|
| | 103RD GENERAL ASSEMBLY
State of Illinois
2023 and 2024 HB5066 Introduced 2/8/2024, by Rep. Maura Hirschauer SYNOPSIS AS INTRODUCED: | | | Amends the Uranium and Thorium Mill Tailings Control Act. Provides that the Illinois Emergency Management Agency and Office of Homeland Security may approve a request for license termination following adoption and implantation by the municipality or county in which the material milling facility is located of one or more ordinances restricting the use of groundwater on the property that has been licensed for the milling of source material and the property downgradient from that property if the ordinance ensures public health and safety and is in effect at the time of license termination. Requires the ordinances adopted for the purpose of terminating a license to remain in effect until the Agency approves in writing that the ordinances are no longer needed. |
| |
| | A BILL FOR |
|
|
| | HB5066 | | LRB103 38838 BDA 68975 b |
|
|
1 | | AN ACT concerning safety. |
2 | | Be it enacted by the People of the State of Illinois, |
3 | | represented in the General Assembly: |
4 | | Section 5. The Uranium and Thorium Mill Tailings Control |
5 | | Act is amended by changing Section 32 as follows: |
6 | | (420 ILCS 42/32) |
7 | | Sec. 32. Limitations on groundwater and property use. |
8 | | (a) In connection with the decommissioning of a source |
9 | | material milling facility or the termination of the facility's |
10 | | license, the Agency shall have the authority to adopt by rule, |
11 | | or impose by order or license amendment or condition, |
12 | | restrictions on the use of groundwater on any property that |
13 | | has been licensed for the milling of source material and any |
14 | | property downgradient from the property that has been licensed |
15 | | for the milling of source material where the groundwater |
16 | | impacted by a licensed facility has constituents above |
17 | | naturally-occurring levels and is in excess of the groundwater |
18 | | standards enforceable by the Agency. |
19 | | (a-5) As an alternative to the method prescribed in |
20 | | subsection (a), the Agency may approve a request for license |
21 | | termination following adoption and implementation by the |
22 | | municipality or county in which the material milling facility |
23 | | is located of one or more ordinances restricting the use of |