings as guaranteed in this |
22 | | subsection (h-2). The retail customers shall have first |
23 | | priority in recovering that debt above any creditors, |
24 | | except the original senior secured lender to the extent |
25 | | that the original senior secured lender has any senior |
26 | | secured debt outstanding, including any clean coal SNG |
|
| | 09700SB1533ham001 | - 72 - | LRB097 09938 ASK 56357 a |
|
|
1 | | brownfield facility parent companies or affiliates. |
2 | | (7) The clean coal SNG brownfield facility, the |
3 | | utilities, and the trustee shall work together to take |
4 | | commercially reasonable steps to minimize the tax impact of |
5 | | these transactions, while preserving the consumer |
6 | | benefits. |
7 | | (8) The clean coal SNG brownfield facility shall each |
8 | | month, starting in the facility's first year of commercial |
9 | | operation, file with the Commission, in such form as the |
10 | | Commission shall require, a report as to the consumer |
11 | | protection reserve account. The monthly report must |
12 | | contain the following information: |
13 | | (A) the extent the monthly delivered SNG price is |
14 | | greater than, less than, or equal to the Chicago |
15 | | City-gate price; |
16 | | (B) the amount credited or debited to the consumer |
17 | | protection reserve account during the month; |
18 | | (C) the amounts credited to consumers and |
19 | | distributed to the clean coal SNG brownfield facility |
20 | | during the month; |
21 | | (D) the total amount of the consumer protection |
22 | | reserve account at the beginning and end of the month; |
23 | | (E) the total amount of consumer savings to date; |
24 | | (F) a confidential summary of the inputs used to |
25 | | calculate the additional net revenue; and |
26 | | (G) any other additional information the |
|
| | 09700SB1533ham001 | - 73 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Commission shall require. |
2 | | When any report is erroneous or defective or appears to |
3 | | the Commission to be erroneous or defective, the Commission |
4 | | may notify the clean coal SNG brownfield facility to amend |
5 | | the report within 30 days, and, before or after the |
6 | | termination of the 30-day period, the Commission may |
7 | | examine the trustee of the consumer protection reserve |
8 | | account or the officers, agents, employees, books, |
9 | | records, or accounts of the clean coal SNG brownfield |
10 | | facility and correct such items in the report as upon such |
11 | | examination the Commission may find defective or |
12 | | erroneous. All reports shall be under oath. |
13 | | All reports made to the Commission by the clean coal |
14 | | SNG brownfield and the contents of the reports shall be |
15 | | open to public inspection and shall be deemed a public |
16 | | record under the Freedom of Information Act. Such reports |
17 | | shall be preserved in the office of the Commission. The |
18 | | Commission shall publish an annual summary of the reports |
19 | | prior to February 1 of the following year. The annual |
20 | | summary shall be made available to the public on the |
21 | | Commission's website and shall be submitted to the General |
22 | | Assembly. |
23 | | Any facility that fails to file a report required under |
24 | | this paragraph (8) to the Commission within the time |
25 | | specified or to make specific answer to any question |
26 | | propounded by the Commission within 30 days from the time |
|
| | 09700SB1533ham001 | - 74 - | LRB097 09938 ASK 56357 a |
|
|
1 | | it is lawfully required to do so, or within such further |
2 | | time not to exceed 90 days as may in its discretion be |
3 | | allowed by the Commission, shall pay a penalty of $500 to |
4 | | the Commission for each day it is in default. |
5 | | Any person who willfully makes any false report to the |
6 | | Commission or to any member, officer, or employee thereof, |
7 | | any person who willfully in a report withholds or fails to |
8 | | provide material information to which the Commission is |
9 | | entitled under this paragraph (8) and which information is |
10 | | either required to be filed by statute, rule, regulation, |
11 | | order, or decision of the Commission or has been requested |
12 | | by the Commission, and any person who willfully aids or |
13 | | abets such person shall be guilty of a Class A misdemeanor. |
14 | | (h-3) Recoverable costs and revenue by the clean coal SNG |
15 | | brownfield facility. |
16 | | (1) A capital recovery charge approved by the |
17 | | Commission shall be recoverable by the clean coal SNG |
18 | | brownfield facility under a sourcing agreement. The |
19 | | capital recovery charge shall be comprised of capital costs |
20 | | and a reasonable rate of return. "Capital costs" means |
21 | | costs to be incurred in connection with the construction |
22 | | and development of a facility, as defined in Section 1-10 |
23 | | of the Illinois Power Agency Act, and such other costs as |
24 | | the Capital Development Board deems appropriate to be |
25 | | recovered in the capital recovery charge. |
26 | | (A) Capital costs. The Capital Development Board |
|
| | 09700SB1533ham001 | - 75 - | LRB097 09938 ASK 56357 a |
|
|
1 | | shall calculate a range of capital costs that it |
2 | | believes would be reasonable for the clean coal SNG |
3 | | brownfield facility to recover under the sourcing |
4 | | agreement. In making this determination, the Capital |
5 | | Development Board shall review the facility cost
|
6 | | report, if any, of the clean coal SNG brownfield
|
7 | | facility, adjusting the results based on the change in
|
8 | | the Annual Consumer Price Index for All Urban Consumers
|
9 | | for the Midwest Region as published in April by the
|
10 | | United States Department of Labor, Bureau of Labor
|
11 | | Statistics, the final draft of the sourcing agreement, |
12 | | and the rate of return approved by the Commission. In |
13 | | addition, the Capital Development Board may consult as |
14 | | much as it deems necessary with the clean coal SNG |
15 | | brownfield facility and conduct whatever research and |
16 | | investigation it deems necessary. |
17 | | The Capital Development Board shall retain an |
18 | | engineering expert to assist in determining both the |
19 | | range of capital costs and the range of operations and |
20 | | maintenance costs that it believes would be reasonable |
21 | | for the clean coal SNG brownfield facility to recover |
22 | | under the sourcing agreement. Provided, however, that |
23 | | such expert shall: (i) not have been involved in the |
24 | | clean coal SNG brownfield facility's facility cost |
25 | | report, if any, (ii) not own or control any direct or |
26 | | indirect interest in the initial clean coal facility, |
|
| | 09700SB1533ham001 | - 76 - | LRB097 09938 ASK 56357 a |
|
|
1 | | and (iii) have no contractual relationship with the |
2 | | clean coal SNG brownfield facility. In order to qualify |
3 | | as an independent expert, a person or company must |
4 | | have: |
5 | | (i) direct previous experience conducting |
6 | | front-end engineering and design studies for |
7 | | large-scale energy facilities and administering |
8 | | large-scale energy operations and maintenance |
9 | | contracts, which may be particularized to the |
10 | | specific type of financing associated with the |
11 | | clean coal SNG brownfield facility; |
12 | | (ii) an advanced degree in economics, |
13 | | mathematics, engineering, or a related area of |
14 | | study; |
15 | | (iii) ten years of experience in the energy |
16 | | sector, including construction and risk management |
17 | | experience; |
18 | | (iv) expertise in assisting companies with |
19 | | obtaining financing for large-scale energy |
20 | | projects, which may be particularized to the |
21 | | specific type of financing associated with the |
22 | | clean coal SNG brownfield facility; |
23 | | (v) expertise in operations and maintenance |
24 | | which may be particularized to the specific type of |
25 | | operations and maintenance associated with the |
26 | | clean coal SNG brownfield facility; |
|
| | 09700SB1533ham001 | - 77 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (vi) expertise in credit and contract |
2 | | protocols; |
3 | | (vii) adequate resources to perform and |
4 | | fulfill the required functions and |
5 | | responsibilities; and |
6 | | (viii) the absence of a conflict of interest |
7 | | and inappropriate bias for or against an affected |
8 | | gas utility or the clean coal SNG brownfield |
9 | | facility. |
10 | | The clean coal SNG brownfield facility and the |
11 | | Illinois Power Agency shall cooperate with the Capital |
12 | | Development Board in any investigation it deems |
13 | | necessary. The Capital Development Board shall make |
14 | | its final determination of the range of capital costs |
15 | | confidentially and shall submit that range to the |
16 | | Commission in a confidential filing within 120 days |
17 | | after the effective date of this amendatory Act of the |
18 | | 97th General Assembly. The clean coal SNG brownfield |
19 | | facility shall submit to the Commission its estimate of |
20 | | the capital costs to be recovered under the sourcing |
21 | | agreement. Only after the clean coal SNG brownfield |
22 | | facility has submitted this estimate shall the |
23 | | Commission publicly announce the range of capital |
24 | | costs submitted by the Capital Development Board. |
25 | | In the event that the estimate submitted by the |
26 | | clean coal SNG brownfield facility is within or below |
|
| | 09700SB1533ham001 | - 78 - | LRB097 09938 ASK 56357 a |
|
|
1 | | the range submitted by the Capital Development Board, |
2 | | the clean coal SNG brownfield facility's estimate |
3 | | shall be approved by the Commission as the amount of |
4 | | capital costs to be recovered under the sourcing |
5 | | agreement. In the event that the estimate submitted by |
6 | | the clean coal SNG brownfield facility is above the |
7 | | range submitted by the Capital Development Board, the |
8 | | amount of capital costs at the lowest end of the range |
9 | | submitted by the Capital Development Board shall be |
10 | | approved by the Commission as the amount of capital |
11 | | costs to be recovered under the sourcing agreement. |
12 | | Within 15 days after the Capital Development Board has |
13 | | submitted its range and the clean coal SNG brownfield |
14 | | facility has submitted its estimate, the Commission |
15 | | shall approve the capital costs for the clean coal SNG |
16 | | brownfield facility. |
17 | | The Capital Development Board shall monitor the |
18 | | construction of the clean coal SNG brownfield facility |
19 | | for the full duration of construction to assess |
20 | | potential cost overruns. The Capital Development |
21 | | Board, in its discretion, may retain an expert to |
22 | | facilitate such monitoring. The clean coal SNG |
23 | | brownfield facility shall pay a reasonable fee as |
24 | | required by the Capital Development Board for the |
25 | | Capital Development Board's services under this |
26 | | subsection (h-3) to be deposited into the Capital |
|
| | 09700SB1533ham001 | - 79 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Development Board Revolving Fund, and such fee shall |
2 | | not be passed through to a utility or its customers. If |
3 | | an expert is retained by the Capital Development Board |
4 | | for monitoring of construction, then the clean coal SNG |
5 | | brownfield facility must pay for the expert's |
6 | | reasonable fees and such costs shall not be passed |
7 | | through to a utility or its customers. |
8 | | (B) Rate of Return. No later than 30 days after the |
9 | | date on which the Illinois Power Agency submits a final |
10 | | draft sourcing agreement, the Commission shall hold a |
11 | | public hearing to determine the rate of return to be |
12 | | recovered under the sourcing agreement. Rate of return |
13 | | shall be comprised of the clean coal SNG brownfield |
14 | | facility's actual cost of debt, including |
15 | | mortgage-style amortization, and a reasonable return |
16 | | on equity. The Commission shall post notice of the |
17 | | hearing on its website no later than 10 days prior to |
18 | | the date of the hearing. The Commission shall provide |
19 | | the public and all interested parties, including the |
20 | | gas utilities, the Attorney General, and the Illinois |
21 | | Power Agency, an opportunity to be heard. |
22 | | In determining the return on equity, the |
23 | | Commission shall select a commercially reasonable |
24 | | return on equity taking into account the return on |
25 | | equity being received by developers of similar |
26 | | facilities in or outside of Illinois, the need to |
|
| | 09700SB1533ham001 | - 80 - | LRB097 09938 ASK 56357 a |
|
|
1 | | balance an incentive for clean-coal technology with |
2 | | the need to protect ratepayers from high gas prices, |
3 | | the risks being borne by the clean coal SNG brownfield |
4 | | facility in the final draft sourcing agreement, and any |
5 | | other information that the Commission may deem |
6 | | relevant. The Commission may establish a return on |
7 | | equity that varies with the amount of savings, if any, |
8 | | to customers during the term of the sourcing agreement, |
9 | | comparing the delivered SNG price to a daily weighted |
10 | | average price of natural gas, based upon an index. The |
11 | | Illinois Power Agency shall recommend a return on |
12 | | equity to the Commission using the same criteria. |
13 | | Within 60 days after receiving the final draft sourcing |
14 | | agreement from the Illinois Power Agency, the |
15 | | Commission shall approve the rate of return for the |
16 | | clean coal brownfield facility. Within 30 days after |
17 | | obtaining debt financing for the clean coal SNG |
18 | | brownfield facility, the clean coal SNG brownfield |
19 | | facility shall file a notice with the Commission |
20 | | identifying the actual cost of debt. |
21 | | (2) Operations and maintenance costs approved by the |
22 | | Commission shall be recoverable by the clean coal SNG |
23 | | brownfield facility under the sourcing agreement. The |
24 | | operations and maintenance costs mean costs that have been |
25 | | incurred for the administration, supervision, operation, |
26 | | maintenance, preservation, and protection of the clean |
|
| | 09700SB1533ham001 | - 81 - | LRB097 09938 ASK 56357 a |
|
|
1 | | coal SNG brownfield facility's physical plant. |
2 | | The Capital Development Board shall calculate a range |
3 | | of operations and maintenance costs that it believes would |
4 | | be reasonable for the clean coal SNG brownfield facility to |
5 | | recover under the sourcing agreement, incorporating an
|
6 | | inflation index or combination of inflation indices to
most |
7 | | accurately reflect the actual costs of operating the
clean |
8 | | coal SNG brownfield facility. In making this |
9 | | determination, the Capital Development Board shall review |
10 | | the facility cost report, if any, of the clean coal SNG
|
11 | | brownfield facility, adjusting the results for inflation
|
12 | | based on the change in the Annual Consumer Price Index for
|
13 | | All Urban Consumers for the Midwest Region as published in
|
14 | | April by the United States Department of Labor, Bureau of
|
15 | | Labor Statistics, the final draft of the sourcing |
16 | | agreement, and the rate of return approved by the |
17 | | Commission. In addition, the Capital Development Board may |
18 | | consult as much as it deems necessary with the clean coal |
19 | | SNG brownfield facility and conduct whatever research and |
20 | | investigation it deems necessary. As set forth in |
21 | | subparagraph (A) of paragraph (1) of this subsection (h-3), |
22 | | the Capital Development Board shall retain an independent |
23 | | engineering expert to assist in determining both the range |
24 | | of operations and maintenance costs that it believes would |
25 | | be reasonable for the clean coal SNG brownfield to recover |
26 | | under the sourcing agreement. The clean coal SNG brownfield |
|
| | 09700SB1533ham001 | - 82 - | LRB097 09938 ASK 56357 a |
|
|
1 | | facility and the Illinois Power Agency shall cooperate with |
2 | | the Capital Development Board in any investigation it deems |
3 | | necessary. The Capital Development Board shall make its |
4 | | final determination of the range of operations and |
5 | | maintenance costs confidentially and shall submit that |
6 | | range to the Commission in a confidential filing within 120 |
7 | | days after the effective date of this amendatory Act of the |
8 | | 97th General Assembly. |
9 | | The clean coal SNG brownfield facility shall submit to |
10 | | the Commission its estimate of the operations and |
11 | | maintenance costs to be recovered under the sourcing |
12 | | agreement. Only after the clean coal SNG brownfield |
13 | | facility has submitted this estimate shall the Commission |
14 | | publicly announce the range of operations and maintenance |
15 | | costs submitted by the Capital Development Board. In the |
16 | | event that the estimate submitted by the clean coal SNG |
17 | | brownfield facility is within or below the range submitted |
18 | | by the Capital Development Board, the clean coal SNG |
19 | | brownfield facility's estimate shall be approved by the |
20 | | Commission as the amount of operations and maintenance |
21 | | costs to be recovered under the sourcing agreement. In the |
22 | | event that the estimate submitted by the clean coal SNG |
23 | | brownfield facility is above the range submitted by the |
24 | | Capital Development Board, the amount of operations and |
25 | | maintenance costs at the lowest end of the range submitted |
26 | | by the Capital Development Board shall be approved by the |
|
| | 09700SB1533ham001 | - 83 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Commission as the amount of operations and maintenance |
2 | | costs to be recovered under the sourcing agreement. Within |
3 | | 15 days after the Capital Development Board has submitted |
4 | | its range and the clean coal SNG brownfield facility has |
5 | | submitted its estimate, the Commission shall approve the |
6 | | operations and maintenance costs for the clean coal SNG |
7 | | brownfield facility. |
8 | | The clean coal SNG brownfield facility shall pay for |
9 | | the independent engineering expert's reasonable fees and |
10 | | such costs shall not be passed through to a utility or its |
11 | | customers. The clean coal SNG brownfield facility shall pay |
12 | | a reasonable fee as required by the Capital Development |
13 | | Board for the Capital Development Board's services under |
14 | | this subsection (h-3) to be deposited into the Capital |
15 | | Development Board Revolving Fund, and such fee shall not be |
16 | | passed through to a utility or its customers. |
17 | | (3) Sequestration costs approved by the Commission |
18 | | shall be recoverable by the clean coal SNG brownfield |
19 | | facility. "Sequestration costs" means costs to be incurred |
20 | | by the clean coal SNG brownfield facility in accordance |
21 | | with its Commission-approved carbon capture and |
22 | | sequestration plan to: |
23 | | (A) capture carbon dioxide; |
24 | | (B) build, operate, and maintain a sequestration |
25 | | site in which carbon dioxide may be injected; |
26 | | (C) build, operate, and maintain a carbon dioxide |
|
| | 09700SB1533ham001 | - 84 - | LRB097 09938 ASK 56357 a |
|
|
1 | | pipeline; and |
2 | | (D) transport the carbon dioxide to the |
3 | | sequestration site or a pipeline. |
4 | | The Commission shall assess the prudency of the |
5 | | sequestration costs for the clean coal SNG brownfield |
6 | | facility before construction commences at the |
7 | | sequestration site or pipeline. Any revenues the clean coal |
8 | | SNG brownfield facility receives as a result of the |
9 | | capture, transportation, or sequestration of carbon |
10 | | dioxide shall be first credited against all sequestration |
11 | | costs, with the positive balance, if any, treated as |
12 | | additional net revenue. |
13 | | The Commission may, in its discretion, retain an expert |
14 | | to assist in its review of sequestration costs. The clean |
15 | | coal SNG brownfield facility shall pay for the expert's |
16 | | reasonable fees if an expert is retained by the Commission, |
17 | | and such costs shall not be passed through to a utility or |
18 | | its customers. Once made, the Commission's determination |
19 | | of the amount of recoverable sequestration costs shall not |
20 | | be increased unless the clean coal SNG brownfield facility |
21 | | can show by clear and convincing evidence that (i) the |
22 | | costs were not reasonably foreseeable; (ii) the costs were |
23 | | due to circumstances beyond the clean coal SNG brownfield |
24 | | facility's control; and (iii) the clean coal SNG brownfield |
25 | | facility took all reasonable steps to mitigate the costs. |
26 | | If the Commission determines that sequestration costs may |
|
| | 09700SB1533ham001 | - 85 - | LRB097 09938 ASK 56357 a |
|
|
1 | | be increased, the Commission shall provide for notice and a |
2 | | public hearing for approval of the increased sequestration |
3 | | costs. |
4 | | (4) Actual delivered and processed fuel costs shall be |
5 | | set by the Illinois Power Agency through a SNG feedstock |
6 | | procurement, pursuant to Sections 1-20, 1-77, and 1-78 of |
7 | | the Illinois Power Agency Act, to be performed at least |
8 | | every 5 years and purchased by the clean coal SNG |
9 | | brownfield facility pursuant to feedstock procurement |
10 | | contracts developed by the Illinois Power Agency, with coal |
11 | | comprising at least 50% of the total feedstock over the |
12 | | term of the sourcing agreement and petroleum coke |
13 | | comprising the remainder of the SNG feedstock. If the |
14 | | Commission fails to approve a feedstock procurement plan or |
15 | | fails to approve the results of a feedstock procurement |
16 | | event, then the fuel shall be purchased by the company |
17 | | month-by-month on the spot market and those actual |
18 | | delivered and processed fuel costs shall be recoverable |
19 | | under the sourcing agreement. If a supplier defaults under |
20 | | the terms of a procurement contract, then the Illinois |
21 | | Power Agency shall immediately initiate a feedstock |
22 | | procurement process to obtain a replacement supply, and, |
23 | | prior to the conclusion of that process, fuel shall be |
24 | | purchased by the company month-by-month on the spot market |
25 | | and those actual delivered and processed fuel costs shall |
26 | | be recoverable under the sourcing agreement. |
|
| | 09700SB1533ham001 | - 86 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (5) Taxes and fees imposed by the federal government, |
2 | | the State, or any unit of local government applicable to |
3 | | the clean coal SNG brownfield facility, excluding income |
4 | | tax, shall be recoverable by the clean coal SNG brownfield |
5 | | facility under the sourcing agreement to the extent such |
6 | | taxes and fees were not applicable to the facility on the |
7 | | date of this amendatory Act of the 97th General Assembly. |
8 | | (6) The actual transportation costs, in accordance |
9 | | with the applicable utility's tariffs, and third-party |
10 | | marketer costs incurred by the company, if any, associated |
11 | | with transporting the SNG from the clean coal SNG |
12 | | brownfield facility to the Chicago City-gate to sell such |
13 | | SNG into the natural gas markets shall be recoverable under |
14 | | the sourcing agreement. |
15 | | (7) Unless otherwise provided, within 30 days after a |
16 | | decision of the Commission on recoverable costs under this |
17 | | Section, any interested party to the Commission's decision |
18 | | may apply for a rehearing with respect to the decision. The |
19 | | Commission shall receive and consider the application for |
20 | | rehearing and shall grant or deny the application in whole |
21 | | or in part within 20 days after the date of the receipt of |
22 | | the application by the Commission. If no rehearing is |
23 | | applied for within the required 30 days or an application |
24 | | for rehearing is denied, then the Commission decision shall |
25 | | be final. If an application for rehearing is granted, then |
26 | | the Commission shall hold a rehearing within 30 days after |
|
| | 09700SB1533ham001 | - 87 - | LRB097 09938 ASK 56357 a |
|
|
1 | | granting the application. The decision of the Commission |
2 | | upon rehearing shall be final. |
3 | | Any person affected by a decision of the Commission |
4 | | under this subsection (h-3) may have the decision reviewed |
5 | | only under and in accordance with the Administrative Review |
6 | | Law. Unless otherwise provided, the provisions of the |
7 | | Administrative Review Law, all amendments and |
8 | | modifications to that Law, and the rules adopted pursuant |
9 | | to that Law shall apply to and govern all proceedings for |
10 | | the judicial review of final administrative decisions of |
11 | | the Commission under this subsection (h-3). The term |
12 | | "administrative decision" is defined as in Section 3-101 of |
13 | | the Code of Civil Procedure. |
14 | | (8) The Capital Development Board shall adopt and make |
15 | | public a policy detailing the process for retaining experts |
16 | | under this Section. Any experts retained to assist with |
17 | | calculating the range of capital costs or operations and |
18 | | maintenance costs shall be retained no later than 45 days |
19 | | after the effective date of this amendatory Act of the 97th |
20 | | General Assembly. |
21 | | (h-4) No later than 90 days after the Illinois Power Agency |
22 | | submits the final draft sourcing agreement pursuant to |
23 | | subsection (h-1), the Commission shall approve a sourcing |
24 | | agreement containing the capital costs, rate of return, and |
25 | | operations and maintenance costs. Once the sourcing agreement |
26 | | is approved, then the gas utility subject to that sourcing |
|
| | 09700SB1533ham001 | - 88 - | LRB097 09938 ASK 56357 a |
|
|
1 | | agreement shall have 45 days after the date of the Commission's |
2 | | approval to enter into the sourcing agreement. |
3 | | (h-5) The Attorney General, on behalf of the people of the |
4 | | State of Illinois, may specifically enforce the requirements of |
5 | | this subsection (h-5). All contracts under subsection (h) of |
6 | | this Act and all sourcing agreements under subsection (h-1) of |
7 | | this Act , regardless of duration, shall require the owner of |
8 | | any facility supplying SNG under the contract or sourcing |
9 | | agreement to provide documentation to the Commission each year, |
10 | | starting in the facility's first year of commercial operation, |
11 | | accurately reporting the quantity of carbon dioxide emissions |
12 | | from the facility that have been captured and sequestered and |
13 | | reporting any quantities of carbon dioxide released from the |
14 | | site or sites at which carbon dioxide emissions were |
15 | | sequestered in prior years, based on continuous monitoring of |
16 | | those sites. If, in any year, the owner of the facility |
17 | | described in subsection (h) of this Act fails to demonstrate |
18 | | that the SNG facility captured and sequestered at least 90% of |
19 | | the total carbon dioxide emissions that the facility would |
20 | | otherwise emit or that sequestration of emissions from prior |
21 | | years has failed, resulting in the release of carbon dioxide |
22 | | into the atmosphere, then the owner of the facility must offset |
23 | | excess emissions. Any such carbon dioxide offsets must be |
24 | | permanent, additional, verifiable, real, located within the |
25 | | State of Illinois, and legally and practicably enforceable; |
26 | | provided that the owner of the facility described in subsection |
|
| | 09700SB1533ham001 | - 89 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (h) of this Act shall not be obligated to acquire carbon |
2 | | dioxide emission offsets to the extent that the cost of |
3 | | acquiring such offsets would exceed $40 million in any given |
4 | | year. No costs of any purchases of carbon offsets may be |
5 | | recovered from a utility or its customers. All carbon offsets |
6 | | purchased for this purpose must be permanently retired. |
7 | | If, in any year, the owner of a clean coal SNG brownfield |
8 | | facility fails to demonstrate that the clean coal SNG |
9 | | brownfield facility captured and sequestered at least 85% of |
10 | | the total carbon dioxide emissions that the facility would |
11 | | otherwise emit, then the owner of the clean coal SNG brownfield |
12 | | facility must pay a penalty of $20 per ton of excess carbon |
13 | | emissions up to $20,000,000, which shall be deposited into the |
14 | | Energy Efficiency Trust Fund and distributed pursuant to |
15 | | subsection (b) of Section 6-6 of the Renewable Energy, Energy |
16 | | Efficiency, and Coal Resources Development Law of 1997. |
17 | | Provided, however, to the extent that the owner of the clean |
18 | | coal SNG brownfield facility can demonstrate that the failure |
19 | | was as a result of acts of God (including fire, flood, |
20 | | earthquake, tornado, lightning, hurricane, or other natural |
21 | | disaster); any amendment, modification, or abrogation of any |
22 | | applicable law or regulation that would prevent performance; |
23 | | war; invasion; act of foreign enemies; hostilities (regardless |
24 | | of whether war is declared); civil war; rebellion; revolution; |
25 | | insurrection; military or usurped power or confiscation; |
26 | | terrorist activities; civil disturbances; riots; |
|
| | 09700SB1533ham001 | - 90 - | LRB097 09938 ASK 56357 a |
|
|
1 | | nationalization; sabotage; blockage; or embargo, the owner of |
2 | | the clean coal SNG brownfield facility shall not be subject to |
3 | | a penalty if and only if (i) it promptly provides notice of its |
4 | | failure to the Commission; (ii) as soon as practicable and |
5 | | consistent with any order or direction from the Commission, it |
6 | | submits to the Commission proposed modifications to its carbon |
7 | | capture and sequestration plan; and (iii) it carries out its |
8 | | proposed modifications in the manner and time directed by the |
9 | | Commission. If the Commission finds that the facility has not |
10 | | satisfied each of these requirements, then the facility shall |
11 | | be subject to the penalty. If the owner of a clean coal SNG |
12 | | brownfield facility demonstrates that the clean coal SNG |
13 | | brownfield facility captured and sequestered more than 85% of |
14 | | the total carbon emissions that the facility would otherwise |
15 | | emit, the owner of the clean coal SNG brownfield facility may |
16 | | credit such additional amounts to reduce the amount of any |
17 | | future penalty to be paid. The penalty resulting from the |
18 | | failure to capture and sequester at least the minimum amount of |
19 | | carbon dioxide shall not be passed on to a utility or its |
20 | | customers. |
21 | | In addition to any penalty for the clean coal SNG |
22 | | brownfield facility's failure to capture and sequester at least |
23 | | its minimum sequestration requirement, the Attorney General, |
24 | | on behalf of the People of the State of Illinois, shall bring |
25 | | an action for specific performance of this subsection (h-5). |
26 | | Such action may be filed in any circuit court in Illinois. By |
|
| | 09700SB1533ham001 | - 91 - | LRB097 09938 ASK 56357 a |
|
|
1 | | entering into a sourcing agreement pursuant to subsection (h-1) |
2 | | of this Section, the clean coal SNG brownfield facility agrees |
3 | | to waive any objections to venue or to the jurisdiction of the |
4 | | court with regard to the Attorney General's action for specific |
5 | | performance under this subsection (h-5). |
6 | | In addition, carbon dioxide emission credits equivalent to |
7 | | 50% of the amount of credits associated with the required |
8 | | sequestration of carbon dioxide from the facility must be |
9 | | permanently retired. Compliance with the sequestration |
10 | | requirements and the offset purchase requirements specified in |
11 | | this subsection (h-5) for the facility described in subsection |
12 | | (h) of this Act shall be assessed annually by an independent |
13 | | expert retained by the owner of the SNG facility described in |
14 | | subsection (h) of this Act , with the advance written approval |
15 | | of the Attorney General. Compliance with the sequestration |
16 | | requirements and penalty requirements specified in this |
17 | | subsection (h-5) for the clean coal SNG brownfield facility |
18 | | shall be assessed annually by the Commission, which may in its |
19 | | discretion retain an expert to facilitate its assessment. If an |
20 | | expert is retained by the Commission, then the clean coal SNG |
21 | | brownfield facility shall pay for the expert's reasonable fees, |
22 | | and such costs shall not be passed through to a utility or its |
23 | | customers. A SNG facility operating pursuant to this subsection |
24 | | (h-5) shall not forfeit its designation as a clean coal SNG |
25 | | facility or a clean coal SNG brownfield facility if the |
26 | | facility fails to fully comply with the applicable carbon |
|
| | 09700SB1533ham001 | - 92 - | LRB097 09938 ASK 56357 a |
|
|
1 | | sequestration requirements in any given year, provided the |
2 | | requisite offsets are purchased or requisite penalties are |
3 | | paid . |
4 | | Responsibility for compliance with the sequestration |
5 | | requirements specified in this subsection (h-5) for the clean |
6 | | coal SNG brownfield facility shall reside solely with the clean |
7 | | coal SNG brownfield facility regardless of whether the facility |
8 | | has contracted with another party to capture, transport, or |
9 | | sequester carbon dioxide. |
10 | | (h-7) Sequestration permitting, oversight, and |
11 | | investigations. |
12 | | (1) No clean coal facility or clean coal SNG brownfield |
13 | | facility may transport or sequester carbon dioxide unless |
14 | | the Commission approves the method of carbon dioxide |
15 | | transportation or sequestration. Such approval shall be |
16 | | required regardless of whether the facility has contracted |
17 | | with another to transport or sequester the carbon dioxide. |
18 | | Nothing in this subsection (h-7) shall release the owner or |
19 | | operator of a carbon dioxide sequestration site or carbon |
20 | | dioxide pipeline from any other permitting requirements |
21 | | under applicable State and federal laws, statutes, rules, |
22 | | or regulations. |
23 | | (2) The Commission shall review carbon dioxide |
24 | | transportation and sequestration methods proposed by a |
25 | | clean coal facility or a clean coal SNG brownfield facility |
26 | | and shall approve those methods it deems reasonable and |
|
| | 09700SB1533ham001 | - 93 - | LRB097 09938 ASK 56357 a |
|
|
1 | | cost-effective. For purposes of this review, |
2 | | "cost-effective" means a commercially reasonable price for |
3 | | similar carbon dioxide transportation or sequestration |
4 | | techniques. In determining whether sequestration is |
5 | | reasonable and cost-effective, the Commission may consult |
6 | | with the Illinois State Geological Survey and retain third |
7 | | parties to assist in its determination, provided that such |
8 | | third parties shall not own or control any direct or |
9 | | indirect interest in the facility that is proposing the |
10 | | carbon dioxide transportation or the carbon dioxide |
11 | | sequestration method and shall have no contractual |
12 | | relationship with that facility. If a third party is |
13 | | retained by the Commission, then the facility proposing the |
14 | | carbon dioxide transportation or sequestration method |
15 | | shall pay for the expert's reasonable fees, and these costs |
16 | | shall not be passed through to a utility or its customers. |
17 | | No later than 6 months prior to the date upon which the |
18 | | owner intends to commence construction of a clean coal |
19 | | facility or the clean coal SNG brownfield facility, the |
20 | | owner of the facility shall file with the Commission a |
21 | | carbon dioxide transportation or sequestration plan. The |
22 | | Commission shall hold a public hearing within 30 days after |
23 | | receipt of the facility's carbon dioxide transportation or |
24 | | sequestration plan. The Commission shall post notice of the |
25 | | review on its website upon submission of a carbon dioxide |
26 | | transportation or sequestration method and shall accept |
|
| | 09700SB1533ham001 | - 94 - | LRB097 09938 ASK 56357 a |
|
|
1 | | written public comments. The Commission shall take the |
2 | | comments into account when making its decision. |
3 | | The Commission may not approve a carbon dioxide |
4 | | sequestration method if the owner or operator of the |
5 | | sequestration site has not received (i) an Underground |
6 | | Injection Control permit from the Illinois Environmental |
7 | | Protection Agency pursuant to the Environmental Protection |
8 | | Act; (ii) an Underground Injection Control permit from the |
9 | | Illinois Department of Natural Resources pursuant to the |
10 | | Illinois Oil and Gas Act; or (iii) a permit similar to |
11 | | items (i) or (ii) from the state in which the sequestration |
12 | | site is located if the sequestration will take place |
13 | | outside of Illinois. The Commission shall approve or deny |
14 | | the carbon dioxide transportation or sequestration method |
15 | | within 90 days after the receipt of all required |
16 | | information. |
17 | | (3) At least annually, the Illinois Environmental |
18 | | Protection Agency shall inspect all carbon dioxide |
19 | | sequestration sites in Illinois. The Illinois |
20 | | Environmental Protection Agency may, as often as deemed |
21 | | necessary, monitor and conduct investigations of those |
22 | | sites. The owner or operator of the sequestration site must |
23 | | cooperate with the Illinois Environmental Protection |
24 | | Agency investigations of carbon dioxide sequestration |
25 | | sites. |
26 | | If the Illinois Environmental Protection Agency |
|
| | 09700SB1533ham001 | - 95 - | LRB097 09938 ASK 56357 a |
|
|
1 | | determines at any time a site creates conditions that |
2 | | warrant the issuance of a seal order under Section 34 of |
3 | | the Environmental Protection Act, then the Illinois |
4 | | Environmental Protection Agency shall seal the site |
5 | | pursuant to the Environmental Protection Act. If the |
6 | | Illinois Environmental Protection Agency determines at any |
7 | | time a carbon dioxide sequestration site creates |
8 | | conditions that warrant the institution of a civil action |
9 | | for an injunction under Section 43 of the Environmental |
10 | | Protection Act, then the Illinois Environmental Protection |
11 | | Agency shall request the State's Attorney or the Attorney |
12 | | General institute such action. The Illinois Environmental |
13 | | Protection Agency shall provide notice of any such actions |
14 | | as soon as possible on its website. The SNG facility shall |
15 | | incur all reasonable costs associated with any such |
16 | | inspection or monitoring of the sequestration sites, and |
17 | | these costs shall not be recoverable from utilities or |
18 | | their customers. |
19 | | (4) At least annually, the Commission shall inspect all |
20 | | carbon dioxide pipelines in Illinois that transport carbon |
21 | | dioxide to ensure the safety and feasibility of those |
22 | | pipelines. The Commission may, as often as deemed |
23 | | necessary, monitor and conduct investigations of those |
24 | | pipelines. The owner or operator of the pipeline must |
25 | | cooperate with the Commission investigations of the carbon |
26 | | dioxide pipelines. |
|
| | 09700SB1533ham001 | - 96 - | LRB097 09938 ASK 56357 a |
|
|
1 | | In circumstances whereby a carbon dioxide pipeline |
2 | | creates a substantial danger to the environment or to the |
3 | | public health of persons or to the welfare of persons where |
4 | | such danger is to the livelihood of such persons, the |
5 | | State's Attorney or Attorney General, upon the request of |
6 | | the Commission or on his or her own motion, may institute a |
7 | | civil action for an immediate injunction to halt any |
8 | | discharge or other activity causing or contributing to the |
9 | | danger or to require such other action as may be necessary. |
10 | | The court may issue an ex parte order and shall schedule a |
11 | | hearing on the matter not later than 3 working days after |
12 | | the date of injunction. The Commission shall provide notice |
13 | | of any such actions as soon as possible on its website. The |
14 | | SNG facility shall incur all reasonable costs associated |
15 | | with any such inspection or monitoring of the sequestration |
16 | | sites, and these costs shall not be recoverable from a |
17 | | utility or its customers. |
18 | | (h-9) The clean coal SNG brownfield facility shall have the |
19 | | right to recover prudently incurred increased costs or reduced |
20 | | revenue resulting from any new or amendatory legislation or |
21 | | other action. The State of Illinois pledges that the State will |
22 | | not enact any law or take any action to: |
23 | | (1) break, or repeal the authority for, sourcing |
24 | | agreements approved by the Commission and entered into |
25 | | between public utilities and the clean coal SNG brownfield |
26 | | facility; |
|
| | 09700SB1533ham001 | - 97 - | LRB097 09938 ASK 56357 a |
|
|
1 | | (2) deny public utilities full cost recovery for their |
2 | | costs incurred under those sourcing agreements; or |
3 | | (3) deny the clean coal SNG brownfield facility full |
4 | | cost and revenue recovery as provided under those sourcing |
5 | | agreements that are recoverable pursuant to subsection |
6 | | (h-3) of this Section. |
7 | | These pledges are for the benefit of the parties to those |
8 | | sourcing agreements and the issuers and holders of bonds or |
9 | | other obligations issued or incurred to finance or refinance |
10 | | the clean coal SNG brownfield facility. The clean coal SNG |
11 | | brownfield facility is authorized to include and refer to these |
12 | | pledges in any financing agreement into which it may enter in |
13 | | regard to those sourcing agreements. |
14 | | The State of Illinois retains and reserves all other rights |
15 | | to enact new or amendatory legislation or take any other |
16 | | action, without impairment of the right of the clean coal SNG |
17 | | brownfield facility to recover prudently incurred increased |
18 | | costs or reduced revenue resulting from the new or amendatory |
19 | | legislation or other action, including, but not limited to, |
20 | | such legislation or other action that would (i) directly or |
21 | | indirectly raise the costs the clean coal SNG brownfield |
22 | | facility must incur; (ii) directly or indirectly place |
23 | | additional restrictions, regulations, or requirements on the |
24 | | clean coal SNG brownfield facility; (iii) prohibit |
25 | | sequestration in general or prohibit a specific sequestration |
26 | | method or project; or (iv) increase minimum sequestration |
|
| | 09700SB1533ham001 | - 98 - | LRB097 09938 ASK 56357 a |
|
|
1 | | requirements for the clean coal SNG brownfield facility to the |
2 | | extent technically feasible. The clean coal SNG brownfield |
3 | | facility shall have the right to recover prudently incurred |
4 | | increased costs or reduced revenue resulting from the new or |
5 | | amendatory legislation or other action as described in this |
6 | | subsection (h-9). |
7 | | (h-10) Contract costs for SNG incurred by an Illinois gas |
8 | | utility are reasonable and prudent and recoverable through the |
9 | | purchased gas adjustment clause and are not subject to review |
10 | | or disallowance by the Commission. Contract costs are costs |
11 | | incurred by the utility under the terms of a contract that |
12 | | incorporates the terms stated in subsection (h) of this Section |
13 | | as confirmed in writing by the Illinois Power Agency as set |
14 | | forth in subsection (h-20) of this Section, which confirmation |
15 | | shall be deemed conclusive, or as a consequence of or condition |
16 | | to its performance under the contract, including (i) amounts |
17 | | paid for SNG under the SNG contract and (ii) costs of |
18 | | transportation and storage services of SNG purchased from |
19 | | interstate pipelines under federally approved tariffs. Any |
20 | | contract, the terms of which have been confirmed in writing by |
21 | | the Illinois Power Agency as set forth in subsection (h-20) of |
22 | | this Section and the performance of the parties under such |
23 | | contract cannot be grounds for challenging prudence or cost |
24 | | recovery by the utility through the purchased gas adjustment |
25 | | clause, and in such cases, the Commission is directed not to |
26 | | consider, and has no authority to consider, any attempted |
|
| | 09700SB1533ham001 | - 99 - | LRB097 09938 ASK 56357 a |
|
|
1 | | challenges. |
2 | | The contracts entered into by Illinois gas utilities |
3 | | pursuant to subsection (h) of this Section shall provide that |
4 | | the utility retains the right to terminate the contract without |
5 | | further obligation or liability to any party if the contract |
6 | | has been impaired as a result of any legislative, |
7 | | administrative, judicial, or other governmental action that is |
8 | | taken that eliminates all or part of the prudence protection of |
9 | | this subsection (h-10) or denies the recoverability of all or |
10 | | part of the contract costs through the purchased gas adjustment |
11 | | clause. Should any Illinois gas utility exercise its right |
12 | | under this subsection (h-10) to terminate the contract, all |
13 | | contract costs incurred prior to termination are and will be |
14 | | deemed reasonable, prudent, and recoverable as and when |
15 | | incurred and not subject to review or disallowance by the |
16 | | Commission. Any order, issued by the State requiring or |
17 | | authorizing the discontinuation of the merchant function, |
18 | | defined as the purchase and sale of natural gas by an Illinois |
19 | | gas utility for the ultimate consumer in its service territory |
20 | | shall include provisions necessary to prevent the impairment of |
21 | | the value of any contract hereunder over its full term. |
22 | | (h-11) All costs incurred by an Illinois gas utility in |
23 | | procuring SNG from a clean coal SNG brownfield facility |
24 | | pursuant to subsection (h-1) or a third-party marketer pursuant |
25 | | to subsection (h-1), are reasonable and prudent and recoverable |
26 | | through the purchased gas adjustment clause in conjunction with
|
|
| | 09700SB1533ham001 | - 100 - | LRB097 09938 ASK 56357 a |
|
|
1 | | a SNG brownfield facility rider mechanism and are not subject |
2 | | to review or disallowance by the Commission; provided that
if a |
3 | | utility is required by law or otherwise elects to connect
the |
4 | | clean coal SNG brownfield facility to an interstate
pipeline, |
5 | | then the utility shall be entitled to recover
pursuant to its |
6 | | tariffs all just and reasonable costs that are
prudently |
7 | | incurred. Sourcing agreement costs are costs incurred by the |
8 | | utility under the terms of a sourcing agreement that |
9 | | incorporates the terms stated in subsection (h-1) of this |
10 | | Section as approved by the Commission as set forth in |
11 | | subsection (h-4) of this Section, which approval shall be |
12 | | deemed conclusive, or as a consequence of or condition to its |
13 | | performance under the contract, including (i) amounts paid for |
14 | | SNG under the SNG contract and (ii) costs of transportation and |
15 | | storage services of SNG purchased from interstate pipelines |
16 | | under federally approved tariffs. Any sourcing agreement, the |
17 | | terms of which have been approved by the Commission as set |
18 | | forth in subsection (h-4) of this Section, and the performance |
19 | | of the parties under the sourcing agreement cannot be grounds |
20 | | for challenging prudence or cost recovery by the utility |
21 | | through the purchased gas adjustment clause, and in these |
22 | | cases, the Commission is directed not to consider, and has no |
23 | | authority to consider, any attempted challenges. |
24 | | (h-15) With respect to each contract entered into by the |
25 | | company with an Illinois utility in accordance with the terms |
26 | | stated in subsection (h) of this Section, within 60 days |
|
| | 09700SB1533ham001 | - 101 - | LRB097 09938 ASK 56357 a |
|
|
1 | | following the completion of purchases of SNG, the Illinois |
2 | | Power Agency shall conduct an analysis to determine (i) the |
3 | | average contract SNG cost, which shall be calculated as the |
4 | | total amount paid to a company for SNG over the contract term, |
5 | | plus the cost to the utility of the required transportation and |
6 | | storage services of SNG, divided by the total number of MMBtus |
7 | | of SNG actually purchased under the utility contract; (ii) the |
8 | | average natural gas purchase cost, which shall be calculated as |
9 | | the total annual supply costs paid for natural gas (excluding |
10 | | SNG) purchased by such utility over the contract term, plus the |
11 | | costs of transportation and storage services of such natural |
12 | | gas (excluding such costs for SNG), divided by the total number |
13 | | of MMBtus of natural gas (excluding SNG) actually purchased by |
14 | | the utility during the contract term; (iii) the cost |
15 | | differential, which shall be the difference between the average |
16 | | contract SNG cost and the average natural gas purchase cost; |
17 | | and (iv) the revenue share target, which shall be the cost |
18 | | differential multiplied by the total amount of SNG purchased |
19 | | under such utility contract. If the average contract SNG cost |
20 | | is equal to or less than the average natural gas purchase cost, |
21 | | then the company shall have no further obligation to the |
22 | | utility. If the average contract SNG cost for such SNG contract |
23 | | is greater than the average natural gas purchase cost for such |
24 | | utility, then the company shall market the daily production of |
25 | | SNG and distribute on a monthly basis 5% of amounts collected |
26 | | with respect to such future sales to the utilities in |
|
| | 09700SB1533ham001 | - 102 - | LRB097 09938 ASK 56357 a |
|
|
1 | | proportion to each utility's SNG purchases from the company |
2 | | during the term of the SNG contract to be used to reduce the |
3 | | utility's natural gas costs through the purchased gas |
4 | | adjustment clause; such payments to the utility shall continue |
5 | | until such time as the sum of such payments equals the revenue |
6 | | share target of that utility. The company or utilities shall |
7 | | have no obligation to repay the revenue share target except as |
8 | | provided for in this subsection (h-15). |
9 | | (h-20) The General Assembly authorizes the Illinois |
10 | | Finance Authority to issue bonds to the maximum extent |
11 | | permitted to finance coal gasification facilities described in |
12 | | this Section, which constitute both "industrial projects" |
13 | | under Article 801 of the Illinois Finance Authority Act and |
14 | | "clean coal and energy projects" under Sections 825-65 through |
15 | | 825-75 of the Illinois Finance Authority Act. The General |
16 | | Assembly further authorizes the Illinois Power Agency to become |
17 | | party to agreements and take such actions as necessary to |
18 | | enable the Illinois Power Agency or its designate to (i) review |
19 | | and confirm in writing that the terms stated in subsection (h) |
20 | | of this Section are incorporated in the SNG contract, and (ii) |
21 | | conduct an analysis pursuant to subsection (h-15) of this |
22 | | Section. Administrative costs incurred by the Illinois Finance |
23 | | Authority and Illinois Power Agency in performance of this |
24 | | subsection (h-20) shall be subject to reimbursement by the |
25 | | company on terms as the Illinois Finance Authority, the |
26 | | Illinois Power Agency, and the company may agree. The utility |
|
| | 09700SB1533ham001 | - 103 - | LRB097 09938 ASK 56357 a |
|
|
1 | | and its customers shall have no obligation to reimburse the |
2 | | company, the Illinois Finance Authority, or the Illinois Power |
3 | | Agency for any such costs. |
4 | | (i) If a gas utility or an affiliate of a gas utility has |
5 | | an ownership interest in any entity that produces or sells |
6 | | synthetic natural gas, Article VII of this Act shall apply.
|
7 | | (Source: P.A. 95-1027, eff. 6-1-09; 96-1364, eff. 7-28-10.) |
8 | | Section 15. The Illinois Gas Pipeline Safety Act is amended |
9 | | by changing Sections 2.02, 2.03, 2.04, and 3 as follows:
|
10 | | (220 ILCS 20/2.02) (from Ch. 111 2/3, par. 552.2)
|
11 | | Sec. 2.02.
"Gas" means natural gas, flammable gas or gas |
12 | | which is toxic or
corrosive. "Gas" also means carbon dioxide in |
13 | | any physical form, whenever transported by pipeline for the |
14 | | purpose of sequestration.
|
15 | | (Source: P.A. 76-1588.)
|
16 | | (220 ILCS 20/2.03) (from Ch. 111 2/3, par. 552.3)
|
17 | | Sec. 2.03.
"Transportation of gas" means the gathering, |
18 | | transmission, or
distribution of gas by pipeline or its |
19 | | storage, within this State and not
subject to the jurisdiction |
20 | | of the Federal Energy Regulatory
Commission under the
Natural |
21 | | Gas Act, except that it includes the transmission of gas |
22 | | through
pipeline facilities within this State that transport |
23 | | gas from an interstate
gas pipeline to a direct sales customer |
|
| | 09700SB1533ham001 | - 104 - | LRB097 09938 ASK 56357 a |
|
|
1 | | within this State purchasing gas
for its own consumption. |
2 | | "Transportation of gas" also includes
the conveyance of gas |
3 | | from a gas main through the primary fuel line to the
outside |
4 | | wall of residential
premises. If the gas meter is placed within |
5 | | 3 feet of the structure, the
utility's responsibility shall end |
6 | | at the outlet side of the meter. "Transportation of gas" also |
7 | | includes the conveyance of carbon dioxide in any physical form |
8 | | for the purpose of sequestration.
|
9 | | (Source: P.A. 87-1092; 88-314.)
|
10 | | (220 ILCS 20/2.04) (from Ch. 111 2/3, par. 552.4)
|
11 | | Sec. 2.04.
"Pipeline facilities" includes new and existing |
12 | | pipe rights-of-way and
any equipment, facility, or building |
13 | | used in the transportation of gas
or the
treatment of gas |
14 | | during the course of transportation and
includes facilities |
15 | | within this State that transport gas from an interstate
gas |
16 | | pipeline to a direct sales customer within this State |
17 | | purchasing gas
for its own consumption, but
"rights-of-way" as |
18 | | used in this Act does not authorize the Commission to
|
19 | | prescribe, under this Act, the location or
routing of any |
20 | | pipeline facility. "Pipeline facilities" also includes
new and |
21 | | existing pipes and lines and any other equipment, facility, or
|
22 | | structure, except customer-owned branch lines connected to the |
23 | | primary fuel
lines, used to convey gas from a gas main to the |
24 | | outside wall of
residential premises, and any person who |
25 | | provides gas service directly to its
residential customer |
|
| | 09700SB1533ham001 | - 105 - | LRB097 09938 ASK 56357 a |
|
|
1 | | through these facilities shall be deemed to operate
such |
2 | | pipeline facilities for purposes of this Act irrespective of |
3 | | the ownership
of the facilities or the location of the |
4 | | facilities with respect to the
meter, except that a person who |
5 | | provides gas service to a "master meter
system", as that term |
6 | | is defined at 49 C.F.R. Section 191.3, shall not be
deemed to |
7 | | operate any facilities downstream of the master meter. |
8 | | "Pipeline facilities" also includes new and existing pipe |
9 | | rights-of-way and any equipment, facility, or building used in |
10 | | the transportation of carbon dioxide in any physical form for |
11 | | the purpose of sequestration.
|
12 | | (Source: P.A. 87-1092; 88-314.)
|
13 | | (220 ILCS 20/3) (from Ch. 111 2/3, par. 553)
|
14 | | Sec. 3.
(a) As soon as practicable, but not later than 3 |
15 | | months after the
effective date of this Act, the Commission |
16 | | shall adopt rules establishing
minimum safety standards for the |
17 | | transportation of gas and for pipeline
facilities. Such rules |
18 | | shall be at least as inclusive, as stringent, and
compatible |
19 | | with, the minimum safety standards adopted by the Secretary of
|
20 | | Transportation under the Federal Act. Thereafter, the |
21 | | Commission shall
maintain such rules so that the rules are at |
22 | | least as inclusive, as
stringent, and compatible with, the |
23 | | minimum standards from time to time in
effect under the Federal |
24 | | Act. The Commission shall also adopt rules establishing minimum |
25 | | safety standards for the transportation of carbon dioxide in |
|
| | 09700SB1533ham001 | - 106 - | LRB097 09938 ASK 56357 a |
|
|
1 | | any physical form for the purpose of sequestration and for |
2 | | pipeline facilities used for that function.
|
3 | | (b) Standards established under this Act may apply to the |
4 | | design,
installation, inspection, testing, construction, |
5 | | extension, operation,
replacement, and maintenance of pipeline |
6 | | facilities. Standards affecting
the design, installation, |
7 | | construction, initial inspection and initial
testing are not |
8 | | applicable to pipeline facilities in existence on the date
such |
9 | | standards are adopted. Whenever the Commission finds a |
10 | | particular
facility to be hazardous to life or property, it may |
11 | | require the person
operating such facility to take the steps |
12 | | necessary to remove the hazard.
|
13 | | (c) Standards established by the Commission under this Act |
14 | | shall,
subject to paragraphs (a) and (b) of this Section 3, be |
15 | | practicable and
designed to meet the need for pipeline safety. |
16 | | In prescribing such
standards, the Commission shall consider: |
17 | | similar standards established in
other states; relevant |
18 | | available pipeline safety data; whether such
standards are |
19 | | appropriate for the particular type of pipeline
|
20 | | transportation; the reasonableness of any proposed standards; |
21 | | and the
extent to which such standards will contribute to |
22 | | public safety.
|
23 | | Rules adopted under this Act are subject to "The Illinois |
24 | | Administrative
Procedure Act", approved September 22, 1975, as |
25 | | amended.
|
26 | | (Source: P.A. 83-333.)
|
|
| | 09700SB1533ham001 | - 107 - | LRB097 09938 ASK 56357 a |
|
|
1 | | Section 20. The Illinois Environmental Protection Act is |
2 | | amended by adding Section 13.7 as follows: |
3 | | (415 ILCS 5/13.7 new) |
4 | | Sec. 13.7. Carbon dioxide sequestration sites. |
5 | | (a) For purposes of this Section, the term "carbon dioxide |
6 | | sequestration site" means a site or facility for which the |
7 | | Agency has issued a permit for the underground injection of |
8 | | carbon dioxide. |
9 | | (b) The Agency shall inspect carbon dioxide sequestration |
10 | | sites for compliance with this Act, rules adopted under this |
11 | | Act, and permits issued by the Agency. |
12 | | (c) If the Agency issues a seal order under Section 34 of |
13 | | this Act in relation to a carbon dioxide sequestration site, or |
14 | | if a civil action for an injunction to halt activity at a |
15 | | carbon dioxide sequestration site is initiated under Section 43 |
16 | | of this Act at the request of the Agency, then the Agency shall |
17 | | post notice of such action on its website. |
18 | | (d) Persons seeking a permit or permit modification for the |
19 | | underground injection of carbon dioxide shall be liable to the |
20 | | Agency for all reasonable and documented costs incurred by the |
21 | | Agency that are associated with review and issuance of the |
22 | | permit, including, but not limited to, costs associated with |
23 | | public hearings and the review of permit applications. Once a |
24 | | permit is issued, the permittee shall be liable to the Agency |
|
| | 09700SB1533ham001 | - 108 - | LRB097 09938 ASK 56357 a |
|
|
1 | | for all reasonable and documented costs incurred by the Agency |
2 | | that are associated with inspections and other oversight of the |
3 | | carbon dioxide sequestration site. Persons liable for costs |
4 | | under this subsection (d) must pay the costs upon invoicing, or |
5 | | other request or demand for payment, by the Agency. Costs for |
6 | | which a person is liable under this subsection (d) are in |
7 | | addition to any other fees, penalties, or other relief provided |
8 | | under this Act or any other law. |
9 | | Moneys collected under this subsection (d) shall be |
10 | | deposited into the Environmental Protection Permit and |
11 | | Inspection Fund established under Section 22.8 of this Act. The |
12 | | Agency may adopt rules relating to the collection of costs due |
13 | | under this subsection (d). |
14 | | (e) The Agency shall not issue a permit or permit |
15 | | modification for the underground injection of carbon dioxide |
16 | | unless all costs for which the permitee is liable under |
17 | | subsection (d) of this Section have been paid. |
18 | | (f) No person shall fail or refuse to pay costs for which |
19 | | the person is liable under subsection (d) of this Section. |
20 | | Section 85. Rulemaking. The Illinois Environmental |
21 | | Protection Agency, the Illinois Commerce Commission, the |
22 | | Capital Development Board, and the Illinois Department of |
23 | | Natural Resources shall have rulemaking authority to implement |
24 | | the provisions of this amendatory Act of the 97th General |
25 | | Assembly. |