| | 100TH GENERAL ASSEMBLY
State of Illinois
2017 and 2018 SB3131 Introduced 2/15/2018, by Sen. Sue Rezin SYNOPSIS AS INTRODUCED: | | |
Amends the Public Utilities Act. Changes references to "hearing examiner" to references to "administrative law judge" throughout the Act. Repeals provisions concerning emission allowances, conducting a study on billing practices and policies, conducting a study on strategic options for changing the structure of energy service markets, conducting a study on the feasibility of wheeling electricity in the State, rules for recovering costs of canceled facilities, recovery of additional charges refunded to customers, conducting a study on implementing promotional rates for industrial and commercial customers, alternative rate regulations, and conducting a study on patterns of entry and exit for each relevant market for telecommunications services. Removes references to repealed provisions. Makes conforming changes in the High Speed Internet Services and Information Technology Act. Makes other changes. Effective immediately.
|
| |
| | A BILL FOR |
|
|
| | SB3131 | | LRB100 19958 SMS 35239 b |
|
|
1 | | AN ACT concerning regulation.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The High Speed Internet Services and Information |
5 | | Technology Act is amended by changing Section 20 as follows: |
6 | | (20 ILCS 661/20)
|
7 | | Sec. 20. Duties of the enlisted nonprofit organization. |
8 | | (a) The high speed Internet deployment strategy and demand |
9 | | creation initiative to be performed by the nonprofit |
10 | | organization shall include, but not be limited to, the |
11 | | following actions: |
12 | | (1) Create a geographic statewide inventory of high |
13 | | speed Internet service and other relevant broadband and |
14 | | information technology services. The inventory shall: |
15 | | (A) identify geographic gaps in high speed |
16 | | Internet service through a method of GIS mapping of |
17 | | service availability and GIS analysis at the census |
18 | | block level; |
19 | | (B) provide a baseline assessment of statewide |
20 | | high speed Internet deployment in terms of percentage |
21 | | of Illinois households with high speed Internet |
22 | | availability; and |
23 | | (C) collect from Facilities-based Providers of |
|
| | SB3131 | - 2 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Broadband Connections to End User Locations the |
2 | | information provided pursuant to the agreements |
3 | | entered into with the non-profit organization as of the |
4 | | effective date of this amendatory Act of the 96th |
5 | | General Assembly or similar information from |
6 | | Facilities-based Providers of Broadband Connections to |
7 | | End User Locations that do not have the agreements on |
8 | | said date. |
9 | | For the purposes of item (C), "Facilities-based |
10 | | Providers of Broadband Connections to End User |
11 | | Locations" means an entity that meets any of the |
12 | | following conditions: |
13 | | (i) It owns the portion of the physical |
14 | | facility that terminates at the end user location. |
15 | | (ii) It obtains unbundled network elements |
16 | | (UNEs), special access lines, or other leased |
17 | | facilities that terminate at the end user location |
18 | | and provisions or equips them as broadband. |
19 | | (iii) It provisions or equips a broadband |
20 | | wireless channel to the end user location over |
21 | | licensed or unlicensed spectrum. |
22 | | "Facilities-based Provider of Broadband |
23 | | Connections to End User Locations" does not include |
24 | | providers of terrestrial fixed wireless services (such |
25 | | as Wi-Fi and other wireless Ethernet, or wireless local |
26 | | area network, applications) that only enable local |
|
| | SB3131 | - 3 - | LRB100 19958 SMS 35239 b |
|
|
1 | | distribution and sharing of a premises broadband |
2 | | facility and does not include air-to-ground services. |
3 | | shall have the same meaning as that term is defined in |
4 | | Section 13-407 of the Public Utilities Act. |
5 | | (2) Track and identify, through customer interviews |
6 | | and surveys and other publicly available sources, |
7 | | statewide residential and business adoption of high speed |
8 | | Internet, computers, and related information technology |
9 | | and any barriers to adoption. |
10 | | (3) Build and facilitate in each county or designated |
11 | | region a local technology planning team with members |
12 | | representing a cross section of the community, including, |
13 | | but not limited to, representatives of business, K-12 |
14 | | education, health care, libraries, higher education, |
15 | | community-based organizations, local government, tourism, |
16 | | parks and recreation, and agriculture. Each team shall |
17 | | benchmark technology use across relevant community |
18 | | sectors, set goals for improved technology use within each |
19 | | sector, and develop a plan for achieving its goals, with |
20 | | specific recommendations for online application |
21 | | development and demand creation. |
22 | | (4) Collaborate with high speed Internet providers and |
23 | | technology companies to encourage deployment and use, |
24 | | especially in underserved areas, by aggregating local |
25 | | demand, mapping analysis, and creating market intelligence |
26 | | to improve the business case for providers to deploy. |
|
| | SB3131 | - 4 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (5) Collaborate with the Department in developing a |
2 | | program to increase computer ownership and broadband |
3 | | access for disenfranchised populations across the State. |
4 | | The program may include grants to local community |
5 | | technology centers that provide technology training, |
6 | | promote computer ownership, and increase broadband access. |
7 | | (6) Collaborate with the Department and the Illinois |
8 | | Commerce Commission regarding the collection of the |
9 | | information required by this Section to assist in |
10 | | monitoring and analyzing the broadband markets and the |
11 | | status of competition and deployment of broadband services |
12 | | to consumers in the State, including the format of |
13 | | information requested, provided the Commission enters into |
14 | | the proprietary and confidentiality agreements governing |
15 | | such information. |
16 | | (b) The nonprofit organization may apply for federal grants |
17 | | consistent with the objectives of this Act. |
18 | | (c) (Blank). |
19 | | (d) The nonprofit organization shall have the power to |
20 | | obtain or to raise funds other than the grants received from |
21 | | the Department under this Act. |
22 | | (e) The nonprofit organization and its Board of Directors |
23 | | shall exist separately and independently from the Department |
24 | | and any other governmental entity, but shall cooperate with |
25 | | other public or private entities it deems appropriate in |
26 | | carrying out its duties. |
|
| | SB3131 | - 5 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (f) Notwithstanding anything in this Act or any other Act |
2 | | to the contrary, any information that is designated |
3 | | confidential or proprietary by an entity providing the |
4 | | information to the nonprofit organization or any other entity |
5 | | to accomplish the objectives of this Act shall be deemed |
6 | | confidential, proprietary, and a trade secret and treated by |
7 | | the nonprofit organization or anyone else possessing the |
8 | | information as such and shall not be disclosed. |
9 | | (g) The nonprofit organization shall provide a report to |
10 | | the Commission on Government Forecasting and Accountability on |
11 | | an annual basis for the first 3 complete State fiscal years |
12 | | following its enlistment.
|
13 | | (Source: P.A. 99-576, eff. 7-15-16.) |
14 | | Section 10. The Public Utilities Act is amended by changing |
15 | | Sections 2-105, 2-106, 4-304, 5-102, 6-102, 7-204, 8-103B, |
16 | | 8-508, 8-509, 9-102.1, 9-201, 9-214, 9-222.2, 9-223, 10-101, |
17 | | 10-101.1, 10-103, 10-104, 10-105, 10-106, 10-107, 10-110, |
18 | | 10-111, 10-201, 10-204, 13-506.2, 13-515, 16-108.5, and 16-111 |
19 | | as follows:
|
20 | | (220 ILCS 5/2-105) (from Ch. 111 2/3, par. 2-105)
|
21 | | Sec. 2-105. Organization; executive director; assistants |
22 | | to Commissioners.
|
23 | | (a) In order that the Commission
may perform the duties and |
24 | | exercise the powers granted to it and assume its
|
|
| | SB3131 | - 6 - | LRB100 19958 SMS 35239 b |
|
|
1 | | responsibilities under this Act and any and all other statutes |
2 | | of this
State, the Commission, acting jointly, shall hire an |
3 | | executive director who
shall be responsible to the Commission |
4 | | and shall serve subject only to
removal by the Commission for |
5 | | good cause. The executive director shall be
responsible for the |
6 | | supervision and direction of the Commission staff and
for the |
7 | | necessary administrative activities of the Commission, subject |
8 | | only
to Commission direction and approval. In furtherance |
9 | | thereof, the executive
director may organize the Commission |
10 | | staff into such departments, bureaus,
sections, or divisions as |
11 | | he may deem necessary or appropriate. In
connection therewith, |
12 | | the executive director may delegate and assign to one
or more |
13 | | staff member or members the supervision and direction of any |
14 | | such
department, bureau, section, or division.
|
15 | | (b) The executive director shall obtain, subject to the |
16 | | provisions of
the Personnel Code, such accountants, engineers, |
17 | | experts, inspectors, clerks,
and employees as may be
necessary |
18 | | to carry out the provisions of this Act or to perform the |
19 | | duties
and exercise the powers conferred by law upon the |
20 | | Commission. All
accountants, engineers, experts, inspectors, |
21 | | clerks, and employees of the
Commission shall receive the |
22 | | compensation fixed by the Executive Director,
subject only to |
23 | | Commission approval. Notwithstanding these provisions, each
|
24 | | commissioner shall have the authority to retain up to 2 |
25 | | full-time
assistants, subject to the provisions of the |
26 | | Personnel Code, who shall be
supervised by the commissioner and |
|
| | SB3131 | - 7 - | LRB100 19958 SMS 35239 b |
|
|
1 | | whose compensation shall be fixed by
the commissioner.
|
2 | | (c) The commissioners, executive director, administrative |
3 | | law judges hearing examiners ,
accountants, engineers, clerks, |
4 | | inspectors, experts, and other employees
shall have reimbursed |
5 | | to them all actual and necessary traveling and other
expenses |
6 | | and disbursements necessarily incurred or made by them in the
|
7 | | discharge of their official duties. The Commission and |
8 | | executive director
may also incur necessary expenses for office |
9 | | furniture, stationery,
printing, and other incidental |
10 | | expenses.
|
11 | | (d) A copy of any contract executed between the Commission |
12 | | and the
executive director which establishes or provides for |
13 | | the expenditure of
public funds shall be filed with the State |
14 | | Comptroller within 15 days of
execution and shall be available |
15 | | for public inspection. Any cancellation
or modification of any |
16 | | such contract shall be filed with the State
Comptroller within |
17 | | 15 days of execution and shall be available for public
|
18 | | inspection. When a contract or modification required to be |
19 | | filed under
this subsection has not been filed within 30 days |
20 | | of execution, the State
Comptroller shall refuse to issue any |
21 | | warrant for payment thereunder until
the Commission files the |
22 | | contract or modification with the State Comptroller.
|
23 | | (Source: P.A. 89-429, eff. 12-15-95.)
|
24 | | (220 ILCS 5/2-106) (from Ch. 111 2/3, par. 2-106)
|
25 | | Sec. 2-106.
(a) The executive director shall employ |
|
| | SB3131 | - 8 - | LRB100 19958 SMS 35239 b |
|
|
1 | | administrative law judges hearing examiners to
make valuations |
2 | | of public utility properties, or to estimate proper rates of
|
3 | | service of public utilities, or to examine other questions |
4 | | coming before
the Commission, by taking testimony or by |
5 | | independent investigation.
The executive director shall |
6 | | designate one administrative law judge hearing examiner to |
7 | | serve as
chief administrative law judge hearing examiner who |
8 | | shall be responsible for supervising and
directing the |
9 | | activities of all administrative law judges hearing examiners , |
10 | | subject to the approval
of the executive director. |
11 | | Administrative law judges Hearing examiners shall, under the |
12 | | direction of
the chief administrative law judge hearing |
13 | | examiner , take testimony of witnesses, examine accounts,
|
14 | | records, books, papers and physical properties, either by |
15 | | holding hearings
or making independent investigations, in any |
16 | | matter referred to them by the
chief administrative law judge |
17 | | hearing examiner ; and make report thereof to the chief |
18 | | administrative law judge hearing examiner ,
and attend at |
19 | | hearings before the Commission when so directed by the chief |
20 | | administrative law judge
hearing examiner , for the purpose of |
21 | | explaining their investigations and
the result thereof to the |
22 | | Commission and the parties interested; and
perform such other |
23 | | duties as the chief administrative law judge hearing examiner |
24 | | may direct.
|
25 | | (b) All administrative law judges hearing examiners |
26 | | employed by the Commission shall be thoroughly
familiar with |
|
| | SB3131 | - 9 - | LRB100 19958 SMS 35239 b |
|
|
1 | | applicable rules of evidence, procedure and administrative
|
2 | | law. At least every two years after an administrative law judge |
3 | | a hearing examiner is employed by the
Commission, the executive |
4 | | director and chief administrative law judge hearing examiner |
5 | | shall review
the performance of such administrative law judge |
6 | | hearing examiner based on whether the administrative law judge |
7 | | examiner :
|
8 | | (i) is, and is perceived to be, fair to all parties;
|
9 | | (ii) has a judicious and considerate temperament;
|
10 | | (iii) is capable of comprehending and properly conducting |
11 | | proceedings
and other duties to which he is assigned;
|
12 | | (iv) is capable of understanding and rendering rulings on |
13 | | legal and evidentiary issues;
|
14 | | (v) is capable of independently evaluating the evidentiary |
15 | | record and
drafting a proposed final order which reflects |
16 | | careful, impartial and
competent analysis; and
|
17 | | (vi) meets any other qualifications deemed relevant or |
18 | | necessary by the
executive director or chief administrative law |
19 | | judge hearing examiner .
|
20 | | (Source: P.A. 84-617.)
|
21 | | (220 ILCS 5/4-304) (from Ch. 111 2/3, par. 4-304)
|
22 | | Sec. 4-304.
Beginning in 1986, the Commission shall prepare |
23 | | an
annual report which shall be filed by January 31 of each |
24 | | year with the Joint
Committee on Legislative Support Services |
25 | | of the General Assembly and the Governor and which shall be |
|
| | SB3131 | - 10 - | LRB100 19958 SMS 35239 b |
|
|
1 | | publicly available. Such
report shall include:
|
2 | | (1) A general review of agency activities and changes, |
3 | | including:
|
4 | | (a) a review of significant decisions and other |
5 | | regulatory actions for
the preceding year, and pending |
6 | | cases, and an analysis of the impact of
such decisions |
7 | | and actions, and potential impact of any significant |
8 | | pending
cases;
|
9 | | (b) for each significant decision, regulatory |
10 | | action and pending
case, a description of the positions |
11 | | advocated by major parties, including
Commission |
12 | | staff, and for each such decision rendered or action |
13 | | taken, the
position adopted by the Commission and |
14 | | reason therefor;
|
15 | | (c) a description of the Commission's budget, |
16 | | caseload, and staff
levels, including specifically:
|
17 | | (i) a breakdown by type of case of the cases |
18 | | resolved and filed during
the year and of pending |
19 | | cases;
|
20 | | (ii) a description of the allocation of the |
21 | | Commission's budget,
identifying amounts budgeted |
22 | | for each significant regulatory function or
|
23 | | activity and for each department, bureau, section, |
24 | | division or office of
the Commission and its |
25 | | employees;
|
26 | | (iii) a description of current employee |
|
| | SB3131 | - 11 - | LRB100 19958 SMS 35239 b |
|
|
1 | | levels, identifying any change
occurring during |
2 | | the year in the number of employees, personnel |
3 | | policies
and practices or compensation levels; and |
4 | | identifying the number and type
of employees |
5 | | assigned to each Commission regulatory function |
6 | | and to each
department, bureau, section, division |
7 | | or office of the Commission;
|
8 | | (d) a description of any significant changes in |
9 | | Commission policies,
programs or practices with |
10 | | respect to agency organization and
administration, |
11 | | hearings and procedures or substantive regulatory
|
12 | | activity.
|
13 | | (2) A discussion and analysis of the state of each |
14 | | utility industry
regulated by the Commission and |
15 | | significant changes, trends and developments
therein, |
16 | | including the number and types of firms offering each |
17 | | utility
service, existing, new and prospective |
18 | | technologies, variations in the
quality, availability and |
19 | | price for utility services in different
geographic areas of |
20 | | the State, and any other industry factors or
circumstances |
21 | | which may affect the public interest or the regulation of |
22 | | such
industries.
|
23 | | (3) A specific discussion of the energy planning |
24 | | responsibilities and
activities of the Commission and |
25 | | energy utilities, including:
|
26 | | (a) the extent to which conservation, |
|
| | SB3131 | - 12 - | LRB100 19958 SMS 35239 b |
|
|
1 | | cogeneration, renewable energy
technologies and |
2 | | improvements in energy efficiency are being utilized |
3 | | by energy
consumers, the extent to which additional |
4 | | potential exists for the economical
utilization of |
5 | | such supplies, and a description of existing and |
6 | | proposed
programs and policies designed to promote and |
7 | | encourage such utilization;
|
8 | | (b) a description of each energy plan filed with |
9 | | the Commission pursuant
to the provisions of this Act, |
10 | | and a copy, or detailed summary of the most
recent |
11 | | energy plans adopted by the Commission;
|
12 | | (c) a discussion of the powers by which the |
13 | | Commission is implementing
the planning |
14 | | responsibilities of Article VIII, including a |
15 | | description of
the staff and budget assigned to such |
16 | | function, the procedures by which
Commission staff |
17 | | reviews and analyzes energy plans submitted by the |
18 | | utilities,
the Department of Natural Resources, and |
19 | | any other person or
party; and
|
20 | | (d) a summary of the adoption of solar photovoltaic |
21 | | systems by residential and small business consumers in |
22 | | Illinois and a description of any and all barriers to |
23 | | residential and small business consumers' financing, |
24 | | installation, and valuation of energy produced by |
25 | | solar photovoltaic systems; electric utilities, |
26 | | alternative retail electric suppliers, and installers |
|
| | SB3131 | - 13 - | LRB100 19958 SMS 35239 b |
|
|
1 | | of distributed generation shall provide all |
2 | | information requested by the Commission or its staff |
3 | | necessary to complete the analysis required by this |
4 | | paragraph (d). |
5 | | (4) A discussion of the extent to which utility |
6 | | services are available
to all Illinois citizens including:
|
7 | | (a) the percentage and number of persons or |
8 | | households requiring each
such service who are not |
9 | | receiving such service, and the reasons therefore,
|
10 | | including specifically the number of such persons or |
11 | | households who are
unable to afford such service;
|
12 | | (b) a critical analysis of existing programs |
13 | | designed to promote and
preserve the availability and |
14 | | affordability of utility services; and
|
15 | | (c) an analysis of the financial impact on |
16 | | utilities and other
ratepayers of the inability of some |
17 | | customers or potential customers to
afford utility |
18 | | service, including the number of service |
19 | | disconnections and
reconnections, and cost thereof and |
20 | | the dollar amount of uncollectible
accounts recovered |
21 | | through rates.
|
22 | | (5) A detailed description of the means by which the |
23 | | Commission is
implementing its new statutory |
24 | | responsibilities under this Act, and the
status of such |
25 | | implementation, including specifically:
|
26 | | (a) Commission reorganization resulting from the |
|
| | SB3131 | - 14 - | LRB100 19958 SMS 35239 b |
|
|
1 | | addition of an
Executive Director and administrative |
2 | | law judge hearing examiner qualifications and review;
|
3 | | (b) Commission responsibilities for construction |
4 | | and rate supervision,
including construction cost |
5 | | audits, management audits, excess capacity
|
6 | | adjustments, phase-ins of new plant and the means and |
7 | | capability for monitoring
and reevaluating existing or |
8 | | future construction projects;
|
9 | | (c) promulgation and application of rules |
10 | | concerning ex parte
communications, circulation of |
11 | | recommended orders and transcription of closed
|
12 | | meetings.
|
13 | | (6) A description of all appeals taken from Commission |
14 | | orders, findings
or decisions and the status and outcome of |
15 | | such appeals.
|
16 | | (7) A description of the status of all studies and |
17 | | investigations
required by this Act, including those |
18 | | ordered pursuant to Section Sections 8-304,
9-242, 9-244 |
19 | | and 13-301 and all
such subsequently ordered studies or |
20 | | investigations.
|
21 | | (8) A discussion of new or potential developments in |
22 | | federal
legislation, and federal agency and judicial |
23 | | decisions relevant to State
regulation of utility |
24 | | services.
|
25 | | (9) All recommendations for appropriate legislative |
26 | | action by the General
Assembly.
|
|
| | SB3131 | - 15 - | LRB100 19958 SMS 35239 b |
|
|
1 | | The Commission may include such other information as it |
2 | | deems to be
necessary or beneficial in describing or explaining |
3 | | its activities or
regulatory responsibilities. The report |
4 | | required by this Section shall be
adopted by a vote of the full |
5 | | Commission prior to filing.
|
6 | | (Source: P.A. 99-107, eff. 7-22-15.)
|
7 | | (220 ILCS 5/5-102) (from Ch. 111 2/3, par. 5-102)
|
8 | | Sec. 5-102.
The Commission shall have power to establish a |
9 | | uniform system of
accounts to be kept by public utilities or to |
10 | | classify public utilities and
to establish a uniform system of |
11 | | accounts for each class and to prescribe
the manner in which |
12 | | such accounts shall be kept. It may also, in its
discretion, |
13 | | prescribe the forms of accounts to be kept by public utilities,
|
14 | | including records of service, as well as accounts of earnings |
15 | | and expenses,
and any other forms, records and memoranda which |
16 | | in the judgment of the
Commission may be necessary to carry out |
17 | | any of the provisions of this Act.
The system of accounts |
18 | | established by the Commission and the forms of
accounts |
19 | | prescribed by it shall not be inconsistent, in the case of
|
20 | | corporations subject to the provisions of the Act of Congress |
21 | | entitled, "An
Act to regulate commerce," approved February |
22 | | fourth, eighteen hundred and
eighty-seven, and the Acts |
23 | | amendatory thereof and supplementary thereto,
with the systems |
24 | | and forms from time to time established for such
corporations |
25 | | by the Interstate Commerce Commission, but nothing herein
|
|
| | SB3131 | - 16 - | LRB100 19958 SMS 35239 b |
|
|
1 | | contained shall affect the power of the Commission to prescribe |
2 | | forms of
accounts for such corporations, with the approval of |
3 | | the Interstate
Commerce Commission, covering information in |
4 | | addition to that required by
the Interstate Commerce |
5 | | Commission. Where the Commission has prescribed the
forms of |
6 | | accounts to be kept by any public utility for any of its |
7 | | business,
it shall thereafter be unlawful for such public |
8 | | utility to keep any
accounts for such business other than those |
9 | | prescribed or approved by the
Commission, or those prescribed |
10 | | by or under the authority of any other
state or of the United |
11 | | States.
|
12 | | The Commission may, from time to time, alter, amend or |
13 | | repeal, in whole
or in part, any uniform system of accounts, or |
14 | | the form and manner of
keeping accounts.
|
15 | | (Source: P.A. 84-617.)
|
16 | | (220 ILCS 5/6-102) (from Ch. 111 2/3, par. 6-102)
|
17 | | Sec. 6-102. Authorization of issues of stock.
|
18 | | (a) Subject to the provisions of this Act and of the order |
19 | | of the
Commission issued as provided in this Act, a public |
20 | | utility may issue
stocks and stock certificates, and bonds, |
21 | | notes and other evidences of
indebtedness payable at periods of |
22 | | more than 12 months after the date
thereof for any lawful |
23 | | purpose. However, such public utility
shall first have secured |
24 | | from the Commission an order authorizing such
issue and stating |
25 | | the amount thereof and the purpose or purposes to which
the |
|
| | SB3131 | - 17 - | LRB100 19958 SMS 35239 b |
|
|
1 | | issue or the proceeds thereof are to be applied, and that in |
2 | | the
opinion of the Commission, the money, property or labor to |
3 | | be procured or
paid for by such issue is reasonably required |
4 | | for the purpose or purposes
specified in the order.
|
5 | | (b) The provisions of this subsection (b) shall apply
only |
6 | | to (1) any issuances of stock in a cumulative amount,
exclusive |
7 | | of any issuances referred to in item (3), that are
10% or more |
8 | | in a calendar year or 20% or more in a 24-month
period of the |
9 | | total common stockholders' equity or of the
total amount of |
10 | | preferred stock outstanding, as the case may
be, of the public |
11 | | utility, and (2) to any issuances of bonds,
notes or other |
12 | | evidences of indebtedness in a cumulative
principal amount, |
13 | | exclusive of any issuances referred to in
item (3), that are |
14 | | 10% or more in a calendar year or 20% or
more in a 24-month |
15 | | period of the aggregate principal amount of
bonds, notes and |
16 | | other evidences of indebtedness of the public
utility |
17 | | outstanding, all as of the date of the issuance, but
shall not |
18 | | apply to (3) any issuances of stock or of bonds,
notes or other |
19 | | evidences of indebtedness 90% or more of the
proceeds of which |
20 | | are to be used by the public utility for
purposes of refunding, |
21 | | redeeming or refinancing outstanding
issues of stock, bonds, |
22 | | notes or other evidences of
indebtedness.
To enable it to |
23 | | determine whether it will issue the
order required by |
24 | | subsection (a) of this Section, the Commission may hold a |
25 | | hearing and may make such additional
inquiry or investigation, |
26 | | and examine such witnesses, books, papers,
accounts, documents |
|
| | SB3131 | - 18 - | LRB100 19958 SMS 35239 b |
|
|
1 | | and contracts and require the filing of such data as it
may |
2 | | deem of assistance. The public utility may be required by the
|
3 | | Commission to disclose every interest of the directors of such |
4 | | public
utility in any transaction under investigation. The |
5 | | Commission shall have
power to investigate all such |
6 | | transactions and to inquire into the good
faith thereof, to |
7 | | examine books, papers, accounts, documents and contracts
of |
8 | | public utilities, construction or other companies or of firms |
9 | | or
individuals with whom the public utility shall have had |
10 | | financial
transactions, for the purpose of enabling it to |
11 | | verify any statements
furnished, and to examine into the actual |
12 | | value of property acquired by or
services rendered to such |
13 | | public utility. Before issuing its order, the
Commission, when |
14 | | it is deemed necessary by the Commission, shall make an
|
15 | | adequate physical valuation of all property of the public |
16 | | utility, but a
valuation already made under proper public |
17 | | supervision may be adopted,
either in whole or in part, at the |
18 | | discretion of the Commission; and shall
also examine all |
19 | | previously authorized or outstanding securities of the
public |
20 | | utility, and fixed charges attached thereto. A statement of the
|
21 | | results of such physical valuation, and a statement of the |
22 | | character of all
outstanding securities, together with the |
23 | | conditions under which they are
held, shall be included in the |
24 | | order. The Commission may require that such
information or such |
25 | | part thereof as it thinks proper, shall appear upon the
stock, |
26 | | stock certificate, bond, note or other evidence of indebtedness
|
|
| | SB3131 | - 19 - | LRB100 19958 SMS 35239 b |
|
|
1 | | authorized by its order. The Commission may by its order grant |
2 | | permission
for the issue of such stock certificates, or bonds, |
3 | | notes or other
evidences of indebtedness in the amount applied |
4 | | for, or in a lesser amount,
or not at all, and may attach to the |
5 | | exercise of its permission such
condition or conditions as it |
6 | | may deem reasonable and necessary.
Nothing in this Section |
7 | | shall prevent a public utility from seeking, nor
the Commission |
8 | | from approving, a shelf registration plan for issuing
|
9 | | securities over a reasonable period in accordance with |
10 | | regulations
established by the United States Securities and |
11 | | Exchange Commission. Any
securities issued pursuant to an |
12 | | approved shelf registration plan need not
be further approved |
13 | | by the Commission so long as they are in compliance
with the |
14 | | approved shelf registration plan. The
Commission shall have the |
15 | | power to refuse its approval of applications to
issue |
16 | | securities, in whole or in part, upon a finding that the issue |
17 | | of
such securities would be contrary to public interest. The |
18 | | Commission may
also require the public utility to compile for |
19 | | the information of its
shareholders such facts in regard to its |
20 | | financial transactions, in such
form as the Commission may |
21 | | direct.
|
22 | | No public utility shall, without the consent of the |
23 | | Commission, apply
the issue of any stock or stock certificates, |
24 | | or bond, note or other
evidence of indebtedness, which was |
25 | | issued pursuant to an order of the
Commission entered pursuant |
26 | | to this subsection (b), or any part thereof, or
any proceeds |
|
| | SB3131 | - 20 - | LRB100 19958 SMS 35239 b |
|
|
1 | | thereof, to
any purpose not specified in the Commission's order |
2 | | or to any purpose
specified in the Commission's order in excess |
3 | | of the amount authorized for
such purpose; or issue or dispose |
4 | | of the same on any terms less favorable
than those specified in |
5 | | such order, or a modification thereof. The
Commission shall |
6 | | have the power to require public utilities to account for
the |
7 | | disposition of the proceeds of all sales of stocks and stock |
8 | | certificates,
and bonds, notes and other evidences of |
9 | | indebtedness, which were issued
pursuant to an order of the |
10 | | Commission entered pursuant to this subsection
(b), in such |
11 | | form and detail
as it may deem advisable, and to establish such |
12 | | rules and regulations as it
may deem reasonable and necessary |
13 | | to insure the disposition of such
proceeds for the purpose or |
14 | | purposes specified in its order.
|
15 | | (c) A public utility may issue notes, for proper purposes, |
16 | | and not in
violation of any provision of this Act or any other |
17 | | Act, payable at periods
of not more than 12 months after the |
18 | | date of issuance of the same, without
the consent of the |
19 | | Commission; but no such note shall, in whole or in part,
be |
20 | | renewed or be refunded from the proceeds of any other such note |
21 | | or
evidence of indebtedness from time to time without the |
22 | | consent of the
Commission for an aggregate period of longer |
23 | | than 2 years.
A "telecommunications carrier" as that term is |
24 | | defined by Section 13-202
of this Act is exempt from the |
25 | | requirements of this subsection (c).
|
26 | | (d) Any issuance of stock or of bonds, notes or other
|
|
| | SB3131 | - 21 - | LRB100 19958 SMS 35239 b |
|
|
1 | | evidences of indebtedness, other than issuances of notes
|
2 | | pursuant to subsection (c) of this Section, which is not
|
3 | | subject to subsection (b) of this Section, shall be regulated
|
4 | | by the Commission as follows: the public utility shall file
|
5 | | with the Commission, at least 15 days before the date of the
|
6 | | issuance, an informational statement setting forth the type
and |
7 | | amount of the issue and the purpose or purposes to which
the |
8 | | issue or the proceeds thereof are to be applied. Prior to
the |
9 | | date of the issuance specified in the public utility's
filing, |
10 | | the Commission, if it finds that the issuance is not
subject to |
11 | | subsection (b) of this Section, shall issue a
written order in |
12 | | conformance with subsection (a) of this
Section authorizing the |
13 | | issuance. Notwithstanding any other
provisions of this Act, the |
14 | | Commission may delegate its
authority to enter the order |
15 | | required by this subsection (d)
to an administrative law judge |
16 | | a hearing examiner .
|
17 | | (e) The Commission shall have no power to authorize the |
18 | | capitalization
of
the right to be a corporation, or to |
19 | | authorize the capitalization of any
franchise, license, or |
20 | | permit whatsoever or the right to own, operate or
enjoy any |
21 | | such franchise, license, or permit, in excess of the amount
|
22 | | (exclusive of any tax or annual charge) actually paid to the |
23 | | State or to a
political subdivision thereof as the |
24 | | consideration for the grant of such
franchise, license, permit |
25 | | or right; nor shall any contract for
consolidation or lease be |
26 | | capitalized, nor shall any public utility
hereafter issue any |
|
| | SB3131 | - 22 - | LRB100 19958 SMS 35239 b |
|
|
1 | | bonds, notes or other evidences of indebtedness against
or as a |
2 | | lien, upon any contract for consolidation or merger.
|
3 | | (f) The provisions of this Section shall not apply to |
4 | | public utilities
which
are not corporations duly incorporated |
5 | | under the laws of this State to the
extent that any such public |
6 | | utility may issue stock, bonds, notes or other
evidences of |
7 | | indebtedness not directly or indirectly constituting or
|
8 | | creating a lien or charge on, or right to profits from, any |
9 | | property used
or useful in rendering service within this State. |
10 | | Nothing in this Section
or in Section 6-104 of this Act shall |
11 | | be construed to require a common carrier
by railroad subject to |
12 | | Part I of the Interstate Commerce Act, being part of
an Act of |
13 | | the 49th Congress of the United States entitled "An Act to
|
14 | | Regulate Commerce", as amended, to secure from the Commission |
15 | | authority
to issue or execute or deliver any conditional sales |
16 | | contract or similar
contract or instrument reserving or |
17 | | retaining title in the seller for all
or part of the purchase |
18 | | price of equipment or property used or to be used
for or in |
19 | | connection with the transportation of persons or property.
|
20 | | (Source: P.A. 90-561, eff. 12-16-97; 91-69, eff. 7-9-99.)
|
21 | | (220 ILCS 5/7-204) (from Ch. 111 2/3, par. 7-204)
|
22 | | Sec. 7-204. Reorganization defined; Commission approval |
23 | | therefore.
|
24 | | (a) For purposes of this Section, "reorganization" means |
25 | | any
transaction which, regardless of the means by which it is |
|
| | SB3131 | - 23 - | LRB100 19958 SMS 35239 b |
|
|
1 | | accomplished,
results in a change in the ownership of a |
2 | | majority of the voting capital
stock of an Illinois public |
3 | | utility; or the ownership or control of any
entity which owns |
4 | | or controls a majority of the voting capital stock of a
public |
5 | | utility; or by which 2 public utilities merge, or by which a |
6 | | public
utility acquires substantially all of the assets of |
7 | | another public utility;
provided, however, that |
8 | | "reorganization" as used in this
Section shall not include a |
9 | | mortgage or pledge transaction entered into to
secure a bona |
10 | | fide borrowing by the party granting the mortgage or making the
|
11 | | pledge.
|
12 | | In addition to the foregoing, "reorganization" shall |
13 | | include for purposes
of this Section any transaction which, |
14 | | regardless of the means by which it
is accomplished, will have |
15 | | the effect of terminating the affiliated
interest status of any |
16 | | entity as defined in paragraphs (a), (b), (c) or
(d) of |
17 | | subsection (2) of Section 7-101 of this Act where such entity |
18 | | had
transactions with the public utility, in the 12 calendar |
19 | | months
immediately preceding the date of termination of such |
20 | | affiliated interest
status subject to subsection (3) of Section |
21 | | 7-101 of this Act with a
value greater than 15% of the public |
22 | | utility's revenues for that same
12-month period. If the |
23 | | proposed transaction would have
the effect of
terminating the |
24 | | affiliated interest status of more than one Illinois public
|
25 | | utility, the utility with the greatest revenues for the |
26 | | 12-month period
shall be used to determine whether such |
|
| | SB3131 | - 24 - | LRB100 19958 SMS 35239 b |
|
|
1 | | proposed transaction is a
reorganization for the purposes of |
2 | | this Section. The Commission shall have
jurisdiction over any |
3 | | reorganization as defined herein.
|
4 | | (b) No reorganization shall take place without prior |
5 | | Commission
approval.
The Commission shall not approve any |
6 | | proposed reorganization if the
Commission finds, after notice |
7 | | and hearing, that the reorganization will
adversely affect the |
8 | | utility's ability to perform its duties under this
Act. The |
9 | | Commission shall not approve any proposed reorganization |
10 | | unless the Commission finds, after notice and hearing, In |
11 | | reviewing any proposed reorganization, the Commission must |
12 | | find that:
|
13 | | (1) the proposed reorganization will not diminish the
|
14 | | utility's ability to provide adequate, reliable, |
15 | | efficient, safe and least-cost
public utility service;
|
16 | | (2) the proposed reorganization will not result in the
|
17 | | unjustified
subsidization of non-utility activities by the |
18 | | utility or its customers;
|
19 | | (3) costs and facilities are fairly and reasonably |
20 | | allocated
between
utility and non-utility activities in |
21 | | such a manner that the Commission may
identify those costs |
22 | | and facilities which are properly included by the
utility |
23 | | for ratemaking purposes;
|
24 | | (4) the proposed reorganization will not significantly |
25 | | impair
the utility's
ability to raise necessary capital on |
26 | | reasonable terms or to maintain a
reasonable capital |
|
| | SB3131 | - 25 - | LRB100 19958 SMS 35239 b |
|
|
1 | | structure;
|
2 | | (5) the utility will remain subject to all applicable |
3 | | laws,
regulations, rules, decisions and policies governing |
4 | | the regulation of Illinois
public utilities;
|
5 | | (6) the proposed reorganization is not likely to have a
|
6 | | significant adverse effect on competition in those markets
|
7 | | over which the Commission has jurisdiction;
|
8 | | (7) the proposed reorganization is not likely to result |
9 | | in any
adverse rate impacts on retail customers.
|
10 | | (c) The Commission shall not approve a reorganization
|
11 | | without ruling on: (i) the allocation of any savings resulting
|
12 | | from the proposed reorganization; and (ii) whether the |
13 | | companies should
be allowed to recover any costs incurred in |
14 | | accomplishing the
proposed reorganization and, if so, the |
15 | | amount of costs eligible for
recovery and how the costs will be |
16 | | allocated.
|
17 | | (d) The Commission shall issue its Order approving or
|
18 | | denying the proposed reorganization within 11 months after the
|
19 | | application is filed. The Commission may extend the deadline
|
20 | | for a period equivalent to the length of any delay which the
|
21 | | Commission finds to have been caused by the Applicant's
failure |
22 | | to provide data or information requested by the
Commission or |
23 | | that the Commission ordered the Applicant to
provide to the |
24 | | parties. The Commission may also extend the
deadline by an |
25 | | additional period not to exceed 3 months to
consider amendments |
26 | | to the Applicant's filing, or to consider
reasonably |
|
| | SB3131 | - 26 - | LRB100 19958 SMS 35239 b |
|
|
1 | | unforeseeable changes in circumstances subsequent
to the |
2 | | Applicant's initial filing.
|
3 | | (e) Subsections (c) and (d) and subparagraphs (6) and (7) |
4 | | of
subsection (b) of this Section shall apply only to merger
|
5 | | applications submitted to the Commission subsequent to April
|
6 | | 23, 1997. No other Commission approvals shall be required for
|
7 | | mergers that are subject to this Section.
|
8 | | (f) In approving any proposed reorganization pursuant to |
9 | | this Section
the
Commission may impose such terms, conditions |
10 | | or requirements as, in its
judgment, are necessary to protect |
11 | | the interests of the public utility and its
customers.
|
12 | | (Source: P.A. 90-561, eff. 12-16-97 .)
|
13 | | (220 ILCS 5/8-103B) |
14 | | Sec. 8-103B. Energy efficiency and demand-response |
15 | | measures. |
16 | | (a) It is the policy of the State that electric utilities |
17 | | are required to use cost-effective energy efficiency and |
18 | | demand-response measures to reduce delivery load. Requiring |
19 | | investment in cost-effective energy efficiency and |
20 | | demand-response measures will reduce direct and indirect costs |
21 | | to consumers by decreasing environmental impacts and by |
22 | | avoiding or delaying the need for new generation, transmission, |
23 | | and distribution infrastructure. It serves the public interest |
24 | | to allow electric utilities to recover costs for reasonably and |
25 | | prudently incurred expenditures for energy efficiency and |
|
| | SB3131 | - 27 - | LRB100 19958 SMS 35239 b |
|
|
1 | | demand-response measures. As used in this Section, |
2 | | "cost-effective" means that the measures satisfy the total |
3 | | resource cost test. The low-income measures described in |
4 | | subsection (c) of this Section shall not be required to meet |
5 | | the total resource cost test. For purposes of this Section, the |
6 | | terms "energy-efficiency", "demand-response", "electric |
7 | | utility", and "total resource cost test" have the meanings set |
8 | | forth in the Illinois Power Agency Act. |
9 | | (a-5) This Section applies to electric utilities serving |
10 | | more than 500,000 retail customers in the State for those |
11 | | multi-year plans commencing after December 31, 2017. |
12 | | (b) For purposes of this Section, electric utilities |
13 | | subject to this Section that serve more than 3,000,000 retail |
14 | | customers in the State shall be deemed to have achieved a |
15 | | cumulative persisting annual savings of 6.6% from energy |
16 | | efficiency measures and programs implemented during the period |
17 | | beginning January 1, 2012 and ending December 31, 2017, which |
18 | | percent is based on the deemed average weather normalized sales |
19 | | of electric power and energy during calendar years 2014, 2015, |
20 | | and 2016 of 88,000,000 MWhs. For the purposes of this |
21 | | subsection (b) and subsection (b-5), the 88,000,000 MWhs of |
22 | | deemed electric power and energy sales shall be reduced by the |
23 | | number of MWhs equal to the sum of the annual consumption of |
24 | | customers that are exempt from subsections (a) through (j) of |
25 | | this Section under subsection (l) of this Section, as averaged |
26 | | across the calendar years 2014, 2015, and 2016. After 2017, the |
|
| | SB3131 | - 28 - | LRB100 19958 SMS 35239 b |
|
|
1 | | deemed value of cumulative persisting annual savings from |
2 | | energy efficiency measures and programs implemented during the |
3 | | period beginning January 1, 2012 and ending December 31, 2017, |
4 | | shall be reduced each year, as follows, and the applicable |
5 | | value shall be applied to and count toward the utility's |
6 | | achievement of the cumulative persisting annual savings goals |
7 | | set forth in subsection (b-5): |
8 | | (1) 5.8% deemed cumulative persisting annual savings |
9 | | for the year ending December 31, 2018; |
10 | | (2) 5.2% deemed cumulative persisting annual savings |
11 | | for the year ending December 31, 2019; |
12 | | (3) 4.5% deemed cumulative persisting annual savings |
13 | | for the year ending December 31, 2020; |
14 | | (4) 4.0% deemed cumulative persisting annual savings |
15 | | for the year ending December 31, 2021; |
16 | | (5) 3.5% deemed cumulative persisting annual savings |
17 | | for the year ending December 31, 2022; |
18 | | (6) 3.1% deemed cumulative persisting annual savings |
19 | | for the year ending December 31, 2023; |
20 | | (7) 2.8% deemed cumulative persisting annual savings |
21 | | for the year ending December 31, 2024; |
22 | | (8) 2.5% deemed cumulative persisting annual savings |
23 | | for the year ending December 31, 2025; |
24 | | (9) 2.3% deemed cumulative persisting annual savings |
25 | | for the year ending December 31, 2026; |
26 | | (10) 2.1% deemed cumulative persisting annual savings |
|
| | SB3131 | - 29 - | LRB100 19958 SMS 35239 b |
|
|
1 | | for the year ending December 31, 2027; |
2 | | (11) 1.8% deemed cumulative persisting annual savings |
3 | | for the year ending December 31, 2028; |
4 | | (12) 1.7% deemed cumulative persisting annual savings |
5 | | for the year ending December 31, 2029; and |
6 | | (13) 1.5% deemed cumulative persisting annual savings |
7 | | for the year ending December 31, 2030. |
8 | | For purposes of this Section, "cumulative persisting |
9 | | annual savings" means the total electric energy savings in a |
10 | | given year from measures installed in that year or in previous |
11 | | years, but no earlier than January 1, 2012, that are still |
12 | | operational and providing savings in that year because the |
13 | | measures have not yet reached the end of their useful lives. |
14 | | (b-5) Beginning in 2018, electric utilities subject to this |
15 | | Section that serve more than 3,000,000 retail customers in the |
16 | | State shall achieve the following cumulative persisting annual |
17 | | savings goals, as modified by subsection (f) of this Section |
18 | | and as compared to the deemed baseline of 88,000,000 MWhs of |
19 | | electric power and energy sales set forth in subsection (b), as |
20 | | reduced by the number of MWhs equal to the sum of the annual |
21 | | consumption of customers that are exempt from subsections (a) |
22 | | through (j) of this Section under subsection (l) of this |
23 | | Section as averaged across the calendar years 2014, 2015, and |
24 | | 2016, through the implementation of energy efficiency measures |
25 | | during the applicable year and in prior years, but no earlier |
26 | | than January 1, 2012: |
|
| | SB3131 | - 30 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (1) 7.8% cumulative persisting annual savings for the |
2 | | year ending December 31, 2018; |
3 | | (2) 9.1% cumulative persisting annual savings for the |
4 | | year ending December 31, 2019; |
5 | | (3) 10.4% cumulative persisting annual savings for the |
6 | | year ending December 31, 2020; |
7 | | (4) 11.8% cumulative persisting annual savings for the |
8 | | year ending December 31, 2021; |
9 | | (5) 13.1% cumulative persisting annual savings for the |
10 | | year ending December 31, 2022; |
11 | | (6) 14.4% cumulative persisting annual savings for the |
12 | | year ending December 31, 2023; |
13 | | (7) 15.7% cumulative persisting annual savings for the |
14 | | year ending December 31, 2024; |
15 | | (8) 17% cumulative persisting annual savings for the |
16 | | year ending December 31, 2025; |
17 | | (9) 17.9% cumulative persisting annual savings for the |
18 | | year ending December 31, 2026; |
19 | | (10) 18.8% cumulative persisting annual savings for |
20 | | the year ending December 31, 2027; |
21 | | (11) 19.7% cumulative persisting annual savings for |
22 | | the year ending December 31, 2028; |
23 | | (12) 20.6% cumulative persisting annual savings for |
24 | | the year ending December 31, 2029; and |
25 | | (13) 21.5% cumulative persisting annual savings for |
26 | | the year ending December 31, 2030. |
|
| | SB3131 | - 31 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (b-10) For purposes of this Section, electric utilities |
2 | | subject to this Section that serve less than 3,000,000 retail |
3 | | customers but more than 500,000 retail customers in the State |
4 | | shall be deemed to have achieved a cumulative persisting annual |
5 | | savings of 6.6% from energy efficiency measures and programs |
6 | | implemented during the period beginning January 1, 2012 and |
7 | | ending December 31, 2017, which is based on the deemed average |
8 | | weather normalized sales of electric power and energy during |
9 | | calendar years 2014, 2015, and 2016 of 36,900,000 MWhs. For the |
10 | | purposes of this subsection (b-10) and subsection (b-15), the |
11 | | 36,900,000 MWhs of deemed electric power and energy sales shall |
12 | | be reduced by the number of MWhs equal to the sum of the annual |
13 | | consumption of customers that are exempt from subsections (a) |
14 | | through (j) of this Section under subsection (l) of this |
15 | | Section, as averaged across the calendar years 2014, 2015, and |
16 | | 2016. After 2017, the deemed value of cumulative persisting |
17 | | annual savings from energy efficiency measures and programs |
18 | | implemented during the period beginning January 1, 2012 and |
19 | | ending December 31, 2017, shall be reduced each year, as |
20 | | follows, and the applicable value shall be applied to and count |
21 | | toward the utility's achievement of the cumulative persisting |
22 | | annual savings goals set forth in subsection (b-15): |
23 | | (1) 5.8% deemed cumulative persisting annual savings |
24 | | for the year ending December 31, 2018; |
25 | | (2) 5.2% deemed cumulative persisting annual savings |
26 | | for the year ending December 31, 2019; |
|
| | SB3131 | - 32 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (3) 4.5% deemed cumulative persisting annual savings |
2 | | for the year ending December 31, 2020; |
3 | | (4) 4.0% deemed cumulative persisting annual savings |
4 | | for the year ending December 31, 2021; |
5 | | (5) 3.5% deemed cumulative persisting annual savings |
6 | | for the year ending December 31, 2022; |
7 | | (6) 3.1% deemed cumulative persisting annual savings |
8 | | for the year ending December 31, 2023; |
9 | | (7) 2.8% deemed cumulative persisting annual savings |
10 | | for the year ending December 31, 2024; |
11 | | (8) 2.5% deemed cumulative persisting annual savings |
12 | | for the year ending December 31, 2025; |
13 | | (9) 2.3% deemed cumulative persisting annual savings |
14 | | for the year ending December 31, 2026; |
15 | | (10) 2.1% deemed cumulative persisting annual savings |
16 | | for the year ending December 31, 2027; |
17 | | (11) 1.8% deemed cumulative persisting annual savings |
18 | | for the year ending December 31, 2028; |
19 | | (12) 1.7% deemed cumulative persisting annual savings |
20 | | for the year ending December 31, 2029; and |
21 | | (13) 1.5% deemed cumulative persisting annual savings |
22 | | for the year ending December 31, 2030. |
23 | | (b-15) Beginning in 2018, electric utilities subject to |
24 | | this Section that serve less than 3,000,000 retail customers |
25 | | but more than 500,000 retail customers in the State shall |
26 | | achieve the following cumulative persisting annual savings |
|
| | SB3131 | - 33 - | LRB100 19958 SMS 35239 b |
|
|
1 | | goals, as modified by subsection (b-20) and subsection (f) of |
2 | | this Section and as compared to the deemed baseline as reduced |
3 | | by the number of MWhs equal to the sum of the annual |
4 | | consumption of customers that are exempt from subsections (a) |
5 | | through (j) of this Section under subsection (l) of this |
6 | | Section as averaged across the calendar years 2014, 2015, and |
7 | | 2016, through the implementation of energy efficiency measures |
8 | | during the applicable year and in prior years, but no earlier |
9 | | than January 1, 2012: |
10 | | (1) 7.4% cumulative persisting annual savings for the |
11 | | year ending December 31, 2018; |
12 | | (2) 8.2% cumulative persisting annual savings for the |
13 | | year ending December 31, 2019; |
14 | | (3) 9.0% cumulative persisting annual savings for the |
15 | | year ending December 31, 2020; |
16 | | (4) 9.8% cumulative persisting annual savings for the |
17 | | year ending December 31, 2021; |
18 | | (5) 10.6% cumulative persisting annual savings for the |
19 | | year ending December 31, 2022; |
20 | | (6) 11.4% cumulative persisting annual savings for the |
21 | | year ending December 31, 2023; |
22 | | (7) 12.2% cumulative persisting annual savings for the |
23 | | year ending December 31, 2024; |
24 | | (8) 13% cumulative persisting annual savings for the |
25 | | year ending December 31, 2025; |
26 | | (9) 13.6% cumulative persisting annual savings for the |
|
| | SB3131 | - 34 - | LRB100 19958 SMS 35239 b |
|
|
1 | | year ending December 31, 2026; |
2 | | (10) 14.2% cumulative persisting annual savings for |
3 | | the year ending December 31, 2027; |
4 | | (11) 14.8% cumulative persisting annual savings for |
5 | | the year ending December 31, 2028; |
6 | | (12) 15.4% cumulative persisting annual savings for |
7 | | the year ending December 31, 2029; and |
8 | | (13) 16% cumulative persisting annual savings for the |
9 | | year ending December 31, 2030. |
10 | | The difference between the cumulative persisting annual |
11 | | savings goal for the applicable calendar year and the |
12 | | cumulative persisting annual savings goal for the immediately |
13 | | preceding calendar year is 0.8% for the period of January 1, |
14 | | 2018 through December 31, 2025 and 0.6% for the period of |
15 | | January 1, 2026 through December 31, 2030. |
16 | | (b-20) Each electric utility subject to this Section may |
17 | | include cost-effective voltage optimization measures in its |
18 | | plans submitted under subsections (f) and (g) of this Section, |
19 | | and the costs incurred by a utility to implement the measures |
20 | | under a Commission-approved plan shall be recovered under the |
21 | | provisions of Article IX or Section 16-108.5 of this Act. For |
22 | | purposes of this Section, the measure life of voltage |
23 | | optimization measures shall be 15 years. The measure life |
24 | | period is independent of the depreciation rate of the voltage |
25 | | optimization assets deployed. |
26 | | Within 270 days after the effective date of this amendatory |
|
| | SB3131 | - 35 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Act of the 99th General Assembly, an electric utility that |
2 | | serves less than 3,000,000 retail customers but more than |
3 | | 500,000 retail customers in the State shall file a plan with |
4 | | the Commission that identifies the cost-effective voltage |
5 | | optimization investment the electric utility plans to |
6 | | undertake through December 31, 2024. The Commission, after |
7 | | notice and hearing, shall approve or approve with modification |
8 | | the plan within 120 days after the plan's filing and, in the |
9 | | order approving or approving with modification the plan, the |
10 | | Commission shall adjust the applicable cumulative persisting |
11 | | annual savings goals set forth in subsection (b-15) to reflect |
12 | | any amount of cost-effective energy savings approved by the |
13 | | Commission that is greater than or less than the following |
14 | | cumulative persisting annual savings values attributable to |
15 | | voltage optimization for the applicable year: |
16 | | (1) 0.0% of cumulative persisting annual savings for |
17 | | the year ending December 31, 2018; |
18 | | (2) 0.17% of cumulative persisting annual savings for |
19 | | the year ending December 31, 2019; |
20 | | (3) 0.17% of cumulative persisting annual savings for |
21 | | the year ending December 31, 2020; |
22 | | (4) 0.33% of cumulative persisting annual savings for |
23 | | the year ending December 31, 2021; |
24 | | (5) 0.5% of cumulative persisting annual savings for |
25 | | the year ending December 31, 2022; |
26 | | (6) 0.67% of cumulative persisting annual savings for |
|
| | SB3131 | - 36 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the year ending December 31, 2023; |
2 | | (7) 0.83% of cumulative persisting annual savings for |
3 | | the year ending December 31, 2024; and |
4 | | (8) 1.0% of cumulative persisting annual savings for |
5 | | the year ending December 31, 2025. |
6 | | (b-25) In the event an electric utility jointly offers an |
7 | | energy efficiency measure or program with a gas utility under |
8 | | plans approved under this Section and Section 8-104 of this |
9 | | Act, the electric utility may continue offering the program, |
10 | | including the gas energy efficiency measures, in the event the |
11 | | gas utility discontinues funding the program. In that event, |
12 | | the energy savings value associated with such other fuels shall |
13 | | be converted to electric energy savings on an equivalent Btu |
14 | | basis for the premises. However, the electric utility shall |
15 | | prioritize programs for low-income residential customers to |
16 | | the extent practicable. An electric utility may recover the |
17 | | costs of offering the gas energy efficiency measures under this |
18 | | subsection (b-25). |
19 | | For those energy efficiency measures or programs that save |
20 | | both electricity and other fuels but are not jointly offered |
21 | | with a gas utility under plans approved under this Section and |
22 | | Section 8-104 or not offered with an affiliated gas utility |
23 | | under paragraph (6) of subsection (f) of Section 8-104 of this |
24 | | Act, the electric utility may count savings of fuels other than |
25 | | electricity toward the achievement of its annual savings goal, |
26 | | and the energy savings value associated with such other fuels |
|
| | SB3131 | - 37 - | LRB100 19958 SMS 35239 b |
|
|
1 | | shall be converted to electric energy savings on an equivalent |
2 | | Btu basis at the premises. |
3 | | In no event shall more than 10% of each year's applicable |
4 | | annual incremental goal as defined in paragraph (7) of |
5 | | subsection (g) of this Section be met through savings of fuels |
6 | | other than electricity. |
7 | | (c) Electric utilities shall be responsible for overseeing |
8 | | the design, development, and filing of energy efficiency plans |
9 | | with the Commission and may, as part of that implementation, |
10 | | outsource various aspects of program development and |
11 | | implementation. A minimum of 10%, for electric utilities that |
12 | | serve more than 3,000,000 retail customers in the State, and a |
13 | | minimum of 7%, for electric utilities that serve less than |
14 | | 3,000,000 retail customers but more than 500,000 retail |
15 | | customers in the State, of the utility's entire portfolio |
16 | | funding level for a given year shall be used to procure |
17 | | cost-effective energy efficiency measures from units of local |
18 | | government, municipal corporations, school districts, public |
19 | | housing, and community college districts, provided that a |
20 | | minimum percentage of available funds shall be used to procure |
21 | | energy efficiency from public housing, which percentage shall |
22 | | be equal to public housing's share of public building energy |
23 | | consumption. |
24 | | The utilities shall also implement energy efficiency |
25 | | measures targeted at low-income households, which, for |
26 | | purposes of this Section, shall be defined as households at or |
|
| | SB3131 | - 38 - | LRB100 19958 SMS 35239 b |
|
|
1 | | below 80% of area median income, and expenditures to implement |
2 | | the measures shall be no less than $25,000,000 per year for |
3 | | electric utilities that serve more than 3,000,000 retail |
4 | | customers in the State and no less than $8,350,000 per year for |
5 | | electric utilities that serve less than 3,000,000 retail |
6 | | customers but more than 500,000 retail customers in the State. |
7 | | Each electric utility shall assess opportunities to |
8 | | implement cost-effective energy efficiency measures and |
9 | | programs through a public housing authority or authorities |
10 | | located in its service territory. If such opportunities are |
11 | | identified, the utility shall propose such measures and |
12 | | programs to address the opportunities. Expenditures to address |
13 | | such opportunities shall be credited toward the minimum |
14 | | procurement and expenditure requirements set forth in this |
15 | | subsection (c). |
16 | | Implementation of energy efficiency measures and programs |
17 | | targeted at low-income households should be contracted, when it |
18 | | is practicable, to independent third parties that have |
19 | | demonstrated capabilities to serve such households, with a |
20 | | preference for not-for-profit entities and government agencies |
21 | | that have existing relationships with or experience serving |
22 | | low-income communities in the State. |
23 | | Each electric utility shall develop and implement |
24 | | reporting procedures that address and assist in determining the |
25 | | amount of energy savings that can be applied to the low-income |
26 | | procurement and expenditure requirements set forth in this |
|
| | SB3131 | - 39 - | LRB100 19958 SMS 35239 b |
|
|
1 | | subsection (c). |
2 | | The electric utilities shall also convene a low-income |
3 | | energy efficiency advisory committee to assist in the design |
4 | | and evaluation of the low-income energy efficiency programs. |
5 | | The committee shall be comprised of the electric utilities |
6 | | subject to the requirements of this Section, the gas utilities |
7 | | subject to the requirements of Section 8-104 of this Act, the |
8 | | utilities' low-income energy efficiency implementation |
9 | | contractors, and representatives of community-based |
10 | | organizations. |
11 | | (d) Notwithstanding any other provision of law to the |
12 | | contrary, a utility providing approved energy efficiency |
13 | | measures and, if applicable, demand-response measures in the |
14 | | State shall be permitted to recover all reasonable and |
15 | | prudently incurred costs of those measures from all retail |
16 | | customers, except as provided in subsection (l) of this |
17 | | Section, as follows, provided that nothing in this subsection |
18 | | (d) permits the double recovery of such costs from customers: |
19 | | (1) The utility may recover its costs through an |
20 | | automatic adjustment clause tariff filed with and approved |
21 | | by the Commission. The tariff shall be established outside |
22 | | the context of a general rate case. Each year the |
23 | | Commission shall initiate a review to reconcile any amounts |
24 | | collected with the actual costs and to determine the |
25 | | required adjustment to the annual tariff factor to match |
26 | | annual expenditures. To enable the financing of the |
|
| | SB3131 | - 40 - | LRB100 19958 SMS 35239 b |
|
|
1 | | incremental capital expenditures, including regulatory |
2 | | assets, for electric utilities that serve less than |
3 | | 3,000,000 retail customers but more than 500,000 retail |
4 | | customers in the State, the utility's actual year-end |
5 | | capital structure that includes a common equity ratio, |
6 | | excluding goodwill, of up to and including 50% of the total |
7 | | capital structure shall be deemed reasonable and used to |
8 | | set rates. |
9 | | (2) A utility may recover its costs through an energy |
10 | | efficiency formula rate approved by the Commission under a |
11 | | filing under subsections (f) and (g) of this Section, which |
12 | | shall specify the cost components that form the basis of |
13 | | the rate charged to customers with sufficient specificity |
14 | | to operate in a standardized manner and be updated annually |
15 | | with transparent information that reflects the utility's |
16 | | actual costs to be recovered during the applicable rate |
17 | | year, which is the period beginning with the first billing |
18 | | day of January and extending through the last billing day |
19 | | of the following December. The energy efficiency formula |
20 | | rate shall be implemented through a tariff filed with the |
21 | | Commission under subsections (f) and (g) of this Section |
22 | | that is consistent with the provisions of this paragraph |
23 | | (2) and that shall be applicable to all delivery services |
24 | | customers. The Commission shall conduct an investigation |
25 | | of the tariff in a manner consistent with the provisions of |
26 | | this paragraph (2), subsections (f) and (g) of this |
|
| | SB3131 | - 41 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Section, and the provisions of Article IX of this Act to |
2 | | the extent they do not conflict with this paragraph (2). |
3 | | The energy efficiency formula rate approved by the |
4 | | Commission shall remain in effect at the discretion of the |
5 | | utility and shall do the following: |
6 | | (A) Provide for the recovery of the utility's |
7 | | actual costs incurred under this Section that are |
8 | | prudently incurred and reasonable in amount consistent |
9 | | with Commission practice and law. The sole fact that a |
10 | | cost differs from that incurred in a prior calendar |
11 | | year or that an investment is different from that made |
12 | | in a prior calendar year shall not imply the imprudence |
13 | | or unreasonableness of that cost or investment. |
14 | | (B) Reflect the utility's actual year-end capital |
15 | | structure for the applicable calendar year, excluding |
16 | | goodwill, subject to a determination of prudence and |
17 | | reasonableness consistent with Commission practice and |
18 | | law. To enable the financing of the incremental capital |
19 | | expenditures, including regulatory assets, for |
20 | | electric utilities that serve less than 3,000,000 |
21 | | retail customers but more than 500,000 retail |
22 | | customers in the State, a participating electric |
23 | | utility's actual year-end capital structure that |
24 | | includes a common equity ratio, excluding goodwill, of |
25 | | up to and including 50% of the total capital structure |
26 | | shall be deemed reasonable and used to set rates. |
|
| | SB3131 | - 42 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (C) Include a cost of equity, which shall be |
2 | | calculated as the sum of the following: |
3 | | (i) the average for the applicable calendar |
4 | | year of the monthly average yields of 30-year U.S. |
5 | | Treasury bonds published by the Board of Governors |
6 | | of the Federal Reserve System in its weekly H.15 |
7 | | Statistical Release or successor publication; and |
8 | | (ii) 580 basis points. |
9 | | At such time as the Board of Governors of the |
10 | | Federal Reserve System ceases to include the monthly |
11 | | average yields of 30-year U.S. Treasury bonds in its |
12 | | weekly H.15 Statistical Release or successor |
13 | | publication, the monthly average yields of the U.S. |
14 | | Treasury bonds then having the longest duration |
15 | | published by the Board of Governors in its weekly H.15 |
16 | | Statistical Release or successor publication shall |
17 | | instead be used for purposes of this paragraph (2). |
18 | | (D) Permit and set forth protocols, subject to a |
19 | | determination of prudence and reasonableness |
20 | | consistent with Commission practice and law, for the |
21 | | following: |
22 | | (i) recovery of incentive compensation expense |
23 | | that is based on the achievement of operational |
24 | | metrics, including metrics related to budget |
25 | | controls, outage duration and frequency, safety, |
26 | | customer service, efficiency and productivity, and |
|
| | SB3131 | - 43 - | LRB100 19958 SMS 35239 b |
|
|
1 | | environmental compliance; however, this protocol |
2 | | shall not apply if such expense related to costs |
3 | | incurred under this Section is recovered under |
4 | | Article IX or Section 16-108.5 of this Act; |
5 | | incentive compensation expense that is based on |
6 | | net income or an affiliate's earnings per share |
7 | | shall not be recoverable under the
energy |
8 | | efficiency formula rate; |
9 | | (ii) recovery of pension and other |
10 | | post-employment benefits expense, provided that |
11 | | such costs are supported by an actuarial study; |
12 | | however, this protocol shall not apply if such |
13 | | expense related to costs incurred under this |
14 | | Section is recovered under Article IX or Section |
15 | | 16-108.5 of this Act; |
16 | | (iii) recovery of existing regulatory assets |
17 | | over the periods previously authorized by the |
18 | | Commission; |
19 | | (iv) as described in subsection (e), |
20 | | amortization of costs incurred under this Section; |
21 | | and |
22 | | (v) projected, weather normalized billing |
23 | | determinants for the applicable rate year. |
24 | | (E) Provide for an annual reconciliation, as |
25 | | described in paragraph (3) of this subsection (d), less |
26 | | any deferred taxes related to the reconciliation, with |
|
| | SB3131 | - 44 - | LRB100 19958 SMS 35239 b |
|
|
1 | | interest at an annual rate of return equal to the |
2 | | utility's weighted average cost of capital, including |
3 | | a revenue conversion factor calculated to recover or |
4 | | refund all additional income taxes that may be payable |
5 | | or receivable as a result of that return, of the energy |
6 | | efficiency revenue requirement reflected in rates for |
7 | | each calendar year, beginning with the calendar year in |
8 | | which the utility files its energy efficiency formula |
9 | | rate tariff under this paragraph (2), with what the |
10 | | revenue requirement would have been had the actual cost |
11 | | information for the applicable calendar year been |
12 | | available at the filing date. |
13 | | The utility shall file, together with its tariff, the |
14 | | projected costs to be incurred by the utility during the |
15 | | rate year under the utility's multi-year plan approved |
16 | | under subsections (f) and (g) of this Section, including, |
17 | | but not limited to, the projected capital investment costs |
18 | | and projected regulatory asset balances with |
19 | | correspondingly updated depreciation and amortization |
20 | | reserves and expense, that shall populate the energy |
21 | | efficiency formula rate and set the initial rates under the |
22 | | formula. |
23 | | The Commission shall review the proposed tariff in |
24 | | conjunction with its review of a proposed multi-year plan, |
25 | | as specified in paragraph (5) of subsection (g) of this |
26 | | Section. The review shall be based on the same evidentiary |
|
| | SB3131 | - 45 - | LRB100 19958 SMS 35239 b |
|
|
1 | | standards, including, but not limited to, those concerning |
2 | | the prudence and reasonableness of the costs incurred by |
3 | | the utility, the Commission applies in a hearing to review |
4 | | a filing for a general increase in rates under Article IX |
5 | | of this Act. The initial rates shall take effect beginning |
6 | | with the January monthly billing period following the |
7 | | Commission's approval. |
8 | | The tariff's rate design and cost allocation across |
9 | | customer classes shall be consistent with the utility's |
10 | | automatic adjustment clause tariff in effect on the |
11 | | effective date of this amendatory Act of the 99th General |
12 | | Assembly; however, the Commission may revise the tariff's |
13 | | rate design and cost allocation in subsequent proceedings |
14 | | under paragraph (3) of this subsection (d). |
15 | | If the energy efficiency formula rate is terminated, |
16 | | the then current rates shall remain in effect until such |
17 | | time as the energy efficiency costs are incorporated into |
18 | | new rates that are set under this subsection (d) or Article |
19 | | IX of this Act, subject to retroactive rate adjustment, |
20 | | with interest, to reconcile rates charged with actual |
21 | | costs. |
22 | | (3) The provisions of this paragraph (3) shall only |
23 | | apply to an electric utility that has elected to file an |
24 | | energy efficiency formula rate under paragraph (2) of this |
25 | | subsection (d). Subsequent to the Commission's issuance of |
26 | | an order approving the utility's energy efficiency formula |
|
| | SB3131 | - 46 - | LRB100 19958 SMS 35239 b |
|
|
1 | | rate structure and protocols, and initial rates under |
2 | | paragraph (2) of this subsection (d), the utility shall |
3 | | file, on or before June 1 of each year, with the Chief |
4 | | Clerk of the Commission its updated cost inputs to the |
5 | | energy efficiency formula rate for the applicable rate year |
6 | | and the corresponding new charges, as well as the |
7 | | information described in paragraph (9) of subsection (g) of |
8 | | this Section. Each such filing shall conform to the |
9 | | following requirements and include the following |
10 | | information: |
11 | | (A) The inputs to the energy efficiency formula |
12 | | rate for the applicable rate year shall be based on the |
13 | | projected costs to be incurred by the utility during |
14 | | the rate year under the utility's multi-year plan |
15 | | approved under subsections (f) and (g) of this Section, |
16 | | including, but not limited to, projected capital |
17 | | investment costs and projected regulatory asset |
18 | | balances with correspondingly updated depreciation and |
19 | | amortization reserves and expense. The filing shall |
20 | | also include a reconciliation of the energy efficiency |
21 | | revenue requirement that was in effect for the prior |
22 | | rate year (as set by the cost inputs for the prior rate |
23 | | year) with the actual revenue requirement for the prior |
24 | | rate year (determined using a year-end rate base) that |
25 | | uses amounts reflected in the applicable FERC Form 1 |
26 | | that reports the actual costs for the prior rate year. |
|
| | SB3131 | - 47 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Any over-collection or under-collection indicated by |
2 | | such reconciliation shall be reflected as a credit |
3 | | against, or recovered as an additional charge to, |
4 | | respectively, with interest calculated at a rate equal |
5 | | to the utility's weighted average cost of capital |
6 | | approved by the Commission for the prior rate year, the |
7 | | charges for the applicable rate year. Such |
8 | | over-collection or under-collection shall be adjusted |
9 | | to remove any deferred taxes related to the |
10 | | reconciliation, for purposes of calculating interest |
11 | | at an annual rate of return equal to the utility's |
12 | | weighted average cost of capital approved by the |
13 | | Commission for the prior rate year, including a revenue |
14 | | conversion factor calculated to recover or refund all |
15 | | additional income taxes that may be payable or |
16 | | receivable as a result of that return. Each |
17 | | reconciliation shall be certified by the participating |
18 | | utility in the same manner that FERC Form 1 is |
19 | | certified. The filing shall also include the charge or |
20 | | credit, if any, resulting from the calculation |
21 | | required by subparagraph (E) of paragraph (2) of this |
22 | | subsection (d). |
23 | | Notwithstanding any other provision of law to the |
24 | | contrary, the intent of the reconciliation is to |
25 | | ultimately reconcile both the revenue requirement |
26 | | reflected in rates for each calendar year, beginning |
|
| | SB3131 | - 48 - | LRB100 19958 SMS 35239 b |
|
|
1 | | with the calendar year in which the utility files its |
2 | | energy efficiency formula rate tariff under paragraph |
3 | | (2) of this subsection (d), with what the revenue |
4 | | requirement determined using a year-end rate base for |
5 | | the applicable calendar year would have been had the |
6 | | actual cost information for the applicable calendar |
7 | | year been available at the filing date. |
8 | | For purposes of this Section, "FERC Form 1" means |
9 | | the Annual Report of Major Electric Utilities, |
10 | | Licensees and Others that electric utilities are |
11 | | required to file with the Federal Energy Regulatory |
12 | | Commission under the Federal Power Act, Sections 3, |
13 | | 4(a), 304 and 209, modified as necessary to be |
14 | | consistent with 83 Ill. Admin. Code Part 415 as of May |
15 | | 1, 2011. Nothing in this Section is intended to allow |
16 | | costs that are not otherwise recoverable to be |
17 | | recoverable by virtue of inclusion in FERC Form 1. |
18 | | (B) The new charges shall take effect beginning on |
19 | | the first billing day of the following January billing |
20 | | period and remain in effect through the last billing |
21 | | day of the next December billing period regardless of |
22 | | whether the Commission enters upon a hearing under this |
23 | | paragraph (3). |
24 | | (C) The filing shall include relevant and |
25 | | necessary data and documentation for the applicable |
26 | | rate year. Normalization adjustments shall not be |
|
| | SB3131 | - 49 - | LRB100 19958 SMS 35239 b |
|
|
1 | | required. |
2 | | Within 45 days after the utility files its annual |
3 | | update of cost inputs to the energy efficiency formula |
4 | | rate, the Commission shall with reasonable notice, |
5 | | initiate a proceeding concerning whether the projected |
6 | | costs to be incurred by the utility and recovered during |
7 | | the applicable rate year, and that are reflected in the |
8 | | inputs to the energy efficiency formula rate, are |
9 | | consistent with the utility's approved multi-year plan |
10 | | under subsections (f) and (g) of this Section and whether |
11 | | the costs incurred by the utility during the prior rate |
12 | | year were prudent and reasonable. The Commission shall also |
13 | | have the authority to investigate the information and data |
14 | | described in paragraph (9) of subsection (g) of this |
15 | | Section, including the proposed adjustment to the |
16 | | utility's return on equity component of its weighted |
17 | | average cost of capital. During the course of the |
18 | | proceeding, each objection shall be stated with |
19 | | particularity and evidence provided in support thereof, |
20 | | after which the utility shall have the opportunity to rebut |
21 | | the evidence. Discovery shall be allowed consistent with |
22 | | the Commission's Rules of Practice, which Rules of Practice |
23 | | shall be enforced by the Commission or the assigned |
24 | | administrative law judge hearing examiner . The Commission |
25 | | shall apply the same evidentiary standards, including, but |
26 | | not limited to, those concerning the prudence and |
|
| | SB3131 | - 50 - | LRB100 19958 SMS 35239 b |
|
|
1 | | reasonableness of the costs incurred by the utility, during |
2 | | the proceeding as it would apply in a proceeding to review |
3 | | a filing for a general increase in rates under Article IX |
4 | | of this Act. The Commission shall not, however, have the |
5 | | authority in a proceeding under this paragraph (3) to |
6 | | consider or order any changes to the structure or protocols |
7 | | of the energy efficiency formula rate approved under |
8 | | paragraph (2) of this subsection (d). In a proceeding under |
9 | | this paragraph (3), the Commission shall enter its order no |
10 | | later than the earlier of 195 days after the utility's |
11 | | filing of its annual update of cost inputs to the energy |
12 | | efficiency formula rate or December 15. The utility's |
13 | | proposed return on equity calculation, as described in |
14 | | paragraphs (7) through (9) of subsection (g) of this |
15 | | Section, shall be deemed the final, approved calculation on |
16 | | December 15 of the year in which it is filed unless the |
17 | | Commission enters an order on or before December 15, after |
18 | | notice and hearing, that modifies such calculation |
19 | | consistent with this Section. The Commission's |
20 | | determinations of the prudence and reasonableness of the |
21 | | costs incurred, and determination of such return on equity |
22 | | calculation, for the applicable calendar year shall be |
23 | | final upon entry of the Commission's order and shall not be |
24 | | subject to reopening, reexamination, or collateral attack |
25 | | in any other Commission proceeding, case, docket, order, |
26 | | rule, or regulation; however, nothing in this paragraph (3) |
|
| | SB3131 | - 51 - | LRB100 19958 SMS 35239 b |
|
|
1 | | shall prohibit a party from petitioning the Commission to |
2 | | rehear or appeal to the courts the order under the |
3 | | provisions of this Act. |
4 | | (e)
Beginning on the effective date of this amendatory Act |
5 | | of the 99th General Assembly, a utility subject to the |
6 | | requirements of this Section may elect to defer, as a |
7 | | regulatory asset, up to the full amount of its expenditures |
8 | | incurred under this Section for each annual period, including, |
9 | | but not limited to, any expenditures incurred above the funding |
10 | | level set by subsection (f) of this Section for a given year. |
11 | | The total expenditures deferred as a regulatory asset in a |
12 | | given year shall be amortized and recovered over a period that |
13 | | is equal to the weighted average of the energy efficiency |
14 | | measure lives implemented for that year that are reflected in |
15 | | the regulatory asset. The unamortized balance shall be |
16 | | recognized as of December 31 for a given year. The utility |
17 | | shall also earn a return on the total of the unamortized |
18 | | balances of all of the energy efficiency regulatory assets, |
19 | | less any deferred taxes related to those unamortized balances, |
20 | | at an annual rate equal to the utility's weighted average cost |
21 | | of capital that includes, based on a year-end capital |
22 | | structure, the utility's actual cost of debt for the applicable |
23 | | calendar year and a cost of equity, which shall be calculated |
24 | | as the sum of the (i) the average for the applicable calendar |
25 | | year of the monthly average yields of 30-year U.S. Treasury |
26 | | bonds published by the Board of Governors of the Federal |
|
| | SB3131 | - 52 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Reserve System in its weekly H.15 Statistical Release or |
2 | | successor publication; and (ii) 580 basis points, including a |
3 | | revenue conversion factor calculated to recover or refund all |
4 | | additional income taxes that may be payable or receivable as a |
5 | | result of that return. Capital investment costs shall be |
6 | | depreciated and recovered over their useful lives consistent |
7 | | with generally accepted accounting principles. The weighted |
8 | | average cost of capital shall be applied to the capital |
9 | | investment cost balance, less any accumulated depreciation and |
10 | | accumulated deferred income taxes, as of December 31 for a |
11 | | given year. |
12 | | When an electric utility creates a regulatory asset under |
13 | | the provisions of this Section, the costs are recovered over a |
14 | | period during which customers also receive a benefit which is |
15 | | in the public interest. Accordingly, it is the intent of the |
16 | | General Assembly that an electric utility that elects to create |
17 | | a regulatory asset under the provisions of this Section shall |
18 | | recover all of the associated costs as set forth in this |
19 | | Section. After the Commission has approved the prudence and |
20 | | reasonableness of the costs that comprise the regulatory asset, |
21 | | the electric utility shall be permitted to recover all such |
22 | | costs, and the value and recoverability through rates of the |
23 | | associated regulatory asset shall not be limited, altered, |
24 | | impaired, or reduced. |
25 | | (f) Beginning in 2017, each electric utility shall file an |
26 | | energy efficiency plan with the Commission to meet the energy |
|
| | SB3131 | - 53 - | LRB100 19958 SMS 35239 b |
|
|
1 | | efficiency standards for the next applicable multi-year period |
2 | | beginning January 1 of the year following the filing, according |
3 | | to the schedule set forth in paragraphs (1) through (3) of this |
4 | | subsection (f). If a utility does not file such a plan on or |
5 | | before the applicable filing deadline for the plan, it shall |
6 | | face a penalty of $100,000 per day until the plan is filed. |
7 | | (1) No later than 30 days after the effective date of |
8 | | this amendatory Act of the 99th General Assembly or May 1, |
9 | | 2017, whichever is later, each electric utility shall file |
10 | | a 4-year energy efficiency plan commencing on January 1, |
11 | | 2018 that is designed to achieve the cumulative persisting |
12 | | annual savings goals specified in paragraphs (1) through |
13 | | (4) of subsection (b-5) of this Section or in paragraphs |
14 | | (1) through (4) of subsection (b-15) of this Section, as |
15 | | applicable, through implementation of energy efficiency |
16 | | measures; however, the goals may be reduced if the |
17 | | utility's expenditures are limited pursuant to subsection |
18 | | (m) of this Section or, for a utility that serves less than |
19 | | 3,000,000 retail customers, if each of the following |
20 | | conditions are met: (A) the plan's analysis and forecasts |
21 | | of the utility's ability to acquire energy savings |
22 | | demonstrate that achievement of such goals is not cost |
23 | | effective; and (B) the amount of energy savings achieved by |
24 | | the utility as determined by the independent evaluator for |
25 | | the most recent year for which savings have been evaluated |
26 | | preceding the plan filing was less than the average annual |
|
| | SB3131 | - 54 - | LRB100 19958 SMS 35239 b |
|
|
1 | | amount of savings required to achieve the goals for the |
2 | | applicable 4-year plan period. Except as provided in |
3 | | subsection (m) of this Section, annual increases in |
4 | | cumulative persisting annual savings goals during the |
5 | | applicable 4-year plan period shall not be reduced to |
6 | | amounts that are less than the maximum amount of cumulative |
7 | | persisting annual savings that is forecast to be |
8 | | cost-effectively achievable during the 4-year plan period. |
9 | | The Commission shall review any proposed goal reduction as |
10 | | part of its review and approval of the utility's proposed |
11 | | plan. |
12 | | (2) No later than March 1, 2021, each electric utility |
13 | | shall file a 4-year energy efficiency plan commencing on |
14 | | January 1, 2022 that is designed to achieve the cumulative |
15 | | persisting annual savings goals specified in paragraphs |
16 | | (5) through (8) of subsection (b-5) of this Section or in |
17 | | paragraphs (5) through (8) of subsection (b-15) of this |
18 | | Section, as applicable, through implementation of energy |
19 | | efficiency measures; however, the goals may be reduced if |
20 | | the utility's expenditures are limited pursuant to |
21 | | subsection (m) of this Section or, each of the following |
22 | | conditions are met: (A) the plan's analysis and forecasts |
23 | | of the utility's ability to acquire energy savings |
24 | | demonstrate that achievement of such goals is not cost |
25 | | effective; and (B) the amount of energy savings achieved by |
26 | | the utility as determined by the independent evaluator for |
|
| | SB3131 | - 55 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the most recent year for which savings have been evaluated |
2 | | preceding the plan filing was less than the average annual |
3 | | amount of savings required to achieve the goals for the |
4 | | applicable 4-year plan period. Except as provided in |
5 | | subsection (m) of this Section, annual increases in |
6 | | cumulative persisting annual savings goals during the |
7 | | applicable 4-year plan period shall not be reduced to |
8 | | amounts that are less than the maximum amount of cumulative |
9 | | persisting annual savings that is forecast to be |
10 | | cost-effectively achievable during the 4-year plan period. |
11 | | The Commission shall review any proposed goal reduction as |
12 | | part of its review and approval of the utility's proposed |
13 | | plan. |
14 | | (3) No later than March 1, 2025, each electric utility |
15 | | shall file a 5-year energy efficiency plan commencing on |
16 | | January 1, 2026 that is designed to achieve the cumulative |
17 | | persisting annual savings goals specified in paragraphs |
18 | | (9) through (13) of subsection (b-5) of this Section or in |
19 | | paragraphs (9) through (13) of subsection (b-15) of this |
20 | | Section, as applicable, through implementation of energy |
21 | | efficiency measures; however, the goals may be reduced if |
22 | | the utility's expenditures are limited pursuant to |
23 | | subsection (m) of this Section or, each of the following |
24 | | conditions are met: (A) the plan's analysis and forecasts |
25 | | of the utility's ability to acquire energy savings |
26 | | demonstrate that achievement of such goals is not cost |
|
| | SB3131 | - 56 - | LRB100 19958 SMS 35239 b |
|
|
1 | | effective; and (B) the amount of energy savings achieved by |
2 | | the utility as determined by the independent evaluator for |
3 | | the most recent year for which savings have been evaluated |
4 | | preceding the plan filing was less than the average annual |
5 | | amount of savings required to achieve the goals for the |
6 | | applicable 5-year plan period. Except as provided in |
7 | | subsection (m) of this Section, annual increases in |
8 | | cumulative persisting annual savings goals during the |
9 | | applicable 5-year plan period shall not be reduced to |
10 | | amounts that are less than the maximum amount of cumulative |
11 | | persisting annual savings that is forecast to be |
12 | | cost-effectively achievable during the 5-year plan period. |
13 | | The Commission shall review any proposed goal reduction as |
14 | | part of its review and approval of the utility's proposed |
15 | | plan. |
16 | | Each utility's plan shall set forth the utility's proposals |
17 | | to meet the energy efficiency standards identified in |
18 | | subsection (b-5) or (b-15), as applicable and as such standards |
19 | | may have been modified under this subsection (f), taking into |
20 | | account the unique circumstances of the utility's service |
21 | | territory. For those plans commencing on January 1, 2018, the |
22 | | Commission shall seek public comment on the utility's plan and |
23 | | shall issue an order approving or disapproving each plan no |
24 | | later than August 31, 2017, or 105 days after the effective |
25 | | date of this amendatory Act of the 99th General Assembly, |
26 | | whichever is later. For those plans commencing after December |
|
| | SB3131 | - 57 - | LRB100 19958 SMS 35239 b |
|
|
1 | | 31, 2021, the Commission shall seek public comment on the |
2 | | utility's plan and shall issue an order approving or |
3 | | disapproving each plan within 6 months after its submission. If |
4 | | the Commission disapproves a plan, the Commission shall, within |
5 | | 30 days, describe in detail the reasons for the disapproval and |
6 | | describe a path by which the utility may file a revised draft |
7 | | of the plan to address the Commission's concerns |
8 | | satisfactorily. If the utility does not refile with the |
9 | | Commission within 60 days, the utility shall be subject to |
10 | | penalties at a rate of $100,000 per day until the plan is |
11 | | filed. This process shall continue, and penalties shall accrue, |
12 | | until the utility has successfully filed a portfolio of energy |
13 | | efficiency and demand-response measures. Penalties shall be |
14 | | deposited into the Energy Efficiency Trust Fund. |
15 | | (g) In submitting proposed plans and funding levels under |
16 | | subsection (f) of this Section to meet the savings goals |
17 | | identified in subsection (b-5) or (b-15) of this Section, as |
18 | | applicable, the utility shall: |
19 | | (1) Demonstrate that its proposed energy efficiency |
20 | | measures will achieve the applicable requirements that are |
21 | | identified in subsection (b-5) or (b-15) of this Section, |
22 | | as modified by subsection (f) of this Section. |
23 | | (2) Present specific proposals to implement new |
24 | | building and appliance standards that have been placed into |
25 | | effect. |
26 | | (3) Demonstrate that its overall portfolio of |
|
| | SB3131 | - 58 - | LRB100 19958 SMS 35239 b |
|
|
1 | | measures, not including low-income programs described in |
2 | | subsection (c) of this Section, is cost-effective using the |
3 | | total resource cost test or complies with paragraphs (1) |
4 | | through (3) of subsection (f) of this Section and |
5 | | represents a diverse cross-section of opportunities for |
6 | | customers of all rate classes, other than those customers |
7 | | described in subsection (l) of this Section, to participate |
8 | | in the programs. Individual measures need not be cost |
9 | | effective. |
10 | | (4) Present a third-party energy efficiency |
11 | | implementation program subject to the following |
12 | | requirements: |
13 | | (A) beginning with the year commencing January 1, |
14 | | 2019, electric utilities that serve more than |
15 | | 3,000,000 retail customers in the State shall fund |
16 | | third-party energy efficiency programs in an amount |
17 | | that is no less than $25,000,000 per year, and electric |
18 | | utilities that serve less than 3,000,000 retail |
19 | | customers but more than 500,000 retail customers in the |
20 | | State shall fund third-party energy efficiency |
21 | | programs in an amount that is no less than $8,350,000 |
22 | | per year; |
23 | | (B) during 2018, the utility shall conduct a |
24 | | solicitation process for purposes of requesting |
25 | | proposals from third-party vendors for those |
26 | | third-party energy efficiency programs to be offered |
|
| | SB3131 | - 59 - | LRB100 19958 SMS 35239 b |
|
|
1 | | during one or more of the years commencing January 1, |
2 | | 2019, January 1, 2020, and January 1, 2021; for those |
3 | | multi-year plans commencing on January 1, 2022 and |
4 | | January 1, 2026, the utility shall conduct a |
5 | | solicitation process during 2021 and 2025, |
6 | | respectively, for purposes of requesting proposals |
7 | | from third-party vendors for those third-party energy |
8 | | efficiency programs to be offered during one or more |
9 | | years of the respective multi-year plan period; for |
10 | | each solicitation process, the utility shall identify |
11 | | the sector, technology, or geographical area for which |
12 | | it is seeking requests for proposals; |
13 | | (C) the utility shall propose the bidder |
14 | | qualifications, performance measurement process, and |
15 | | contract structure, which must include a performance |
16 | | payment mechanism and general terms and conditions; |
17 | | the proposed qualifications, process, and structure |
18 | | shall be subject to Commission approval; and |
19 | | (D) the utility shall retain an independent third |
20 | | party to score the proposals received through the |
21 | | solicitation process described in this paragraph (4), |
22 | | rank them according to their cost per lifetime |
23 | | kilowatt-hours saved, and assemble the portfolio of |
24 | | third-party programs. |
25 | | The electric utility shall recover all costs |
26 | | associated with Commission-approved, third-party |
|
| | SB3131 | - 60 - | LRB100 19958 SMS 35239 b |
|
|
1 | | administered programs regardless of the success of those |
2 | | programs. |
3 | | (4.5)Implement cost-effective demand-response measures |
4 | | to reduce peak demand by 0.1% over the prior year for |
5 | | eligible retail customers, as defined in Section 16-111.5 |
6 | | of this Act, and for customers that elect hourly service |
7 | | from the utility pursuant to Section 16-107 of this Act, |
8 | | provided those customers have not been declared |
9 | | competitive. This requirement continues until December 31, |
10 | | 2026. |
11 | | (5) Include a proposed or revised cost-recovery tariff |
12 | | mechanism, as provided for under subsection (d) of this |
13 | | Section, to fund the proposed energy efficiency and |
14 | | demand-response measures and to ensure the recovery of the |
15 | | prudently and reasonably incurred costs of |
16 | | Commission-approved programs. |
17 | | (6) Provide for an annual independent evaluation of the |
18 | | performance of the cost-effectiveness of the utility's |
19 | | portfolio of measures, as well as a full review of the |
20 | | multi-year plan results of the broader net program impacts |
21 | | and, to the extent practical, for adjustment of the |
22 | | measures on a going-forward basis as a result of the |
23 | | evaluations. The resources dedicated to evaluation shall |
24 | | not exceed 3% of portfolio resources in any given year. |
25 | | (7) For electric utilities that serve more than |
26 | | 3,000,000 retail customers in the State: |
|
| | SB3131 | - 61 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (A) Through December 31, 2025, provide for an |
2 | | adjustment to the return on equity component of the |
3 | | utility's weighted average cost of capital calculated |
4 | | under subsection (d) of this Section: |
5 | | (i) If the independent evaluator determines |
6 | | that the utility achieved a cumulative persisting |
7 | | annual savings that is less than the applicable |
8 | | annual incremental goal, then the return on equity |
9 | | component shall be reduced by a maximum of 200 |
10 | | basis points in the event that the utility achieved |
11 | | no more than 75% of such goal. If the utility |
12 | | achieved more than 75% of the applicable annual |
13 | | incremental goal but less than 100% of such goal, |
14 | | then the return on equity component shall be |
15 | | reduced by 8 basis points for each percent by which |
16 | | the utility failed to achieve the goal. |
17 | | (ii) If the independent evaluator determines |
18 | | that the utility achieved a cumulative persisting |
19 | | annual savings that is more than the applicable |
20 | | annual incremental goal, then the return on equity |
21 | | component shall be increased by a maximum of 200 |
22 | | basis points in the event that the utility achieved |
23 | | at least 125% of such goal. If the utility achieved |
24 | | more than 100% of the applicable annual |
25 | | incremental goal but less than 125% of such goal, |
26 | | then the return on equity component shall be |
|
| | SB3131 | - 62 - | LRB100 19958 SMS 35239 b |
|
|
1 | | increased by 8 basis points for each percent by |
2 | | which the utility achieved above the goal. If the |
3 | | applicable annual incremental goal was reduced |
4 | | under paragraphs (1) or (2) of subsection (f) of |
5 | | this Section, then the following adjustments shall |
6 | | be made to the calculations described in this item |
7 | | (ii): |
8 | | (aa) the calculation for determining |
9 | | achievement that is at least 125% of the |
10 | | applicable annual incremental goal shall use |
11 | | the unreduced applicable annual incremental |
12 | | goal to set the value; and |
13 | | (bb) the calculation for determining |
14 | | achievement that is less than 125% but more |
15 | | than 100% of the applicable annual incremental |
16 | | goal shall use the reduced applicable annual |
17 | | incremental goal to set the value for 100% |
18 | | achievement of the goal and shall use the |
19 | | unreduced goal to set the value for 125% |
20 | | achievement. The 8 basis point value shall also |
21 | | be modified, as necessary, so that the 200 |
22 | | basis points are evenly apportioned among each |
23 | | percentage point value between 100% and 125% |
24 | | achievement. |
25 | | (B) For the period January 1, 2026 through December |
26 | | 31, 2030, provide for an adjustment to the return on |
|
| | SB3131 | - 63 - | LRB100 19958 SMS 35239 b |
|
|
1 | | equity component of the utility's weighted average |
2 | | cost of capital calculated under subsection (d) of this |
3 | | Section: |
4 | | (i) If the independent evaluator determines |
5 | | that the utility achieved a cumulative persisting |
6 | | annual savings that is less than the applicable |
7 | | annual incremental goal, then the return on equity |
8 | | component shall be reduced by a maximum of 200 |
9 | | basis points in the event that the utility achieved |
10 | | no more than 66% of such goal. If the utility |
11 | | achieved more than 66% of the applicable annual |
12 | | incremental goal but less than 100% of such goal, |
13 | | then the return on equity component shall be |
14 | | reduced by 6 basis points for each percent by which |
15 | | the utility failed to achieve the goal. |
16 | | (ii) If the independent evaluator determines |
17 | | that the utility achieved a cumulative persisting |
18 | | annual savings that is more than the applicable |
19 | | annual incremental goal, then the return on equity |
20 | | component shall be increased by a maximum of 200 |
21 | | basis points in the event that the utility achieved |
22 | | at least 134% of such goal. If the utility achieved |
23 | | more than 100% of the applicable annual |
24 | | incremental goal but less than 134% of such goal, |
25 | | then the return on equity component shall be |
26 | | increased by 6 basis points for each percent by |
|
| | SB3131 | - 64 - | LRB100 19958 SMS 35239 b |
|
|
1 | | which the utility achieved above the goal. If the |
2 | | applicable annual incremental goal was reduced |
3 | | under paragraph (3) of subsection (f) of this |
4 | | Section, then the following adjustments shall be |
5 | | made to the calculations described in this item |
6 | | (ii): |
7 | | (aa) the calculation for determining |
8 | | achievement that is at least 134% of the |
9 | | applicable annual incremental goal shall use |
10 | | the unreduced applicable annual incremental |
11 | | goal to set the value; and |
12 | | (bb) the calculation for determining |
13 | | achievement that is less than 134% but more |
14 | | than 100% of the applicable annual incremental |
15 | | goal shall use the reduced applicable annual |
16 | | incremental goal to set the value for 100% |
17 | | achievement of the goal and shall use the |
18 | | unreduced goal to set the value for 134% |
19 | | achievement. The 6 basis point value shall also |
20 | | be modified, as necessary, so that the 200 |
21 | | basis points are evenly apportioned among each |
22 | | percentage point value between 100% and 134% |
23 | | achievement. |
24 | | (7.5) For purposes of this Section, the term |
25 | | "applicable
annual incremental goal" means the difference |
26 | | between the
cumulative persisting annual savings goal for |
|
| | SB3131 | - 65 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the calendar
year that is the subject of the independent |
2 | | evaluator's
determination and the cumulative persisting |
3 | | annual savings
goal for the immediately preceding calendar |
4 | | year, as such
goals are defined in subsections (b-5) and |
5 | | (b-15) of this
Section and as these goals may have been |
6 | | modified as
provided for under subsection (b-20) and |
7 | | paragraphs (1)
through (3) of subsection (f) of this |
8 | | Section. Under
subsections (b), (b-5), (b-10), and (b-15) |
9 | | of this Section,
a utility must first replace energy |
10 | | savings from measures
that have reached the end of their |
11 | | measure lives and would
otherwise have to be replaced to |
12 | | meet the applicable
savings goals identified in subsection |
13 | | (b-5) or (b-15) of this Section before any progress towards |
14 | | achievement of its
applicable annual incremental goal may |
15 | | be counted.
Notwithstanding anything else set forth in this |
16 | | Section,
the difference between the actual annual |
17 | | incremental
savings achieved in any given year, including |
18 | | the
replacement of energy savings from measures that have
|
19 | | expired, and the applicable annual incremental goal shall
|
20 | | not affect adjustments to the return on equity for
|
21 | | subsequent calendar years under this subsection (g). |
22 | | (8) For electric utilities that serve less than |
23 | | 3,000,000 retail customers but more than 500,000 retail |
24 | | customers in the State: |
25 | | (A) Through December 31, 2025, the applicable |
26 | | annual incremental goal shall be compared to the annual |
|
| | SB3131 | - 66 - | LRB100 19958 SMS 35239 b |
|
|
1 | | incremental savings as determined by the independent |
2 | | evaluator. |
3 | | (i) The return on equity component shall be |
4 | | reduced by 8 basis points for each percent by which |
5 | | the utility did not achieve 84.4% of the applicable |
6 | | annual incremental goal. |
7 | | (ii) The return on equity component shall be |
8 | | increased by 8 basis points for each percent by |
9 | | which the utility exceeded 100% of the applicable |
10 | | annual incremental goal. |
11 | | (iii) The return on equity component shall not |
12 | | be increased or decreased if the annual |
13 | | incremental savings as determined by the |
14 | | independent evaluator is greater than 84.4% of the |
15 | | applicable annual incremental goal and less than |
16 | | 100% of the applicable annual incremental goal. |
17 | | (iv) The return on equity component shall not |
18 | | be increased or decreased by an amount greater than |
19 | | 200 basis points pursuant to this subparagraph |
20 | | (A). |
21 | | (B) For the period of January 1, 2026 through |
22 | | December 31, 2030, the applicable annual incremental |
23 | | goal shall be compared to the annual incremental |
24 | | savings as determined by the independent evaluator. |
25 | | (i) The return on equity component shall be |
26 | | reduced by 6 basis points for each percent by which |
|
| | SB3131 | - 67 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the utility did not achieve 100% of the applicable |
2 | | annual incremental goal. |
3 | | (ii) The return on equity component shall be |
4 | | increased by 6 basis points for each percent by |
5 | | which the utility exceeded 100% of the applicable |
6 | | annual incremental goal. |
7 | | (iii) The return on equity component shall not |
8 | | be increased or decreased by an amount greater than |
9 | | 200 basis points pursuant to this subparagraph |
10 | | (B). |
11 | | (C) If the applicable annual incremental goal was |
12 | | reduced under paragraphs (1), (2) or (3) of subsection |
13 | | (f) of this Section, then the following adjustments |
14 | | shall be made to the calculations described in |
15 | | subparagraphs (A) and (B) of this paragraph (8): |
16 | | (i) The calculation for determining |
17 | | achievement that is at least 125% or 134%, as |
18 | | applicable, of the applicable annual incremental |
19 | | goal shall use the unreduced applicable annual |
20 | | incremental goal to set the value. |
21 | | (ii) For the period through December 31, 2025, |
22 | | the calculation for determining achievement that |
23 | | is less than 125% but more than 100% of the |
24 | | applicable annual incremental goal shall use the |
25 | | reduced applicable annual incremental goal to set |
26 | | the value for 100% achievement of the goal and |
|
| | SB3131 | - 68 - | LRB100 19958 SMS 35239 b |
|
|
1 | | shall use the unreduced goal to set the value for |
2 | | 125% achievement. The 8 basis point value shall |
3 | | also be modified, as necessary, so that the 200 |
4 | | basis points are evenly apportioned among each |
5 | | percentage point value between 100% and 125% |
6 | | achievement. |
7 | | (iii) For the period of January 1, 2026 through |
8 | | December 31, 2030, the calculation for determining |
9 | | achievement that is less than 134% but more than |
10 | | 100% of the applicable annual incremental goal |
11 | | shall use the reduced applicable annual |
12 | | incremental goal to set the value for 100% |
13 | | achievement of the goal and shall use the unreduced |
14 | | goal to set the value for 125% achievement. The 6 |
15 | | basis point value shall also be modified, as |
16 | | necessary, so that the 200 basis points are evenly |
17 | | apportioned among each percentage point value |
18 | | between 100% and 134% achievement. |
19 | | (9) The utility shall submit the energy savings data to |
20 | | the independent evaluator no later than 30 days after the |
21 | | close of the plan year. The independent evaluator shall |
22 | | determine the cumulative persisting annual savings for a |
23 | | given plan year no later than 120 days after the close of |
24 | | the plan year. The utility shall submit an informational |
25 | | filing to the Commission no later than 160 days after the |
26 | | close of the plan year that attaches the independent |
|
| | SB3131 | - 69 - | LRB100 19958 SMS 35239 b |
|
|
1 | | evaluator's final report identifying the cumulative |
2 | | persisting annual savings for the year and calculates, |
3 | | under paragraph (7) or (8) of this subsection (g), as |
4 | | applicable, any resulting change to the utility's return on |
5 | | equity component of the weighted average cost of capital |
6 | | applicable to the next plan year beginning with the January |
7 | | monthly billing period and extending through the December |
8 | | monthly billing period. However, if the utility recovers |
9 | | the costs incurred under this Section under paragraphs (2) |
10 | | and (3) of subsection (d) of this Section, then the utility |
11 | | shall not be required to submit such informational filing, |
12 | | and shall instead submit the information that would |
13 | | otherwise be included in the informational filing as part |
14 | | of its filing under paragraph (3) of such subsection (d) |
15 | | that is due on or before June 1 of each year. |
16 | | For those utilities that must submit the informational |
17 | | filing, the Commission may, on its own motion or by |
18 | | petition, initiate an investigation of such filing, |
19 | | provided, however, that the utility's proposed return on |
20 | | equity calculation shall be deemed the final, approved |
21 | | calculation on December 15 of the year in which it is filed |
22 | | unless the Commission enters an order on or before December |
23 | | 15, after notice and hearing, that modifies such |
24 | | calculation consistent with this Section. |
25 | | The adjustments to the return on equity component |
26 | | described in paragraphs (7) and (8) of this subsection (g) |
|
| | SB3131 | - 70 - | LRB100 19958 SMS 35239 b |
|
|
1 | | shall be applied as described in such paragraphs through a |
2 | | separate tariff mechanism, which shall be filed by the |
3 | | utility under subsections (f) and (g) of this Section. |
4 | | (h) No more than 6% of energy efficiency and |
5 | | demand-response program revenue may be allocated for research, |
6 | | development, or pilot deployment of new equipment or measures.
|
7 | | (i) When practicable, electric utilities shall incorporate |
8 | | advanced metering infrastructure data into the planning, |
9 | | implementation, and evaluation of energy efficiency measures |
10 | | and programs, subject to the data privacy and confidentiality |
11 | | protections of applicable law. |
12 | | (j) The independent evaluator shall follow the guidelines |
13 | | and use the savings set forth in Commission-approved energy |
14 | | efficiency policy manuals and technical reference manuals, as |
15 | | each may be updated from time to time. Until such time as |
16 | | measure life values for energy efficiency measures implemented |
17 | | for low-income households under subsection (c) of this Section |
18 | | are incorporated into such Commission-approved manuals, the |
19 | | low-income measures shall have the same measure life values |
20 | | that are established for same measures implemented in |
21 | | households that are not low-income households. |
22 | | (k) Notwithstanding any provision of law to the contrary, |
23 | | an electric utility subject to the requirements of this Section |
24 | | may file a tariff cancelling an automatic adjustment clause |
25 | | tariff in effect under this Section or Section 8-103, which |
26 | | shall take effect no later than one business day after the date |
|
| | SB3131 | - 71 - | LRB100 19958 SMS 35239 b |
|
|
1 | | such tariff is filed. Thereafter, the utility shall be |
2 | | authorized to defer and recover its expenditures incurred under |
3 | | this Section through a new tariff authorized under subsection |
4 | | (d) of this Section or in the utility's next rate case under |
5 | | Article IX or Section 16-108.5 of this Act, with interest at an |
6 | | annual rate equal to the utility's weighted average cost of |
7 | | capital as approved by the Commission in such case. If the |
8 | | utility elects to file a new tariff under subsection (d) of |
9 | | this Section, the utility may file the tariff within 10 days |
10 | | after the effective date of this amendatory Act of the 99th |
11 | | General Assembly, and the cost inputs to such tariff shall be |
12 | | based on the projected costs to be incurred by the utility |
13 | | during the calendar year in which the new tariff is filed and |
14 | | that were not recovered under the tariff that was cancelled as |
15 | | provided for in this subsection. Such costs shall include those |
16 | | incurred or to be incurred by the utility under its multi-year |
17 | | plan approved under subsections (f) and (g) of this Section, |
18 | | including, but not limited to, projected capital investment |
19 | | costs and projected regulatory asset balances with |
20 | | correspondingly updated depreciation and amortization reserves |
21 | | and expense. The Commission shall, after notice and hearing, |
22 | | approve, or approve with modification, such tariff and cost |
23 | | inputs no later than 75 days after the utility filed the |
24 | | tariff, provided that such approval, or approval with |
25 | | modification, shall be consistent with the provisions of this |
26 | | Section to the extent they do not conflict with this subsection |
|
| | SB3131 | - 72 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (k). The tariff approved by the Commission shall take effect no |
2 | | later than 5 days after the Commission enters its order |
3 | | approving the tariff. |
4 | | No later than 60 days after the effective date of the |
5 | | tariff cancelling the utility's automatic adjustment clause |
6 | | tariff, the utility shall file a reconciliation that reconciles |
7 | | the moneys collected under its automatic adjustment clause |
8 | | tariff with the costs incurred during the period beginning June |
9 | | 1, 2016 and ending on the date that the electric utility's |
10 | | automatic adjustment clause tariff was cancelled. In the event |
11 | | the reconciliation reflects an under-collection, the utility |
12 | | shall recover the costs as specified in this subsection (k). If |
13 | | the reconciliation reflects an over-collection, the utility |
14 | | shall apply the amount of such over-collection as a one-time |
15 | | credit to retail customers' bills. |
16 | | (l) For the calendar years covered by a multi-year plan |
17 | | commencing after December 31, 2017, subsections (a) through (j) |
18 | | of this Section do not apply to any retail customers of an |
19 | | electric utility that serves more than 3,000,000 retail |
20 | | customers in the State and whose total highest 30 minute demand |
21 | | was more than 10,000 kilowatts, or any retail customers of an |
22 | | electric utility that serves less than 3,000,000 retail |
23 | | customers but more than 500,000 retail customers in the State |
24 | | and whose total highest 15 minute demand was more than 10,000 |
25 | | kilowatts. For purposes of this subsection (l), "retail |
26 | | customer" has the meaning set forth in Section 16-102 of this |
|
| | SB3131 | - 73 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Act. A determination of whether this subsection is applicable |
2 | | to a customer shall be made for each multi-year plan beginning |
3 | | after December 31, 2017. The criteria for determining whether |
4 | | this subsection (l) is applicable to a retail customer shall be |
5 | | based on the 12 consecutive billing periods prior to the start |
6 | | of the first year of each such multi-year plan. |
7 | | (m) Notwithstanding the requirements of this Section, as |
8 | | part of a proceeding to approve a multi-year plan under |
9 | | subsections (f) and (g) of this Section, the Commission shall |
10 | | reduce the amount of energy efficiency measures implemented for |
11 | | any single year, and whose costs are recovered under subsection |
12 | | (d) of this Section, by an amount necessary to limit the |
13 | | estimated average net increase due to the cost of the measures |
14 | | to no more than |
15 | | (1) 3.5% for the each of the 4 years beginning January |
16 | | 1, 2018, |
17 | | (2) 3.75% for each of the 4 years beginning January 1, |
18 | | 2022, and |
19 | | (3) 4% for each of the 5 years beginning January 1, |
20 | | 2026, |
21 | | of the average amount paid per kilowatthour by residential |
22 | | eligible retail customers during calendar year 2015. To |
23 | | determine the total amount that may be spent by an electric |
24 | | utility in any single year, the applicable percentage of the |
25 | | average amount paid per kilowatthour shall be multiplied by the |
26 | | total amount of energy delivered by such electric utility in |
|
| | SB3131 | - 74 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the calendar year 2015, adjusted to reflect the proportion of |
2 | | the utility's load attributable to customers who are exempt |
3 | | from subsections (a) through (j) of this Section under |
4 | | subsection (l) of this Section. For purposes of this subsection |
5 | | (m), the amount paid per kilowatthour includes,
without |
6 | | limitation, estimated amounts paid for supply,
transmission, |
7 | | distribution, surcharges, and add-on taxes. For purposes of |
8 | | this Section, "eligible retail customers" shall have the |
9 | | meaning set forth in Section 16-111.5 of this Act. Once the |
10 | | Commission has approved a plan under subsections (f) and (g) of |
11 | | this Section, no subsequent rate impact determinations shall be |
12 | | made.
|
13 | | (Source: P.A. 99-906, eff. 6-1-17 .)
|
14 | | (220 ILCS 5/8-508) (from Ch. 111 2/3, par. 8-508)
|
15 | | Sec. 8-508.
No Except as provided in Section 12-306, no |
16 | | public utility shall
abandon or discontinue any service or, in |
17 | | the case of an electric utility,
make any modification as |
18 | | herein defined, without first having secured the
approval of |
19 | | the Commission, except in case of assignment, transfer,
lease |
20 | | or sale of the whole or any part of its franchises, licenses,
|
21 | | permits, plant, equipment, business, or other property to any |
22 | | political
subdivision or municipal corporation of this State. |
23 | | In the case of the
assignment, transfer, lease or sale, in |
24 | | whole or in part, of any franchise,
license, permit, plant, |
25 | | equipment, business or other property to any
political |
|
| | SB3131 | - 75 - | LRB100 19958 SMS 35239 b |
|
|
1 | | subdivision or municipal corporation of this State, the public
|
2 | | utility shall notify the Commission of such transaction. |
3 | | "Modification" as
used in this Section means any change of fuel |
4 | | type which would result in an
annual net systemwide decreased |
5 | | use of 10% or more of coal mined in Illinois.
The Commission |
6 | | shall conduct public hearings on any request by a public
|
7 | | utility to make such modification and shall accept testimony |
8 | | from interested
parties qualified to provide evidence |
9 | | regarding the cost or cost savings
of the proposed modification |
10 | | as compared with the cost or cost savings of
alternative |
11 | | actions by the utility and shall consider the impact on |
12 | | employment
related to the production of coal in Illinois. Such |
13 | | hearings shall be commenced
no later than 30 days after the |
14 | | filing of the request by the public utility
and shall be |
15 | | concluded within 120 days from the date of filing. The |
16 | | Commission
must issue its final determination within 60 days of |
17 | | the conclusion of the
hearing. In making its determination the |
18 | | Commission shall attach primary
weight to the cost or cost |
19 | | savings to the customers of the utility. In
granting its |
20 | | approval, the Commission may impose such terms, conditions
or |
21 | | requirements as in its judgment are necessary to protect the |
22 | | public
interest. Provided, however, that any public utility |
23 | | abandoning or
discontinuing service in pursuance of authority |
24 | | granted by the
Commission shall be deemed to have waived any |
25 | | and all objections to the
terms, conditions or requirements |
26 | | imposed by the Commission in that
regard. Provided, further, |
|
| | SB3131 | - 76 - | LRB100 19958 SMS 35239 b |
|
|
1 | | that nothing in this Section shall be
construed to limit the |
2 | | right of a public utility to discontinue service
to individual |
3 | | patrons in accordance with the effective rules,
regulations, |
4 | | and practices of such public utility.
|
5 | | The Commission, after a hearing upon its own motion or upon |
6 | | petition
of any public utility, shall have power by order to |
7 | | authorize or require
any public utility to curtail or |
8 | | discontinue service to individual
customers or classes |
9 | | thereof, or for specific purposes or uses, and
otherwise to |
10 | | regulate the furnishing of service, provided that preference
|
11 | | for service shall be given to those customers serving essential |
12 | | human needs and
governmental agencies performing law |
13 | | enforcement functions, whenever and to the
extent such action |
14 | | is required by the convenience and necessity of the
public |
15 | | during time of war, invasion, insurrection or martial law, or |
16 | | by
reason of a catastrophe, emergency, or shortage of fuel, |
17 | | supplies or
equipment employed or service furnished by such |
18 | | public utility;
provided, however, that an interim order, |
19 | | effective for a period not
exceeding 15 days, may be made |
20 | | without a hearing if the circumstances do
not reasonably permit |
21 | | the holding of a hearing. Orders for the
curtailment or |
22 | | discontinuance of service pursuant to this paragraph
shall not |
23 | | be continued in effect for any period beyond that which is
|
24 | | reasonably necessary, shall be vacated by the Commission as |
25 | | soon as
public convenience and necessity permit, and shall |
26 | | include such
arrangements for substitute service in the interim |
|
| | SB3131 | - 77 - | LRB100 19958 SMS 35239 b |
|
|
1 | | as the Commission in its
judgment may impose. Every such order, |
2 | | during the
period it is in effect and for such further period, |
3 | | if any, as the
Commission may provide, shall have the effect of |
4 | | suspending the
operation of all prior orders or parts of orders |
5 | | of the Commission
inconsistent therewith. No public utility |
6 | | shall be held liable for any
damage resulting from any action |
7 | | taken, or any omission to act, pursuant
to or in compliance |
8 | | with any order under this paragraph for the
curtailment or |
9 | | discontinuance of service unless such order was procured
by the |
10 | | fraud of the public utility.
|
11 | | (Source: P.A. 87-173.)
|
12 | | (220 ILCS 5/8-509) (from Ch. 111 2/3, par. 8-509) |
13 | | Sec. 8-509. When necessary for the construction of any |
14 | | alterations,
additions, extensions or improvements ordered or |
15 | | authorized under Section 8-406.1 or ,
8-503 , or 12-218 of this |
16 | | Act, any public utility may enter upon, take or
damage private |
17 | | property in the manner provided for by the law of eminent |
18 | | domain. If a public utility seeks relief under this Section in |
19 | | the same proceeding in which it seeks a certificate of public |
20 | | convenience and necessity under Section 8-406.1 of this Act, |
21 | | the Commission shall enter its order under this Section either |
22 | | as part of the Section 8-406.1 order or at the same time it |
23 | | enters the Section 8-406.1 order. If a public utility seeks |
24 | | relief under this Section after the Commission enters its order |
25 | | in the Section 8-406.1 proceeding, the Commission shall issue |
|
| | SB3131 | - 78 - | LRB100 19958 SMS 35239 b |
|
|
1 | | its order under this Section within 45 days after the utility |
2 | | files its petition under this Section. |
3 | | This Section applies to the exercise of eminent domain |
4 | | powers by
telephone companies or telecommunications carriers |
5 | | only when the facilities
to be constructed are intended to be |
6 | | used in whole or in part for providing
one or more intrastate |
7 | | telecommunications services classified as
"noncompetitive" |
8 | | under Section 13-502 in a tariff filed by the condemnor.
The |
9 | | exercise of eminent domain powers by telephone companies or
|
10 | | telecommunications carriers in all other cases shall be |
11 | | governed solely by
"An Act relating to the powers, duties and |
12 | | property of telephone
companies", approved May 16, 1903, as now |
13 | | or hereafter amended. |
14 | | (Source: P.A. 96-1348, eff. 7-28-10.)
|
15 | | (220 ILCS 5/9-102.1)
|
16 | | Sec. 9-102.1. Negotiated rates.
|
17 | | (a) Notwithstanding anything to the contrary in any other |
18 | | Section of Article
IX of this Act, the Commission may approve |
19 | | one or more rate schedules filed by
a public utility that |
20 | | enable the public utility to provide service to customers
under |
21 | | contracts that are treated as proprietary and confidential by |
22 | | the
Commission notwithstanding the filing thereof. Service |
23 | | under the contracts
shall be provided on such terms and for |
24 | | such rates or charges as the public
utility and the customer |
25 | | agree upon, without regard to any rate schedules the
public |
|
| | SB3131 | - 79 - | LRB100 19958 SMS 35239 b |
|
|
1 | | utility may have filed with the Commission under any other |
2 | | Section of
Article IX of this Act. The contracts shall be filed |
3 | | with the Commission,
notwithstanding anything to the contrary |
4 | | in any schedule referred to in
subsection (b) of this Section.
|
5 | | For purposes of
Section 3-121 of this Act, the amounts |
6 | | collected under the contracts shall
be treated as having been |
7 | | collected under rates that the public utility is
required to |
8 | | file under Section 9-102 of this Act.
|
9 | | (b) Each schedule described in subsection (a) that became |
10 | | effective before
August 25, 1995, and any contract thereunder, |
11 | | shall be deemed to have become
effective in accordance with its |
12 | | terms, subject to the provisions of any
Commission order that |
13 | | purported to authorize the schedule.
|
14 | | (c) In any determination of the rates to be charged by an |
15 | | electric public
utility having contracts in effect pursuant to |
16 | | schedules filed under this
Section or schedules referred to in |
17 | | subsection (b) of this Section, the
revenues
received, or to be |
18 | | received, by the electric public utility under each such
|
19 | | contract shall be deemed to be equal to the revenues, based on |
20 | | the actual usage
of the customer, that would have been, or |
21 | | would be, received under the lowest
rates available under |
22 | | schedules on file pursuant to Section 9-201, applicable
to a |
23 | | class of consumers that includes the customer, including any |
24 | | applicable
riders or surcharges, plus any revenues that would |
25 | | have been, or would be
required to pay for investment or |
26 | | expenses incurred by the electric public
utility that would not |
|
| | SB3131 | - 80 - | LRB100 19958 SMS 35239 b |
|
|
1 | | be incurred if service were provided under such lowest
rates. |
2 | | The cost of capital used to determine rates to be charged by |
3 | | the
electric public utility shall be that which would have |
4 | | obtained if service were
provided under such lowest rates.
The |
5 | | provisions of this subsection (c) shall not apply: (1) in any
|
6 | | determination of the rates to be charged by a gas public |
7 | | utility, and (2) in
any determination of the rates to be |
8 | | charged by an electric public utility, to
contracts in effect |
9 | | prior to the effective date of this amendatory Act of 1996
|
10 | | pursuant
to economic development schedules referred to in |
11 | | Section 9-241 of this Act,
under which the electric public |
12 | | utility is authorized to provide discounts for
new electrical |
13 | | sales that result from the location of new or expanded
|
14 | | industrial facilities in the electric public utility's service |
15 | | territory. The
preceding sentence shall not be construed to |
16 | | diminish the Commission's existing
authority as of the |
17 | | effective date of this amendatory Act of 1996 to allocate
the |
18 | | costs
of all public utilities equitably, in any determination |
19 | | of rates, so as to set
rates which are just and reasonable.
|
20 | | (d) Any contract filed pursuant to the provisions of |
21 | | subsection (a) of
this
Section
shall be accorded
proprietary |
22 | | and confidential treatment by the Commission and otherwise |
23 | | deemed
to be exempt from the requirements of Sections 9-102, |
24 | | 9-103, 9-104, 9-201,
9-240, 9-241, and 9-243, except to the |
25 | | extent the Commission may, in its
discretion,
order otherwise. |
26 | | The Commission shall permit any statutory consumer protection
|
|
| | SB3131 | - 81 - | LRB100 19958 SMS 35239 b |
|
|
1 | | agency to have access to any such contract,
provided that: (i) |
2 | | the agency, and each individual that will
have access on behalf |
3 | | of the agency, agree in writing to keep such contract
|
4 | | confidential, such agreement to be in a form
established by the |
5 | | Commission; and (ii) access is limited to full-time
employees
|
6 | | of the agency and such other persons as are acceptable to the |
7 | | public utility
or,
if the agency and the public utility are |
8 | | unable to agree, are determined to be
acceptable by the |
9 | | Commission. "Statutory consumer protection agency" means any
|
10 | | office, corporation, or other agency created by Article XI of |
11 | | this Act or any
other Illinois statute as of the effective date |
12 | | of this amendatory Act of 1996
that has an express statutory |
13 | | duty to represent the interest of public utility
customers, any |
14 | | such agency subsequently created by act of the General Assembly
|
15 | | that expressly authorizes
the agency to access the information |
16 | | described in this subsection, or the
Attorney General of the |
17 | | State of Illinois.
|
18 | | (e) Nothing in this Section shall be construed to give a |
19 | | public utility the
authority to provide electric or natural gas |
20 | | service to a customer the public
utility is not otherwise |
21 | | lawfully entitled to serve. Nothing in this Section
shall be |
22 | | construed to affect in any way the service rights of electric
|
23 | | suppliers as granted under the Electric Supplier Act.
|
24 | | (f) The provisions of subsection (b) of this Section |
25 | | 9-102.1 are intended
to be severable from the remaining |
26 | | provisions of this Act; and therefore, no
determination of the |
|
| | SB3131 | - 82 - | LRB100 19958 SMS 35239 b |
|
|
1 | | validity of the provisions of subsection (b) shall affect
the |
2 | | validity of the remaining provisions of this Section 9-102.1.
|
3 | | (g) After January 1, 2001, no contract for electric service |
4 | | may be entered
into under any schedule filed pursuant to the |
5 | | provisions of subsection (a) of
this Section or under any |
6 | | schedule referred to in subsection (b) of this
Section.
The |
7 | | foregoing provision shall not affect any contract entered into |
8 | | prior to
January 1, 2001.
|
9 | | (h) Nothing contained in this Section shall be construed as |
10 | | preventing any
customer or other appropriate party from filing |
11 | | a complaint or otherwise
requesting that the Commission |
12 | | investigate the reasonableness of the terms and
conditions of |
13 | | any schedule filed under this Section or referred to in
|
14 | | subsection
(b) of this Section. Nothing contained in this |
15 | | Section shall be construed as
affecting the right of any |
16 | | customer or public utility to enter into and enforce
any |
17 | | contract providing for the amounts to be charged for service |
18 | | where the
contract is or has been filed pursuant to any other |
19 | | Section of this Act.
Nothing contained in this Section shall be |
20 | | construed to limit any Commission
authority to authorize a |
21 | | public utility to engage in experimental programs
relating to |
22 | | competition, including direct access programs.
|
23 | | (Source: P.A. 89-600, eff. 8-2-96.)
|
24 | | (220 ILCS 5/9-201) (from Ch. 111 2/3, par. 9-201)
|
25 | | Sec. 9-201.
(a) Unless the Commission otherwise orders, and |
|
| | SB3131 | - 83 - | LRB100 19958 SMS 35239 b |
|
|
1 | | except as
otherwise provided in this Section, no change shall |
2 | | be made by any
public utility in any rate or other charge or |
3 | | classification, or in any
rule, regulation, practice or |
4 | | contract relating to or affecting any rate
or other charge, |
5 | | classification or service, or in any privilege or
facility, |
6 | | except after 45 days' notice to the Commission and to the
|
7 | | public as herein provided. Such notice shall be given by filing |
8 | | with
the Commission and keeping open for public inspection new |
9 | | schedules or
supplements stating plainly the change or changes |
10 | | to be made in the
schedule or schedules then in force, and the |
11 | | time when the change or
changes will go into effect, and by |
12 | | publication in a newspaper of
general circulation or such other |
13 | | notice to persons affected by such
change as may be prescribed |
14 | | by rule of the Commission. The Commission,
for good cause |
15 | | shown, may allow changes without requiring the 45 days'
notice |
16 | | herein provided for, by an order specifying the changes so to |
17 | | be
made and the time when they shall take effect and the manner |
18 | | in which
they shall be filed and published.
|
19 | | When any change is proposed in any rate or other charge, or
|
20 | | classification, or in any rule, regulation, practice, or |
21 | | contract
relating to or affecting any rate or other charge, |
22 | | classification or
service, or in any privilege or facility, |
23 | | such proposed change shall be
plainly indicated on the new |
24 | | schedule filed with the Commission, by some
character to be |
25 | | designated by the Commission, immediately preceding or
|
26 | | following the item.
|
|
| | SB3131 | - 84 - | LRB100 19958 SMS 35239 b |
|
|
1 | | When any public utility providing water or sewer service |
2 | | proposes any
change in any rate or other charge, or |
3 | | classification, or in any rule,
regulation, practice, or |
4 | | contract relating to or affecting any rate or
other charge, |
5 | | classification or service, or in any privilege or facility,
|
6 | | such utility shall, in addition to the other notice |
7 | | requirements of this
Act, provide notice of such change to all |
8 | | customers potentially affected by
including a notice and |
9 | | description of such change, and of Commission
procedures for |
10 | | intervention, in the first bill sent to each such customer
|
11 | | after the filing of the proposed change.
|
12 | | For water or sewer utilities with greater than 15,000 total |
13 | | customers, the following notice requirements are applicable, |
14 | | in addition to the other notice requirements of this Act: |
15 | | (1) As a separate bill insert, an initial notice in the |
16 | | first bill sent to all customers potentially affected by |
17 | | the proposed change after the filing of the proposed change |
18 | | shall include: |
19 | | (A) the approximate date when the change or changes |
20 | | shall go into effect assuming the Commission utilizes |
21 | | the 11-month process as described in this Section; |
22 | | (B) a statement indicating that the estimated bill |
23 | | impact may vary based on multiple factors, including, |
24 | | but not limited to, meter size, usage volume, and the |
25 | | fire protection district; |
26 | | (C) the water or sewer utility's customer service |
|
| | SB3131 | - 85 - | LRB100 19958 SMS 35239 b |
|
|
1 | | number or other number as may be appropriate where an |
2 | | authorized agent of the water or sewer utility can |
3 | | explain how the proposed increase might impact an |
4 | | individual customer's bill; |
5 | | (D) if the proposed change involves a change from a |
6 | | flat to a volumetric rate, an explanation of volumetric |
7 | | rate; |
8 | | (E) a reference to the water or sewer utility's |
9 | | website where customers can find tips on water |
10 | | conservation; and |
11 | | (F) for customers receiving both water and sewer |
12 | | service from a utility and if the customer has an |
13 | | option to install a separate meter for irrigation to |
14 | | mitigate sewer charges, an explanation of the water and |
15 | | sewer utility's and the customer's responsibilities |
16 | | for installation of a separate meter if such a change |
17 | | is approved. |
18 | | (2) A second notice to all customers shall be included |
19 | | on the first bill after the Commission suspends the tariffs |
20 | | initiating the rate case. |
21 | | (3) Final notice of such change shall be sent to all |
22 | | customers potentially affected by the proposed change by |
23 | | including information required under this paragraph (3) |
24 | | with the first bill after the effective date of the rates |
25 | | approved by the Final Order of the Commission in a rate |
26 | | case. The notice shall include the following: |
|
| | SB3131 | - 86 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (A) the date when the change or changes went into |
2 | | effect; |
3 | | (B) the water or sewer utility's customer service |
4 | | number or other number as may be appropriate where an |
5 | | authorized agent of the water or sewer utility can |
6 | | explain how the proposed increase might impact an |
7 | | individual customer's bill; |
8 | | (C) an explanation that usage shall now be charged |
9 | | at a volumetric rate rather than a flat rate, if |
10 | | applicable; |
11 | | (D) a reference to the water or sewer utility's |
12 | | website where the customer can find tips on water |
13 | | conservation; and |
14 | | (E) for customers receiving both water and sewer |
15 | | service from a utility and if the customer has an |
16 | | option to install a separate meter for irrigation to |
17 | | mitigate sewer charges, an explanation of the water and |
18 | | sewer utility's and the customer's responsibilities |
19 | | for installation of a separate meter if such a change |
20 | | is approved. |
21 | | (b) Whenever there shall be filed with the Commission any |
22 | | schedule
stating an individual or joint rate or other charge, |
23 | | classification,
contract, practice, rule or regulation, the |
24 | | Commission shall have power,
and it is hereby given authority, |
25 | | either upon complaint or upon its own
initiative without |
26 | | complaint, at once, and if it so orders, without
answer or |
|
| | SB3131 | - 87 - | LRB100 19958 SMS 35239 b |
|
|
1 | | other formal pleadings by the interested public utility or
|
2 | | utilities, but upon reasonable notice, to enter upon a hearing
|
3 | | concerning the propriety of such rate or other charge, |
4 | | classification,
contract, practice, rule or regulation, and |
5 | | pending the hearing and
decision thereon, such rate or other |
6 | | charge, classification, contract,
practice, rule or regulation |
7 | | shall not go into effect. The period of
suspension of such rate |
8 | | or other charge, classification, contract,
practice, rule or |
9 | | regulation shall not extend more than 105 days beyond
the time |
10 | | when such rate or other charge, classification, contract,
|
11 | | practice, rule or regulation would otherwise go into effect |
12 | | unless the
Commission, in its discretion, extends the period of |
13 | | suspension for a
further period not exceeding 6 months.
|
14 | | All rates or other charges, classifications, contracts, |
15 | | practices, rules or
regulations not so suspended shall, on the |
16 | | expiration of 45 days from
the time of filing the same with the |
17 | | Commission, or of such lesser time
as the Commission may grant, |
18 | | go into effect and be the established and
effective rates or |
19 | | other charges, classifications, contracts, practices,
rules |
20 | | and regulations, subject to the power of the Commission, after |
21 | | a
hearing had on its own motion or upon complaint, as herein |
22 | | provided, to
alter or modify the same.
|
23 | | Within 30 days after such changes have been
authorized by |
24 | | the Commission, copies of the new or revised schedules
shall be |
25 | | posted or filed in accordance with the terms of Section 9-103 |
26 | | of
this Act, in such a manner that all changes shall be plainly |
|
| | SB3131 | - 88 - | LRB100 19958 SMS 35239 b |
|
|
1 | | indicated. The Commission shall incorporate into the period of |
2 | | suspension a review period of 4 business days during which the |
3 | | Commission may review and determine whether the new or revised |
4 | | schedules comply with the Commission's decision approving a |
5 | | change to the public utility's rates. Such review period shall |
6 | | not extend the suspension period by more than 2 days. Absent |
7 | | notification to the contrary within the 4 business day period, |
8 | | the new or revised schedules shall be deemed approved.
|
9 | | (c) If the Commission enters upon a hearing concerning the |
10 | | propriety of
any proposed rate or other charge, classification, |
11 | | contract, practice, rule
or regulation, the Commission shall |
12 | | establish the rates or other charges,
classifications, |
13 | | contracts, practices, rules or regulations proposed, in
whole |
14 | | or in part, or others in lieu thereof, which it shall find to |
15 | | be just
and reasonable. In such hearing, the burden of proof to |
16 | | establish the justness
and reasonableness of the proposed rates |
17 | | or other charges, classifications,
contracts, practices, rules |
18 | | or regulations, in whole and in part, shall be
upon the |
19 | | utility. The utility, the staff of the Commission, the Attorney |
20 | | General, or any party to a proceeding initiated under this |
21 | | Section who has been granted intervenor status and submitted a |
22 | | post-hearing brief must be given the opportunity to present |
23 | | oral argument, if requested no later than the date for filing |
24 | | exceptions, on the propriety of any proposed rate or other |
25 | | charge, classification, contract, practice, rule, or |
26 | | regulation. No rate or other charge, classification, contract,
|
|
| | SB3131 | - 89 - | LRB100 19958 SMS 35239 b |
|
|
1 | | practice, rule or regulation shall be found just and reasonable |
2 | | unless it
is consistent with Sections of this Article. |
3 | | (d) Except where compliance with Section 8-401 of this Act |
4 | | is of urgent and immediate concern, no representative of a |
5 | | public utility may discuss with a commissioner, commissioner's |
6 | | assistant, or administrative law judge hearing examiner in a |
7 | | non-public setting a planned filing for a general rate |
8 | | increase. If a public utility makes a filing under this |
9 | | Section, then no substantive communication by any such person |
10 | | with a commissioner, commissioner's assistant , or |
11 | | administrative law judge hearing examiner concerning the |
12 | | filing is permitted until a notice of hearing has been issued. |
13 | | After the notice of hearing has been issued, the only |
14 | | communications by any such person with a commissioner, |
15 | | commissioner's assistant, or administrative law judge hearing |
16 | | examiner concerning the filing permitted are communications |
17 | | permitted under Section 10-103 of this Act. If any such |
18 | | communication does occur, then within 5 days of the docket |
19 | | being initiated all details relating to the communication shall |
20 | | be placed on the public record of the proceeding. The record |
21 | | shall include any materials, whether written, recorded, |
22 | | filmed, or graphic in nature, produced or reproduced on any |
23 | | media, used in connection with the communication. The record |
24 | | shall reflect the names of all persons who transmitted, |
25 | | received, or were otherwise involved in the communication, the |
26 | | duration of the communication, and whether the communication |
|
| | SB3131 | - 90 - | LRB100 19958 SMS 35239 b |
|
|
1 | | occurred in person or by other means. In the case of an oral |
2 | | communication, the record shall also reflect the location or |
3 | | locations of all persons involved in the communication and, if |
4 | | the communication occurred by telephone, the telephone numbers |
5 | | for the callers and recipients of the communication. A |
6 | | commissioner, commissioner's assistant, or administrative law |
7 | | judge hearing examiner who is involved in any such |
8 | | communication shall be recused from the affected proceeding. |
9 | | The Commission, or any commissioner or administrative law judge |
10 | | hearing examiner presiding over the proceeding shall, in the |
11 | | event of a violation of this Section, take action necessary to |
12 | | ensure that such violation does not prejudice any party or |
13 | | adversely affect the fairness of the proceedings including |
14 | | dismissing the affected proceeding. Nothing in this subsection |
15 | | (d) is intended to preclude otherwise allowable updates on |
16 | | issues that may be indirectly related to a general rate case |
17 | | filing because cost recovery for the underlying activity may be |
18 | | requested. Such updates may include, without limitation, |
19 | | issues related to outages and restoration, credit ratings, |
20 | | security issuances, reliability, Federal Energy Regulatory |
21 | | Commission matters, Federal Communications Commission matters, |
22 | | regional reliability organizations, consumer education, or |
23 | | labor matters, provided that such updates may not include cost |
24 | | recovery in a planned rate case.
|
25 | | (Source: P.A. 98-191, eff. 1-1-14.)
|
|
| | SB3131 | - 91 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (220 ILCS 5/9-214) (from Ch. 111 2/3, par. 9-214)
|
2 | | Sec. 9-214. (a) As used in this Section:
|
3 | | (1) "CWIP" means those assets which are recorded as |
4 | | construction work in
progress on a public utility's books |
5 | | of accounts maintained in accordance
with the applicable |
6 | | regulations and orders of the Commission.
|
7 | | (2) "Rate base" means the original cost value of the |
8 | | property on which
a return is allowed.
|
9 | | (3) "CWIP ratio" means the fraction, expressed as a |
10 | | percentage,
calculated by dividing the amount of CWIP |
11 | | included in a public utility's
rate base by the utility's |
12 | | rate base.
|
13 | | (4) "Existing CWIP" means the amount of CWIP included |
14 | | in the rate base
on December 1, 1983.
|
15 | | (b) In any determination under Section 9-201, 9-202 or |
16 | | 9-250 of this Act
in a proceeding begun on or after December 1, |
17 | | 1983:
|
18 | | (1) For any public utility with a CWIP ratio on |
19 | | December 1, 1983, which
is less than 15%, the Commission |
20 | | shall not include in the rate base for
such public utility |
21 | | an amount for CWIP to exceed 80% of existing CWIP for
the |
22 | | period from December 1, 1983 through December 31, 1984, and |
23 | | 60% of
existing CWIP for the period from January 1, 1985 |
24 | | through December 31, 1985
and 40% of existing CWIP for the |
25 | | period from January 1, 1986 through
December 31, 1986, and |
26 | | 20% of existing CWIP for the period from January 1,
1987 |
|
| | SB3131 | - 92 - | LRB100 19958 SMS 35239 b |
|
|
1 | | through December 31, 1987.
|
2 | | (2) For any public utility with a CWIP ratio on |
3 | | December 1, 1983
which is greater than or equal to 15%, the |
4 | | Commission shall not include in
the rate base for such |
5 | | public utility an amount for CWIP in excess of the
amount |
6 | | of CWIP included in the rate base on December 1, 1983, plus |
7 | | 50% of
the allowed construction expenses incurred by the |
8 | | public utility from the
date of the most recent rate |
9 | | determination by the Commission prior to
December 1, 1983.
|
10 | | (c) The limitations set forth in paragraph (b) of this |
11 | | Section shall not
be interpreted as an expansion of the |
12 | | Commission's authority to include
CWIP in the rate base, but |
13 | | rather solely as a limitation thereon.
|
14 | | (d) The Commission shall not include an amount for CWIP in |
15 | | the rate base
for any public utility for the period after |
16 | | December 31, 1988.
|
17 | | (e) Notwithstanding the provisions of paragraphs (b) and |
18 | | (d) of this
Section the Commission may include in the rate base |
19 | | of a public utility an
amount for CWIP for a public utility's |
20 | | investment which is scheduled to be
placed in service within 12 |
21 | | months of the date of the rate determination.
For the purposes |
22 | | of this paragraph nuclear generating facilities shall
be |
23 | | considered to be in service upon the commencement of electric |
24 | | generation.
|
25 | | (f) Notwithstanding the provisions of paragraph (b) and |
26 | | (d), the
Commission may include in the rate base of a public |
|
| | SB3131 | - 93 - | LRB100 19958 SMS 35239 b |
|
|
1 | | utility an amount of
CWIP for a public utility's investment in |
2 | | pollution control devices for the
control of sulfur dioxide |
3 | | emissions and the purification of water and
sewage; provided, |
4 | | however, that upon application by a public utility
which is |
5 | | constructing one or more pollution control devices for the |
6 | | control
of sulfur dioxide emissions as part of a Clean Air Act |
7 | | compliance plan
approved by the Commission pursuant to |
8 | | subsection (e) of Section 8-402.1,
the Commission shall include |
9 | | in such public utility's rate base an amount
of CWIP equal to |
10 | | its investment in such pollution control device or
devices, but |
11 | | not to exceed the estimated cost of such facilities specified
|
12 | | in the Commission's order or supplemental order pursuant to |
13 | | subsection (e)
of Section 8-402.1. For purposes of this |
14 | | subsection (f), the public
utility's investment shall not |
15 | | include the amount of any state, federal or
other grants |
16 | | provided to the public utility to fund the design,
acquisition, |
17 | | construction, installation and testing of pollution control
|
18 | | devices for the control of sulfur dioxide emissions.
|
19 | | (g) Except for those amounts of CWIP described in |
20 | | paragraphs (e) and (f)
of this Section, the Commission shall |
21 | | consider, in any rate filing
subsequent to the coming on line |
22 | | of any new utility plant where CWIP funds
have been allowed in |
23 | | rate base, a rate moderation plan directed towards
allowing an |
24 | | appropriate return to ratepayers for previous amounts
|
25 | | attributable to CWIP funds.
|
26 | | The Commission shall conduct an investigation and study of |
|
| | SB3131 | - 94 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the costs
and benefits to ratepayers of the inclusion of |
2 | | construction work in
progress in rate base. Such study shall |
3 | | include a full opportunity for
participation by the public |
4 | | through notice and hearings. If the
Commission determines that |
5 | | in certain circumstances the inclusion of CWIP
in rate base |
6 | | would be demonstrably beneficial to ratepayers, the
Commission |
7 | | shall report its findings with recommendations to the General
|
8 | | Assembly by December 31, 1988.
|
9 | | (Source: P.A. 87-173.)
|
10 | | (220 ILCS 5/9-222.2) (from Ch. 111 2/3, par. 9-222.2)
|
11 | | Sec. 9-222.2. Additional Charge - Recovery. The additional |
12 | | charge
authorized by Section 9-221 or Section 9-222 shall be |
13 | | made (i) in the case
of a tax measured by gross receipts or |
14 | | gross revenue, by adding to the
customer's bill a uniform |
15 | | percentage to those amounts payable by the
customer for |
16 | | intrastate utility service which are includible in the measure
|
17 | | of such tax, except, however, such method is not required where |
18 | | practical
considerations justify a utility's or |
19 | | telecommunications carrier's use of
another just and |
20 | | reasonable method of recovering its entire liability for
such |
21 | | tax, and (ii) in the case of a tax measured by the number of |
22 | | therms or
kilowatt-hours distributed, supplied, furnished, |
23 | | sold, transported or
transmitted, by adding to the customer's |
24 | | bill an amount equal to the number
of therms or kilowatt-hours |
25 | | which are includible in the measure of such
tax, multiplied by |
|
| | SB3131 | - 95 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the applicable tax rate. Without limiting the
generality of the |
2 | | foregoing, it shall not be deemed unjust and unreasonable
or a |
3 | | violation of Section 9-241 for telecommunications carriers to |
4 | | recover
the expense of taxes imposed by any municipality |
5 | | pursuant to Section 8-11-2
of the Illinois Municipal Code on |
6 | | coin revenues generated by coin-operated
telecommunications |
7 | | devices by including the expense of the tax within the
coin |
8 | | rates for intra-state coin paid telecommunications services.
|
9 | | (Source: P.A. 87-750.)
|
10 | | (220 ILCS 5/9-223) (from Ch. 111 2/3, par. 9-223)
|
11 | | Sec. 9-223. Fire protection charge.
|
12 | | (a) The Commission may authorize any public utility engaged |
13 | | in
the production, storage, transmission, sale, delivery or |
14 | | furnishing of water
to impose a fire protection charge, in |
15 | | addition to any rate authorized by
this Act, sufficient to |
16 | | cover a reasonable portion of the cost of providing
the |
17 | | capacity, facilities and the water necessary to meet the fire |
18 | | protection
needs of any municipality or public fire protection |
19 | | district. Such fire
protection charge shall be in the form of a |
20 | | fixed amount per bill and shall
be shown separately on the |
21 | | utility bill of each customer of the municipality
or fire |
22 | | protection district. Any filing by a public utility to impose |
23 | | such a
fire protection charge or to modify a charge shall be |
24 | | made pursuant to Section
9-201 of this Act. Any fire protection |
25 | | charge imposed shall reflect the
costs associated with |
|
| | SB3131 | - 96 - | LRB100 19958 SMS 35239 b |
|
|
1 | | providing fire protection service for each municipality
or fire |
2 | | protection district. No such charge shall be imposed directly |
3 | | on
any municipality or fire protection district for a |
4 | | reasonable level of fire
protection services unless provided |
5 | | for in a separate agreement between the
municipality or the |
6 | | fire protection district and the utility.
|
7 | | (b) (Blank). By December 31, 2007, the Commission shall |
8 | | conduct at least 3 public forums to evaluate the purpose and |
9 | | use of each fire protection charge imposed under this Section. |
10 | | At least one forum must be held in northern Illinois, at least |
11 | | one forum must be held in central Illinois, and at least one |
12 | | forum must be held in southern Illinois. The Commission must |
13 | | invite a representative from each municipality and fire |
14 | | protection district affected by a fire protection charge under |
15 | | this Section to attend a public forum. The Commission shall |
16 | | report its findings concerning recommendations concerning the |
17 | | purpose and use of each fire protection charge to the General |
18 | | Assembly no later than the last day of the veto session in |
19 | | 2008.
|
20 | | (Source: P.A. 94-950, eff. 6-27-06.)
|
21 | | (220 ILCS 5/10-101) (from Ch. 111 2/3, par. 10-101)
|
22 | | Sec. 10-101.
The Commission, or any commissioner or |
23 | | administrative law judge hearing examiner
designated by the |
24 | | Commission, shall have power to hold investigations,
inquiries |
25 | | and hearings concerning any matters covered by the provisions
|
|
| | SB3131 | - 97 - | LRB100 19958 SMS 35239 b |
|
|
1 | | of this Act, or by any other Acts relating to public utilities |
2 | | subject
to such rules and regulations as the Commission may |
3 | | establish. In the
conduct of any investigation, inquiry or |
4 | | hearing the provisions of the
Illinois Administrative |
5 | | Procedure Act, including but not limited to Sections
10-25 and |
6 | | 10-35 of that Act, shall be applicable and the
Commission's |
7 | | rules shall be consistent therewith. Complaint cases initiated
|
8 | | pursuant to any Section of this Act, investigative proceedings |
9 | | and ratemaking
cases shall be considered "contested cases" as |
10 | | defined in Section 1-30 of the Illinois Administrative |
11 | | Procedure Act, any contrary provision
therein notwithstanding. |
12 | | Any proceeding intended to lead to the establishment
of |
13 | | policies, practices, rules or programs applicable to more than
|
14 | | one utility may, in the Commission's discretion, be conducted |
15 | | pursuant to
either rulemaking or contested case provisions, |
16 | | provided such choice is clearly
indicated at the beginning of |
17 | | such proceeding and subsequently adhered to. No
violation of |
18 | | this Section or the Illinois Administrative Procedure Act and |
19 | | no
informality in any proceeding or in the manner of taking |
20 | | testimony before the
Commission, any commissioner or |
21 | | administrative law judge hearing examiner of the Commission |
22 | | shall
invalidate any order, decision, rule or regulation made, |
23 | | approved, or confirmed
by the Commission in the absence of |
24 | | prejudice. All hearings conducted by the
Commission shall be |
25 | | open to the public.
|
26 | | Each commissioner and every administrative law judge |
|
| | SB3131 | - 98 - | LRB100 19958 SMS 35239 b |
|
|
1 | | hearing examiner of the Commission designated by
it to hold any |
2 | | inquiry, investigation or hearing, shall have the power to
|
3 | | administer oaths and affirmations, certify to all official |
4 | | acts, issue
subpoenas, compel the attendance and testimony of |
5 | | witnesses, and the production
of papers, books, accounts and |
6 | | documents.
|
7 | | Hearings shall be held either by the Commission or by one |
8 | | or more
commissioners or administrative law judges hearing |
9 | | examiners .
|
10 | | When any attorney who is not admitted to the practice of |
11 | | law in Illinois by unlimited or conditional admission, but who |
12 | | is licensed in another state,
territory, or commonwealth of the |
13 | | United States, the District of Columbia, or a foreign country |
14 | | may desire to appear before the Commission, such
attorney shall |
15 | | be allowed to appear before the Commission as provided in |
16 | | Supreme Court Rule 707.
|
17 | | All evidence presented at hearings held by the Commission |
18 | | or under its
authority shall become a part of the records of |
19 | | the Commission. In all cases
in which the Commission bases any |
20 | | action on reports of investigation or
inquiries not conducted |
21 | | as hearings, such reports shall be made a part of the
records |
22 | | of the Commission. All proceedings of the Commission and all |
23 | | documents
and records in its possession shall be public |
24 | | records, except as in this Act
otherwise provided.
|
25 | | To the extent consistent with this Section and the Illinois |
26 | | Administrative
Procedure Act, the Commission may adopt |
|
| | SB3131 | - 99 - | LRB100 19958 SMS 35239 b |
|
|
1 | | reasonable and proper rules and
regulations relative to the |
2 | | exercise of its powers, and proper rules to govern
its |
3 | | proceedings, and regulate the mode and manner of all |
4 | | investigations and
hearings, and alter and amend the same.
|
5 | | (Source: P.A. 98-895, eff. 1-1-15 .)
|
6 | | (220 ILCS 5/10-101.1)
|
7 | | Sec. 10-101.1. Mediation; arbitration; case management.
|
8 | | (a) It is the intent of the General Assembly that |
9 | | proceedings before the
Commission shall be concluded as |
10 | | expeditiously as is possible consistent with
the right of the |
11 | | parties to the due process of law and protection of
the
public |
12 | | interest. It is further the intent of the General Assembly to |
13 | | permit and
encourage voluntary mediation and voluntary binding |
14 | | arbitration of disputes
arising under this Act.
|
15 | | (b) Nothing in this Act shall prevent parties to contested |
16 | | cases brought
before the Commission from resolving those cases, |
17 | | or other disputes arising
under this Act, in part or in their |
18 | | entirety, by agreement of all parties, by
compromise and |
19 | | settlement, or by voluntary mediation; provided, however, that
|
20 | | nothing in this Section shall limit the Commission's authority |
21 | | to conduct such
investigations and enter such orders as it |
22 | | shall deem necessary to enforce the
provisions of this Act or |
23 | | otherwise protect the public interest. Evidence of
conduct or |
24 | | statements made by a party in furtherance of voluntary |
25 | | mediation or
in compromise negotiations is not admissible as |
|
| | SB3131 | - 100 - | LRB100 19958 SMS 35239 b |
|
|
1 | | evidence should the matter
subsequently be heard by the |
2 | | Commission; provided, however that evidence
otherwise |
3 | | discoverable is not excluded or deemed inadmissible merely |
4 | | because
it is presented in the course of voluntary mediation or |
5 | | compromise
negotiations.
No civil penalty shall be imposed upon |
6 | | parties that reach an agreement pursuant
to the mediation |
7 | | procedures in this Section.
|
8 | | (c) The Commission shall prescribe by rule such procedures |
9 | | and facilities
as are necessary to permit parties to resolve |
10 | | disputes through voluntary
mediation prior to the filing of, or |
11 | | at any point during, the pendency of a
contested matter. |
12 | | Parties to disputes arising under this Act are encouraged to
|
13 | | submit disputes to the Commission for voluntary mediation, |
14 | | which shall not
be binding upon the parties. Submission of a |
15 | | dispute to voluntary mediation
shall
not compromise the right |
16 | | of any party to bring action under this Act.
|
17 | | (d) In any contested case before the Commission, at the |
18 | | Commission's or administrative law judge's
hearing examiner's |
19 | | direction or on motion of any party, a case management
|
20 | | conference may be held at such time in the proceeding prior to |
21 | | evidentiary
hearing as the administrative law judge hearing |
22 | | examiner deems proper. Prior to the conference, when
directed |
23 | | to do so, all parties shall file a case management memorandum |
24 | | that
addresses items (1) through (9) as directed by the |
25 | | administrative law judge hearing examiner .
At the conference, |
26 | | the following shall be considered:
|
|
| | SB3131 | - 101 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (1) the identification and simplification of the |
2 | | issues; provided,
however, that the identification of |
3 | | issues by a party shall not
foreclose that party from |
4 | | raising such other meritorious issues as
that party might |
5 | | subsequently identify;
|
6 | | (2) amendments to the pleadings;
|
7 | | (3) the possibility of obtaining admissions of fact and |
8 | | of documents
which will avoid unnecessary proof;
|
9 | | (4) limitations on discovery including:
|
10 | | (A) the area of expertise and the number of |
11 | | witnesses who
will likely be called; provided, |
12 | | however, that the identification
of witnesses by a |
13 | | party shall not foreclose that party from
producing |
14 | | such other witnesses as that party might
subsequently |
15 | | identify; and
|
16 | | (B) schedules for responses to and completion of |
17 | | discovery;
provided, however, that such responses |
18 | | shall under no
circumstances be provided later than 28
|
19 | | days after such discovery or requests are served, |
20 | | unless the administrative law judge
hearing examiner |
21 | | shall order or
the parties agree to some other time |
22 | | period for
response;
|
23 | | (5) the possibility of settlement and scheduling of a |
24 | | settlement
conference;
|
25 | | (6) the advisability of alternative dispute resolution |
26 | | including, but
not limited to, mediation or arbitration;
|
|
| | SB3131 | - 102 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (7) the date on which the matter should be ready for |
2 | | evidentiary
hearing and the likely duration of the hearing;
|
3 | | (8) the advisability of holding subsequent case |
4 | | management
conferences; and
|
5 | | (9) any other matters that may aid in the disposition |
6 | | of the action.
|
7 | | (e) The Commission is hereby authorized, if requested by |
8 | | all parties to
any complaint brought under this Act, to |
9 | | arbitrate the complaint and to enter a
binding arbitration |
10 | | award disposing of the complaint. The Commission shall
|
11 | | prescribe by rule procedures for arbitration.
|
12 | | (Source: P.A. 92-22, eff. 6-30-01.)
|
13 | | (220 ILCS 5/10-103) (from Ch. 111 2/3, par. 10-103)
|
14 | | Sec. 10-103. In all proceedings, investigations or |
15 | | hearings conducted by
the Commission, except in the disposition |
16 | | of matters which the Commission
is authorized to entertain or |
17 | | dispose of on an ex parte basis, any finding,
decision or order |
18 | | made by the Commission shall be based exclusively on the
record |
19 | | for decision in the case, which shall include only the |
20 | | transcript of
testimony and exhibits together with all papers |
21 | | and requests filed in the
proceeding, including, in contested |
22 | | cases, the documents and information
described in Section 10-35 |
23 | | of the Illinois Administrative Procedure Act.
|
24 | | The provisions of Section 10-60 of the Illinois |
25 | | Administrative
Procedure Act shall apply in full to Commission |
|
| | SB3131 | - 103 - | LRB100 19958 SMS 35239 b |
|
|
1 | | proceedings, including
ratemaking cases, any provision of the |
2 | | Illinois Administrative Procedure Act to
the contrary |
3 | | notwithstanding. |
4 | | The provisions of Section 10-60 shall
not apply, however, |
5 | | to communications between Commission employees who are
engaged |
6 | | in investigatory, prosecutorial or advocacy functions and |
7 | | other parties
to the proceeding, provided that such Commission |
8 | | employees are still prohibited
from communicating on an ex |
9 | | parte basis, as designated in Section 10-60,
directly or |
10 | | indirectly, with members of the Commission, any administrative |
11 | | law judge hearing examiner in
the proceeding, or any Commission |
12 | | employee who is or may reasonably be expected
to be involved in |
13 | | the decisional process of the proceeding. Any commissioner, |
14 | | administrative law judge hearing examiner , or other person who |
15 | | is
or may reasonably be expected to be involved in the |
16 | | decisional process of a
proceeding, who receives, or who makes |
17 | | or knowingly causes to be made, a
communication prohibited by |
18 | | this Section or Section 10-60 of the Illinois
Administrative |
19 | | Procedure Act as modified by this Section, shall place on the
|
20 | | public record of the proceeding (1) any and all such written |
21 | | communications;
(2) memoranda stating the substance of any and |
22 | | all such oral communications;
and (3) any and all written |
23 | | responses and memoranda stating the substance
of any and all |
24 | | oral responses to the materials described in clauses (1)
and |
25 | | (2).
|
26 | | The Commission, or any commissioner or administrative law |
|
| | SB3131 | - 104 - | LRB100 19958 SMS 35239 b |
|
|
1 | | judge hearing examiner presiding over
the proceeding, shall in |
2 | | the event of a violation of this Section, take
whatever action |
3 | | is necessary to ensure that such violation does not
prejudice |
4 | | any party or adversely affect the fairness of the proceedings, |
5 | | including dismissing the affected matter.
|
6 | | (Source: P.A. 96-33, eff. 7-10-09.)
|
7 | | (220 ILCS 5/10-104) (from Ch. 111 2/3, par. 10-104)
|
8 | | Sec. 10-104.
All hearings before the Commission or any |
9 | | commissioner or administrative law judge
hearing examiner |
10 | | shall be held within the county in which the subject
matter of |
11 | | the hearing is situated, or if the subject matter of the |
12 | | hearing
is situated in more than one county, then at a place or |
13 | | places designated
by the Commission, or agreed upon by the |
14 | | parties in interest, within one or
more such counties, or at |
15 | | the place which in the judgment of the Commission
shall be most |
16 | | convenient to the parties to be heard.
|
17 | | (Source: P.A. 84-617.)
|
18 | | (220 ILCS 5/10-105) (from Ch. 111 2/3, par. 10-105)
|
19 | | Sec. 10-105.
No person shall be excused from testifying or |
20 | | from producing any
papers, books, accounts or documents in any |
21 | | investigation or inquiry or
upon any hearing ordered by the |
22 | | Commission, when ordered to do so by the
Commission or any |
23 | | commissioner or administrative law judge hearing examiner ,
|
24 | | upon the ground that the testimony or evidence, documentary or
|
|
| | SB3131 | - 105 - | LRB100 19958 SMS 35239 b |
|
|
1 | | otherwise, may tend to incriminate him or subject him to a |
2 | | penalty or
forfeiture. But no person shall be prosecuted or |
3 | | subjected to any penalty
or forfeiture for or on account of any |
4 | | transaction, matter or thing
concerning which he may testify or |
5 | | produce evidence, documentary or
otherwise, before the |
6 | | Commission or a commissioner or administrative law judge |
7 | | hearing examiner :
Provided, that such immunity shall extend |
8 | | only to a natural person, who in
obedience to a subpoena, gives |
9 | | testimony under oath or produces evidence,
documentary or |
10 | | otherwise under oath. No person so testifying shall be
exempt |
11 | | from prosecution and punishment for perjury committed in so |
12 | | testifying.
The Commission or a commissioner or administrative |
13 | | law judge
hearing examiner may, on the motion of a party or on |
14 | | its own
motion, strike, in whole or in part, the testimony of a |
15 | | person who is not
reasonably
prepared to respond to questions |
16 | | under cross-examination intending to elicit
information |
17 | | directly related to matters raised by that person in his
|
18 | | testimony.
|
19 | | (Source: P.A. 93-457, eff. 8-8-03.)
|
20 | | (220 ILCS 5/10-106) (from Ch. 111 2/3, par. 10-106)
|
21 | | Sec. 10-106.
All subpoenas issued under the terms of this |
22 | | Act may be served
by any person of full age. The fees of |
23 | | witnesses for attendance and travel
shall be the same as fees |
24 | | of witnesses before the circuit courts of this
State, such fees |
25 | | to be paid when the witness is excused from further
attendance, |
|
| | SB3131 | - 106 - | LRB100 19958 SMS 35239 b |
|
|
1 | | when the witness is subpoenaed at the instance of the
|
2 | | Commission, or any commissioner or administrative law judge |
3 | | hearing examiner ; and the
disbursements made in the payment of |
4 | | such fees shall be audited and paid in
the same manner as are |
5 | | other expenses of the Commission. Whenever a
subpoena is issued |
6 | | at the instance of a complainant, respondent, or other
party to |
7 | | any proceeding before the Commission, the Commission may |
8 | | require
that the cost of service thereof and the fee of the |
9 | | witness shall be borne
by the party at whose instance the |
10 | | witness is summoned, and the Commission
shall have power, in |
11 | | its discretion, to require a deposit to cover the cost
of such |
12 | | service and witness fees and the payment of the legal witness |
13 | | fee
and mileage to the witness when served with subpoena. A |
14 | | subpoena issued as
aforesaid shall be served in the same manner |
15 | | as a subpoena issued out of a
court.
|
16 | | Any person who shall be served with a subpoena to appear |
17 | | and testify, or
to produce books, papers, accounts or |
18 | | documents, issued by the Commission
or by any commissioner or |
19 | | administrative law judge hearing examiner , in the course of an |
20 | | inquiry,
investigation or hearing conducted under any of the |
21 | | provisions of this Act,
and who refuse or neglect to appear, or |
22 | | to testify, or to produce books,
papers, accounts and documents |
23 | | relevant to said inquiry, investigation or
hearing as commanded |
24 | | in such subpoena, shall be guilty of a Class A misdemeanor.
|
25 | | Any circuit court of this State, upon application
of the |
26 | | Commission, or a commissioner or administrative law judge |
|
| | SB3131 | - 107 - | LRB100 19958 SMS 35239 b |
|
|
1 | | hearing examiner , may, in its
discretion, compel the attendance |
2 | | of witnesses, the production of
books, papers, accounts and |
3 | | documents, and the giving of testimony before
the Commission, |
4 | | or before any such commissioner or administrative law judge |
5 | | hearing examiner , by
an attachment for contempt or otherwise, |
6 | | in the same manner as production
of evidence may be compelled |
7 | | before the court.
|
8 | | The Commission or a commissioner or administrative law |
9 | | judge hearing examiner or any party may in
any investigation or |
10 | | hearing before the Commission, cause the deposition
of |
11 | | witnesses residing within or without the State to be taken in |
12 | | the manner
prescribed by law for like depositions in civil |
13 | | actions in the courts of
this State and to that end may compel |
14 | | the attendance of witnesses and the
production of papers, |
15 | | books, accounts and documents.
|
16 | | The Commission may require, by order served on any public |
17 | | utility in the
manner provided herein for the service of |
18 | | orders, the production within
this State at such time and place |
19 | | as it may designate, of any books,
accounts, papers or |
20 | | documents kept by any public utility operating within
this |
21 | | State in any office or place without this State, or, at its |
22 | | option,
verified copies in lieu thereof, so that an examination |
23 | | thereof may be made
by the Commission or under its direction.
|
24 | | (Source: P.A. 84-617.)
|
25 | | (220 ILCS 5/10-107) (from Ch. 111 2/3, par. 10-107)
|
|
| | SB3131 | - 108 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Sec. 10-107.
The Commission, each commissioner and each
|
2 | | employee of the Commission properly authorized thereby shall
|
3 | | have the right, at any and all times to inspect the papers, |
4 | | books, accounts
and documents, plant, equipment or other |
5 | | property of any public utility, and
the Commission, each |
6 | | commissioner and any administrative law judge hearing examiner |
7 | | of the Commission
authorized to administer oaths shall have the |
8 | | power
to examine under oath any officer, agent or employee of |
9 | | such public utility
in relation to any matter within the |
10 | | jurisdiction of the Commission. A
person other than a |
11 | | commissioner or administrative law judge hearing examiner |
12 | | demanding such
inspection shall produce under the seal of the |
13 | | Commission his authority to
make such inspection. A written |
14 | | record of the testimony or statement so
given under oath shall |
15 | | be made and filed with the Commission. Information
so obtained |
16 | | shall not be admitted in evidence or used in any proceeding
|
17 | | except in proceedings provided for in this Act.
|
18 | | Any party to a proceeding before the Commission shall have |
19 | | the right to
inspect the records of all hearings, |
20 | | investigations or inquiries conducted
by or under the authority |
21 | | of the Commission, which may relate to the issues
involved in |
22 | | such proceeding; and to submit suggestions as to other matters
|
23 | | to be investigated or as to questions to be propounded. If the |
24 | | Commission
is satisfied that such suggested investigation |
25 | | should be made or such
suggested questions answered, and that |
26 | | the information desired is within
the power of either party to |
|
| | SB3131 | - 109 - | LRB100 19958 SMS 35239 b |
|
|
1 | | furnish, it shall enter an order requiring the
investigation to |
2 | | be made or the questions to be answered, and upon failure
or |
3 | | refusal to comply with such order, the Commission shall either |
4 | | refuse to
grant the relief prayed for by the party refusing to |
5 | | comply, or may grant the
relief prayed for by the opposing |
6 | | party against the party refusing to comply.
|
7 | | (Source: P.A. 84-617.)
|
8 | | (220 ILCS 5/10-110) (from Ch. 111 2/3, par. 10-110)
|
9 | | Sec. 10-110.
At the time fixed for any hearing upon a |
10 | | complaint, the
complainant and the person or corporation |
11 | | complained of, and such persons
or corporations as the |
12 | | Commission may allow to intervene, shall be entitled
to be |
13 | | heard and to introduce evidence. The Commission shall issue |
14 | | process
to enforce the attendance of all necessary witnesses. |
15 | | At the conclusion of
such hearing the Commission shall make and |
16 | | render findings concerning the
subject matter and facts |
17 | | inquired into and enter its order based thereon. A
copy of such |
18 | | order, certified under the seal of the Commission, shall be
|
19 | | served upon the person or corporation complained of, or his or |
20 | | its
attorney, which order shall, of its own force, take effect |
21 | | and become
operative twenty days after the service thereof, |
22 | | except as otherwise
provided, and shall continue in force |
23 | | either for a period which may be
designated therein or until |
24 | | changed or abrogated by the Commission. Where
an order cannot, |
25 | | in the judgment of the Commission, be complied with within
|
|
| | SB3131 | - 110 - | LRB100 19958 SMS 35239 b |
|
|
1 | | twenty days, the Commission may prescribe such additional time |
2 | | as in its
judgment is reasonably necessary to comply with the |
3 | | order, and may, on
application and for good cause shown, extend |
4 | | the time for compliance fixed
in its order. A full and complete |
5 | | record shall be preserved of all
proceedings had before the |
6 | | Commission, or any member thereof, or any administrative law |
7 | | judge hearing
examiner , on any formal hearing had, and all |
8 | | testimony shall
be taken down by a stenographer appointed by |
9 | | the Commission, and the
parties shall be entitled to be heard |
10 | | in person or by attorney.
|
11 | | In any proceeding involving a public
utility in which the |
12 | | lawfulness of any of its rates or other charges shall
be called |
13 | | in question by any person or corporation furnishing a commodity
|
14 | | or service in competition with said public utility at prices or |
15 | | charges not
subject to regulation, the Commission may |
16 | | investigate the competitive
prices or other charges demanded or |
17 | | received by such person or corporation
for such commodity or |
18 | | service, including the rates or other charges
applicable to the |
19 | | transportation thereof. The Commission may, on its own
motion |
20 | | or that of any party to such proceeding, issue subpoenas to |
21 | | secure
the appearance of witnesses or the production of books, |
22 | | papers, accounts
and documents necessary to ascertain the |
23 | | prices, rates or other charges for
such commodity or service or |
24 | | for the transportation thereof, and shall
dismiss from such |
25 | | proceeding any party failing to comply with a subpoena so
|
26 | | issued.
|
|
| | SB3131 | - 111 - | LRB100 19958 SMS 35239 b |
|
|
1 | | In case of an appeal from any order or decision of the |
2 | | Commission, under
the terms of Sections 10-201 and 10-202 of |
3 | | this Act, a transcript of such
testimony, together with all |
4 | | exhibits or copies thereof introduced and all
information |
5 | | secured by the Commission on its own initiative and considered
|
6 | | by it in rendering its order or decision (and required by this |
7 | | Act to be
made a part of its records) and of the pleadings, |
8 | | records and proceedings
in the case, including transcripts of |
9 | | Commission meetings prepared in accordance with Section 10-102 |
10 | | of this Act, shall constitute the record of the Commission: |
11 | | Provided, that
on appeal from an order or decision of the |
12 | | Commission, the person or
corporation taking the appeal and the |
13 | | Commission may stipulate that a
certain question or certain |
14 | | questions alone and a specified portion only of
the evidence |
15 | | shall be certified to the court for its judgment, whereupon
|
16 | | such stipulation and the question or questions and the evidence |
17 | | therein
specified shall constitute the record on appeal.
|
18 | | Copies of all official documents and orders filed or |
19 | | deposited according
to law in the office of the Commission, |
20 | | certified by the Chairman of
the Commission or his or her |
21 | | designee to be true
copies of the originals, under
the official |
22 | | seal of the Commission, shall be evidence in like manner as
the |
23 | | originals.
|
24 | | In any matter concerning which the Commission is authorized |
25 | | to hold a
hearing, upon complaint or application or upon its |
26 | | own motion, notice shall
be given to the public utility and to |
|
| | SB3131 | - 112 - | LRB100 19958 SMS 35239 b |
|
|
1 | | such other interested persons as the
Commission shall deem |
2 | | necessary in the manner provided in
Section 10-108, and the |
3 | | hearing shall be conducted in like manner as if
complaint
had |
4 | | been made to or by the Commission. But nothing in this Act |
5 | | shall be
taken to limit or restrict the power of the |
6 | | Commission, summarily, of its
own motion, with or without |
7 | | notice, to conduct any investigations or
inquiries authorized |
8 | | by this Act, in such manner and by such means as it
may deem |
9 | | proper, and to take such action as it may deem necessary in
|
10 | | connection therewith. With respect to any rules, regulations, |
11 | | decisions or
orders which the Commission is authorized to issue |
12 | | without a hearing, and
so issues, any public utility or other |
13 | | person or corporation affected
thereby and deeming such rules, |
14 | | regulations, decisions or orders, or any of
them, improper, |
15 | | unreasonable or contrary to law, may apply for a hearing
|
16 | | thereon, setting forth specifically in such application every |
17 | | ground of
objection which the applicant desires to urge against |
18 | | such rule,
regulation, decision or order. The Commission may, |
19 | | in its discretion, grant
or deny the application, and a |
20 | | hearing, if had, shall be subject to the
provisions of this and |
21 | | the preceding Sections.
|
22 | | (Source: P.A. 96-33, eff. 7-10-09.)
|
23 | | (220 ILCS 5/10-111) (from Ch. 111 2/3, par. 10-111)
|
24 | | Sec. 10-111.
In any hearing, proceeding, investigation , or |
25 | | rulemaking
conducted by the Commission, the Commission, |
|
| | SB3131 | - 113 - | LRB100 19958 SMS 35239 b |
|
|
1 | | commissioner , or administrative law judge hearing examiner
|
2 | | presiding, shall, after the close of evidentiary hearings, |
3 | | prepare a
recommended or tentative decision, finding , or order , |
4 | | including a statement
of findings and conclusions and the |
5 | | reasons or basis therefore, on all the
material issues of fact, |
6 | | law , or discretion presented on the record. Such
recommended or |
7 | | tentative decision, finding , or order shall be served on all
|
8 | | parties who shall be entitled to a reasonable opportunity to |
9 | | respond
thereto, either in briefs or comments otherwise to be |
10 | | filed or separately.
The recommended or tentative decision, |
11 | | finding , or order and any responses
thereto , shall be included |
12 | | in the record for decision. This Section shall
not apply to any |
13 | | hearing, proceeding, or investigation conducted under Section
|
14 | | 13-515.
|
15 | | (Source: P.A. 96-33, eff. 7-10-09.)
|
16 | | (220 ILCS 5/10-201) (from Ch. 111 2/3, par. 10-201)
|
17 | | Sec. 10-201. (a) Jurisdiction. Within 35 days from the date |
18 | | that
a copy of the order or decision sought to be reviewed was |
19 | | served upon the party
affected by any order or decision of the |
20 | | Commission refusing an application for
a rehearing of any rule, |
21 | | regulation, order or decision of the Commission,
including any |
22 | | order granting or denying interim rate relief, or within 35 |
23 | | days
from the date that a copy of the order or decision sought |
24 | | to be reviewed was
served upon the party affected by any final |
25 | | order or decision of the Commission
upon and after a rehearing |
|
| | SB3131 | - 114 - | LRB100 19958 SMS 35239 b |
|
|
1 | | of any rule, regulation, order or decision of the
Commission, |
2 | | including any order granting or denying interim rate relief, |
3 | | any
person or corporation affected by such rule, regulation, |
4 | | order or decision, may
appeal to the appellate court of the |
5 | | judicial district in which the subject
matter of the hearing is |
6 | | situated, or if the subject matter of the hearing is
situated |
7 | | in more than one district, then of any one of such districts, |
8 | | for the
purpose of having the reasonableness or lawfulness of |
9 | | the rule, regulation,
order or decision inquired into and |
10 | | determined.
|
11 | | The court first acquiring jurisdiction of any appeal from |
12 | | any rule,
regulation, order or decision shall have and retain |
13 | | jurisdiction of such appeal
and of all further appeals from the |
14 | | same rule, regulation, order or decision
until such appeal is |
15 | | disposed of in such appellate court.
|
16 | | (b) Pleadings and Record. No proceeding to contest any |
17 | | rule,
regulation, decision or order which the Commission is |
18 | | authorized to issue
without a hearing and has so issued shall |
19 | | be brought in any court unless
application shall have been |
20 | | first made to the Commission for a hearing
thereon and until |
21 | | after such application has been acted upon by the
Commission, |
22 | | nor shall any person or corporation in any court urge or rely
|
23 | | upon any grounds not set forth in such application for a |
24 | | hearing before the
Commission, but the Commission shall decide |
25 | | the questions presented by the
application with all possible |
26 | | expedition consistent with the duties of the
Commission. The |
|
| | SB3131 | - 115 - | LRB100 19958 SMS 35239 b |
|
|
1 | | party taking such an appeal shall file with the Commission
|
2 | | written notice of the appeal. The Commission, upon the
filing |
3 | | of such notice of appeal, shall, within 5 days thereafter, file |
4 | | with
the clerk of the appellate court to which such appeal is |
5 | | taken a certified
copy of the order appealed. The Commission |
6 | | shall prepare a copy of the transcript
of the evidence, |
7 | | including exhibits and transcripts of Commission meetings |
8 | | prepared in accordance with Section 10-102 of this Act, or any |
9 | | portion of the record designated in a stipulation that only
|
10 | | certain questions are involved on appeal, which stipulation is |
11 | | to be
included in the record provided for in Section 10-110. |
12 | | The Commission shall
certify the record and file the same with |
13 | | the clerk of the appellate court to
which such appeal is taken |
14 | | within 35 days of the filing of the notice of appeal. The party |
15 | | serving such notice of appeal shall,
within 5 days after the |
16 | | service of such notice upon the Commission, file a
copy of the |
17 | | notice, with proof of service, with the clerk of the court to
|
18 | | which such appeal is taken, and thereupon the appellate court |
19 | | shall have
jurisdiction over the appeal. The appeal shall be |
20 | | heard according to the
rules governing other civil cases, so |
21 | | far as the same are applicable.
|
22 | | (c) No appellate court shall permit a
party affected by any |
23 | | rule, regulation, order or decision of the Commission
to |
24 | | intervene or become a party plaintiff or appellant in such |
25 | | court who has
not taken an appeal from such rule, regulation, |
26 | | order or decision in the
manner as herein provided.
|
|
| | SB3131 | - 116 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (d) No new or additional evidence may be introduced in any
|
2 | | proceeding upon appeal from a rule, regulation, order or |
3 | | decision of the
Commission, issued or confirmed after a |
4 | | hearing, but the appeal shall be
heard on the record of the |
5 | | Commission as certified by it. The findings and
conclusions of |
6 | | the Commission on questions of fact shall be held prima
facie |
7 | | to be true and as found by the Commission; rules, regulations, |
8 | | orders
or decisions of the Commission shall be held to be prima |
9 | | facie reasonable,
and the burden of proof upon all issues |
10 | | raised by the appeal shall
be upon the person or corporation |
11 | | appealing from such rules, regulations,
orders or decisions.
|
12 | | (e) Powers and duties of Reviewing Court:
|
13 | | (i) An appellate court to which any such appeal is |
14 | | taken shall have the
power, and it shall be its duty, to |
15 | | hear and determine such appeal with all
convenient speed. |
16 | | Any proceeding in any court in this State directly |
17 | | affecting
a rule, regulation, order or decision of the |
18 | | Commission, or to which the
Commission is a party, shall |
19 | | have priority in hearing and determination
over all other |
20 | | civil proceedings pending in such court, excepting |
21 | | election
contests.
|
22 | | (ii) If it appears that the Commission failed to |
23 | | receive evidence
properly proffered, on a hearing or a |
24 | | rehearing, or an application
therefor, the court shall |
25 | | remand the case, in whole or in part, to
the Commission |
26 | | with instructions to receive the testimony so proffered and
|
|
| | SB3131 | - 117 - | LRB100 19958 SMS 35239 b |
|
|
1 | | rejected, and to enter a new order based upon the evidence |
2 | | theretofore
taken, and such new evidence as it is directed |
3 | | to receive, unless it shall
appear that such new evidence |
4 | | would not be controlling, in which case the
court shall so |
5 | | find in its order. If the court remands only part of the
|
6 | | Commission's rule, regulation, order or decision, it shall |
7 | | determine without
delay the lawfulness and reasonableness |
8 | | of any independent portions of the
rule, regulation, order |
9 | | or decision subject to appeal.
|
10 | | (iii) If the court determines that the Commission's |
11 | | rule, regulation,
order or decision does not contain |
12 | | findings or analysis sufficient to allow
an informed |
13 | | judicial review thereof, the court shall remand the rule,
|
14 | | regulation, order or decision, in whole or in part, with |
15 | | instructions to
the Commission to make the necessary |
16 | | findings or analysis.
|
17 | | (iv) The court shall reverse a Commission rule, |
18 | | regulation, order or
decision, in whole or in part, if it |
19 | | finds that:
|
20 | | A. The findings of the Commission are not supported |
21 | | by substantial
evidence based on the entire record of |
22 | | evidence presented to or before the
Commission for and |
23 | | against such rule, regulation, order or decision; or
|
24 | | B. The rule, regulation, order or decision is |
25 | | without the jurisdiction
of the Commission; or
|
26 | | C. The rule, regulation, order or decision is in |
|
| | SB3131 | - 118 - | LRB100 19958 SMS 35239 b |
|
|
1 | | violation of the State
or federal constitution or laws; |
2 | | or
|
3 | | D. The proceedings or manner by which the |
4 | | Commission considered and
decided its rule, |
5 | | regulation, order or decision were in violation of the
|
6 | | State or federal constitution or laws, to the prejudice |
7 | | of the appellant.
|
8 | | (v) The court may affirm or reverse the rule, |
9 | | regulation, order or
decision of the Commission in whole or |
10 | | in part, or to remand the decision
in whole or in part |
11 | | where a hearing has been held before the Commission,
and to |
12 | | state the questions requiring further hearings or |
13 | | proceedings and
to give such other instructions as may be |
14 | | proper.
|
15 | | (vi) When the court remands a rule, regulation, order |
16 | | or decision of
the Commission, in whole or in part, the |
17 | | Commission shall enter its final
order with respect to the |
18 | | remanded rule, regulation, order or decision no
later than |
19 | | 6 months after the date of issuance of the court's mandate. |
20 | | The
Commission shall enter its final order, with respect to |
21 | | any remanded matter
pending before it on the effective date |
22 | | of this amendatory Act of 1988, no
later than 6 months |
23 | | after the effective date of this amendatory Act of 1988.
|
24 | | However, when the court mandates, or grants an extension of |
25 | | time which the
court determines to be necessary for, the |
26 | | taking of additional evidence, the
Commission shall enter |
|
| | SB3131 | - 119 - | LRB100 19958 SMS 35239 b |
|
|
1 | | an interim order within 6 months after the issuance of
the |
2 | | mandate (or within 6 months after the effective date of |
3 | | this amendatory Act
of 1988 in the case of a remanded |
4 | | matter pending before it on the effective
date of this |
5 | | amendatory Act of 1988), and the Commission shall enter its |
6 | | final
order within 5 months after the date the interim |
7 | | order was entered.
|
8 | | (f) When no appeal is taken from a rule, regulation, order |
9 | | or decision of
the Commission, as herein provided, parties |
10 | | affected by such rule,
regulation, order or decision, shall be |
11 | | deemed to have waived the right to
have the merits of the |
12 | | controversy reviewed by a court and there shall be
no trial of |
13 | | the merits of any controversy in which such rule, regulation,
|
14 | | order or decision was made, by any court to which application |
15 | | may be made
for the enforcement of the same, or in any other |
16 | | judicial proceedings.
|
17 | | (Source: P.A. 96-33, eff. 7-10-09.)
|
18 | | (220 ILCS 5/10-204) (from Ch. 111 2/3, par. 10-204)
|
19 | | Sec. 10-204.
(a) The pendency of an appeal shall not of |
20 | | itself stay or
suspend the operation of the rule, regulation, |
21 | | order or decision of the
Commission, but during the pendency of |
22 | | the appeal the reviewing court may
in its discretion stay or |
23 | | suspend, in whole or in part, the operation of
the Commission's |
24 | | rule, regulation, order or decision.
Any stocks or stock |
25 | | certificates, bonds, notes, or other evidence of
indebtedness |
|
| | SB3131 | - 120 - | LRB100 19958 SMS 35239 b |
|
|
1 | | issued pursuant to and in accordance with an order of the
|
2 | | Commission shall be valid and binding in accordance with their |
3 | | terms
notwithstanding such order of the Commission is later |
4 | | vacated, modified, or
otherwise held to be wholly or partly |
5 | | invalid unless operation of such order
of the Commission has |
6 | | been stayed or suspended by the
reviewing court prior to such |
7 | | issuance.
|
8 | | (b) No order so staying or suspending a rule, regulation, |
9 | | order or decision
of the Commission shall be made by the court |
10 | | otherwise than upon 3 days'
notice to the Commission and after |
11 | | a hearing, and if the rule, regulation,
order or decision of |
12 | | the Commission is suspended, the order suspending the
same |
13 | | shall contain a specific finding based upon evidence submitted |
14 | | to the
court, and identified by reference thereto, that great |
15 | | or irreparable
damage would otherwise result to the petitioner, |
16 | | and specifying the nature
of the damage.
|
17 | | (c) In case the rule, regulation, order or decision of the |
18 | | Commission is
stayed or suspended, the order of the court shall |
19 | | not become effective
until a suspending bond shall first have |
20 | | been executed and filed with, and
approved by the Commission |
21 | | (or approved, on review, by the court) payable
to the people of |
22 | | the State of Illinois, and sufficient in amount and
security to |
23 | | insure the prompt payment, by the party petitioning for the
|
24 | | review, of all damages caused by the delay in the enforcement |
25 | | of the rule,
regulation, order or decision of the Commission, |
26 | | and of all moneys which
any person or corporation may be |
|
| | SB3131 | - 121 - | LRB100 19958 SMS 35239 b |
|
|
1 | | compelled to pay, pending the review
proceedings, for |
2 | | transportation, transmission, product, commodity or
service in |
3 | | excess of the charges fixed by the rule, regulation, order or
|
4 | | decision of the Commission, in case said rule, regulation, |
5 | | order or
decision is sustained. However, no bond shall be |
6 | | required in the case of
any stay or suspension granted on |
7 | | application of the State or people of the
State, represented by |
8 | | the Attorney General or Public Counsel, or of any
city or other |
9 | | governmental body. The court in case it stays or suspends the
|
10 | | rule, regulation, order or
decision of the Commission in any |
11 | | manner affecting rates or other charges or
classifications, may |
12 | | in its discretion, also by order direct the public
utility |
13 | | affected to pay into court, from time to time thereto to be
|
14 | | impounded until the final decision of the case or into some |
15 | | bank or trust
company paying interest on deposits, under such |
16 | | conditions as the court may
prescribe, all sums of money which |
17 | | it may collect from any corporation or
person in excess of the |
18 | | sum such corporation or person would have been
compelled to pay |
19 | | if the rule, regulation, order or decision of the
Commission |
20 | | had not been stayed or suspended.
|
21 | | (d) When any rate or other charge has been in force for any |
22 | | length of time
exceeding one year, and that rate or other |
23 | | charge is advanced by the public
utility and the order of the |
24 | | Commission reinstates that such prior rate or
other charge, in |
25 | | whole or in part, no suspending order shall be allowed in
any |
26 | | case from the reinstating order pending the final determination |
|
| | SB3131 | - 122 - | LRB100 19958 SMS 35239 b |
|
|
1 | | of the
case in the reviewing court, pending the final |
2 | | determination
by such reviewing court.
|
3 | | (Source: P.A. 84-617.)
|
4 | | (220 ILCS 5/13-506.2) |
5 | | (Section scheduled to be repealed on December 31, 2020) |
6 | | Sec. 13-506.2. Market regulation for competitive retail |
7 | | services. |
8 | | (a) Definitions. As used in this Section: |
9 | | (1) "Electing Provider" means a telecommunications |
10 | | carrier that is subject to either rate regulation pursuant |
11 | | to Section 13-504 or Section 13-505 or alternative |
12 | | regulation pursuant to Section 13-506.1 and that elects to |
13 | | have the rates, terms, and conditions of its competitive |
14 | | retail telecommunications services solely determined and |
15 | | regulated pursuant to the terms of this Article. |
16 | | (2) "Basic local exchange service" means either a |
17 | | stand-alone residence network access line and per-call |
18 | | usage or, for any geographic area in which such stand-alone |
19 | | service is not offered, a stand-alone flat rate residence |
20 | | network access line for which local calls are not charged |
21 | | for frequency or duration. Extended Area Service shall be |
22 | | included in basic local exchange service. |
23 | | (3) "Existing customer" means a residential customer |
24 | | who was subscribing to one of the optional packages |
25 | | described in subsection (d) of this Section as of the |
|
| | SB3131 | - 123 - | LRB100 19958 SMS 35239 b |
|
|
1 | | effective date of this amendatory Act of the 99th General |
2 | | Assembly. A customer who was subscribing to one of the |
3 | | optional packages on that date but stops subscribing |
4 | | thereafter shall not be considered an "existing customer" |
5 | | as of the date the customer stopped subscribing to the |
6 | | optional package, unless the stoppage is temporary and |
7 | | caused by the customer changing service address locations, |
8 | | or unless the customer resumes subscribing and is eligible |
9 | | to receive discounts on monthly telephone service under the |
10 | | federal Lifeline program, 47 C.F.R. Part 54, Subpart E. |
11 | | (4) "New customer" means a residential customer who was |
12 | | not subscribing to one of the optional packages described |
13 | | in subsection (d) of this Section as of the effective date |
14 | | of this amendatory Act of the 99th General Assembly and who |
15 | | is eligible to receive discounts on monthly telephone |
16 | | service under the federal Lifeline program, 47 C.F.R. Part |
17 | | 54, Subpart E. |
18 | | (b) Election for market regulation.
Notwithstanding any |
19 | | other provision of this Act, an Electing Provider may elect to |
20 | | have the rates, terms, and conditions of its competitive retail |
21 | | telecommunications services solely determined and regulated |
22 | | pursuant to the terms of this Section by filing written notice |
23 | | of its election for market regulation with the Commission. The |
24 | | notice of election shall designate the geographic area of the |
25 | | Electing Provider's service territory where the market |
26 | | regulation shall apply, either on a state-wide basis or in one |
|
| | SB3131 | - 124 - | LRB100 19958 SMS 35239 b |
|
|
1 | | or more specified Market Service Areas ("MSA") or Exchange |
2 | | areas. An Electing Provider shall not make an election for |
3 | | market regulation under this Section unless it commits in its |
4 | | written notice of election for market regulation to fulfill the |
5 | | conditions and requirements in this Section in each geographic |
6 | | area in which market regulation is elected. Immediately upon |
7 | | filing the notice of election for market regulation, the |
8 | | Electing Provider shall be subject to the jurisdiction of the |
9 | | Commission to the extent expressly provided in this Section. |
10 | | (c) Competitive classification. Market regulation shall be |
11 | | available for competitive retail telecommunications services |
12 | | as provided in this subsection. |
13 | | (1) For geographic areas in which telecommunications |
14 | | services provided by the Electing Provider were classified |
15 | | as competitive either through legislative action or a |
16 | | tariff filing pursuant to Section 13-502 prior to January |
17 | | 1, 2010, and that are included in the Electing Provider's |
18 | | notice of election pursuant to subsection (b) of this |
19 | | Section, such services, and all recurring and nonrecurring |
20 | | charges associated with, related to or used in connection |
21 | | with such services, shall be classified as competitive |
22 | | without further Commission review. For services classified |
23 | | as competitive pursuant to this subsection, the |
24 | | requirements or conditions in any order or decision |
25 | | rendered by the Commission pursuant to Section 13-502 prior |
26 | | to the effective date of this amendatory Act of the 96th |
|
| | SB3131 | - 125 - | LRB100 19958 SMS 35239 b |
|
|
1 | | General Assembly, except for the commitments made by the |
2 | | Electing Provider in such order or decision concerning the |
3 | | optional packages required in subsection (d) of this |
4 | | Section and basic local exchange service as defined in this |
5 | | Section, shall no longer be in effect and no Commission |
6 | | investigation, review, or proceeding under Section 13-502 |
7 | | shall be continued, conducted, or maintained with respect |
8 | | to such services, charges, requirements, or conditions. If |
9 | | an Electing Provider has ceased providing optional |
10 | | packages to customers pursuant to subdivision (d)(8) of |
11 | | this Section, the commitments made by the Electing Provider |
12 | | in such order or decision concerning the optional packages |
13 | | under subsection (d) of this Section shall no longer be in |
14 | | effect and no Commission investigation, review, or |
15 | | proceeding under Section 13-502 shall be continued, |
16 | | conducted, or maintained with respect to such packages. |
17 | | (2) For those geographic areas in which residential |
18 | | local exchange telecommunications services have not been |
19 | | classified as competitive as of the effective date of this |
20 | | amendatory Act of the 96th General Assembly, all |
21 | | telecommunications services provided to residential and |
22 | | business end users by an Electing Provider in the |
23 | | geographic area that is included in its notice of election |
24 | | pursuant to subsection (b) shall be classified as |
25 | | competitive for purposes of this Article without further |
26 | | Commission review. |
|
| | SB3131 | - 126 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (3) If an Electing Provider was previously subject to |
2 | | alternative regulation pursuant to Section 13-506.1 of |
3 | | this Article, the alternative regulation plan shall |
4 | | terminate in whole for all services subject to that plan |
5 | | and be of no force or effect, without further Commission |
6 | | review or action, when the Electing Provider's residential |
7 | | local exchange telecommunications service in each MSA in |
8 | | its telecommunications service area in the State has been |
9 | | classified as competitive pursuant to either subdivision |
10 | | (c)(1) or (c)(2) of this Section. |
11 | | (4) The service packages described in Section 13-518 |
12 | | shall be classified as competitive for purposes of this |
13 | | Section if offered by an Electing Provider in a geographic |
14 | | area in which local exchange telecommunications service |
15 | | has been classified as competitive pursuant to either |
16 | | subdivision (c)(1) or (c)(2) of this Section. |
17 | | (5) Where a service, or its functional equivalent, or a |
18 | | substitute service offered by a carrier that is not an |
19 | | Electing Provider or the incumbent local exchange carrier |
20 | | for that area is also being offered by an Electing Provider |
21 | | for some identifiable class or group of customers in an |
22 | | exchange, group of exchanges, or some other clearly defined |
23 | | geographical area, the service offered by a carrier that is |
24 | | not an Electing Provider or the incumbent local exchange |
25 | | carrier for that area shall be classified as competitive |
26 | | without further Commission review. |
|
| | SB3131 | - 127 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (6) Notwithstanding any other provision of this Act, |
2 | | retail telecommunications services classified as |
3 | | competitive pursuant to Section 13-502 or subdivision |
4 | | (c)(5) of this Section shall have their rates, terms, and |
5 | | conditions solely determined and regulated pursuant to the |
6 | | terms of this Section in the same manner and to the same |
7 | | extent as the competitive retail telecommunications |
8 | | services of an Electing Provider, except that subsections |
9 | | (d), (g), and (j) of this Section shall not apply to a |
10 | | carrier that is not an Electing Provider or to the |
11 | | competitive telecommunications services of a carrier that |
12 | | is not an Electing Provider. The access services of a |
13 | | carrier that is not an Electing Provider shall remain |
14 | | subject to Section 13-900.2. The requirements in |
15 | | subdivision (e)(3) of this Section shall not apply to |
16 | | retail telecommunications services classified as |
17 | | competitive pursuant to Section 13-502 or subdivision |
18 | | (c)(5) of this Section, except that, upon request from the |
19 | | Commission, the telecommunications carrier providing |
20 | | competitive retail telecommunications services shall |
21 | | provide a report showing the number of credits and |
22 | | exemptions for the requested time period. |
23 | | (d) Consumer choice safe harbor options. |
24 | | (1) Subject to subdivision (d)(8) of this Section, an |
25 | | Electing Provider in each of the MSA or Exchange areas |
26 | | classified as competitive pursuant to subdivision (c)(1) |
|
| | SB3131 | - 128 - | LRB100 19958 SMS 35239 b |
|
|
1 | | or (c)(2) of this Section shall offer to all residential |
2 | | customers who choose to subscribe the following optional |
3 | | packages of services priced at the same rate levels in |
4 | | effect on January 1, 2010: |
5 | | (A) A basic package, which shall consist of a |
6 | | stand-alone residential network access line and 30 |
7 | | local calls. If the Electing Provider offers a |
8 | | stand-alone residential access line and local usage on |
9 | | a per call basis, the price for the basic package shall |
10 | | be the Electing Provider's applicable price in effect |
11 | | on January 1, 2010 for the sum of a residential access |
12 | | line and 30 local calls, additional calls over 30 calls |
13 | | shall be provided at the current per call rate. |
14 | | However, this basic package is not required if |
15 | | stand-alone residential network access lines or |
16 | | per-call local usage are not offered by the Electing |
17 | | Provider in the geographic area on January 1, 2010 or |
18 | | if the Electing Provider has not increased its |
19 | | stand-alone network access line and local usage rates, |
20 | | including Extended Area Service rates, since January |
21 | | 1, 2010. |
22 | | (B) An extra package, which shall consist of |
23 | | residential basic local exchange network access line |
24 | | and unlimited local calls. The price for the extra |
25 | | package shall be the Electing Provider's applicable |
26 | | price in effect on January 1, 2010 for a residential |
|
| | SB3131 | - 129 - | LRB100 19958 SMS 35239 b |
|
|
1 | | access line with unlimited local calls. |
2 | | (C) A plus package, which shall consist of |
3 | | residential basic local exchange network access line, |
4 | | unlimited local calls, and the customer's choice of 2 |
5 | | vertical services offered by the Electing Provider. |
6 | | The term "vertical services" as used in this |
7 | | subsection, includes, but is not limited to, call |
8 | | waiting, call forwarding, 3-way calling, caller ID, |
9 | | call tracing, automatic callback, repeat dialing, and |
10 | | voicemail. The price for the plus package shall be the |
11 | | Electing Provider's applicable price in effect on |
12 | | January 1, 2010 for the sum of a residential access |
13 | | line with unlimited local calls and 2 times the average |
14 | | price for the vertical features included in the |
15 | | package. |
16 | | (2) Subject to subdivision (d)(8) of this Section, for |
17 | | those geographic areas in which local exchange |
18 | | telecommunications services were classified as competitive |
19 | | on the effective date of this amendatory Act of the 96th |
20 | | General Assembly, an Electing Provider in each such MSA or |
21 | | Exchange area shall be subject to the same terms and |
22 | | conditions as provided in commitments made by the Electing |
23 | | Provider in connection with such previous competitive |
24 | | classifications, which shall apply with equal force under |
25 | | this Section, except as follows: (i) the limits on price |
26 | | increases on the optional packages required by this Section |
|
| | SB3131 | - 130 - | LRB100 19958 SMS 35239 b |
|
|
1 | | shall be extended consistent with subsection (d)(1) of this |
2 | | Section and (ii) the price for the extra package required |
3 | | by subsection (d)(1)(B) shall be reduced by one dollar from |
4 | | the price in effect on January 1, 2010. In addition, if an |
5 | | Electing Provider obtains a competitive classification |
6 | | pursuant to subsection (c)(1) and (c)(2), the price for the |
7 | | optional packages shall be determined in such area in |
8 | | compliance with subsection (d)(1), except the price for the |
9 | | plus package required by subsection (d)(1) (C) shall be the |
10 | | lower of the price for such area or the price of the plus |
11 | | package in effect on January 1, 2010 for areas classified |
12 | | as competitive pursuant to subsection (c)(1). |
13 | | (3) To the extent that the requirements in Section |
14 | | 13-518 applied to a telecommunications carrier prior to the |
15 | | effective date of this Section and that telecommunications |
16 | | carrier becomes an Electing Provider in accordance with the |
17 | | provisions of this Section, the requirements in Section |
18 | | 13-518 shall cease to apply to that Electing Provider in |
19 | | those geographic areas included in the Electing Provider's |
20 | | notice of election pursuant to subsection (b) of this |
21 | | Section. |
22 | | (4) Subject to subdivision (d)(8) of this Section, an |
23 | | Electing Provider shall make the optional packages |
24 | | required by this subsection and stand-alone residential |
25 | | network access lines and local usage, where offered, |
26 | | readily available to the public by providing information, |
|
| | SB3131 | - 131 - | LRB100 19958 SMS 35239 b |
|
|
1 | | in a clear manner, to residential customers. Information |
2 | | shall be made available on a website, and an Electing |
3 | | Provider shall provide notification to its customers every |
4 | | 6 months, provided that notification may consist of a bill |
5 | | page message that provides an objective description of the |
6 | | safe harbor options that includes a telephone number and |
7 | | website address where the customer may obtain additional |
8 | | information about the packages from the Electing Provider. |
9 | | The optional packages shall be offered on a monthly basis |
10 | | with no term of service requirement. An Electing Provider |
11 | | shall allow online electronic ordering of the optional |
12 | | packages and stand-alone residential network access lines |
13 | | and local usage, where offered, on its website in a manner |
14 | | similar to the online electronic ordering of its other |
15 | | residential services. |
16 | | (5) Subject to subdivision (d)(8) of this Section, an |
17 | | Electing Provider shall comply with the Commission's |
18 | | existing rules, regulations, and notices in Title 83, Part |
19 | | 735 of the Illinois Administrative Code when offering or |
20 | | providing the optional packages required by this |
21 | | subsection (d) and stand-alone residential network access |
22 | | lines. |
23 | | (6) Subject to subdivision (d)(8) of this Section, an |
24 | | Electing Provider shall provide to the Commission |
25 | | semi-annual subscribership reports as of June 30 and |
26 | | December 31 that contain the number of its customers |
|
| | SB3131 | - 132 - | LRB100 19958 SMS 35239 b |
|
|
1 | | subscribing to each of the consumer choice safe harbor |
2 | | packages required by subsection (d)(1) of this Section and |
3 | | the number of its customers subscribing to retail |
4 | | residential basic local exchange service as defined in |
5 | | subsection (a)(2) of this Section. The first semi-annual |
6 | | reports shall be made on April 1, 2011 for December 31, |
7 | | 2010, and on September 1, 2011 for June 30, 2011, and |
8 | | semi-annually on April 1 and September 1 thereafter. Such |
9 | | subscribership information shall be accorded confidential |
10 | | and proprietary treatment upon request by the Electing |
11 | | Provider. |
12 | | (7) The Commission shall have the power, after notice |
13 | | and hearing as provided in this Article, upon complaint or |
14 | | upon its own motion, to take corrective action if the |
15 | | requirements of this Section are not complied with by an |
16 | | Electing Provider. |
17 | | (8) On and after the effective date of this amendatory |
18 | | Act of the 99th General Assembly, an Electing Provider |
19 | | shall continue to offer and provide the optional packages |
20 | | described in this subsection (d) to existing customers and |
21 | | new customers. On and after July 1, 2017, an Electing |
22 | | Provider may immediately stop offering the optional |
23 | | packages described in this subsection (d) and, upon |
24 | | providing two notices to affected customers and to the |
25 | | Commission, may stop providing the optional packages |
26 | | described in this subsection (d) to all customers who |
|
| | SB3131 | - 133 - | LRB100 19958 SMS 35239 b |
|
|
1 | | subscribe to one of the optional packages. The first notice |
2 | | shall be provided at least 90 days before the date upon |
3 | | which the Electing Provider intends to stop providing the |
4 | | optional packages, and the second notice must be provided |
5 | | at least 30 days before that date. The first notice shall |
6 | | not be provided prior to July 1, 2017. Each notice must |
7 | | identify the date on which the Electing Provider intends to |
8 | | stop providing the optional packages, at least one |
9 | | alternative service available to the customer, and a |
10 | | telephone number by which the customer may contact a |
11 | | service representative of the Electing Provider. After |
12 | | July 1, 2017 with respect to new customers, and upon the |
13 | | expiration of the second notice period with respect to |
14 | | customers who were subscribing to one of the optional |
15 | | packages, subdivisions (d)(1), (d)(2), (d)(4), (d)(5), |
16 | | (d)(6), and (d)(7) of this Section shall not apply to the |
17 | | Electing Provider. Notwithstanding any other provision of |
18 | | this Article, an Electing Provider that has ceased |
19 | | providing the optional packages under this subdivision |
20 | | (d)(8) is not subject to Section 13-301(1)(c) of this Act. |
21 | | Notwithstanding any other provision of this Act, and |
22 | | subject to subdivision (d)(7) of this Section, the |
23 | | Commission's authority over the discontinuance of the |
24 | | optional packages described in this subsection (d) by an |
25 | | Electing Provider shall be governed solely by this |
26 | | subsection (d)(8). |
|
| | SB3131 | - 134 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (e) Service quality and customer credits for basic local |
2 | | exchange service. |
3 | | (1) An Electing Provider shall meet the following |
4 | | service quality standards in providing basic local |
5 | | exchange service, which for purposes of this subsection |
6 | | (e), includes both basic local exchange service and any |
7 | | consumer choice safe harbor options that may be required by |
8 | | subsection (d) of this Section. |
9 | | (A) Install basic local exchange service within 5 |
10 | | business days after receipt of an order from the |
11 | | customer unless the customer requests an installation |
12 | | date that is beyond 5 business days after placing the |
13 | | order for basic service and to inform the customer of |
14 | | the Electing Provider's duty to install service within |
15 | | this timeframe. If installation of service is |
16 | | requested on or by a date more than 5 business days in |
17 | | the future, the Electing Provider shall install |
18 | | service by the date requested. |
19 | | (B) Restore basic local exchange service for the |
20 | | customer within 30 hours after receiving notice that |
21 | | the customer is out of service. |
22 | | (C) Keep all repair and installation appointments |
23 | | for basic local exchange service if a customer premises |
24 | | visit requires a customer to be present. The |
25 | | appointment window shall be either a specific time or, |
26 | | at a maximum, a 4-hour time block during evening, |
|
| | SB3131 | - 135 - | LRB100 19958 SMS 35239 b |
|
|
1 | | weekend, and normal business hours. |
2 | | (D) Inform a customer when a repair or installation |
3 | | appointment requires the customer to be present. |
4 | | (2) Customers shall be credited by the Electing |
5 | | Provider for violations of basic local exchange service |
6 | | quality standards described in subdivision (e)(1) of this |
7 | | Section. The credits shall be applied automatically on the |
8 | | statement issued to the customer for the next monthly |
9 | | billing cycle following the violation or following the |
10 | | discovery of the violation. The next monthly billing cycle |
11 | | following the violation or the discovery of the violation |
12 | | means the billing cycle immediately following the billing |
13 | | cycle in process at the time of the violation or discovery |
14 | | of the violation, provided the total time between the |
15 | | violation or discovery of the violation and the issuance of |
16 | | the credit shall not exceed 60 calendar days. The Electing |
17 | | Provider is responsible for providing the credits and the |
18 | | customer is under no obligation to request such credits. |
19 | | The following credits shall apply: |
20 | | (A) If an Electing Provider fails to repair an |
21 | | out-of-service condition for basic local exchange |
22 | | service within 30 hours, the Electing Provider shall |
23 | | provide a credit to the customer. If the service |
24 | | disruption is for more than 30 hours, but not more than |
25 | | 48 hours, the credit must be equal to a pro-rata |
26 | | portion of the monthly recurring charges for all basic |
|
| | SB3131 | - 136 - | LRB100 19958 SMS 35239 b |
|
|
1 | | local exchange services disrupted. If the service |
2 | | disruption is for more than 48 hours, but not more than |
3 | | 72 hours, the credit must be equal to at least 33% of |
4 | | one month's recurring charges for all local services |
5 | | disrupted. If the service disruption is for more than |
6 | | 72 hours, but not more than 96 hours, the credit must |
7 | | be equal to at least 67% of one month's recurring |
8 | | charges for all basic local exchange services |
9 | | disrupted. If the service disruption is for more than |
10 | | 96 hours, but not more than 120 hours, the credit must |
11 | | be equal to one month's recurring charges for all basic |
12 | | local exchange services disrupted. For each day or |
13 | | portion thereof that the service disruption continues |
14 | | beyond the initial 120-hour period, the Electing |
15 | | Provider shall also provide an additional credit of $20 |
16 | | per calendar day. |
17 | | (B) If an Electing Provider fails to install basic |
18 | | local exchange service as required under subdivision |
19 | | (e)(1) of this Section, the Electing Provider shall |
20 | | waive 50% of any installation charges, or in the |
21 | | absence of an installation charge or where |
22 | | installation is pursuant to the Link Up program, the |
23 | | Electing Provider shall provide a credit of $25. If an |
24 | | Electing Provider fails to install service within 10 |
25 | | business days after the service application is placed, |
26 | | or fails to install service within 5 business days |
|
| | SB3131 | - 137 - | LRB100 19958 SMS 35239 b |
|
|
1 | | after the customer's requested installation date, if |
2 | | the requested date was more than 5 business days after |
3 | | the date of the order, the Electing Provider shall |
4 | | waive 100% of the installation charge, or in the |
5 | | absence of an installation charge or where |
6 | | installation is provided pursuant to the Link Up |
7 | | program, the Electing Provider shall provide a credit |
8 | | of $50. For each day that the failure to install |
9 | | service continues beyond the initial 10 business days, |
10 | | or beyond 5 business days after the customer's |
11 | | requested installation date, if the requested date was |
12 | | more than 5 business days after the date of the order, |
13 | | the Electing Provider shall also provide an additional |
14 | | credit of $20 per calendar day until the basic local |
15 | | exchange service is installed. |
16 | | (C) If an Electing Provider fails to keep a |
17 | | scheduled repair or installation appointment when a |
18 | | customer premises visit requires a customer to be |
19 | | present as required under subdivision (e)(1) of this |
20 | | Section, the Electing Provider shall credit the |
21 | | customer $25 per missed appointment. A credit required |
22 | | by this subdivision does not apply when the Electing |
23 | | Provider provides the customer notice of its inability |
24 | | to keep the appointment no later than 8:00 pm of the |
25 | | day prior to the scheduled date of the appointment. |
26 | | (D) Credits required by this subsection do not |
|
| | SB3131 | - 138 - | LRB100 19958 SMS 35239 b |
|
|
1 | | apply if the violation of a service quality standard: |
2 | | (i) occurs as a result of a negligent or |
3 | | willful act on the part of the customer; |
4 | | (ii) occurs as a result of a malfunction of |
5 | | customer-owned telephone equipment or inside |
6 | | wiring; |
7 | | (iii) occurs as a result of, or is extended by, |
8 | | an emergency situation as defined in 83 Ill. Adm. |
9 | | Code 732.10; |
10 | | (iv) is extended by the Electing Provider's |
11 | | inability to gain access to the customer's |
12 | | premises due to the customer missing an |
13 | | appointment, provided that the violation is not |
14 | | further extended by the Electing Provider; |
15 | | (v) occurs as a result of a customer request to |
16 | | change the scheduled appointment, provided that |
17 | | the violation is not further extended by the |
18 | | Electing Provider; |
19 | | (vi) occurs as a result of an Electing |
20 | | Provider's right to refuse service to a customer as |
21 | | provided in Commission rules; or |
22 | | (vii) occurs as a result of a lack of |
23 | | facilities where a customer requests service at a |
24 | | geographically remote location, where a customer |
25 | | requests service in a geographic area where the |
26 | | Electing Provider is not currently offering |
|
| | SB3131 | - 139 - | LRB100 19958 SMS 35239 b |
|
|
1 | | service, or where there are insufficient |
2 | | facilities to meet the customer's request for |
3 | | service, subject to an Electing Provider's |
4 | | obligation for reasonable facilities planning. |
5 | | (3) Each Electing Provider shall provide to the |
6 | | Commission on a quarterly basis and in a form suitable for |
7 | | posting on the Commission's website in conformance with the |
8 | | rules adopted by the Commission and in effect on April 1, |
9 | | 2010, a public report that includes the following data for |
10 | | basic local exchange service quality of service: |
11 | | (A) With regard to credits due in accordance with |
12 | | subdivision (e)(2)(A) as a result of out-of-service |
13 | | conditions lasting more than 30 hours: |
14 | | (i) the total dollar amount of any customer |
15 | | credits paid; |
16 | | (ii) the number of credits issued for repairs |
17 | | between 30 and 48 hours; |
18 | | (iii) the number of credits issued for repairs |
19 | | between 49 and 72 hours; |
20 | | (iv) the number of credits issued for repairs |
21 | | between 73 and 96 hours; |
22 | | (v) the number of credits used for repairs |
23 | | between 97 and 120 hours; |
24 | | (vi) the number of credits issued for repairs |
25 | | greater than 120 hours; and |
26 | | (vii) the number of exemptions claimed for |
|
| | SB3131 | - 140 - | LRB100 19958 SMS 35239 b |
|
|
1 | | each of the categories identified in subdivision |
2 | | (e)(2)(D). |
3 | | (B) With regard to credits due in accordance with |
4 | | subdivision (e)(2)(B) as a result of failure to install |
5 | | basic local exchange service: |
6 | | (i) the total dollar amount of any customer |
7 | | credits paid; |
8 | | (ii) the number of installations after 5 |
9 | | business days; |
10 | | (iii) the number of installations after 10 |
11 | | business days; |
12 | | (iv) the number of installations after 11 |
13 | | business days; and |
14 | | (v) the number of exemptions claimed for each |
15 | | of the categories identified in subdivision |
16 | | (e)(2)(D). |
17 | | (C) With regard to credits due in accordance with |
18 | | subdivision (e)(2)(C) as a result of missed |
19 | | appointments: |
20 | | (i) the total dollar amount of any customer |
21 | | credits paid; |
22 | | (ii) the number of any customers receiving |
23 | | credits; and |
24 | | (iii) the number of exemptions claimed for |
25 | | each of the categories identified in subdivision |
26 | | (e)(2)(D). |
|
| | SB3131 | - 141 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (D) The Electing Provider's annual report required |
2 | | by this subsection shall also include, for |
3 | | informational reporting, the performance data |
4 | | described in subdivisions (e)(2)(A), (e)(2)(B), and |
5 | | (e)(2)(C), and trouble reports per 100 access lines |
6 | | calculated using the Commission's existing applicable |
7 | | rules and regulations for such measures, including the |
8 | | requirements for service standards established in this |
9 | | Section. |
10 | | (4) It is the intent of the General Assembly that the |
11 | | service quality rules and customer credits in this |
12 | | subsection (e) of this Section and other enforcement |
13 | | mechanisms, including fines and penalties authorized by |
14 | | Section 13-305, shall apply on a nondiscriminatory basis to |
15 | | all Electing Providers. Accordingly, notwithstanding any |
16 | | provision of any service quality rules promulgated by the |
17 | | Commission, any alternative regulation plan adopted by the |
18 | | Commission, or any other order of the Commission, any |
19 | | Electing Provider that is subject to any other order of the |
20 | | Commission and that violates or fails to comply with the |
21 | | service quality standards promulgated pursuant to this |
22 | | subsection (e) or any other order of the Commission shall |
23 | | not be subject to any fines, penalties, customer credits, |
24 | | or enforcement mechanisms other than such fines or |
25 | | penalties or customer credits as may be imposed by the |
26 | | Commission in accordance with the provisions of this |
|
| | SB3131 | - 142 - | LRB100 19958 SMS 35239 b |
|
|
1 | | subsection (e) and Section 13-305, which are to be |
2 | | generally applicable to all Electing Providers. The amount |
3 | | of any fines or penalties imposed by the Commission for |
4 | | failure to comply with the requirements of this subsection |
5 | | (e) shall be an appropriate amount, taking into account, at |
6 | | a minimum, the Electing Provider's gross annual intrastate |
7 | | revenue; the frequency, duration, and recurrence of the |
8 | | violation; and the relative harm caused to the affected |
9 | | customers or other users of the network. In imposing fines |
10 | | and penalties, the Commission shall take into account |
11 | | compensation or credits paid by the Electing Provider to |
12 | | its customers pursuant to this subsection (e) in |
13 | | compensation for any violation found pursuant to this |
14 | | subsection (e), and in any event the fine or penalty shall |
15 | | not exceed an amount equal to the maximum amount of a civil |
16 | | penalty that may be imposed under Section 13-305. |
17 | | (5) An Electing Provider in each of the MSA or Exchange |
18 | | areas classified as competitive pursuant to subsection (c) |
19 | | of this Section shall fulfill the requirements in |
20 | | subdivision (e)(3) of this Section for 3 years after its |
21 | | notice of election becomes effective. After such 3 years, |
22 | | the requirements in subdivision (e)(3) of this Section |
23 | | shall not apply to such Electing Provider, except that, |
24 | | upon request from the Commission, the Electing Provider |
25 | | shall provide a report showing the number of credits and |
26 | | exemptions for the requested time period. |
|
| | SB3131 | - 143 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (f) Commission jurisdiction over competitive retail |
2 | | telecommunications services. Except as otherwise expressly |
3 | | stated in this Section, the Commission shall thereafter have no |
4 | | jurisdiction or authority over any aspect of competitive retail |
5 | | telecommunications service of an Electing Provider in those |
6 | | geographic areas included in the Electing Provider's notice of |
7 | | election pursuant to subsection (b) of this Section or of a |
8 | | retail telecommunications service classified as competitive |
9 | | pursuant to Section 13-502 or subdivision (c)(5) of this |
10 | | Section, heretofore subject to the jurisdiction of the |
11 | | Commission, including but not limited to, any requirements of |
12 | | this Article related to the terms, conditions, rates, quality |
13 | | of service, availability, classification or any other aspect of |
14 | | any competitive retail telecommunications services. No |
15 | | telecommunications carrier shall commit any unfair or |
16 | | deceptive act or practice in connection with any aspect of the |
17 | | offering or provision of any competitive retail |
18 | | telecommunications service. Nothing in this Article shall |
19 | | limit or affect any provisions in the Consumer Fraud and |
20 | | Deceptive Business Practices Act with respect to any unfair or |
21 | | deceptive act or practice by a telecommunications carrier. |
22 | | (g) Commission authority over access services upon |
23 | | election for market regulation. |
24 | | (1) As part of its Notice of Election for Market |
25 | | Regulation, the Electing Provider shall reduce its |
26 | | intrastate switched access rates to rates no higher than |
|
| | SB3131 | - 144 - | LRB100 19958 SMS 35239 b |
|
|
1 | | its interstate switched access rates in 4 installments. The |
2 | | first reduction must be made 30 days after submission of |
3 | | its complete application for Notice of Election for Market |
4 | | Regulation, and the Electing Provider must reduce its |
5 | | intrastate switched access rates by an amount equal to 33% |
6 | | of the difference between its current intrastate switched |
7 | | access rates and its current interstate switched access |
8 | | rates. The second reduction must be made no later than one |
9 | | year after the first reduction, and the Electing Provider |
10 | | must reduce its then current intrastate switched access |
11 | | rates by an amount equal to 41% of the difference between |
12 | | its then current intrastate switched access rates and its |
13 | | then current interstate switched access rates. The third |
14 | | reduction must be made no later than one year after the |
15 | | second reduction, and the Electing Provider must reduce its |
16 | | then current intrastate switched access rates by an amount |
17 | | equal to 50% of the difference between its then current |
18 | | intrastate switched access rate and its then current |
19 | | interstate switched access rates. The fourth reduction |
20 | | must be made on or before June 30, 2013, and the Electing |
21 | | Provider must reduce its intrastate switched access rate to |
22 | | mirror its then current interstate switched access rates |
23 | | and rate structure. Following the fourth reduction, each |
24 | | Electing Provider must continue to set its intrastate |
25 | | switched access rates to mirror its interstate switched |
26 | | access rates and rate structure. For purposes of this |
|
| | SB3131 | - 145 - | LRB100 19958 SMS 35239 b |
|
|
1 | | subsection, the rate for intrastate switched access |
2 | | service means the composite, per-minute rate for that |
3 | | service, including all applicable fixed and |
4 | | traffic-sensitive charges, including, but not limited to, |
5 | | carrier common line charges. |
6 | | (2) Nothing in paragraph (1) of this subsection (g) |
7 | | prohibits an Electing Provider from electing to offer |
8 | | intrastate switched access service at rates lower than its |
9 | | interstate switched access rates. |
10 | | (3) The Commission shall have no authority to order an |
11 | | Electing Provider to set its rates for intrastate switched |
12 | | access at a level lower than its interstate switched access |
13 | | rates. |
14 | | (4) The Commission's authority under this subsection |
15 | | (g) shall only apply to Electing Providers under Market |
16 | | Regulation. The Commission's authority over switched |
17 | | access services for all other carriers is retained under |
18 | | Section 13-900.2 of this Act. |
19 | | (h) Safety of service equipment and facilities. |
20 | | (1) An Electing Provider shall furnish, provide, and |
21 | | maintain such service instrumentalities, equipment, and |
22 | | facilities as shall promote the safety, health, comfort, |
23 | | and convenience of its patrons, employees, and public and |
24 | | as shall be in all respects adequate, reliable, and |
25 | | efficient without discrimination or delay. Every Electing |
26 | | Provider shall provide service and facilities that are in |
|
| | SB3131 | - 146 - | LRB100 19958 SMS 35239 b |
|
|
1 | | all respects environmentally safe. |
2 | | (2) The Commission is authorized to conduct an |
3 | | investigation of any Electing Provider or part thereof. The |
4 | | investigation may examine the reasonableness, prudence, or |
5 | | efficiency of any aspect of the Electing Provider's |
6 | | operations or functions that may affect the adequacy, |
7 | | safety, efficiency, or reliability of telecommunications |
8 | | service. The Commission may conduct or order an |
9 | | investigation only when it has reasonable grounds to |
10 | | believe that the investigation is necessary to assure that |
11 | | the Electing Provider is providing adequate, efficient, |
12 | | reliable, and safe service. The Commission shall, before |
13 | | initiating any such investigation, issue an order |
14 | | describing the grounds for the investigation and the |
15 | | appropriate scope and nature of the investigation, which |
16 | | shall be reasonably related to the grounds relied upon by |
17 | | the Commission in its order. |
18 | | (i) (Blank). |
19 | | (j) Application of Article VII. The provisions of Sections |
20 | | 7-101, 7-102, 7-104, 7-204, 7-205, and 7-206 of this Act are |
21 | | applicable to an Electing Provider offering or providing retail |
22 | | telecommunications service, and the Commission's regulation |
23 | | thereof, except that (1) the approval of contracts and |
24 | | arrangements with affiliated interests required by paragraph |
25 | | (3) of Section 7-101 shall not apply to such telecommunications |
26 | | carriers provided that, except as provided in item (2), those |
|
| | SB3131 | - 147 - | LRB100 19958 SMS 35239 b |
|
|
1 | | contracts and arrangements shall be filed with the Commission; |
2 | | (2) affiliated interest contracts or arrangements entered into |
3 | | by such telecommunications carriers where the increased |
4 | | obligation thereunder does not exceed the lesser of $5,000,000 |
5 | | or 5% of such carrier's prior annual revenue from |
6 | | noncompetitive services are not required to be filed with the |
7 | | Commission; and (3) any consent and approval of the Commission |
8 | | required by Section 7-102 is not required for the sale, lease, |
9 | | assignment, or transfer by any Electing Provider of any |
10 | | property that is not necessary or useful in the performance of |
11 | | its duties to the public. |
12 | | (k) Notwithstanding other provisions of this Section, the |
13 | | Commission retains its existing authority to enforce the |
14 | | provisions, conditions, and requirements of the following |
15 | | Sections of this Article: 13-101, 13-103, 13-201, 13-301, |
16 | | 13-301.1, 13-301.2, 13-301.3, 13-303, 13-303.5, 13-304, |
17 | | 13-305, 13-401, 13-401.1, 13-402, 13-403, 13-404, 13-404.1, |
18 | | 13-404.2, 13-405, 13-406, 13-407, 13-501, 13-501.5, 13-503, |
19 | | 13-505, 13-509, 13-510, 13-512, 13-513, 13-514, 13-515, |
20 | | 13-516, 13-519, 13-702, 13-703, 13-704, 13-705, 13-706, |
21 | | 13-707, 13-709, 13-713, 13-801, 13-802.1, 13-804, 13-900, |
22 | | 13-900.1, 13-900.2, 13-901, 13-902, and 13-903, which are fully |
23 | | and equally applicable to Electing Providers and to |
24 | | telecommunications carriers providing retail |
25 | | telecommunications service classified as competitive pursuant |
26 | | to Section 13-502 or subdivision (c)(5) of this Section subject |
|
| | SB3131 | - 148 - | LRB100 19958 SMS 35239 b |
|
|
1 | | to the provisions of this Section. On the effective date of |
2 | | this amendatory Act of the 98th General Assembly, the following |
3 | | Sections of this Article shall cease to apply to Electing |
4 | | Providers and to telecommunications carriers providing retail |
5 | | telecommunications service classified as competitive pursuant |
6 | | to Section 13-502 or subdivision (c)(5) of this Section: |
7 | | 13-302, 13-405.1, 13-502, 13-502.5, 13-504, 13-505.2, |
8 | | 13-505.3, 13-505.4, 13-505.5, 13-505.6, 13-506.1, 13-507, |
9 | | 13-507.1, 13-508, 13-508.1, 13-517, 13-518, 13-601, 13-701, |
10 | | and 13-712.
|
11 | | (Source: P.A. 99-6, eff. 6-29-15; 100-20, eff. 7-1-17.)
|
12 | | (220 ILCS 5/13-515)
|
13 | | (Section scheduled to be repealed on December 31, 2020)
|
14 | | Sec. 13-515. Enforcement.
|
15 | | (a) The following expedited procedures shall be used
to |
16 | | enforce the provisions of Section 13-514 of this
Act, provided |
17 | | that, for a violation of paragraph (8) of Section 13-514 to |
18 | | qualify for the expedited procedures of this Section, the |
19 | | violation must be in a manner that unreasonably delays, |
20 | | increases the cost, or impedes the availability of |
21 | | telecommunications services to consumers. However, the
|
22 | | Commission, the complainant, and the respondent may mutually |
23 | | agree to adjust
the
procedures established in this Section.
|
24 | | (b) (Blank).
|
25 | | (c) No complaint may be filed under this Section until the
|
|
| | SB3131 | - 149 - | LRB100 19958 SMS 35239 b |
|
|
1 | | complainant has first notified the respondent of the alleged
|
2 | | violation and offered the respondent
48 hours to correct the |
3 | | situation. Provision of notice and the
opportunity to correct |
4 | | the situation creates a rebuttable presumption of
knowledge |
5 | | under Section 13-514.
After the filing of a complaint under |
6 | | this Section, the parties may agree to
follow the mediation |
7 | | process under Section 10-101.1 of this Act. The time
periods |
8 | | specified in subdivision (d)(7) of this Section shall be tolled
|
9 | | during the time
spent in mediation under Section 10-101.1.
|
10 | | (d) A telecommunications carrier may file a complaint with |
11 | | the
Commission alleging a violation of Section 13-514 in
|
12 | | accordance with this subsection:
|
13 | | (1) The complaint shall be filed with the Chief Clerk |
14 | | of the
Commission and shall be served in hand upon the
|
15 | | respondent, the executive director, and the general
|
16 | | counsel of the Commission at the time of the filing.
|
17 | | (2) A complaint filed under this subsection shall |
18 | | include a
statement that the requirements of subsection (c)
|
19 | | have been fulfilled and that the respondent did not
correct |
20 | | the situation as requested.
|
21 | | (3) Reasonable discovery specific to the issue of the |
22 | | complaint may
commence upon filing of the complaint.
|
23 | | Requests for discovery must be served in hand and
responses |
24 | | to discovery must be provided in hand to
the requester |
25 | | within 14 days after a request for
discovery is made.
|
26 | | (4) An answer and any other responsive pleading to the
|
|
| | SB3131 | - 150 - | LRB100 19958 SMS 35239 b |
|
|
1 | | complaint shall be filed with the Commission and
served in |
2 | | hand at the same time upon the
complainant, the executive |
3 | | director, and the general
counsel of the Commission within |
4 | | 7 days after the
date on which the complaint is filed.
|
5 | | (5) If the answer or responsive pleading raises the |
6 | | issue that the
complaint violates subsection (i) of this |
7 | | Section, the complainant may file a
reply to
such |
8 | | allegation within 3 days after actual service of such |
9 | | answer or responsive
pleading. Within 4 days after the time |
10 | | for filing a reply has expired, the
hearing officer or |
11 | | arbitrator shall either issue a written decision |
12 | | dismissing
the complaint as frivolous in violation of |
13 | | subsection (i) of this Section
including the
reasons for |
14 | | such disposition or shall issue an order directing that the
|
15 | | complaint shall proceed.
|
16 | | (6) A pre-hearing conference shall be held within 14 |
17 | | days
after the date on which the complaint is filed.
|
18 | | (7) The hearing shall commence within 30 days of the
|
19 | | date on which the complaint is filed. The hearing may
be |
20 | | conducted by an administrative law judge a hearing examiner |
21 | | or by an
arbitrator. Parties and the Commission staff shall |
22 | | be
entitled to present evidence and legal argument in oral
|
23 | | or written form as deemed appropriate by the administrative |
24 | | law judge hearing examiner or arbitrator.
The |
25 | | administrative law judge hearing examiner or arbitrator |
26 | | shall issue
a written decision within 60 days after the |
|
| | SB3131 | - 151 - | LRB100 19958 SMS 35239 b |
|
|
1 | | date on
which the complaint is filed. The decision shall
|
2 | | include reasons for the disposition of the complaint
and, |
3 | | if a violation of Section 13-514 is found, directions
and a |
4 | | deadline for correction of the violation.
|
5 | | (8) Any party may file a petition requesting the |
6 | | Commission to review
the decision of the administrative law |
7 | | judge hearing examiner or arbitrator within 5 days of such
|
8 | | decision. Any party may file a response to a petition for |
9 | | review within 3
business days after actual service of the |
10 | | petition. After the time for filing
of the petition for |
11 | | review, but no later than 15 days after the decision of the |
12 | | administrative law judge
hearing examiner or arbitrator, |
13 | | the Commission shall decide to adopt the
decision of the |
14 | | administrative law judge hearing examiner or arbitrator or |
15 | | shall issue its own final
order.
|
16 | | (e) If the alleged violation has a substantial adverse |
17 | | effect
on the ability of the complainant to provide service to
|
18 | | customers, the complainant may include in its complaint a
|
19 | | request for an order for emergency relief. The
Commission, |
20 | | acting through its designated administrative law judge hearing
|
21 | | examiner or arbitrator, shall act upon such a request
within 2 |
22 | | business days of the filing of the complaint. An order for
|
23 | | emergency relief may be granted, without an evidentiary
|
24 | | hearing, upon a verified factual showing that the party
seeking |
25 | | relief will likely succeed on the merits, that the
party will |
26 | | suffer irreparable harm in its ability to serve
customers if |
|
| | SB3131 | - 152 - | LRB100 19958 SMS 35239 b |
|
|
1 | | emergency relief is not granted, and that the
order is in the |
2 | | public interest. An order for emergency
relief shall include a |
3 | | finding that the requirements of this
subsection have been |
4 | | fulfilled and shall specify the
directives that must be |
5 | | fulfilled by the respondent and
deadlines for meeting those |
6 | | directives. The decision of
the administrative law judge |
7 | | hearing examiner or arbitrator to grant or deny
emergency |
8 | | relief shall be considered an order of the
Commission unless |
9 | | the Commission enters its own order within 2 calendar days of
|
10 | | the decision of the administrative law judge hearing examiner |
11 | | or arbitrator. The order for emergency
relief may require
the |
12 | | responding party to act or refrain from acting so as to
protect |
13 | | the provision of competitive service offerings to
customers. |
14 | | Any action required by an emergency relief
order must be |
15 | | technically feasible and economically reasonable and the
|
16 | | respondent
must be given a reasonable period of time to comply |
17 | | with
the order.
|
18 | | (f) The Commission is authorized to obtain outside |
19 | | resources
including, but not limited to, arbitrators and |
20 | | consultants for
the purposes of the hearings authorized by this |
21 | | Section.
Any arbitrator or consultant obtained by the |
22 | | Commission
shall be approved by both parties to the hearing.
|
23 | | The cost of such outside resources including, but not limited |
24 | | to, arbitrators
and consultants shall be borne by the parties. |
25 | | The Commission shall review
the bill for reasonableness and |
26 | | assess the parties for reasonable costs
dividing the costs |
|
| | SB3131 | - 153 - | LRB100 19958 SMS 35239 b |
|
|
1 | | according to the resolution of the complaint brought under
this |
2 | | Section. Such costs shall be paid by the parties directly to |
3 | | the
arbitrators, consultants, and other providers of outside |
4 | | resources within 60
days after receiving notice of the |
5 | | assessments from the Commission. Interest
at the statutory rate |
6 | | shall accrue after expiration of the 60-day period. The
|
7 | | Commission, arbitrators, consultants, or other providers of |
8 | | outside
resources may apply to a court of competent |
9 | | jurisdiction for an order
requiring payment.
|
10 | | (g) The Commission shall assess the parties under this |
11 | | subsection for
all of the
Commission's costs of investigation |
12 | | and conduct of the
proceedings brought under this Section |
13 | | including, but not limited to, the
prorated salaries of staff, |
14 | | attorneys, administrative law judges hearing examiners , and |
15 | | support
personnel and including any travel and per diem, |
16 | | directly attributable to the
complaint brought pursuant to this |
17 | | Section, but excluding those costs provided
for in subsection |
18 | | (f), dividing the costs according to the resolution of
the |
19 | | complaint brought under this Section. All
assessments made |
20 | | under this subsection shall be paid into the Public
Utility |
21 | | Fund within
60 days after receiving notice of the assessments |
22 | | from the
Commission. Interest at the statutory rate shall |
23 | | accrue after
the expiration of the 60 day period. The |
24 | | Commission is
authorized to apply to a court of competent |
25 | | jurisdiction for an
order requiring payment.
|
26 | | (h) If the Commission determines that there is an imminent
|
|
| | SB3131 | - 154 - | LRB100 19958 SMS 35239 b |
|
|
1 | | threat to competition or to the public interest, the
Commission |
2 | | may, notwithstanding any other provision of this Act, seek
|
3 | | temporary, preliminary, or permanent
injunctive relief from a |
4 | | court of competent jurisdiction either
prior to or after the |
5 | | hearing.
|
6 | | (i) A party shall not bring or defend a proceeding brought |
7 | | under
this Section or assert or controvert an issue in a |
8 | | proceeding brought under
this Section, unless
there is a |
9 | | non-frivolous basis for doing so. By presenting a
pleading, |
10 | | written motion, or other paper in complaint or
defense of the |
11 | | actions or inaction of a party under this
Section, a party is |
12 | | certifying to the Commission that to the
best of that party's |
13 | | knowledge, information, and belief,
formed after a reasonable |
14 | | inquiry of the subject matter of the
complaint or defense, that |
15 | | the complaint or defense is well
grounded in law and fact, and |
16 | | under the circumstances:
|
17 | | (1) it is not being presented to harass the other |
18 | | party,
cause unnecessary delay in the provision of
|
19 | | competitive telecommunications services to
consumers, or |
20 | | create needless increases in the cost of
litigation; and
|
21 | | (2) the allegations and other factual contentions have
|
22 | | evidentiary support or, if specifically so identified, are
|
23 | | likely to have evidentiary support after reasonable
|
24 | | opportunity for further investigation or discovery as |
25 | | defined herein.
|
26 | | (j) If, after notice and a reasonable opportunity to |
|
| | SB3131 | - 155 - | LRB100 19958 SMS 35239 b |
|
|
1 | | respond,
the Commission determines that subsection (i) has been
|
2 | | violated, the Commission shall impose appropriate
sanctions |
3 | | upon the party or parties that have violated
subsection (i) or |
4 | | are responsible for the violation. The
sanctions shall be not |
5 | | more than $30,000, plus the
amount of expenses accrued by the |
6 | | Commission for
conducting the hearing. Payment of sanctions |
7 | | imposed under this subsection
shall be made to the Common |
8 | | School Fund within 30 days of
imposition of such sanctions.
|
9 | | (k) An appeal of a Commission Order made pursuant to this
|
10 | | Section shall not effectuate a stay of the Order unless a court
|
11 | | of competent jurisdiction specifically finds that the party
|
12 | | seeking the stay will likely succeed on the merits, that the |
13 | | party
will suffer irreparable harm without the stay, and that |
14 | | the stay is
in the public interest.
|
15 | | (Source: P.A. 100-20, eff. 7-1-17.)
|
16 | | (220 ILCS 5/16-108.5) |
17 | | Sec. 16-108.5. Infrastructure investment and |
18 | | modernization; regulatory reform. |
19 | | (a) (Blank). |
20 | | (b) For purposes of this Section, "participating utility" |
21 | | means an electric utility or a combination utility serving more |
22 | | than 1,000,000 customers in Illinois that voluntarily elects |
23 | | and commits to undertake (i) the infrastructure investment |
24 | | program consisting of the commitments and obligations |
25 | | described in this subsection (b) and (ii) the customer |
|
| | SB3131 | - 156 - | LRB100 19958 SMS 35239 b |
|
|
1 | | assistance program consisting of the commitments and |
2 | | obligations described in subsection (b-10) of this Section, |
3 | | notwithstanding any other provisions of this Act and without |
4 | | obtaining any approvals from the Commission or any other agency |
5 | | other than as set forth in this Section, regardless of whether |
6 | | any such approval would otherwise be required. "Combination |
7 | | utility" means a utility that, as of January 1, 2011, provided |
8 | | electric service to at least one million retail customers in |
9 | | Illinois and gas service to at least 500,000 retail customers |
10 | | in Illinois. A participating utility shall recover the |
11 | | expenditures made under the infrastructure investment program |
12 | | through the ratemaking process, including, but not limited to, |
13 | | the performance-based formula rate and process set forth in |
14 | | this Section. |
15 | | During the infrastructure investment program's peak |
16 | | program year, a participating utility other than a combination |
17 | | utility shall create 2,000 full-time equivalent jobs in |
18 | | Illinois, and a participating utility that is a combination |
19 | | utility shall create 450 full-time equivalent jobs in Illinois |
20 | | related to the provision of electric service. These jobs shall |
21 | | include direct jobs, contractor positions, and induced jobs, |
22 | | but shall not include any portion of a job commitment, not |
23 | | specifically contingent on an amendatory Act of the 97th |
24 | | General Assembly becoming law, between a participating utility |
25 | | and a labor union that existed on December 30, 2011 (the |
26 | | effective date of Public Act 97-646) and that has not yet been |
|
| | SB3131 | - 157 - | LRB100 19958 SMS 35239 b |
|
|
1 | | fulfilled. A portion of the full-time equivalent jobs created |
2 | | by each participating utility shall include incremental |
3 | | personnel hired subsequent to December 30, 2011 (the effective |
4 | | date of Public Act 97-646). For purposes of this Section, "peak |
5 | | program year" means the consecutive 12-month period with the |
6 | | highest number of full-time equivalent jobs that occurs between |
7 | | the beginning of investment year 2 and the end of investment |
8 | | year 4. |
9 | | A participating utility shall meet one of the following |
10 | | commitments, as applicable: |
11 | | (1) Beginning no later than 180 days after a |
12 | | participating utility other than a combination utility |
13 | | files a performance-based formula rate tariff pursuant to |
14 | | subsection (c) of this Section, or, beginning no later than |
15 | | January 1, 2012 if such utility files such |
16 | | performance-based formula rate tariff within 14 days of |
17 | | October 26, 2011 (the effective date of Public Act 97-616), |
18 | | the participating utility shall, except as provided in |
19 | | subsection (b-5): |
20 | | (A) over a 5-year period, invest an estimated |
21 | | $1,300,000,000 in electric system upgrades, |
22 | | modernization projects, and training facilities, |
23 | | including, but not limited to: |
24 | | (i) distribution infrastructure improvements |
25 | | totaling an estimated $1,000,000,000, including |
26 | | underground residential distribution cable |
|
| | SB3131 | - 158 - | LRB100 19958 SMS 35239 b |
|
|
1 | | injection and replacement and mainline cable |
2 | | system refurbishment and replacement projects; |
3 | | (ii) training facility construction or upgrade |
4 | | projects totaling an estimated $10,000,000, |
5 | | provided that, at a minimum, one such facility |
6 | | shall be located in a municipality having a |
7 | | population of more than 2 million residents and one |
8 | | such facility shall be located in a municipality |
9 | | having a population of more than 150,000 residents |
10 | | but fewer than 170,000 residents; any such new |
11 | | facility located in a municipality having a |
12 | | population of more than 2 million residents must be |
13 | | designed for the purpose of obtaining, and the |
14 | | owner of the facility shall apply for, |
15 | | certification under the United States Green |
16 | | Building Council's Leadership in Energy Efficiency |
17 | | Design Green Building Rating System; |
18 | | (iii) wood pole inspection, treatment, and |
19 | | replacement programs; |
20 | | (iv) an estimated $200,000,000 for reducing |
21 | | the susceptibility of certain circuits to |
22 | | storm-related damage, including, but not limited |
23 | | to, high winds, thunderstorms, and ice storms; |
24 | | improvements may include, but are not limited to, |
25 | | overhead to underground conversion and other |
26 | | engineered outcomes for circuits; the |
|
| | SB3131 | - 159 - | LRB100 19958 SMS 35239 b |
|
|
1 | | participating utility shall prioritize the |
2 | | selection of circuits based on each circuit's |
3 | | historical susceptibility to storm-related damage |
4 | | and the ability to provide the greatest customer |
5 | | benefit upon completion of the improvements; to be |
6 | | eligible for improvement, the participating |
7 | | utility's ability to maintain proper tree |
8 | | clearances surrounding the overhead circuit must |
9 | | not have
been impeded by third parties; and |
10 | | (B) over a 10-year period, invest an estimated |
11 | | $1,300,000,000 to upgrade and modernize its |
12 | | transmission and distribution infrastructure and in |
13 | | Smart Grid electric system upgrades, including, but |
14 | | not limited to: |
15 | | (i) additional smart meters; |
16 | | (ii) distribution automation; |
17 | | (iii) associated cyber secure data |
18 | | communication network; and |
19 | | (iv) substation micro-processor relay |
20 | | upgrades. |
21 | | (2) Beginning no later than 180 days after a |
22 | | participating utility that is a combination utility files a |
23 | | performance-based formula rate tariff pursuant to |
24 | | subsection (c) of this Section, or, beginning no later than |
25 | | January 1, 2012 if such utility files such |
26 | | performance-based formula rate tariff within 14 days of |
|
| | SB3131 | - 160 - | LRB100 19958 SMS 35239 b |
|
|
1 | | October 26, 2011 (the effective date of Public Act 97-616), |
2 | | the participating utility shall, except as provided in |
3 | | subsection (b-5): |
4 | | (A) over a 10-year period, invest an estimated |
5 | | $265,000,000 in electric system upgrades, |
6 | | modernization projects, and training facilities, |
7 | | including, but not limited to: |
8 | | (i) distribution infrastructure improvements |
9 | | totaling an estimated $245,000,000, which may |
10 | | include bulk supply substations, transformers, |
11 | | reconductoring, and rebuilding overhead |
12 | | distribution and sub-transmission lines, |
13 | | underground residential distribution cable |
14 | | injection and replacement and mainline cable |
15 | | system refurbishment and replacement projects; |
16 | | (ii) training facility construction or upgrade |
17 | | projects totaling an estimated $1,000,000; any |
18 | | such new facility must be designed for the purpose |
19 | | of obtaining, and the owner of the facility shall |
20 | | apply for, certification under the United States |
21 | | Green Building Council's Leadership in Energy |
22 | | Efficiency Design Green Building Rating System; |
23 | | and |
24 | | (iii) wood pole inspection, treatment, and |
25 | | replacement programs; and |
26 | | (B) over a 10-year period, invest an estimated |
|
| | SB3131 | - 161 - | LRB100 19958 SMS 35239 b |
|
|
1 | | $360,000,000 to upgrade and modernize its transmission |
2 | | and distribution infrastructure and in Smart Grid |
3 | | electric system upgrades, including, but not limited |
4 | | to: |
5 | | (i) additional smart meters; |
6 | | (ii) distribution automation; |
7 | | (iii) associated cyber secure data |
8 | | communication network; and |
9 | | (iv) substation micro-processor relay |
10 | | upgrades. |
11 | | For purposes of this Section, "Smart Grid electric system |
12 | | upgrades" shall have the meaning set forth in subsection (a) of |
13 | | Section 16-108.6 of this Act. |
14 | | The investments in the infrastructure investment program |
15 | | described in this subsection (b) shall be incremental to the |
16 | | participating utility's annual capital investment program, as |
17 | | defined by, for purposes of this subsection (b), the |
18 | | participating utility's average capital spend for calendar |
19 | | years 2008, 2009, and 2010 as reported in the applicable |
20 | | Federal Energy Regulatory Commission (FERC) Form 1; provided |
21 | | that where one or more utilities have merged, the average |
22 | | capital spend shall be determined using the aggregate of the |
23 | | merged utilities' capital spend reported in FERC Form 1 for the |
24 | | years 2008, 2009, and 2010. A participating utility may add |
25 | | reasonable construction ramp-up and ramp-down time to the |
26 | | investment periods specified in this subsection (b). For each |
|
| | SB3131 | - 162 - | LRB100 19958 SMS 35239 b |
|
|
1 | | such investment period, the ramp-up and ramp-down time shall |
2 | | not exceed a total of 6 months. |
3 | | Within 60 days after filing a tariff under subsection (c) |
4 | | of this Section, a participating utility shall submit to the |
5 | | Commission its plan, including scope, schedule, and staffing, |
6 | | for satisfying its infrastructure investment program |
7 | | commitments pursuant to this subsection (b). The submitted plan |
8 | | shall include a schedule and staffing plan for the next |
9 | | calendar year. The plan shall also include a plan for the |
10 | | creation, operation, and administration of a Smart Grid test |
11 | | bed as described in subsection (c) of Section 16-108.8. The |
12 | | plan need not allocate the work equally over the respective |
13 | | periods, but should allocate material increments throughout |
14 | | such periods commensurate with the work to be undertaken. No |
15 | | later than April 1 of each subsequent year, the utility shall |
16 | | submit to the Commission a report that includes any updates to |
17 | | the plan, a schedule for the next calendar year, the |
18 | | expenditures made for the prior calendar year and cumulatively, |
19 | | and the number of full-time equivalent jobs created for the |
20 | | prior calendar year and cumulatively. If the utility is |
21 | | materially deficient in satisfying a schedule or staffing plan, |
22 | | then the report must also include a corrective action plan to |
23 | | address the deficiency. The fact that the plan, implementation |
24 | | of the plan, or a schedule changes shall not imply the |
25 | | imprudence or unreasonableness of the infrastructure |
26 | | investment program, plan, or schedule. Further, no later than |
|
| | SB3131 | - 163 - | LRB100 19958 SMS 35239 b |
|
|
1 | | 45 days following the last day of the first, second, and third |
2 | | quarters of each year of the plan, a participating utility |
3 | | shall submit to the Commission a verified quarterly report for |
4 | | the prior quarter that includes (i) the total number of |
5 | | full-time equivalent jobs created during the prior quarter, |
6 | | (ii) the total number of employees as of the last day of the |
7 | | prior quarter, (iii) the total number of full-time equivalent |
8 | | hours in each job classification or job title, (iv) the total |
9 | | number of incremental employees and contractors in support of |
10 | | the investments undertaken pursuant to this subsection (b) for |
11 | | the prior quarter, and (v) any other information that the |
12 | | Commission may require by rule. |
13 | | With respect to the participating utility's peak job |
14 | | commitment, if, after considering the utility's corrective |
15 | | action plan and compliance thereunder, the Commission enters an |
16 | | order finding, after notice and hearing, that a participating |
17 | | utility did not satisfy its peak job commitment described in |
18 | | this subsection (b) for reasons that are reasonably within its |
19 | | control, then the Commission shall also determine, after |
20 | | consideration of the evidence, including, but not limited to, |
21 | | evidence submitted by the Department of Commerce and Economic |
22 | | Opportunity and the utility, the deficiency in the number of |
23 | | full-time equivalent jobs during the peak program year due to |
24 | | such failure. The Commission shall notify the Department of any |
25 | | proceeding that is initiated pursuant to this paragraph. For |
26 | | each full-time equivalent job deficiency during the peak |
|
| | SB3131 | - 164 - | LRB100 19958 SMS 35239 b |
|
|
1 | | program year that the Commission finds as set forth in this |
2 | | paragraph, the participating utility shall, within 30 days |
3 | | after the entry of the Commission's order, pay $6,000 to a fund |
4 | | for training grants administered under Section 605-800 of the |
5 | | Department of Commerce and Economic Opportunity Law, which |
6 | | shall not be a recoverable expense. |
7 | | With respect to the participating utility's investment |
8 | | amount commitments, if, after considering the utility's |
9 | | corrective action plan and compliance thereunder, the |
10 | | Commission enters an order finding, after notice and hearing, |
11 | | that a participating utility is not satisfying its investment |
12 | | amount commitments described in this subsection (b), then the |
13 | | utility shall no longer be eligible to annually update the |
14 | | performance-based formula rate tariff pursuant to subsection |
15 | | (d) of this Section. In such event, the then current rates |
16 | | shall remain in effect until such time as new rates are set |
17 | | pursuant to Article IX of this Act, subject to retroactive |
18 | | adjustment, with interest, to reconcile rates charged with |
19 | | actual costs. |
20 | | If the Commission finds that a participating utility is no |
21 | | longer eligible to update the performance-based formula rate |
22 | | tariff pursuant to subsection (d) of this Section, or the |
23 | | performance-based formula rate is otherwise terminated, then |
24 | | the participating utility's voluntary commitments and |
25 | | obligations under this subsection (b) shall immediately |
26 | | terminate, except for the utility's obligation to pay an amount |
|
| | SB3131 | - 165 - | LRB100 19958 SMS 35239 b |
|
|
1 | | already owed to the fund for training grants pursuant to a |
2 | | Commission order. |
3 | | In meeting the obligations of this subsection (b), to the |
4 | | extent feasible and consistent with State and federal law, the |
5 | | investments under the infrastructure investment program should |
6 | | provide employment opportunities for all segments of the |
7 | | population and workforce, including minority-owned and |
8 | | female-owned business enterprises, and shall not, consistent |
9 | | with State and federal law, discriminate based on race or |
10 | | socioeconomic status. |
11 | | (b-5) Nothing in this Section shall prohibit the Commission |
12 | | from investigating the prudence and reasonableness of the |
13 | | expenditures made under the infrastructure investment program |
14 | | during the annual review required by subsection (d) of this |
15 | | Section and shall, as part of such investigation, determine |
16 | | whether the utility's actual costs under the program are |
17 | | prudent and reasonable. The fact that a participating utility |
18 | | invests more than the minimum amounts specified in subsection |
19 | | (b) of this Section or its plan shall not imply imprudence or |
20 | | unreasonableness. |
21 | | If the participating utility finds that it is implementing |
22 | | its plan for satisfying the infrastructure investment program |
23 | | commitments described in subsection (b) of this Section at a |
24 | | cost below the estimated amounts specified in subsection (b) of |
25 | | this Section, then the utility may file a petition with the |
26 | | Commission requesting that it be permitted to satisfy its |
|
| | SB3131 | - 166 - | LRB100 19958 SMS 35239 b |
|
|
1 | | commitments by spending less than the estimated amounts |
2 | | specified in subsection (b) of this Section. The Commission |
3 | | shall, after notice and hearing, enter its order approving, or |
4 | | approving as modified, or denying each such petition within 150 |
5 | | days after the filing of the petition. |
6 | | In no event, absent General Assembly approval, shall the |
7 | | capital investment costs incurred by a participating utility |
8 | | other than a combination utility in satisfying its |
9 | | infrastructure investment program commitments described in |
10 | | subsection (b) of this Section exceed $3,000,000,000 or, for a |
11 | | participating utility that is a combination utility, |
12 | | $720,000,000. If the participating utility's updated cost |
13 | | estimates for satisfying its infrastructure investment program |
14 | | commitments described in subsection (b) of this Section exceed |
15 | | the limitation imposed by this subsection (b-5), then it shall |
16 | | submit a report to the Commission that identifies the increased |
17 | | costs and explains the reason or reasons for the increased |
18 | | costs no later than the year in which the utility estimates it |
19 | | will exceed the limitation. The Commission shall review the |
20 | | report and shall, within 90 days after the participating |
21 | | utility files the report, report to the General Assembly its |
22 | | findings regarding the participating utility's report. If the |
23 | | General Assembly does not amend the limitation imposed by this |
24 | | subsection (b-5), then the utility may modify its plan so as |
25 | | not to exceed the limitation imposed by this subsection (b-5) |
26 | | and may propose corresponding changes to the metrics |
|
| | SB3131 | - 167 - | LRB100 19958 SMS 35239 b |
|
|
1 | | established pursuant to subparagraphs (5) through (8) of |
2 | | subsection (f) of this Section, and the Commission may modify |
3 | | the metrics and incremental savings goals established pursuant |
4 | | to subsection (f) of this Section accordingly. |
5 | | (b-10) All participating utilities shall make |
6 | | contributions for an energy low-income and support program in |
7 | | accordance with this subsection. Beginning no later than 180 |
8 | | days after a participating utility files a performance-based |
9 | | formula rate tariff pursuant to subsection (c) of this Section, |
10 | | or beginning no later than January 1, 2012 if such utility |
11 | | files such performance-based formula rate tariff within 14 days |
12 | | of December 30, 2011 (the effective date of Public Act 97-646), |
13 | | and without obtaining any approvals from the Commission or any |
14 | | other agency other than as set forth in this Section, |
15 | | regardless of whether any such approval would otherwise be |
16 | | required, a participating utility other than a combination |
17 | | utility shall pay $10,000,000 per year for 5 years and a |
18 | | participating utility that is a combination utility shall pay |
19 | | $1,000,000 per year for 10 years to the energy low-income and |
20 | | support program, which is intended to fund customer assistance |
21 | | programs with the primary purpose being avoidance of
imminent |
22 | | disconnection. Such programs may include: |
23 | | (1) a residential hardship program that may partner |
24 | | with community-based
organizations, including senior |
25 | | citizen organizations, and provides grants to low-income |
26 | | residential customers, including low-income senior |
|
| | SB3131 | - 168 - | LRB100 19958 SMS 35239 b |
|
|
1 | | citizens, who demonstrate a hardship; |
2 | | (2) a program that provides grants and other bill |
3 | | payment concessions to veterans with disabilities who |
4 | | demonstrate a hardship and members of the armed services or |
5 | | reserve forces of the United States or members of the |
6 | | Illinois National Guard who are on active duty pursuant to |
7 | | an executive order of the President of the United States, |
8 | | an act of the Congress of the United States, or an order of |
9 | | the Governor and who demonstrate a
hardship; |
10 | | (3) a budget assistance program that provides tools and |
11 | | education to low-income senior citizens to assist them with |
12 | | obtaining information regarding energy usage and
effective |
13 | | means of managing energy costs; |
14 | | (4) a non-residential special hardship program that |
15 | | provides grants to non-residential customers such as small |
16 | | businesses and non-profit organizations that demonstrate a |
17 | | hardship, including those providing services to senior |
18 | | citizen and low-income customers; and |
19 | | (5) a performance-based assistance program that |
20 | | provides grants to encourage residential customers to make |
21 | | on-time payments by matching a portion of the customer's |
22 | | payments or providing credits towards arrearages. |
23 | | The payments made by a participating utility pursuant to |
24 | | this subsection (b-10) shall not be a recoverable expense. A |
25 | | participating utility may elect to fund either new or existing |
26 | | customer assistance programs, including, but not limited to, |
|
| | SB3131 | - 169 - | LRB100 19958 SMS 35239 b |
|
|
1 | | those that are administered by the utility. |
2 | | Programs that use funds that are provided by a |
3 | | participating utility to reduce utility bills may be |
4 | | implemented through tariffs that are filed with and reviewed by |
5 | | the Commission. If a utility elects to file tariffs with the |
6 | | Commission to implement all or a portion of the programs, those |
7 | | tariffs shall, regardless of the date actually filed, be deemed |
8 | | accepted and approved, and shall become effective on December |
9 | | 30, 2011 (the effective date of Public Act 97-646). The |
10 | | participating utilities whose customers benefit from the funds |
11 | | that are disbursed as contemplated in this Section shall file |
12 | | annual reports documenting the disbursement of those funds with |
13 | | the Commission. The Commission has the authority to audit |
14 | | disbursement of the funds to ensure they were disbursed |
15 | | consistently with this Section. |
16 | | If the Commission finds that a participating utility is no |
17 | | longer eligible to update the performance-based formula rate |
18 | | tariff pursuant to subsection (d) of this Section, or the |
19 | | performance-based formula rate is otherwise terminated, then |
20 | | the participating utility's voluntary commitments and |
21 | | obligations under this subsection (b-10) shall immediately |
22 | | terminate. |
23 | | (c) A participating utility may elect to recover its |
24 | | delivery services costs through a performance-based formula |
25 | | rate approved by the Commission, which shall specify the cost |
26 | | components that form the basis of the rate charged to customers |
|
| | SB3131 | - 170 - | LRB100 19958 SMS 35239 b |
|
|
1 | | with sufficient specificity to operate in a standardized manner |
2 | | and be updated annually with transparent information that |
3 | | reflects the utility's actual costs to be recovered during the |
4 | | applicable rate year, which is the period beginning with the |
5 | | first billing day of January and extending through the last |
6 | | billing day of the following December. In the event the utility |
7 | | recovers a portion of its costs through automatic adjustment |
8 | | clause tariffs on October 26, 2011 (the effective date of |
9 | | Public Act 97-616), the utility may elect to continue to |
10 | | recover these costs through such tariffs, but then these costs |
11 | | shall not be recovered through the performance-based formula |
12 | | rate. In the event the participating utility, prior to December |
13 | | 30, 2011 (the effective date of Public Act 97-646), filed |
14 | | electric delivery services tariffs with the Commission |
15 | | pursuant to Section 9-201 of this Act that are related to the |
16 | | recovery of its electric delivery services costs that are still |
17 | | pending on December 30, 2011 (the effective date of Public Act |
18 | | 97-646), the participating utility shall, at the time it files |
19 | | its performance-based formula rate tariff with the Commission, |
20 | | also file a notice of withdrawal with the Commission to |
21 | | withdraw the electric delivery services tariffs previously |
22 | | filed pursuant to Section 9-201 of this Act. Upon receipt of |
23 | | such notice, the Commission shall dismiss with prejudice any |
24 | | docket that had been initiated to investigate the electric |
25 | | delivery services tariffs filed pursuant to Section 9-201 of |
26 | | this Act, and such tariffs and the record related thereto shall |
|
| | SB3131 | - 171 - | LRB100 19958 SMS 35239 b |
|
|
1 | | not be the subject of any further hearing, investigation, or |
2 | | proceeding of any kind related to rates for electric delivery |
3 | | services. |
4 | | The performance-based formula rate shall be implemented |
5 | | through a tariff filed with the Commission consistent with the |
6 | | provisions of this subsection (c) that shall be applicable to |
7 | | all delivery services customers. The Commission shall initiate |
8 | | and conduct an investigation of the tariff in a manner |
9 | | consistent with the provisions of this subsection (c) and the |
10 | | provisions of Article IX of this Act to the extent they do not |
11 | | conflict with this subsection (c). Except in the case where the |
12 | | Commission finds, after notice and hearing, that a |
13 | | participating utility is not satisfying its investment amount |
14 | | commitments under subsection (b) of this Section, the |
15 | | performance-based formula rate shall remain in effect at the |
16 | | discretion of the utility. The performance-based formula rate |
17 | | approved by the Commission shall do the following: |
18 | | (1) Provide for the recovery of the utility's actual |
19 | | costs of delivery services that are prudently incurred and |
20 | | reasonable in amount consistent with Commission practice |
21 | | and law. The sole fact that a cost differs from that |
22 | | incurred in a prior calendar year or that an investment is |
23 | | different from that made in a prior calendar year shall not |
24 | | imply the imprudence or unreasonableness of that cost or |
25 | | investment. |
26 | | (2) Reflect the utility's actual year-end capital |
|
| | SB3131 | - 172 - | LRB100 19958 SMS 35239 b |
|
|
1 | | structure for the applicable calendar year, excluding |
2 | | goodwill, subject to a determination of prudence and |
3 | | reasonableness consistent with Commission practice and |
4 | | law. To enable the financing of the incremental capital |
5 | | expenditures, including regulatory assets, for electric |
6 | | utilities that serve less than 3,000,000 retail customers |
7 | | but more than 500,000 retail customers in the State, a |
8 | | participating electric utility's actual year-end capital |
9 | | structure that includes a common equity ratio, excluding |
10 | | goodwill, of up to and including 50% of the total capital |
11 | | structure shall be deemed reasonable and used to set rates. |
12 | | (3) Include a cost of equity, which shall be calculated |
13 | | as the sum of the following: |
14 | | (A) the average for the applicable calendar year of |
15 | | the monthly average yields of 30-year U.S. Treasury |
16 | | bonds published by the Board of Governors of the |
17 | | Federal Reserve System in its weekly H.15 Statistical |
18 | | Release or successor publication; and |
19 | | (B) 580 basis points. |
20 | | At such time as the Board of Governors of the Federal |
21 | | Reserve System ceases to include the monthly average yields |
22 | | of 30-year U.S. Treasury bonds in its weekly H.15 |
23 | | Statistical Release or successor publication, the monthly |
24 | | average yields of the U.S. Treasury bonds then having the |
25 | | longest duration published by the Board of Governors in its |
26 | | weekly H.15 Statistical Release or successor publication |
|
| | SB3131 | - 173 - | LRB100 19958 SMS 35239 b |
|
|
1 | | shall instead be used for purposes of this paragraph (3). |
2 | | (4) Permit and set forth protocols, subject to a |
3 | | determination of prudence and reasonableness consistent |
4 | | with Commission practice and law, for the following: |
5 | | (A) recovery of incentive compensation expense |
6 | | that is based on the achievement of operational |
7 | | metrics, including metrics related to budget controls, |
8 | | outage duration and frequency, safety, customer |
9 | | service, efficiency and productivity, and |
10 | | environmental compliance. Incentive compensation |
11 | | expense that is based on net income or an affiliate's |
12 | | earnings per share shall not be recoverable under the |
13 | | performance-based formula rate; |
14 | | (B) recovery of pension and other post-employment |
15 | | benefits expense, provided that such costs are |
16 | | supported by an actuarial study; |
17 | | (C) recovery of severance costs, provided that if |
18 | | the amount is over $3,700,000 for a participating |
19 | | utility that is a combination utility or $10,000,000 |
20 | | for a participating utility that serves more than 3 |
21 | | million retail customers, then the full amount shall be |
22 | | amortized consistent with subparagraph (F) of this |
23 | | paragraph (4); |
24 | | (D) investment return at a rate equal to the |
25 | | utility's weighted average cost of long-term debt, on |
26 | | the pension assets as, and in the amount, reported in |
|
| | SB3131 | - 174 - | LRB100 19958 SMS 35239 b |
|
|
1 | | Account 186 (or in such other Account or Accounts as |
2 | | such asset may subsequently be recorded) of the |
3 | | utility's most recently filed FERC Form 1, net of |
4 | | deferred tax benefits; |
5 | | (E) recovery of the expenses related to the |
6 | | Commission proceeding under this subsection (c) to |
7 | | approve this performance-based formula rate and |
8 | | initial rates or to subsequent proceedings related to |
9 | | the formula, provided that the recovery shall be |
10 | | amortized over a 3-year period; recovery of expenses |
11 | | related to the annual Commission proceedings under |
12 | | subsection (d) of this Section to review the inputs to |
13 | | the performance-based formula rate shall be expensed |
14 | | and recovered through the performance-based formula |
15 | | rate; |
16 | | (F) amortization over a 5-year period of the full |
17 | | amount of each charge or credit that exceeds $3,700,000 |
18 | | for a participating utility that is a combination |
19 | | utility or $10,000,000 for a participating utility |
20 | | that serves more than 3 million retail customers in the |
21 | | applicable calendar year and that relates to a |
22 | | workforce reduction program's severance costs, changes |
23 | | in accounting rules, changes in law, compliance with |
24 | | any Commission-initiated audit, or a single storm or |
25 | | other similar expense, provided that any unamortized |
26 | | balance shall be reflected in rate base. For purposes |
|
| | SB3131 | - 175 - | LRB100 19958 SMS 35239 b |
|
|
1 | | of this subparagraph (F), changes in law includes any |
2 | | enactment, repeal, or amendment in a law, ordinance, |
3 | | rule, regulation, interpretation, permit, license, |
4 | | consent, or order, including those relating to taxes, |
5 | | accounting, or to environmental matters, or in the |
6 | | interpretation or application thereof by any |
7 | | governmental authority occurring after October 26, |
8 | | 2011 (the effective date of Public Act 97-616); |
9 | | (G) recovery of existing regulatory assets over |
10 | | the periods previously authorized by the Commission; |
11 | | (H) historical weather normalized billing |
12 | | determinants; and |
13 | | (I) allocation methods for common costs. |
14 | | (5) Provide that if the participating utility's earned |
15 | | rate of return on common equity related to the provision of |
16 | | delivery services for the prior rate year (calculated using |
17 | | costs and capital structure approved by the Commission as |
18 | | provided in subparagraph (2) of this subsection (c), |
19 | | consistent with this Section, in accordance with |
20 | | Commission rules and orders, including, but not limited to, |
21 | | adjustments for goodwill, and after any Commission-ordered |
22 | | disallowances and taxes) is more than 50 basis points |
23 | | higher than the rate of return on common equity calculated |
24 | | pursuant to paragraph (3) of this subsection (c) (after |
25 | | adjusting for any penalties to the rate of return on common |
26 | | equity applied pursuant to the performance metrics |
|
| | SB3131 | - 176 - | LRB100 19958 SMS 35239 b |
|
|
1 | | provision of subsection (f) of this Section), then the |
2 | | participating utility shall apply a credit through the |
3 | | performance-based formula rate that reflects an amount |
4 | | equal to the value of that portion of the earned rate of |
5 | | return on common equity that is more than 50 basis points |
6 | | higher than the rate of return on common equity calculated |
7 | | pursuant to paragraph (3) of this subsection (c) (after |
8 | | adjusting for any penalties to the rate of return on common |
9 | | equity applied pursuant to the performance metrics |
10 | | provision of subsection (f) of this Section) for the prior |
11 | | rate year, adjusted for taxes. If the participating |
12 | | utility's earned rate of return on common equity related to |
13 | | the provision of delivery services for the prior rate year |
14 | | (calculated using costs and capital structure approved by |
15 | | the Commission as provided in subparagraph (2) of this |
16 | | subsection (c), consistent with this Section, in |
17 | | accordance with Commission rules and orders, including, |
18 | | but not limited to, adjustments for goodwill, and after any |
19 | | Commission-ordered disallowances and taxes) is more than |
20 | | 50 basis points less than the return on common equity |
21 | | calculated pursuant to paragraph (3) of this subsection (c) |
22 | | (after adjusting for any penalties to the rate of return on |
23 | | common equity applied pursuant to the performance metrics |
24 | | provision of subsection (f) of this Section), then the |
25 | | participating utility shall apply a charge through the |
26 | | performance-based formula rate that reflects an amount |
|
| | SB3131 | - 177 - | LRB100 19958 SMS 35239 b |
|
|
1 | | equal to the value of that portion of the earned rate of |
2 | | return on common equity that is more than 50 basis points |
3 | | less than the rate of return on common equity calculated |
4 | | pursuant to paragraph (3) of this subsection (c) (after |
5 | | adjusting for any penalties to the rate of return on common |
6 | | equity applied pursuant to the performance metrics |
7 | | provision of subsection (f) of this Section) for the prior |
8 | | rate year, adjusted for taxes. |
9 | | (6) Provide for an annual reconciliation, as described |
10 | | in subsection (d) of this Section, with interest, of the |
11 | | revenue requirement reflected in rates for each calendar |
12 | | year, beginning with the calendar year in which the utility |
13 | | files its performance-based formula rate tariff pursuant |
14 | | to subsection (c) of this Section, with what the revenue |
15 | | requirement would have been had the actual cost information |
16 | | for the applicable calendar year been available at the |
17 | | filing date. |
18 | | The utility shall file, together with its tariff, final |
19 | | data based on its most recently filed FERC Form 1, plus |
20 | | projected plant additions and correspondingly updated |
21 | | depreciation reserve and expense for the calendar year in which |
22 | | the tariff and data are filed, that shall populate the |
23 | | performance-based formula rate and set the initial delivery |
24 | | services rates under the formula. For purposes of this Section, |
25 | | "FERC Form 1" means the Annual Report of Major Electric |
26 | | Utilities, Licensees and Others that electric utilities are |
|
| | SB3131 | - 178 - | LRB100 19958 SMS 35239 b |
|
|
1 | | required to file with the Federal Energy Regulatory Commission |
2 | | under the Federal Power Act, Sections 3, 4(a), 304 and 209, |
3 | | modified as necessary to be consistent with 83 Ill. Admin. Code |
4 | | Part 415 as of May 1, 2011. Nothing in this Section is intended |
5 | | to allow costs that are not otherwise recoverable to be |
6 | | recoverable by virtue of inclusion in FERC Form 1. |
7 | | After the utility files its proposed performance-based |
8 | | formula rate structure and protocols and initial rates, the |
9 | | Commission shall initiate a docket to review the filing. The |
10 | | Commission shall enter an order approving, or approving as |
11 | | modified, the performance-based formula rate, including the |
12 | | initial rates, as just and reasonable within 270 days after the |
13 | | date on which the tariff was filed, or, if the tariff is filed |
14 | | within 14 days after October 26, 2011 (the effective date of |
15 | | Public Act 97-616), then by May 31, 2012. Such review shall be |
16 | | based on the same evidentiary standards, including, but not |
17 | | limited to, those concerning the prudence and reasonableness of |
18 | | the costs incurred by the utility, the Commission applies in a |
19 | | hearing to review a filing for a general increase in rates |
20 | | under Article IX of this Act. The initial rates shall take |
21 | | effect within 30 days after the Commission's order approving |
22 | | the performance-based formula rate tariff. |
23 | | Until such time as the Commission approves a different rate |
24 | | design and cost allocation pursuant to subsection (e) of this |
25 | | Section, rate design and cost allocation across customer |
26 | | classes shall be consistent with the Commission's most recent |
|
| | SB3131 | - 179 - | LRB100 19958 SMS 35239 b |
|
|
1 | | order regarding the participating utility's request for a |
2 | | general increase in its delivery services rates. |
3 | | Subsequent changes to the performance-based formula rate |
4 | | structure or protocols shall be made as set forth in Section |
5 | | 9-201 of this Act, but nothing in this subsection (c) is |
6 | | intended to limit the Commission's authority under Article IX |
7 | | and other provisions of this Act to initiate an investigation |
8 | | of a participating utility's performance-based formula rate |
9 | | tariff, provided that any such changes shall be consistent with |
10 | | paragraphs (1) through (6) of this subsection (c). Any change |
11 | | ordered by the Commission shall be made at the same time new |
12 | | rates take effect following the Commission's next order |
13 | | pursuant to subsection (d) of this Section, provided that the |
14 | | new rates take effect no less than 30 days after the date on |
15 | | which the Commission issues an order adopting the change. |
16 | | A participating utility that files a tariff pursuant to |
17 | | this subsection (c) must submit a one-time $200,000 filing fee |
18 | | at the time the Chief Clerk of the Commission accepts the |
19 | | filing, which shall be a recoverable expense. |
20 | | In the event the performance-based formula rate is |
21 | | terminated, the then current rates shall remain in effect until |
22 | | such time as new rates are set pursuant to Article IX of this |
23 | | Act, subject to retroactive rate adjustment, with interest, to |
24 | | reconcile rates charged with actual costs. At such time that |
25 | | the performance-based formula rate is terminated, the |
26 | | participating utility's voluntary commitments and obligations |
|
| | SB3131 | - 180 - | LRB100 19958 SMS 35239 b |
|
|
1 | | under subsection (b) of this Section shall immediately |
2 | | terminate, except for the utility's obligation to pay an amount |
3 | | already owed to the fund for training grants pursuant to a |
4 | | Commission order issued under subsection (b) of this Section. |
5 | | (d) Subsequent to the Commission's issuance of an order |
6 | | approving the utility's performance-based formula rate |
7 | | structure and protocols, and initial rates under subsection (c) |
8 | | of this Section, the utility shall file, on or before May 1 of |
9 | | each year, with the Chief Clerk of the Commission its updated |
10 | | cost inputs to the performance-based formula rate for the |
11 | | applicable rate year and the corresponding new charges. Each |
12 | | such filing shall conform to the following requirements and |
13 | | include the following information: |
14 | | (1) The inputs to the performance-based formula rate |
15 | | for the applicable rate year shall be based on final |
16 | | historical data reflected in the utility's most recently |
17 | | filed annual FERC Form 1 plus projected plant additions and |
18 | | correspondingly updated depreciation reserve and expense |
19 | | for the calendar year in which the inputs are filed. The |
20 | | filing shall also include a reconciliation of the revenue |
21 | | requirement that was in effect for the prior rate year (as |
22 | | set by the cost inputs for the prior rate year) with the |
23 | | actual revenue requirement for the prior rate year |
24 | | (determined using a year-end rate base) that uses amounts |
25 | | reflected in the applicable FERC Form 1 that reports the |
26 | | actual costs for the prior rate year. Any over-collection |
|
| | SB3131 | - 181 - | LRB100 19958 SMS 35239 b |
|
|
1 | | or under-collection indicated by such reconciliation shall |
2 | | be reflected as a credit against, or recovered as an |
3 | | additional charge to, respectively, with interest |
4 | | calculated at a rate equal to the utility's weighted |
5 | | average cost of capital approved by the Commission for the |
6 | | prior rate year, the charges for the applicable rate year. |
7 | | Provided, however, that the first such reconciliation |
8 | | shall be for the calendar year in which the utility files |
9 | | its performance-based formula rate tariff pursuant to |
10 | | subsection (c) of this Section and shall reconcile (i) the |
11 | | revenue requirement or requirements established by the |
12 | | rate order or orders in effect from time to time during |
13 | | such calendar year (weighted, as applicable) with (ii) the |
14 | | revenue requirement determined using a year-end rate base |
15 | | for that calendar year calculated pursuant to the |
16 | | performance-based formula rate using (A) actual costs for |
17 | | that year as reflected in the applicable FERC Form 1, and |
18 | | (B) for the first such reconciliation only, the cost of |
19 | | equity, which shall be calculated as the sum of 590 basis |
20 | | points plus the average for the applicable calendar year of |
21 | | the monthly average yields of 30-year U.S. Treasury bonds |
22 | | published by the Board of Governors of the Federal Reserve |
23 | | System in its weekly H.15 Statistical Release or successor |
24 | | publication. The first such reconciliation is not intended |
25 | | to provide for the recovery of costs previously excluded |
26 | | from rates based on a prior Commission order finding of |
|
| | SB3131 | - 182 - | LRB100 19958 SMS 35239 b |
|
|
1 | | imprudence or unreasonableness. Each reconciliation shall |
2 | | be certified by the participating utility in the same |
3 | | manner that FERC Form 1 is certified. The filing shall also |
4 | | include the charge or credit, if any, resulting from the |
5 | | calculation required by paragraph (6) of subsection (c) of |
6 | | this Section. |
7 | | Notwithstanding anything that may be to the contrary, |
8 | | the intent of the reconciliation is to ultimately reconcile |
9 | | the revenue requirement reflected in rates for each |
10 | | calendar year, beginning with the calendar year in which |
11 | | the utility files its performance-based formula rate |
12 | | tariff pursuant to subsection (c) of this Section, with |
13 | | what the revenue requirement determined using a year-end |
14 | | rate base for the applicable calendar year would have been |
15 | | had the actual cost information for the applicable calendar |
16 | | year been available at the filing date. |
17 | | (2) The new charges shall take effect beginning on the |
18 | | first billing day of the following January billing period |
19 | | and remain in effect through the last billing day of the |
20 | | next December billing period regardless of whether the |
21 | | Commission enters upon a hearing pursuant to this |
22 | | subsection (d). |
23 | | (3) The filing shall include relevant and necessary |
24 | | data and documentation for the applicable rate year that is |
25 | | consistent with the Commission's rules applicable to a |
26 | | filing for a general increase in rates or any rules adopted |
|
| | SB3131 | - 183 - | LRB100 19958 SMS 35239 b |
|
|
1 | | by the Commission to implement this Section. Normalization |
2 | | adjustments shall not be required. Notwithstanding any |
3 | | other provision of this Section or Act or any rule or other |
4 | | requirement adopted by the Commission, a participating |
5 | | utility that is a combination utility with more than one |
6 | | rate zone shall not be required to file a separate set of |
7 | | such data and documentation for each rate zone and may |
8 | | combine such data and documentation into a single set of |
9 | | schedules. |
10 | | Within 45 days after the utility files its annual update of |
11 | | cost inputs to the performance-based formula rate, the |
12 | | Commission shall have the authority, either upon complaint or |
13 | | its own initiative, but with reasonable notice, to enter upon a |
14 | | hearing concerning the prudence and reasonableness of the costs |
15 | | incurred by the utility to be recovered during the applicable |
16 | | rate year that are reflected in the inputs to the |
17 | | performance-based formula rate derived from the utility's FERC |
18 | | Form 1. During the course of the hearing, each objection shall |
19 | | be stated with particularity and evidence provided in support |
20 | | thereof, after which the utility shall have the opportunity to |
21 | | rebut the evidence. Discovery shall be allowed consistent with |
22 | | the Commission's Rules of Practice, which Rules shall be |
23 | | enforced by the Commission or the assigned administrative law |
24 | | judge hearing examiner . The Commission shall apply the same |
25 | | evidentiary standards, including, but not limited to, those |
26 | | concerning the prudence and reasonableness of the costs |
|
| | SB3131 | - 184 - | LRB100 19958 SMS 35239 b |
|
|
1 | | incurred by the utility, in the hearing as it would apply in a |
2 | | hearing to review a filing for a general increase in rates |
3 | | under Article IX of this Act. The Commission shall not, |
4 | | however, have the authority in a proceeding under this |
5 | | subsection (d) to consider or order any changes to the |
6 | | structure or protocols of the performance-based formula rate |
7 | | approved pursuant to subsection (c) of this Section. In a |
8 | | proceeding under this subsection (d), the Commission shall |
9 | | enter its order no later than the earlier of 240 days after the |
10 | | utility's filing of its annual update of cost inputs to the |
11 | | performance-based formula rate or December 31. The |
12 | | Commission's determinations of the prudence and reasonableness |
13 | | of the costs incurred for the applicable calendar year shall be |
14 | | final upon entry of the Commission's order and shall not be |
15 | | subject to reopening, reexamination, or collateral attack in |
16 | | any other Commission proceeding, case, docket, order, rule or |
17 | | regulation, provided, however, that nothing in this subsection |
18 | | (d) shall prohibit a party from petitioning the Commission to |
19 | | rehear or appeal to the courts the order pursuant to the |
20 | | provisions of this Act. |
21 | | In the event the Commission does not, either upon complaint |
22 | | or its own initiative, enter upon a hearing within 45 days |
23 | | after the utility files the annual update of cost inputs to its |
24 | | performance-based formula rate, then the costs incurred for the |
25 | | applicable calendar year shall be deemed prudent and |
26 | | reasonable, and the filed charges shall not be subject to |
|
| | SB3131 | - 185 - | LRB100 19958 SMS 35239 b |
|
|
1 | | reopening, reexamination, or collateral attack in any other |
2 | | proceeding, case, docket, order, rule, or regulation. |
3 | | A participating utility's first filing of the updated cost |
4 | | inputs, and any Commission investigation of such inputs |
5 | | pursuant to this subsection (d) shall proceed notwithstanding |
6 | | the fact that the Commission's investigation under subsection |
7 | | (c) of this Section is still pending and notwithstanding any |
8 | | other law, order, rule, or Commission practice to the contrary. |
9 | | (e) Nothing in subsections (c) or (d) of this Section shall |
10 | | prohibit the Commission from investigating, or a participating |
11 | | utility from filing, revenue-neutral tariff changes related to |
12 | | rate design of a performance-based formula rate that has been |
13 | | placed into effect for the utility. Following approval of a |
14 | | participating utility's performance-based formula rate tariff |
15 | | pursuant to subsection (c) of this Section, the utility shall |
16 | | make a filing with the Commission within one year after the |
17 | | effective date of the performance-based formula rate tariff |
18 | | that proposes changes to the tariff to incorporate the findings |
19 | | of any final rate design orders of the Commission applicable to |
20 | | the participating utility and entered subsequent to the |
21 | | Commission's approval of the tariff. The Commission shall, |
22 | | after notice and hearing, enter its order approving, or |
23 | | approving with modification, the proposed changes to the |
24 | | performance-based formula rate tariff within 240 days after the |
25 | | utility's filing. Following such approval, the utility shall |
26 | | make a filing with the Commission during each subsequent 3-year |
|
| | SB3131 | - 186 - | LRB100 19958 SMS 35239 b |
|
|
1 | | period that either proposes revenue-neutral tariff changes or |
2 | | re-files the existing tariffs without change, which shall |
3 | | present the Commission with an opportunity to suspend the |
4 | | tariffs and consider revenue-neutral tariff changes related to |
5 | | rate design. |
6 | | (f) Within 30 days after the filing of a tariff pursuant to |
7 | | subsection (c) of this Section, each participating utility |
8 | | shall develop and file with the Commission multi-year metrics |
9 | | designed to achieve, ratably (i.e., in equal segments) over a |
10 | | 10-year period, improvement over baseline performance values |
11 | | as follows: |
12 | | (1) Twenty percent improvement in the System Average |
13 | | Interruption Frequency Index, using a baseline of the |
14 | | average of the data from 2001 through 2010. |
15 | | (2) Fifteen percent improvement in the system Customer |
16 | | Average Interruption Duration Index, using a baseline of |
17 | | the average of the data from 2001 through 2010. |
18 | | (3) For a participating utility other than a |
19 | | combination utility, 20% improvement in the System Average |
20 | | Interruption Frequency Index for its Southern Region, |
21 | | using a baseline of the average of the data from 2001 |
22 | | through 2010. For purposes of this paragraph (3), Southern |
23 | | Region shall have the meaning set forth in the |
24 | | participating utility's most recent report filed pursuant |
25 | | to Section 16-125 of this Act. |
26 | | (3.5) For a participating utility other than a |
|
| | SB3131 | - 187 - | LRB100 19958 SMS 35239 b |
|
|
1 | | combination utility, 20% improvement in the System Average |
2 | | Interruption Frequency Index for its Northeastern Region, |
3 | | using a baseline of the average of the data from 2001 |
4 | | through 2010. For purposes of this paragraph (3.5), |
5 | | Northeastern Region shall have the meaning set forth in the |
6 | | participating utility's most recent report filed pursuant |
7 | | to Section 16-125 of this Act. |
8 | | (4) Seventy-five percent improvement in the total |
9 | | number of customers who exceed the service reliability |
10 | | targets as set forth in subparagraphs (A) through (C) of |
11 | | paragraph (4) of subsection (b) of 83 Ill. Admin. Code Part |
12 | | 411.140 as of May 1, 2011, using 2010 as the baseline year. |
13 | | (5) Reduction in issuance of estimated electric bills: |
14 | | 90% improvement for a participating utility other than a |
15 | | combination utility, and 56% improvement for a |
16 | | participating utility that is a combination utility, using |
17 | | a baseline of the average number of estimated bills for the |
18 | | years 2008 through 2010. |
19 | | (6) Consumption on inactive meters: 90% improvement |
20 | | for a participating utility other than a combination |
21 | | utility, and 56% improvement for a participating utility |
22 | | that is a combination utility, using a baseline of the |
23 | | average unbilled kilowatthours for the years 2009 and 2010. |
24 | | (7) Unaccounted for energy: 50% improvement for a |
25 | | participating utility other than a combination utility |
26 | | using a baseline of the non-technical line loss unaccounted |
|
| | SB3131 | - 188 - | LRB100 19958 SMS 35239 b |
|
|
1 | | for energy kilowatthours for the year 2009. |
2 | | (8) Uncollectible expense: reduce uncollectible |
3 | | expense by at least $30,000,000 for a participating utility |
4 | | other than a combination utility and by at least $3,500,000 |
5 | | for a participating utility that is a combination utility, |
6 | | using a baseline of the average uncollectible expense for |
7 | | the years 2008 through 2010. |
8 | | (9) Opportunities for minority-owned and female-owned |
9 | | business enterprises: design a performance metric |
10 | | regarding the creation of opportunities for minority-owned |
11 | | and female-owned business enterprises consistent with |
12 | | State and federal law using a base performance value of the |
13 | | percentage of the participating utility's capital |
14 | | expenditures that were paid to minority-owned and |
15 | | female-owned business enterprises in 2010. |
16 | | The definitions set forth in 83 Ill. Admin. Code Part |
17 | | 411.20 as of May 1, 2011 shall be used for purposes of |
18 | | calculating performance under paragraphs (1) through (3.5) of |
19 | | this subsection (f), provided, however, that the participating |
20 | | utility may exclude up to 9 extreme weather event days from |
21 | | such calculation for each year, and provided further that the
|
22 | | participating utility shall exclude 9 extreme weather event |
23 | | days when calculating each year of the baseline period to the |
24 | | extent that there are 9 such days in a given year of the |
25 | | baseline period. For purposes of this Section, an extreme |
26 | | weather event day is a 24-hour calendar day (beginning at 12:00 |
|
| | SB3131 | - 189 - | LRB100 19958 SMS 35239 b |
|
|
1 | | a.m. and ending at 11:59 p.m.) during which any weather event |
2 | | (e.g., storm, tornado) caused interruptions for 10,000 or more |
3 | | of the participating utility's customers for 3 hours or more. |
4 | | If there are more than 9 extreme weather event days in a year, |
5 | | then the utility may choose no more than 9 extreme weather |
6 | | event days to exclude, provided that the same extreme weather |
7 | | event days are excluded from each of the calculations performed |
8 | | under paragraphs (1) through (3.5) of this subsection (f). |
9 | | The metrics shall include incremental performance goals |
10 | | for each year of the 10-year period, which shall be designed to |
11 | | demonstrate that the utility is on track to achieve the |
12 | | performance goal in each category at the end of the 10-year |
13 | | period. The utility shall elect when the 10-year period shall |
14 | | commence for the metrics set forth in subparagraphs (1) through |
15 | | (4) and (9) of this subsection (f), provided that it begins no |
16 | | later than 14 months following the date on which the utility |
17 | | begins investing pursuant to subsection (b) of this Section, |
18 | | and when the 10-year period shall commence for the metrics set |
19 | | forth in subparagraphs (5) through (8) of this subsection (f), |
20 | | provided that it begins no later than 14 months following the |
21 | | date on which the Commission enters its order approving the |
22 | | utility's Advanced Metering Infrastructure Deployment Plan |
23 | | pursuant to subsection (c) of Section 16-108.6 of this Act. |
24 | | The metrics and performance goals set forth in |
25 | | subparagraphs (5) through (8) of this subsection (f) are based |
26 | | on the assumptions that the participating utility may fully |
|
| | SB3131 | - 190 - | LRB100 19958 SMS 35239 b |
|
|
1 | | implement the technology described in subsection (b) of this |
2 | | Section, including utilizing the full functionality of such |
3 | | technology and that there is no requirement for personal |
4 | | on-site notification. If the utility is unable to meet the |
5 | | metrics and performance goals set forth in subparagraphs (5) |
6 | | through (8) of this subsection (f) for such reasons, and the |
7 | | Commission so finds after notice and hearing, then the utility |
8 | | shall be excused from compliance, but only to the limited |
9 | | extent achievement of the affected metrics and performance |
10 | | goals was hindered by the less than full implementation. |
11 | | (f-5) The financial penalties applicable to the metrics |
12 | | described in subparagraphs (1) through (8) of subsection (f) of |
13 | | this Section, as applicable, shall be applied through an |
14 | | adjustment to the participating utility's return on equity of |
15 | | no more than a total of 30 basis points in each of the first 3 |
16 | | years, of no more than a total of 34 basis points
in each of the |
17 | | 3 years thereafter, and of no more than a total of 38 basis |
18 | | points in each
of the 4 years thereafter, as follows: |
19 | | (1) With respect to each of the incremental annual |
20 | | performance goals established pursuant to paragraph (1) of |
21 | | subsection (f) of this Section, |
22 | | (A) for each year that a participating utility |
23 | | other than a combination utility does not achieve the |
24 | | annual goal, the participating utility's return on |
25 | | equity shall be reduced as
follows: during years 1 |
26 | | through 3, by 5 basis points; during years 4 through 6, |
|
| | SB3131 | - 191 - | LRB100 19958 SMS 35239 b |
|
|
1 | | by 6 basis points; and during years 7 through 10, by 7 |
2 | | basis points; and |
3 | | (B) for each year that a participating utility that |
4 | | is a combination utility does not achieve the annual |
5 | | goal, the participating utility's return on equity |
6 | | shall be reduced as follows: during years 1 through 3, |
7 | | by 10 basis points; during years 4 through 6, by 12
|
8 | | basis points; and during years 7 through 10, by 14 |
9 | | basis points. |
10 | | (2) With respect to each of the incremental annual |
11 | | performance goals established pursuant to paragraph (2) of |
12 | | subsection (f) of this Section, for each year that the |
13 | | participating utility does not achieve each such goal, the |
14 | | participating utility's return on equity shall be reduced |
15 | | as follows: during years 1 through 3, by 5 basis points; |
16 | | during years 4
through 6, by 6 basis points; and during |
17 | | years 7 through 10, by 7 basis points. |
18 | | (3) With respect to each of the incremental annual |
19 | | performance goals established
pursuant to paragraphs (3) |
20 | | and (3.5) of subsection (f) of this Section, for each year |
21 | | that a participating utility other than a combination |
22 | | utility does not achieve both such
goals, the participating |
23 | | utility's return on equity shall be reduced as follows: |
24 | | during years 1 through 3, by 5 basis points; during years 4 |
25 | | through 6, by 6 basis points; and during years 7 through |
26 | | 10, by 7 basis points. |
|
| | SB3131 | - 192 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (4) With respect to each of the incremental annual |
2 | | performance goals established
pursuant to paragraph (4) of |
3 | | subsection (f) of this Section, for each year that the |
4 | | participating utility does not achieve each such goal, the |
5 | | participating utility's return
on equity shall be reduced |
6 | | as follows: during years 1 through 3, by 5 basis points;
|
7 | | during years 4 through 6, by 6 basis points; and during |
8 | | years 7 through 10, by 7 basis points. |
9 | | (5) With respect to each of the incremental annual |
10 | | performance goals established pursuant to subparagraph (5) |
11 | | of subsection (f) of this Section, for each year that the |
12 | | participating utility does not achieve at least 95% of each |
13 | | such goal, the participating utility's return on equity |
14 | | shall be reduced by 5 basis points for each such unachieved |
15 | | goal. |
16 | | (6) With respect to each of the incremental annual |
17 | | performance goals established pursuant to paragraphs (6), |
18 | | (7), and (8) of subsection (f) of this Section, as |
19 | | applicable, which together measure non-operational |
20 | | customer savings and benefits
relating to the |
21 | | implementation of the Advanced Metering Infrastructure |
22 | | Deployment
Plan, as defined in Section 16-108.6 of this |
23 | | Act, the performance under each such goal shall be |
24 | | calculated in terms of the percentage of the goal achieved. |
25 | | The percentage of goal achieved for each of the goals shall |
26 | | be aggregated, and an average percentage value calculated, |
|
| | SB3131 | - 193 - | LRB100 19958 SMS 35239 b |
|
|
1 | | for each year of the 10-year period. If the utility does |
2 | | not achieve an average percentage value in a given year of |
3 | | at least 95%, the participating utility's return on equity |
4 | | shall be reduced by 5 basis points. |
5 | | The financial penalties shall be applied as described in |
6 | | this subsection (f-5) for the 12-month period in which the |
7 | | deficiency occurred through a separate tariff mechanism, which |
8 | | shall be filed by the utility together with its metrics. In the |
9 | | event the formula rate tariff established pursuant to |
10 | | subsection (c) of this Section terminates, the utility's |
11 | | obligations under subsection (f) of this Section and this |
12 | | subsection (f-5) shall also terminate, provided, however, that |
13 | | the tariff mechanism established pursuant to subsection (f) of |
14 | | this Section and this subsection (f-5) shall remain in effect |
15 | | until any penalties due and owing at the time of such |
16 | | termination are applied. |
17 | | The Commission shall, after notice and hearing, enter an |
18 | | order within 120 days after the metrics are filed approving, or |
19 | | approving with modification, a participating utility's tariff |
20 | | or mechanism to satisfy the metrics set forth in subsection (f) |
21 | | of this Section. On June 1 of each subsequent year, each |
22 | | participating utility shall file a report with the Commission |
23 | | that includes, among other things, a description of how the |
24 | | participating utility performed under each metric and an |
25 | | identification of any extraordinary events that adversely |
26 | | impacted the utility's performance. Whenever a participating |
|
| | SB3131 | - 194 - | LRB100 19958 SMS 35239 b |
|
|
1 | | utility does not satisfy the metrics required pursuant to |
2 | | subsection (f) of this Section, the Commission shall, after |
3 | | notice and hearing, enter an order approving financial |
4 | | penalties in accordance with this subsection (f-5). The |
5 | | Commission-approved financial penalties shall be applied |
6 | | beginning with the next rate year. Nothing in this Section |
7 | | shall authorize the Commission to reduce or otherwise obviate |
8 | | the imposition of financial penalties for failing to achieve |
9 | | one or more of the metrics established pursuant to subparagraph |
10 | | (1) through (4) of subsection (f) of this Section. |
11 | | (g) On or before July 31, 2014, each participating utility |
12 | | shall file a report with the Commission that sets forth the |
13 | | average annual increase in the average amount paid per |
14 | | kilowatthour for residential eligible retail customers, |
15 | | exclusive of the effects of energy efficiency programs, |
16 | | comparing the 12-month period ending May 31, 2012; the 12-month |
17 | | period ending May 31, 2013; and the 12-month period ending May |
18 | | 31, 2014. For a participating utility that is a combination |
19 | | utility with more than one rate zone, the weighted average |
20 | | aggregate increase shall be provided. The report shall be filed |
21 | | together with a statement from an independent auditor attesting |
22 | | to the accuracy of the report. The cost of the independent |
23 | | auditor shall be borne by the participating utility and shall |
24 | | not be a recoverable expense. "The average amount paid per |
25 | | kilowatthour" shall be based on the participating utility's |
26 | | tariffed rates actually in effect and shall not be calculated |
|
| | SB3131 | - 195 - | LRB100 19958 SMS 35239 b |
|
|
1 | | using any hypothetical rate or adjustments to actual charges |
2 | | (other than as specified for energy efficiency) as an input. |
3 | | In the event that the average annual increase exceeds 2.5% |
4 | | as calculated pursuant to this subsection (g), then Sections |
5 | | 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of this Act, other |
6 | | than this subsection, shall be inoperative as they relate to |
7 | | the utility and its service area as of the date of the report |
8 | | due to be submitted pursuant to this subsection and the utility |
9 | | shall no longer be eligible to annually update the |
10 | | performance-based formula rate tariff pursuant to subsection |
11 | | (d) of this Section. In such event, the then current rates |
12 | | shall remain in effect until such time as new rates are set |
13 | | pursuant to Article IX of this Act, subject to retroactive |
14 | | adjustment, with interest, to reconcile rates charged with |
15 | | actual costs, and the participating utility's voluntary |
16 | | commitments and obligations under subsection (b) of this |
17 | | Section shall immediately terminate, except for the utility's |
18 | | obligation to pay an amount already owed to the fund for |
19 | | training grants pursuant to a Commission order issued under |
20 | | subsection (b) of this Section. |
21 | | In the event that the average annual increase is 2.5% or |
22 | | less as calculated pursuant to this subsection (g), then the |
23 | | performance-based formula rate shall remain in effect as set |
24 | | forth in this Section. |
25 | | For purposes of this Section, the amount per kilowatthour |
26 | | means the total amount paid for electric service expressed on a |
|
| | SB3131 | - 196 - | LRB100 19958 SMS 35239 b |
|
|
1 | | per kilowatthour basis, and the total amount paid for electric |
2 | | service includes without limitation amounts paid for supply, |
3 | | transmission, distribution, surcharges, and add-on taxes |
4 | | exclusive of any increases in taxes or new taxes imposed after |
5 | | October 26, 2011 (the effective date of Public Act 97-616). For |
6 | | purposes of this Section, "eligible retail customers" shall |
7 | | have the meaning set forth in Section 16-111.5 of this Act. |
8 | | The fact that this Section becomes inoperative as set forth |
9 | | in this subsection shall not be construed to mean that the |
10 | | Commission may reexamine or otherwise reopen prudence or |
11 | | reasonableness determinations already made. |
12 | | (h) By December 31, 2017, the Commission shall prepare and |
13 | | file with the General Assembly a report on the infrastructure |
14 | | program and the performance-based formula rate. The report |
15 | | shall include the change in the average amount per kilowatthour |
16 | | paid by residential customers between June 1, 2011 and May 31, |
17 | | 2017. If the change in the total average rate paid exceeds 2.5% |
18 | | compounded annually, the Commission shall include in the report |
19 | | an analysis that shows the portion of the change due to the |
20 | | delivery services component and the portion of the change due |
21 | | to the supply component of the rate. The report shall include |
22 | | separate sections for each participating utility. |
23 | | Sections 16-108.5, 16-108.6, 16-108.7, and 16-108.8 of |
24 | | this Act, other than this subsection (h), are inoperative after |
25 | | December 31, 2022 for every participating utility, after which |
26 | | time a participating utility shall no longer be eligible to |
|
| | SB3131 | - 197 - | LRB100 19958 SMS 35239 b |
|
|
1 | | annually update the performance-based formula rate tariff |
2 | | pursuant to subsection (d) of this Section. At such time, the |
3 | | then current rates shall remain in effect until such time as |
4 | | new rates are set pursuant to Article IX of this Act, subject |
5 | | to retroactive adjustment, with interest, to reconcile rates |
6 | | charged with actual costs. |
7 | | The fact that this Section becomes inoperative as set forth |
8 | | in this subsection shall not be construed to mean that the |
9 | | Commission may reexamine or otherwise reopen prudence or |
10 | | reasonableness determinations already made. |
11 | | (i) While a participating utility may use, develop, and |
12 | | maintain broadband systems and the delivery of broadband |
13 | | services, voice-over-internet-protocol services, |
14 | | telecommunications services, and cable and video programming |
15 | | services for use in providing delivery services and Smart Grid |
16 | | functionality or application to its retail customers, |
17 | | including, but not limited to, the installation, |
18 | | implementation and maintenance of Smart Grid electric system |
19 | | upgrades as defined in Section 16-108.6 of this Act, a |
20 | | participating utility is prohibited from offering to its retail |
21 | | customers broadband services or the delivery of broadband |
22 | | services, voice-over-internet-protocol services, |
23 | | telecommunications services, or cable or video programming |
24 | | services, unless they are part of a service directly related to |
25 | | delivery services or Smart Grid functionality or applications |
26 | | as defined in Section 16-108.6 of this Act, and from recovering |
|
| | SB3131 | - 198 - | LRB100 19958 SMS 35239 b |
|
|
1 | | the costs of such offerings from retail customers. |
2 | | (j) Nothing in this Section is intended to legislatively |
3 | | overturn the opinion issued in Commonwealth Edison Co. v. Ill. |
4 | | Commerce Comm'n, Nos. 2-08-0959, 2-08-1037, 2-08-1137, |
5 | | 1-08-3008, 1-08-3030, 1-08-3054, 1-08-3313 cons. (Ill. App. |
6 | | Ct. 2d Dist. Sept. 30, 2010). Public Act 97-616 shall not be |
7 | | construed as creating a contract between the General Assembly |
8 | | and the participating utility, and shall not establish a |
9 | | property right in the participating utility.
|
10 | | (k) The changes made in subsections (c) and (d) of this |
11 | | Section by Public Act 98-15 are intended to be a restatement |
12 | | and clarification of existing law, and intended to give binding |
13 | | effect to the provisions of House Resolution 1157 adopted by |
14 | | the House of Representatives of the 97th General Assembly and |
15 | | Senate Resolution 821 adopted by the Senate of the 97th General |
16 | | Assembly that are reflected in paragraph (3) of this |
17 | | subsection. In addition, Public Act 98-15 preempts and |
18 | | supersedes any final Commission orders entered in Docket Nos. |
19 | | 11-0721, 12-0001, 12-0293, and 12-0321 to the extent |
20 | | inconsistent with the amendatory language added to subsections |
21 | | (c) and (d). |
22 | | (1) No earlier than 5 business days after May 22, 2013 |
23 | | (the effective date of Public Act 98-15), each |
24 | | participating utility shall file any tariff changes |
25 | | necessary to implement the amendatory language set forth in |
26 | | subsections (c) and (d) of this Section by Public Act 98-15 |
|
| | SB3131 | - 199 - | LRB100 19958 SMS 35239 b |
|
|
1 | | and a revised revenue requirement under the participating |
2 | | utility's performance-based formula rate. The Commission |
3 | | shall enter a final order approving such tariff changes and |
4 | | revised revenue requirement within 21 days after the |
5 | | participating utility's filing. |
6 | | (2) Notwithstanding anything that may be to the |
7 | | contrary, a participating utility may file a tariff to |
8 | | retroactively recover its previously unrecovered actual |
9 | | costs of delivery service that are no longer subject to |
10 | | recovery through a reconciliation adjustment under |
11 | | subsection (d) of this Section. This retroactive recovery |
12 | | shall include any derivative adjustments resulting from |
13 | | the changes to subsections (c) and (d) of this Section by |
14 | | Public Act 98-15. Such tariff shall allow the utility to |
15 | | assess, on current customer bills over a period of 12 |
16 | | monthly billing periods, a charge or credit related to |
17 | | those unrecovered costs with interest at the utility's |
18 | | weighted average cost of capital during the period in which |
19 | | those costs were unrecovered. A participating utility may |
20 | | file a tariff that implements a retroactive charge or |
21 | | credit as described in this paragraph for amounts not |
22 | | otherwise included in the tariff filing provided for in |
23 | | paragraph (1) of this subsection (k). The Commission shall |
24 | | enter a final order approving such tariff within 21 days |
25 | | after the participating utility's filing. |
26 | | (3) The tariff changes described in paragraphs (1) and |
|
| | SB3131 | - 200 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (2) of this subsection (k) shall relate only to, and be |
2 | | consistent with, the following provisions of Public Act |
3 | | 98-15: paragraph (2) of subsection (c) regarding year-end |
4 | | capital structure, subparagraph (D) of paragraph (4) of |
5 | | subsection (c) regarding pension assets, and subsection |
6 | | (d) regarding the reconciliation components related to |
7 | | year-end rate base and interest calculated at a rate equal |
8 | | to the utility's weighted average cost of capital. |
9 | | (4) Nothing in this subsection is intended to effect a |
10 | | dismissal of or otherwise affect an appeal from any final |
11 | | Commission orders entered in Docket Nos. 11-0721, 12-0001, |
12 | | 12-0293, and 12-0321 other than to the extent of the |
13 | | amendatory language contained in subsections (c) and (d) of |
14 | | this Section of Public Act 98-15. |
15 | | (l) Each participating utility shall be deemed to have been |
16 | | in full compliance with all requirements of subsection (b) of |
17 | | this Section, subsection (c) of this Section, Section 16-108.6 |
18 | | of this Act, and all Commission orders entered pursuant to |
19 | | Sections 16-108.5 and 16-108.6 of this Act, up to and including |
20 | | May 22, 2013 (the effective date of Public Act 98-15). The |
21 | | Commission shall not undertake any investigation of such |
22 | | compliance and no penalty shall be assessed or adverse action |
23 | | taken against a participating utility for noncompliance with |
24 | | Commission orders associated with subsection (b) of this |
25 | | Section, subsection (c) of this Section, and Section 16-108.6 |
26 | | of this Act prior to such date. Each participating utility |
|
| | SB3131 | - 201 - | LRB100 19958 SMS 35239 b |
|
|
1 | | other than a combination utility shall be permitted, without |
2 | | penalty, a period of 12 months after such effective date to |
3 | | take actions required to ensure its infrastructure investment |
4 | | program is in compliance with subsection (b) of this Section |
5 | | and with Section 16-108.6 of this Act. Provided further, the |
6 | | following subparagraphs shall apply to a participating utility |
7 | | other than a combination utility: |
8 | | (A) if the Commission has initiated a proceeding |
9 | | pursuant to subsection (e) of Section 16-108.6 of this Act |
10 | | that is pending as of May 22, 2013 (the effective date of |
11 | | Public Act 98-15), then the order entered in such |
12 | | proceeding shall, after notice and hearing, accelerate the |
13 | | commencement of the meter deployment schedule approved in |
14 | | the final Commission order on rehearing entered in Docket |
15 | | No. 12-0298; |
16 | | (B) if the Commission has entered an order pursuant to |
17 | | subsection (e) of Section 16-108.6 of this Act prior to May |
18 | | 22, 2013 (the effective date of Public Act 98-15) that does |
19 | | not accelerate the commencement of the meter deployment |
20 | | schedule approved in the final Commission order on |
21 | | rehearing entered in Docket No. 12-0298, then the utility |
22 | | shall file with the Commission, within 45 days after such |
23 | | effective date, a plan for accelerating the commencement of |
24 | | the utility's meter deployment schedule approved in the |
25 | | final Commission order on rehearing entered in Docket No. |
26 | | 12-0298; the Commission shall reopen the proceeding in |
|
| | SB3131 | - 202 - | LRB100 19958 SMS 35239 b |
|
|
1 | | which it entered its order pursuant to subsection (e) of |
2 | | Section 16-108.6 of this Act and shall, after notice and |
3 | | hearing, enter an amendatory order that approves or |
4 | | approves as modified such accelerated plan within 90 days |
5 | | after the utility's filing; or |
6 | | (C) if the Commission has not initiated a proceeding |
7 | | pursuant to subsection (e) of Section 16-108.6 of this Act |
8 | | prior to May 22, 2013 (the effective date of Public Act |
9 | | 98-15), then the utility shall file with the Commission, |
10 | | within 45 days after such effective date, a plan for |
11 | | accelerating the commencement of the utility's meter |
12 | | deployment schedule approved in the final Commission order |
13 | | on rehearing entered in Docket No. 12-0298 and the |
14 | | Commission shall, after notice and hearing, approve or |
15 | | approve as modified such plan within 90 days after the |
16 | | utility's filing. |
17 | | Any schedule for meter deployment approved by the |
18 | | Commission pursuant to this subsection (l) shall take into |
19 | | consideration procurement times for meters and other equipment |
20 | | and operational issues. Nothing in Public Act 98-15 shall |
21 | | shorten or extend the end dates for the 5-year or 10-year |
22 | | periods set forth in subsection (b) of this Section or Section |
23 | | 16-108.6 of this Act. Nothing in this subsection is intended to |
24 | | address whether a participating utility has, or has not, |
25 | | satisfied any or all of the metrics and performance goals |
26 | | established pursuant to subsection (f) of this Section. |
|
| | SB3131 | - 203 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (m) The provisions of Public Act 98-15 are severable under |
2 | | Section 1.31 of the Statute on Statutes. |
3 | | (Source: P.A. 98-15, eff. 5-22-13; 98-1175, eff. 6-1-15; |
4 | | 99-143, eff. 7-27-15; 99-642, eff. 7-28-16; 99-906, eff. |
5 | | 6-1-17 .)
|
6 | | (220 ILCS 5/16-111)
|
7 | | Sec. 16-111. Rates and restructuring transactions during
|
8 | | mandatory transition period; restructuring and other |
9 | | transactions. |
10 | | (a) During the mandatory transition period,
|
11 | | notwithstanding any provision of Article IX of this Act, and
|
12 | | except as provided in subsections (b) and (f)
of this Section, |
13 | | the Commission shall not (i) initiate,
authorize or order any |
14 | | change by way of increase (other than in connection with
a |
15 | | request for rate increase which was filed after September 1, |
16 | | 1997 but prior
to October 15, 1997, by an electric utility |
17 | | serving less than 12,500 customers
in this State), (ii)
|
18 | | initiate or, unless requested by the electric utility,
|
19 | | authorize or order any change by way of decrease,
restructuring |
20 | | or unbundling (except as provided in Section 16-109A), in the
|
21 | | rates of any electric
utility that were in effect on October 1, |
22 | | 1996, or (iii) in any order approving
any application for a |
23 | | merger pursuant to Section 7-204 that was pending as of
May 16, |
24 | | 1997, impose any condition requiring any filing for an |
25 | | increase,
decrease, or change in, or other review of, an |
|
| | SB3131 | - 204 - | LRB100 19958 SMS 35239 b |
|
|
1 | | electric utility's rates or
enforce any such condition of any |
2 | | such order;
provided,
however, that this subsection shall not |
3 | | prohibit the
Commission from:
|
4 | | (1) approving the application of an electric utility
to |
5 | | implement an alternative to rate of return regulation
or a |
6 | | regulatory mechanism that rewards or penalizes the
|
7 | | electric utility through adjustment of rates based on
|
8 | | utility performance , pursuant to Section 9-244 ;
|
9 | | (2) authorizing an electric utility to eliminate its
|
10 | | fuel adjustment clause and adjust its base rate tariffs
in |
11 | | accordance with subsection (b), (d), or (f) of Section
|
12 | | 9-220 of this Act, to fix its fuel adjustment factor in
|
13 | | accordance with subsection (c) of Section 9-220 of this
|
14 | | Act, or to eliminate its fuel adjustment clause in |
15 | | accordance with subsection
(e) of Section 9-220 of this |
16 | | Act;
|
17 | | (3) ordering into effect tariffs for delivery
services |
18 | | and transition charges in accordance with
Sections 16-104 |
19 | | and 16-108, for real-time pricing in
accordance with |
20 | | Section 16-107, or the options required
by Section 16-110 |
21 | | and subsection (n) of 16-112,
allowing a billing experiment |
22 | | in accordance with
Section 16-106, or modifying delivery |
23 | | services tariffs in accordance with
Section 16-109; or
|
24 | | (4) ordering or allowing into effect any tariff to
|
25 | | recover charges pursuant to Sections 9-201.5, 9-220.1,
|
26 | | 9-221, 9-222 (except as provided in Section 9-222.1), |
|
| | SB3131 | - 205 - | LRB100 19958 SMS 35239 b |
|
|
1 | | 16-108, and 16-114 of
this
Act, Section 5-5 of the |
2 | | Electricity Infrastructure Maintenance Fee Law, Section
|
3 | | 6-5 of the Renewable Energy, Energy Efficiency, and Coal |
4 | | Resources Development
Law of 1997, and Section 13 of the |
5 | | Energy Assistance Act.
|
6 | | After December 31, 2004, the provisions of this subsection |
7 | | (a) shall not
apply to an electric utility whose average |
8 | | residential retail rate was less
than or equal to 90% of the |
9 | | average residential retail rate for the "Midwest
Utilities", as |
10 | | that term is defined in subsection (b) of this Section, based |
11 | | on
data reported on Form 1 to the Federal Energy Regulatory |
12 | | Commission for
calendar year 1995, and which served between |
13 | | 150,000 and 250,000 retail
customers in this State on January |
14 | | 1, 1995
unless the electric utility or its holding company has |
15 | | been acquired by or
merged with an affiliate of another |
16 | | electric utility subsequent to January 1,
2002. This exemption |
17 | | shall be limited to
this subsection (a) and shall not extend to |
18 | | any other provisions of this Act.
|
19 | | (b) Notwithstanding the provisions of subsection (a), each |
20 | | Illinois electric
utility serving more than 12,500 customers in |
21 | | Illinois shall file tariffs (i)
reducing, effective August 1, |
22 | | 1998, each component of its base rates to
residential retail
|
23 | | customers by 15% from the base rates in effect immediately |
24 | | prior to January 1,
1998 and (ii) if the public utility |
25 | | provides electric service to (A) more
than
500,000
customers |
26 | | but less than 1,000,000 customers in this State on January 1,
|
|
| | SB3131 | - 206 - | LRB100 19958 SMS 35239 b |
|
|
1 | | 1999,
reducing, effective May 1, 2002, each component of its
|
2 | | base rates to residential retail customers by an additional 5% |
3 | | from the base
rates in effect immediately prior to January 1, |
4 | | 1998, or (B) at least
1,000,000 customers in this State on |
5 | | January 1, 1999,
reducing, effective October 1, 2001, each |
6 | | component of its
base rates to residential retail customers by |
7 | | an additional
5% from the base rates in effect immediately |
8 | | prior to
January 1, 1998.
Provided, however, that (A) if an |
9 | | electric utility's average residential
retail
rate is less than |
10 | | or equal to the average residential retail
rate for a group
of |
11 | | Midwest Utilities (consisting of all investor-owned electric |
12 | | utilities with
annual system peaks in excess of 1000 megawatts |
13 | | in the States of Illinois,
Indiana, Iowa, Kentucky, Michigan, |
14 | | Missouri, Ohio, and Wisconsin), based on
data
reported on Form |
15 | | 1 to the Federal Energy Regulatory Commission for calendar
year |
16 | | 1995,
then it shall only be required to file tariffs (i) |
17 | | reducing, effective August
1, 1998, each component of its base |
18 | | rates to residential
retail customers by
5% from the base rates |
19 | | in effect immediately prior to January 1, 1998, (ii)
reducing, |
20 | | effective October 1, 2000, each component of its base
rates to |
21 | | residential retail customers by the lesser of 5% of the base |
22 | | rates in
effect immediately prior to January 1, 1998 or the
|
23 | | percentage by which the electric utility's average residential |
24 | | retail rate
exceeds the average residential retail rate of the |
25 | | Midwest Utilities,
based on data
reported on Form 1 to the |
26 | | Federal Energy Regulatory Commission for calendar
year 1999, |
|
| | SB3131 | - 207 - | LRB100 19958 SMS 35239 b |
|
|
1 | | and (iii) reducing, effective October 1, 2002, each component |
2 | | of its
base rates to
residential retail customers by an
|
3 | | additional amount equal to the lesser of 5% of the base rates |
4 | | in effect
immediately prior to January 1, 1998 or the |
5 | | percentage by which
the electric utility's average residential |
6 | | retail rate exceeds the average
residential retail rate of the |
7 | | Midwest Utilities,
based on data reported on Form
1 to the |
8 | | Federal Energy Regulatory Commission for calendar year 2001; |
9 | | and (B)
if the average residential retail rate of an electric |
10 | | utility serving between
150,000
and 250,000 retail customers in |
11 | | this State on January 1, 1995 is less than or
equal to 90% of
|
12 | | the average residential retail rate for the Midwest Utilities, |
13 | | based on data
reported
on Form 1 to the Federal Energy |
14 | | Regulatory Commission for calendar year 1995,
then it shall |
15 | | only be required to file tariffs (i) reducing, effective August
|
16 | | 1,
1998, each component of its base rates to residential retail |
17 | | customers by 2%
from the base rates in effect immediately prior |
18 | | to January 1, 1998; (ii)
reducing, effective October 1, 2000, |
19 | | each component of its base rates to
residential retail |
20 | | customers by 2% from the base rate in effect immediately
prior |
21 | | to January 1, 1998; and (iii) reducing, effective October 1, |
22 | | 2002, each
component of its base rates to residential retail |
23 | | customers by 1% from the base
rates in effect immediately prior |
24 | | to January 1, 1998.
Provided,
further, that any electric |
25 | | utility for which a decrease in base rates has been
or is |
26 | | placed into effect between October 1, 1996 and the dates |
|
| | SB3131 | - 208 - | LRB100 19958 SMS 35239 b |
|
|
1 | | specified in the
preceding sentences of this subsection, other |
2 | | than pursuant to the requirements
of this subsection,
shall be |
3 | | entitled to reduce the amount of any reduction or reductions in |
4 | | its
base rates required by this subsection by the amount of |
5 | | such other decrease.
The tariffs required under this
subsection |
6 | | shall be filed 45 days in advance of
the effective date.
|
7 | | Notwithstanding anything to the contrary in Section 9-220 of |
8 | | this Act, no
restatement of base rates in conjunction with the |
9 | | elimination of a fuel
adjustment clause under that Section |
10 | | shall result in a lesser decrease in base
rates than customers |
11 | | would otherwise receive under this subsection had the
electric |
12 | | utility's fuel adjustment clause not been eliminated.
|
13 | | (c) Any utility reducing its base rates by 15% on August 1, |
14 | | 1998 pursuant
to
subsection
(b)
shall include the following |
15 | | statement on its bills for residential customers
from August 1 |
16 | | through December 31, 1998: "Effective August 1, 1998, your |
17 | | rates
have been
reduced by 15% by the Electric Service
Customer |
18 | | Choice and Rate Relief Law of 1997 passed by the Illinois |
19 | | General
Assembly.". Any utility reducing its base rates by 5% |
20 | | on August 1, 1998,
pursuant to subsection (b) shall include the |
21 | | following statement on its bills
for residential customers from |
22 | | August 1 through December 31, 1998: "Effective
August 1,
1998, |
23 | | your rates have been reduced by 5% by the Electric Service |
24 | | Customer
Choice and Rate Relief Law of 1997 passed by the |
25 | | Illinois General Assembly.".
|
26 | | Any utility reducing its base rates by 2% on August 1, 1998 |
|
| | SB3131 | - 209 - | LRB100 19958 SMS 35239 b |
|
|
1 | | pursuant to
subsection (b) shall include the following |
2 | | statement on its bills for
residential customers from August 1 |
3 | | through December 31, 1998: "Effective
August 1, 1998, your |
4 | | rates have been reduced by 2% by the Electric Service
Customer |
5 | | Choice and Rate Relief Law of 1997 passed by the Illinois |
6 | | General
Assembly.".
|
7 | | (d) (Blank.)
|
8 | | (e) (Blank.)
|
9 | | (f) During the mandatory transition period, an electric
|
10 | | utility may file revised tariffs reducing the price of any
|
11 | | tariffed service offered by the electric utility for all
|
12 | | customers taking that tariffed service, which shall be
|
13 | | effective 7 days after filing.
|
14 | | (g) Until all classes of tariffed services are declared |
15 | | competitive, an electric
utility may, without obtaining any |
16 | | approval of the Commission other than that
provided for in this |
17 | | subsection and
notwithstanding any other provision of this Act |
18 | | or any rule or
regulation of the Commission that would require |
19 | | such approval:
|
20 | | (1) implement a reorganization, other than a merger of |
21 | | 2 or
more public utilities as defined in Section 3-105 or |
22 | | their
holding companies;
|
23 | | (2) retire generating plants from service;
|
24 | | (3) sell, assign, lease or otherwise transfer assets to |
25 | | an
affiliated or unaffiliated entity and as part of such
|
26 | | transaction enter into service agreements, power purchase
|
|
| | SB3131 | - 210 - | LRB100 19958 SMS 35239 b |
|
|
1 | | agreements, or other agreements with the transferee; |
2 | | provided,
however, that the prices, terms and conditions of |
3 | | any power
purchase agreement must be approved or allowed |
4 | | into effect by
the Federal Energy Regulatory Commission; or
|
5 | | (4) use any
accelerated cost recovery method including |
6 | | accelerated depreciation,
accelerated amortization or |
7 | | other capital recovery
methods, or record reductions to the |
8 | | original cost of its
assets.
|
9 | | In order to implement a reorganization, retire
generating |
10 | | plants from service, or sell, assign, lease or
otherwise |
11 | | transfer assets pursuant to this Section, the
electric utility |
12 | | shall comply with subsections (c) and (d) of Section
16-128, if |
13 | | applicable, and subsection (k) of this Section, if applicable,
|
14 | | and provide the Commission with at
least 30 days notice of the |
15 | | proposed reorganization or
transaction, which notice shall |
16 | | include the following
information:
|
17 | |
(i) a complete statement of the entries that the
|
18 | | electric utility will make on its books and records of
|
19 | | account to implement the proposed reorganization or
|
20 | | transaction together with a certification from an
|
21 | | independent certified public accountant that such entries
|
22 | | are in accord with generally accepted accounting
|
23 | | principles and, if the Commission has previously approved
|
24 | | guidelines for cost allocations between the utility and
its |
25 | | affiliates, a certification from the chief accounting
|
26 | | officer of the utility that such entries are in accord
with |
|
| | SB3131 | - 211 - | LRB100 19958 SMS 35239 b |
|
|
1 | | those cost allocation guidelines;
|
2 | |
(ii) a description of how the electric utility will
|
3 | | use proceeds of any sale, assignment, lease or transfer
to |
4 | | retire debt or otherwise reduce or recover the costs
of |
5 | | services provided by such electric utility;
|
6 | |
(iii) a list of all federal approvals or approvals
|
7 | | required from departments and agencies of this State,
other |
8 | | than the Commission, that the electric utility has
or will |
9 | | obtain before implementing the reorganization or
|
10 | | transaction;
|
11 | |
(iv) an irrevocable commitment by the electric
utility |
12 | | that it will not, as a result of the transaction,
impose |
13 | | any stranded cost charges that it might otherwise
be |
14 | | allowed to charge retail customers under federal law
or |
15 | | increase the transition charges that it is otherwise
|
16 | | entitled to collect under this Article XVI;
|
17 | |
(v) if the electric utility proposes to sell,
assign, |
18 | | lease or otherwise transfer a generating plant
that brings |
19 | | the amount of net dependable generating
capacity |
20 | | transferred pursuant to this subsection to an
amount equal |
21 | | to or greater than 15% of the electric
utility's net |
22 | | dependable capacity as of the effective
date of this |
23 | | amendatory Act of 1997, and enters into a
power purchase |
24 | | agreement with the entity to which such
generating plant is |
25 | | sold, assigned, leased, or otherwise
transferred, the |
26 | | electric utility also agrees, if its
fuel adjustment clause |
|
| | SB3131 | - 212 - | LRB100 19958 SMS 35239 b |
|
|
1 | | has not already been eliminated,
to eliminate its fuel |
2 | | adjustment clause in accordance
with subsection (b) of |
3 | | Section 9-220 for a period of time
equal to the length of |
4 | | any such power purchase agreement
or successor agreement, |
5 | | or until January 1, 2005,
whichever is longer; if the |
6 | | capacity of the generating
plant so transferred and related |
7 | | power purchase agreement
does not result in the elimination |
8 | | of the fuel adjustment
clause under this subsection, and |
9 | | the fuel adjustment clause has not already
been eliminated, |
10 | | the electric utility shall
agree that the costs associated |
11 | | with the transferred
plant that are included in the |
12 | | calculation of the rate
per kilowatt-hour to be applied |
13 | | pursuant to the electric
utility's fuel adjustment clause |
14 | | during such period shall
not exceed the per kilowatt-hour |
15 | | cost associated with
such generating plant included in the |
16 | | electric utility's
fuel adjustment clause during the full |
17 | | calendar year
preceding the transfer, with such limit to be |
18 | | adjusted
each year thereafter by the Gross Domestic Product
|
19 | | Implicit Price Deflator; and
|
20 | |
(vi) in
addition, if the electric utility proposes to |
21 | | sell, assign, or
lease, (A) either (1) an amount of |
22 | | generating plant that brings the amount of
net dependable |
23 | | generating capacity transferred pursuant to this |
24 | | subsection to
an amount equal to or greater than 15% of its |
25 | | net dependable capacity on the
effective date of this |
26 | | amendatory Act of 1997, or (2) one or more generating
|
|
| | SB3131 | - 213 - | LRB100 19958 SMS 35239 b |
|
|
1 | | plants with a total net dependable capacity of 1100 |
2 | | megawatts, or (B)
transmission and distribution facilities |
3 | | that either (1) bring the amount of
transmission and |
4 | | distribution facilities transferred pursuant to this
|
5 | | subsection to an amount equal to or greater than 15% of the |
6 | | electric utility's
total depreciated original cost |
7 | | investment in such facilities, or (2) represent
an |
8 | | investment of $25,000,000 in terms of total depreciated |
9 | | original cost, the
electric utility shall provide, in
|
10 | | addition to the information listed in subparagraphs
(i) |
11 | | through (v), the following information: (A) a description |
12 | | of how the
electric utility will meet its service |
13 | | obligations under this Act in a safe and
reliable manner |
14 | | and (B) the electric utility's projected earned rate of
|
15 | | return on common equity for each year from the date of the |
16 | | notice through December 31,
2006
both with and without the |
17 | | proposed transaction. If
the Commission has not issued an |
18 | | order initiating a hearing on the proposed
transaction |
19 | | within 30 days after the date the electric utility's notice |
20 | | is
filed, the transaction shall be deemed approved. The |
21 | | Commission may, after
notice and hearing,
prohibit the |
22 | | proposed transaction if it makes either or both of the |
23 | | following
findings: (1) that the proposed transaction will |
24 | | render the electric utility
unable to provide its tariffed |
25 | | services in a safe and reliable manner, or (2)
that there |
26 | | is a strong likelihood that consummation of the proposed |
|
| | SB3131 | - 214 - | LRB100 19958 SMS 35239 b |
|
|
1 | | transaction
will result in the electric utility being |
2 | | entitled to request an increase in
its base rates. Any |
3 | | hearing initiated by the Commission into the proposed
|
4 | | transaction shall be completed, and the Commission's final |
5 | | order approving or
prohibiting the proposed transaction |
6 | | shall be entered, within 90 days after the
date the |
7 | | electric utility's notice was filed.
Provided, however, |
8 | | that a sale, assignment, or lease of transmission |
9 | | facilities
to an independent system operator that meets the |
10 | | requirements of Section 16-126
shall not be subject to |
11 | | Commission approval under this Section.
|
12 | |
In any proceeding conducted by the Commission pursuant |
13 | | to this
subparagraph
(vi), intervention shall be limited to |
14 | | parties with a direct interest in the
transaction which is |
15 | | the subject of the hearing and any statutory consumer
|
16 | | protection agency as defined in subsection (d) of Section |
17 | | 9-102.1.
Notwithstanding the provisions of Section 10-113 |
18 | | of this Act, any application
seeking rehearing of an order |
19 | | issued under this subparagraph (vi), whether
filed by the |
20 | | electric utility or by an intervening party, shall be filed |
21 | | within
10 days after service of the order.
|
22 | | The Commission shall not in any subsequent proceeding or
|
23 | | otherwise, review such a reorganization or other transaction
|
24 | | authorized by this Section, but shall retain the authority to |
25 | | allocate costs as
stated in Section 16-111(i). An entity to |
26 | | which an electric
utility sells, assigns, leases or transfers |
|
| | SB3131 | - 215 - | LRB100 19958 SMS 35239 b |
|
|
1 | | assets pursuant to
this subsection (g) shall not, as a result |
2 | | of the transactions
specified in this subsection (g), be deemed |
3 | | a public utility
as defined in Section 3-105. Nothing in this |
4 | | subsection (g)
shall change any requirement under the |
5 | | jurisdiction of the
Illinois Department of Nuclear Safety |
6 | | including, but not
limited to, the payment of fees. Nothing in |
7 | | this subsection
(g) shall exempt a utility from obtaining a |
8 | | certificate
pursuant to Section 8-406 of this Act for the |
9 | | construction of
a new electric generating facility. Nothing in |
10 | | this
subsection (g) is intended to exempt the transactions |
11 | | hereunder from the
operation of the federal or State antitrust
|
12 | | laws. Nothing in this subsection (g) shall require an electric
|
13 | | utility to use the procedures specified in this subsection for
|
14 | | any of the transactions specified herein. Any other procedure
|
15 | | available under this Act may, at the electric utility's
|
16 | | election, be used for any such transaction.
|
17 | | (h) During the mandatory transition period, the
Commission |
18 | | shall not establish or use any rates of
depreciation, which for |
19 | | purposes of this subsection shall
include amortization, for any |
20 | | electric utility other than
those established pursuant to |
21 | | subsection (c) of Section 5-104
of this Act or utilized |
22 | | pursuant to subsection (g) of this
Section. Provided, however, |
23 | | that in any proceeding to review an electric
utility's rates |
24 | | for tariffed services pursuant to Section 9-201, 9-202, 9-250
|
25 | | or
16-111(d) of this Act, the Commission may establish new |
26 | | rates
of depreciation for the electric utility in the same |
|
| | SB3131 | - 216 - | LRB100 19958 SMS 35239 b |
|
|
1 | | manner provided in
subsection (d) of Section 5-104 of this Act.
|
2 | | An electric utility implementing an accelerated cost
recovery |
3 | | method including accelerated depreciation,
accelerated |
4 | | amortization or other capital recovery methods, or
recording |
5 | | reductions to the original cost of its assets,
pursuant to |
6 | | subsection (g) of this Section, shall file a
statement with the |
7 | | Commission describing the accelerated cost
recovery method to |
8 | | be implemented or the reduction in the
original cost of its |
9 | | assets to be recorded. Upon the filing
of such statement, the |
10 | | accelerated cost recovery method or the
reduction in the |
11 | | original cost of assets shall be deemed to be
approved by the |
12 | | Commission as though an order had been entered
by the |
13 | | Commission.
|
14 | | (i) Subsequent to the mandatory transition period, the
|
15 | | Commission, in any proceeding to establish rates and charges
|
16 | | for tariffed services offered by an electric utility, shall
|
17 | | consider only (1) the then current or projected revenues,
|
18 | | costs, investments and cost of capital directly or
indirectly |
19 | | associated with the provision of such tariffed
services; (2) |
20 | | collection of transition charges in accordance
with Sections |
21 | | 16-102 and 16-108 of this Act; (3) recovery of
any employee |
22 | | transition costs as described in Section 16-128
which the |
23 | | electric utility is continuing to incur, including
recovery of |
24 | | any unamortized portion of such costs previously
incurred or |
25 | | committed, with such costs to be equitably
allocated among |
26 | | bundled services, delivery services, and
contracts with |
|
| | SB3131 | - 217 - | LRB100 19958 SMS 35239 b |
|
|
1 | | alternative retail electric suppliers; and (4)
recovery of the |
2 | | costs associated with the electric utility's
compliance with |
3 | | decommissioning funding requirements; and
shall not consider |
4 | | any other revenues, costs, investments
or cost of capital of |
5 | | either the electric utility or of any
affiliate of the electric |
6 | | utility that are not associated with the provision of
tariffed |
7 | | services. In setting rates for tariffed services, the |
8 | | Commission
shall equitably allocate joint and common costs and |
9 | | investments between the
electric utility's competitive and |
10 | | tariffed services. In determining the
justness and
|
11 | | reasonableness of the electric power and energy component of
an |
12 | | electric utility's rates for tariffed services subsequent
to |
13 | | the mandatory transition period and prior to the time that
the |
14 | | provision of such electric power and energy is declared
|
15 | | competitive, the Commission shall consider the extent to which
|
16 | | the electric utility's tariffed rates for such component for
|
17 | | each customer class exceed the market value determined
pursuant |
18 | | to Section 16-112, and, if the electric power and
energy |
19 | | component of such tariffed rate exceeds the market
value by |
20 | | more than 10% for any customer class, may
establish such |
21 | | electric power and energy component at a rate
equal to the |
22 | | market value plus 10%.
|
23 | | (j) During the mandatory transition period, an electric
|
24 | | utility may elect to transfer to a non-operating income
account |
25 | | under the Commission's Uniform System of Accounts
either or |
26 | | both of (i) an amount of unamortized investment tax
credit that |
|
| | SB3131 | - 218 - | LRB100 19958 SMS 35239 b |
|
|
1 | | is in addition to the ratable amount which is
credited to the |
2 | | electric utility's operating income account
for the year in |
3 | | accordance with Section 46(f)(2) of the
federal Internal |
4 | | Revenue Code of 1986, as in effect prior to P.L. 101-508, or
|
5 | | (ii) "excess tax reserves",
as that term is defined in Section |
6 | | 203(e)(2)(A) of the federal
Tax Reform Act of 1986, provided |
7 | | that (A) the amount
transferred may not exceed the amount of |
8 | | the electric
utility's assets that were created pursuant to |
9 | | Statement of
Financial Accounting Standards No. 71 which the |
10 | | electric
utility has written off during the mandatory |
11 | | transition
period, and (B) the transfer shall not be effective |
12 | | until
approved by the Internal Revenue Service. An electric |
13 | | utility
electing to make such a transfer shall file a statement |
14 | | with
the Commission stating the amount and timing of the |
15 | | transfer
for which it intends to request approval of the |
16 | | Internal
Revenue Service, along with a copy of its proposed |
17 | | request to
the Internal Revenue Service for a ruling. The |
18 | | Commission
shall issue an order within 14 days after the |
19 | | electric
utility's filing approving, subject to receipt of |
20 | | approval
from the Internal Revenue Service, the proposed |
21 | | transfer.
|
22 | | (k) If an electric utility is selling or transferring
to a |
23 | | single buyer 5 or more generating plants located in this State |
24 | | with a
total net dependable capacity of 5000 megawatts or more
|
25 | | pursuant to subsection (g) of this Section and has obtained
a |
26 | | sale price or consideration that exceeds 200% of
the book value |
|
| | SB3131 | - 219 - | LRB100 19958 SMS 35239 b |
|
|
1 | | of such plants, the electric utility must
provide to the |
2 | | Governor, the President of the Illinois
Senate, the Minority |
3 | | Leader of the Illinois Senate, the
Speaker of the Illinois |
4 | | House of Representatives, and the
Minority Leader of the |
5 | | Illinois House of Representatives no
later than 15 days after |
6 | | filing its notice under subsection
(g) of this Section or 5 |
7 | | days after the date on which this
subsection (k) becomes law, |
8 | | whichever is later, a written
commitment in which such electric |
9 | | utility agrees to expend
$2 billion outside the corporate |
10 | | limits of any municipality
with 1,000,000 or more inhabitants |
11 | | within such electric
utility's service area, over a 6-year |
12 | | period beginning
with the calendar year in which the notice is |
13 | | filed, on
projects, programs, and improvements within its |
14 | | service area
relating to transmission and distribution |
15 | | including, without
limitation, infrastructure expansion, |
16 | | repair and
replacement, capital investments, operations and
|
17 | | maintenance, and vegetation management.
|
18 | | (l) Notwithstanding any other provision of this Act or any |
19 | | rule, regulation, or prior order of the Commission, a public |
20 | | utility providing electric and gas service may do any one or |
21 | | more of the following: transfer assets to, reorganize with, or |
22 | | merge with one or more public utilities under common holding |
23 | | company ownership or control in the manner prescribed in |
24 | | subsection (g) of this Section. No merger transaction costs, |
25 | | such as fees paid to attorneys, investment bankers, and other |
26 | | consultants, incurred in connection with a merger pursuant to |
|
| | SB3131 | - 220 - | LRB100 19958 SMS 35239 b |
|
|
1 | | this subsection (l) shall be recoverable in any subsequent rate |
2 | | proceeding. Approval of a merger pursuant to this subsection |
3 | | (l) shall not constitute approval of, or otherwise require, |
4 | | rate recovery of other costs incurred in connection with, or to |
5 | | implement the merger, such as the cost of restructuring, |
6 | | combining, or integrating debt, assets, or systems. Such other |
7 | | costs may be recovered only to the extent that the surviving |
8 | | utility can demonstrate that the cost savings produced by such |
9 | | restructuring, combination, or integration exceed the |
10 | | associated costs. Nothing in this subsection (l) shall impair |
11 | | the terms or conditions of employment or the collective |
12 | | bargaining rights of any employees of the utilities that are |
13 | | transferring assets, reorganizing, or merging.
|
14 | | (m) If an electric utility that on December 31, 2005 |
15 | | provided electric service to at least 100,000 customers in |
16 | | Illinois transfers assets, reorganizes, or merges under this |
17 | | Section, then the same provisions apply that applied during the |
18 | | mandatory transition period under Section 16-128.
|
19 | | (Source: P.A. 95-331, eff. 8-21-07; 95-481, eff. 8-28-07; |
20 | | 95-876, eff. 8-21-08.)
|
21 | | (220 ILCS 5/4-305 rep.) |
22 | | (220 ILCS 5/8-304 rep.) |
23 | | (220 ILCS 5/8-405 rep.) |
24 | | (220 ILCS 5/8-405.1 rep.) |
25 | | (220 ILCS 5/9-216 rep.) |
|
| | SB3131 | - 221 - | LRB100 19958 SMS 35239 b |
|
|
1 | | (220 ILCS 5/9-222.3 rep.) |
2 | | (220 ILCS 5/9-242 rep.) |
3 | | (220 ILCS 5/9-244 rep.) |
4 | | (220 ILCS 5/13-407 rep.) |
5 | | Section 15. The Public Utilities Act is amended by |
6 | | repealing Sections 4-305, 8-304, 8-405, 8-405.1, 9-216, |
7 | | 9-222.3, 9-242, 9-244, and 13-407. |
8 | | Section 99. Effective date. This Act takes effect upon |
9 | | becoming law.
|
| | | SB3131 | - 222 - | LRB100 19958 SMS 35239 b |
|
| 1 | |
INDEX
| 2 | |
Statutes amended in order of appearance
| | 3 | | 20 ILCS 661/20 | | | 4 | | 220 ILCS 5/2-105 | from Ch. 111 2/3, par. 2-105 | | 5 | | 220 ILCS 5/2-106 | from Ch. 111 2/3, par. 2-106 | | 6 | | 220 ILCS 5/4-304 | from Ch. 111 2/3, par. 4-304 | | 7 | | 220 ILCS 5/5-102 | from Ch. 111 2/3, par. 5-102 | | 8 | | 220 ILCS 5/6-102 | from Ch. 111 2/3, par. 6-102 | | 9 | | 220 ILCS 5/7-204 | from Ch. 111 2/3, par. 7-204 | | 10 | | 220 ILCS 5/8-103B | | | 11 | | 220 ILCS 5/8-508 | from Ch. 111 2/3, par. 8-508 | | 12 | | 220 ILCS 5/8-509 | from Ch. 111 2/3, par. 8-509 | | 13 | | 220 ILCS 5/9-102.1 | | | 14 | | 220 ILCS 5/9-201 | from Ch. 111 2/3, par. 9-201 | | 15 | | 220 ILCS 5/9-214 | from Ch. 111 2/3, par. 9-214 | | 16 | | 220 ILCS 5/9-222.2 | from Ch. 111 2/3, par. 9-222.2 | | 17 | | 220 ILCS 5/9-223 | from Ch. 111 2/3, par. 9-223 | | 18 | | 220 ILCS 5/10-101 | from Ch. 111 2/3, par. 10-101 | | 19 | | 220 ILCS 5/10-101.1 | | | 20 | | 220 ILCS 5/10-103 | from Ch. 111 2/3, par. 10-103 | | 21 | | 220 ILCS 5/10-104 | from Ch. 111 2/3, par. 10-104 | | 22 | | 220 ILCS 5/10-105 | from Ch. 111 2/3, par. 10-105 | | 23 | | 220 ILCS 5/10-106 | from Ch. 111 2/3, par. 10-106 | | 24 | | 220 ILCS 5/10-107 | from Ch. 111 2/3, par. 10-107 | | 25 | | 220 ILCS 5/10-110 | from Ch. 111 2/3, par. 10-110 | |
| | | SB3131 | - 223 - | LRB100 19958 SMS 35239 b |
|
| 1 | | 220 ILCS 5/10-111 | from Ch. 111 2/3, par. 10-111 | | 2 | | 220 ILCS 5/10-201 | from Ch. 111 2/3, par. 10-201 | | 3 | | 220 ILCS 5/10-204 | from Ch. 111 2/3, par. 10-204 | | 4 | | 220 ILCS 5/13-506.2 | | | 5 | | 220 ILCS 5/13-515 | | | 6 | | 220 ILCS 5/16-108.5 | | | 7 | | 220 ILCS 5/16-111 | | | 8 | | 220 ILCS 5/4-305 rep. | | | 9 | | 220 ILCS 5/8-304 rep. | | | 10 | | 220 ILCS 5/8-405 rep. | | | 11 | | 220 ILCS 5/8-405.1 rep. | | | 12 | | 220 ILCS 5/9-216 rep. | | | 13 | | 220 ILCS 5/9-222.3 rep. | | | 14 | | 220 ILCS 5/9-242 rep. | | | 15 | | 220 ILCS 5/9-244 rep. | | | 16 | | 220 ILCS 5/13-407 rep. | |
|
|