| | 100TH GENERAL ASSEMBLY
State of Illinois
2017 and 2018 SB1617 Introduced 2/9/2017, by Sen. Don Harmon SYNOPSIS AS INTRODUCED: |
| |
Amends the Public Utilities Act. Provides that no later than September 1, 2020, each alternative retail electric supplier and electric utility operating outside their service territory shall submit a required report to the Illinois Commerce Commission for the compliance period beginning January 1, 2019 and ending May 31, 2019. Removes language requiring alternative retail electric suppliers and electric utilities operating outside their service territories to make all alternative compliance payments that they were obligated to pay for periods through and including May 31, 2019, but were not paid as of that date. Removes language requiring alternative retail electric suppliers to certify in its annual reports that its retail customers are not paying the costs of alternative compliance payments or renewable energy resources that the alternative retail electric supplier is not required to remit or purchase. Effective immediately or on the date certain provisions of Public Act 99-906 take effect, whichever is later.
|
| |
| | A BILL FOR |
|
|
| | SB1617 | | LRB100 06842 RJF 16891 b |
|
|
1 | | AN ACT concerning regulation.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Public Utilities Act is amended by changing |
5 | | Section 16-115D as follows: |
6 | | (220 ILCS 5/16-115D) |
7 | | (Text of Section before amendment by P.A. 99-906 ) |
8 | | Sec. 16-115D. Renewable portfolio standard for alternative |
9 | | retail electric suppliers and electric utilities operating |
10 | | outside their service territories. |
11 | | (a) An alternative retail electric supplier shall be |
12 | | responsible for procuring cost-effective renewable energy |
13 | | resources as required under item (5) of subsection (d) of |
14 | | Section 16-115 of this Act as outlined herein: |
15 | | (1) The definition of renewable energy resources |
16 | | contained in Section 1-10 of the Illinois Power Agency Act |
17 | | applies to all renewable energy resources required to be |
18 | | procured by alternative retail electric suppliers. |
19 | | (2) The quantity of renewable energy resources shall be |
20 | | measured as a percentage of the actual amount of metered |
21 | | electricity (megawatt-hours) delivered by the alternative |
22 | | retail electric supplier to Illinois retail customers |
23 | | during the 12-month period June 1 through May 31, |
|
| | SB1617 | - 2 - | LRB100 06842 RJF 16891 b |
|
|
1 | | commencing June 1, 2009, and the comparable 12-month period |
2 | | in each year thereafter except as provided in item (6) of |
3 | | this subsection (a). |
4 | | (3) The quantity of renewable energy resources shall be |
5 | | in amounts at least equal to the annual percentages set |
6 | | forth in item (1) of subsection (c) of Section 1-75 of the |
7 | | Illinois Power Agency Act. At least 60% of the renewable |
8 | | energy resources procured pursuant to items (1) through (3) |
9 | | of subsection (b) of this Section shall come from wind |
10 | | generation and, starting June 1, 2015, at least 6% of the |
11 | | renewable energy resources procured pursuant to items (1) |
12 | | through (3) of subsection (b) of this Section shall come |
13 | | from solar photovoltaics. If, in any given year, an |
14 | | alternative retail electric supplier does not purchase at |
15 | | least these levels of renewable energy resources, then the |
16 | | alternative retail electric supplier shall make |
17 | | alternative compliance payments, as described in |
18 | | subsection (d) of this Section. |
19 | | (4) The quantity and source of renewable energy |
20 | | resources shall be independently verified through the PJM |
21 | | Environmental Information System Generation Attribute |
22 | | Tracking System (PJM-GATS) or the Midwest Renewable Energy |
23 | | Tracking System (M-RETS), which shall document the |
24 | | location of generation, resource type, month, and year of |
25 | | generation for all qualifying renewable energy resources |
26 | | that an alternative retail electric supplier uses to comply |
|
| | SB1617 | - 3 - | LRB100 06842 RJF 16891 b |
|
|
1 | | with this Section. No later than June 1, 2009, the Illinois |
2 | | Power Agency shall provide PJM-GATS, M-RETS, and |
3 | | alternative retail electric suppliers with all information |
4 | | necessary to identify resources located in Illinois, |
5 | | within states that adjoin Illinois or within portions of |
6 | | the PJM and MISO footprint in the United States that |
7 | | qualify under the definition of renewable energy resources |
8 | | in Section 1-10 of the Illinois Power Agency Act for |
9 | | compliance with this Section 16-115D. Alternative retail |
10 | | electric suppliers shall not be subject to the requirements |
11 | | in item (3) of subsection (c) of Section 1-75 of the |
12 | | Illinois Power Agency Act. |
13 | | (5) All renewable energy credits used to comply with |
14 | | this Section shall be permanently retired. |
15 | | (6) The required procurement of renewable energy |
16 | | resources by an alternative retail electric supplier shall |
17 | | apply to all metered electricity delivered to Illinois |
18 | | retail customers by the alternative retail electric |
19 | | supplier pursuant to contracts executed or extended after |
20 | | March 15, 2009. |
21 | | (b) An alternative retail electric supplier shall comply |
22 | | with the renewable energy portfolio standards by making an |
23 | | alternative compliance payment, as described in subsection (d) |
24 | | of this Section, to cover at least one-half of the alternative |
25 | | retail electric supplier's compliance obligation and any one or |
26 | | combination of the following means to cover the remainder of |
|
| | SB1617 | - 4 - | LRB100 06842 RJF 16891 b |
|
|
1 | | the alternative retail electric supplier's compliance |
2 | | obligation: |
3 | | (1) Generating electricity using renewable energy |
4 | | resources identified pursuant to item (4) of subsection (a) |
5 | | of this Section. |
6 | | (2) Purchasing electricity generated using renewable |
7 | | energy resources identified pursuant to item (4) of |
8 | | subsection (a) of this Section through an energy contract. |
9 | | (3) Purchasing renewable energy credits from renewable |
10 | | energy resources identified pursuant to item (4) of |
11 | | subsection (a) of this Section. |
12 | | (4) Making an alternative compliance payment as |
13 | | described in subsection (d) of this Section. |
14 | | (c) Use of renewable energy credits. |
15 | | (1) Renewable energy credits that are not used by an |
16 | | alternative retail electric supplier to comply with a |
17 | | renewable portfolio standard in a compliance year may be |
18 | | banked and carried forward up to 2 12-month compliance |
19 | | periods after the compliance period in which the credit was |
20 | | generated for the purpose of complying with a renewable |
21 | | portfolio standard in those 2 subsequent compliance |
22 | | periods. For the 2009-2010 and 2010-2011 compliance |
23 | | periods, an alternative retail electric supplier may use |
24 | | renewable credits generated after December 31, 2008 and |
25 | | before June 1, 2009 to comply with this Section. |
26 | | (2) An alternative retail electric supplier is |
|
| | SB1617 | - 5 - | LRB100 06842 RJF 16891 b |
|
|
1 | | responsible for demonstrating that a renewable energy |
2 | | credit used to comply with a renewable portfolio standard |
3 | | is derived from a renewable energy resource and that the |
4 | | alternative retail electric supplier has not used, traded, |
5 | | sold, or otherwise transferred the credit. |
6 | | (3) The same renewable energy credit may be used by an |
7 | | alternative retail electric supplier to comply with a |
8 | | federal renewable portfolio standard and a renewable |
9 | | portfolio standard established under this Act. An |
10 | | alternative retail electric supplier that uses a renewable |
11 | | energy credit to comply with a renewable portfolio standard |
12 | | imposed by any other state may not use the same credit to |
13 | | comply with a renewable portfolio standard established |
14 | | under this Act. |
15 | | (d) Alternative compliance payments. |
16 | | (1) The Commission shall establish and post on its |
17 | | website, within 5 business days after entering an order |
18 | | approving a procurement plan pursuant to Section 1-75 of |
19 | | the Illinois Power Agency Act, maximum alternative |
20 | | compliance payment rates, expressed on a per kilowatt-hour |
21 | | basis, that will be applicable in the first compliance |
22 | | period following the plan approval. A separate maximum |
23 | | alternative compliance payment rate shall be established |
24 | | for the service territory of each electric utility that is |
25 | | subject to subsection (c) of Section 1-75 of the Illinois |
26 | | Power Agency Act. Each maximum alternative compliance |
|
| | SB1617 | - 6 - | LRB100 06842 RJF 16891 b |
|
|
1 | | payment rate shall be equal to the maximum allowable annual |
2 | | estimated average net increase due to the costs of the |
3 | | utility's purchase of renewable energy resources included |
4 | | in the amounts paid by eligible retail customers in |
5 | | connection with electric service, as described in item (2) |
6 | | of subsection (c) of Section 1-75 of the Illinois Power |
7 | | Agency Act for the compliance period, and as established in |
8 | | the approved procurement plan. Following each procurement |
9 | | event through which renewable energy resources are |
10 | | purchased for one or more of these utilities for the |
11 | | compliance period, the Commission shall establish and post |
12 | | on its website estimates of the alternative compliance |
13 | | payment rates, expressed on a per kilowatt-hour basis, that |
14 | | shall apply for that compliance period. Posting of the |
15 | | estimates shall occur no later than 10 business days |
16 | | following the procurement event, however, the Commission |
17 | | shall not be required to establish and post such estimates |
18 | | more often than once per calendar month. By July 1 of each |
19 | | year, the Commission shall establish and post on its |
20 | | website the actual alternative compliance payment rates |
21 | | for the preceding compliance year. For compliance years |
22 | | beginning prior to June 1, 2014, each alternative |
23 | | compliance payment rate shall be equal to the total amount |
24 | | of dollars that the utility contracted to spend on |
25 | | renewable resources, excepting the additional incremental |
26 | | cost attributable to solar resources, for the compliance |
|
| | SB1617 | - 7 - | LRB100 06842 RJF 16891 b |
|
|
1 | | period divided by the forecasted load of eligible retail |
2 | | customers, at the customers' meters, as previously |
3 | | established in the Commission-approved procurement plan |
4 | | for that compliance year. For compliance years commencing |
5 | | on or after June 1, 2014, each alternative compliance |
6 | | payment rate shall be equal to the total amount of dollars |
7 | | that the utility contracted to spend on all renewable |
8 | | resources for the compliance period divided by the |
9 | | forecasted load of eligible retail customers, at the |
10 | | customers' meters, as previously established in the |
11 | | Commission-approved procurement plan for that compliance |
12 | | year. The actual alternative compliance payment rates may |
13 | | not exceed the maximum alternative compliance payment |
14 | | rates established for the compliance period. For purposes |
15 | | of this subsection (d), the term "eligible retail |
16 | | customers" has the same meaning as found in Section |
17 | | 16-111.5 of this Act. |
18 | | (2) In any given compliance year, an alternative retail |
19 | | electric supplier may elect to use alternative compliance |
20 | | payments to comply with all or a part of the applicable |
21 | | renewable portfolio standard. In the event that an |
22 | | alternative retail electric supplier elects to make |
23 | | alternative compliance payments to comply with all or a |
24 | | part of the applicable renewable portfolio standard, such |
25 | | payments shall be made by September 1, 2010 for the period |
26 | | of June 1, 2009 to May 1, 2010 and by September 1 of each |
|
| | SB1617 | - 8 - | LRB100 06842 RJF 16891 b |
|
|
1 | | year thereafter for the subsequent compliance period, in |
2 | | the manner and form as determined by the Commission. Any |
3 | | election by an alternative retail electric supplier to use |
4 | | alternative compliance payments is subject to review by the |
5 | | Commission under subsection (e) of this Section. |
6 | | (3) An alternative retail electric supplier's |
7 | | alternative compliance payments shall be computed |
8 | | separately for each electric utility's service territory |
9 | | within which the alternative retail electric supplier |
10 | | provided retail service during the compliance period, |
11 | | provided that the electric utility was subject to |
12 | | subsection (c) of Section 1-75 of the Illinois Power Agency |
13 | | Act. For each service territory, the alternative retail |
14 | | electric supplier's alternative compliance payment shall |
15 | | be equal to (i) the actual alternative compliance payment |
16 | | rate established in item (1) of this subsection (d), |
17 | | multiplied by (ii) the actual amount of metered electricity |
18 | | delivered by the alternative retail electric supplier to |
19 | | retail customers within the service territory during the |
20 | | compliance period, multiplied by (iii) the result of one |
21 | | minus the ratios of the quantity of renewable energy |
22 | | resources used by the alternative retail electric supplier |
23 | | to comply with the requirements of this Section within the |
24 | | service territory to the product of the percentage of |
25 | | renewable energy resources required under item (3) of |
26 | | subsection (a) of this Section and the actual amount of |
|
| | SB1617 | - 9 - | LRB100 06842 RJF 16891 b |
|
|
1 | | metered electricity delivered by the alternative retail |
2 | | electric supplier to retail customers within the service |
3 | | territory during the compliance period. |
4 | | (4) All alternative compliance payments by alternative |
5 | | retail electric suppliers shall be deposited in the |
6 | | Illinois Power Agency Renewable Energy Resources Fund and |
7 | | used to purchase renewable energy credits, in accordance |
8 | | with Section 1-56 of the Illinois Power Agency Act. |
9 | | Beginning April 1, 2012 and by April 1 of each year |
10 | | thereafter, the Illinois Power Agency shall submit an |
11 | | annual report to the General Assembly, the Commission, and |
12 | | alternative retail electric suppliers that shall include, |
13 | | but not be limited to: |
14 | | (A) the total amount of alternative compliance |
15 | | payments received in aggregate from alternative retail |
16 | | electric suppliers by planning year for all previous |
17 | | planning years in which the alternative compliance |
18 | | payment was in effect; |
19 | | (B) the amount of those payments utilized to |
20 | | purchased renewable energy credits itemized by the |
21 | | date of each procurement in which the payments were |
22 | | utilized; and |
23 | | (C) the unused and remaining balance in the Agency |
24 | | Renewable Energy Resources Fund attributable to those |
25 | | payments. |
26 | | (5) The Commission, in consultation with the Illinois |
|
| | SB1617 | - 10 - | LRB100 06842 RJF 16891 b |
|
|
1 | | Power Agency, shall establish a process or proceeding to |
2 | | consider the impact of a federal renewable portfolio |
3 | | standard, if enacted, on the operation of the alternative |
4 | | compliance mechanism, which shall include, but not be |
5 | | limited to, developing, to the extent permitted by the |
6 | | applicable federal statute, an appropriate methodology to |
7 | | apportion renewable energy credits retired as a result of |
8 | | alternative compliance payments made in accordance with |
9 | | this Section. The Commission shall commence any such |
10 | | process or proceeding within 35 days after enactment of a |
11 | | federal renewable portfolio standard. |
12 | | (e) Each alternative retail electric supplier shall, by |
13 | | September 1, 2010 and by September 1 of each year thereafter, |
14 | | prepare and submit to the Commission a report, in a format to |
15 | | be specified by the Commission on or before December 31, 2009, |
16 | | that provides information certifying compliance by the |
17 | | alternative retail electric supplier with this Section, |
18 | | including copies of all PJM-GATS and M-RETS reports, and |
19 | | documentation relating to banking, retiring renewable energy |
20 | | credits, and any other information that the Commission |
21 | | determines necessary to ensure compliance with this Section. An |
22 | | alternative retail electric supplier may file commercially or |
23 | | financially sensitive information or trade secrets with the |
24 | | Commission as provided under the rules of the Commission. To be |
25 | | filed confidentially, the information shall be accompanied by |
26 | | an affidavit that sets forth both the reasons for the |
|
| | SB1617 | - 11 - | LRB100 06842 RJF 16891 b |
|
|
1 | | confidentiality and a public synopsis of the information. |
2 | | (f) The Commission may initiate a contested case to review |
3 | | allegations that the alternative retail electric supplier has |
4 | | violated this Section, including an order issued or rule |
5 | | promulgated under this Section. In any such proceeding, the |
6 | | alternative retail electric supplier shall have the burden of |
7 | | proof. If the Commission finds, after notice and hearing, that |
8 | | an alternative retail electric supplier has violated this |
9 | | Section, then the Commission shall issue an order requiring the |
10 | | alternative retail electric supplier to: |
11 | | (1) immediately comply with this Section; and |
12 | | (2) if the violation involves a failure to procure the |
13 | | requisite quantity of renewable energy resources or pay the |
14 | | applicable alternative compliance payment by the annual |
15 | | deadline, the Commission shall require the alternative |
16 | | retail electric supplier to double the applicable |
17 | | alternative compliance payment that would otherwise be |
18 | | required to bring the alternative retail electric supplier |
19 | | into compliance with this Section. |
20 | | If an alternative retail electric supplier fails to comply |
21 | | with the renewable energy resource portfolio requirement in |
22 | | this Section more than once in a 5-year period, then the |
23 | | Commission shall revoke the alternative electric supplier's |
24 | | certificate of service authority. The Commission shall not |
25 | | accept an application for a certificate of service authority |
26 | | from an alternative retail electric supplier that has lost |
|
| | SB1617 | - 12 - | LRB100 06842 RJF 16891 b |
|
|
1 | | certification under this subsection (f), or any corporate |
2 | | affiliate thereof, for at least one year after the date of |
3 | | revocation. |
4 | | (g) All of the provisions of this Section apply to electric |
5 | | utilities operating outside their service area except under |
6 | | item (2) of subsection (a) of this Section the quantity of |
7 | | renewable energy resources shall be measured as a percentage of |
8 | | the actual amount of electricity (megawatt-hours) supplied in |
9 | | the State outside of the utility's service territory during the |
10 | | 12-month period June 1 through May 31, commencing June 1, 2009, |
11 | | and the comparable 12-month period in each year thereafter |
12 | | except as provided in item (6) of subsection (a) of this |
13 | | Section. |
14 | | If any such utility fails to procure the requisite quantity |
15 | | of renewable energy resources by the annual deadline, then the |
16 | | Commission shall require the utility to double the alternative |
17 | | compliance payment that would otherwise be required to bring |
18 | | the utility into compliance with this Section. |
19 | | If any such utility fails to comply with the renewable |
20 | | energy resource portfolio requirement in this Section more than |
21 | | once in a 5-year period, then the Commission shall order the |
22 | | utility to cease all sales outside of the utility's service |
23 | | territory for a period of at least one year. |
24 | | (h) The provisions of this Section and the provisions of |
25 | | subsection (d) of Section 16-115 of this Act relating to |
26 | | procurement of renewable energy resources shall not apply to an |
|
| | SB1617 | - 13 - | LRB100 06842 RJF 16891 b |
|
|
1 | | alternative retail electric supplier that operates a combined |
2 | | heat and power system in this State or that has a corporate |
3 | | affiliate that operates such a combined heat and power system |
4 | | in this State that supplies electricity primarily to or for the |
5 | | benefit of: (i) facilities owned by the supplier, its |
6 | | subsidiary, or other corporate affiliate; (ii) facilities |
7 | | electrically integrated with the electrical system of |
8 | | facilities owned by the supplier, its subsidiary, or other |
9 | | corporate affiliate; or (iii) facilities that are adjacent to |
10 | | the site on which the combined heat and power system is |
11 | | located.
|
12 | | (Source: P.A. 96-33, eff. 7-10-09; 96-159, eff. 8-10-09; |
13 | | 96-1437, eff. 8-17-10; 97-658, eff. 1-13-12.) |
14 | | (Text of Section after amendment by P.A. 99-906 ) |
15 | | Sec. 16-115D. Renewable portfolio standard for alternative |
16 | | retail electric suppliers and electric utilities operating |
17 | | outside their service territories. |
18 | | (a) An alternative retail electric supplier shall be |
19 | | responsible for procuring cost-effective renewable energy |
20 | | resources as required under item (5) of subsection (d) of |
21 | | Section 16-115 of this Act as outlined herein: |
22 | | (1) The definition of renewable energy resources |
23 | | contained in Section 1-10 of the Illinois Power Agency Act |
24 | | applies to all renewable energy resources required to be |
25 | | procured by alternative retail electric suppliers. |
|
| | SB1617 | - 14 - | LRB100 06842 RJF 16891 b |
|
|
1 | | (2) Through May 31, 2017, the quantity of renewable |
2 | | energy resources shall be measured as a percentage of the |
3 | | actual amount of metered electricity (megawatt-hours) |
4 | | delivered by the alternative retail electric supplier to |
5 | | Illinois retail customers during the 12-month period June 1 |
6 | | through May 31, commencing June 1, 2009, and the comparable |
7 | | 12-month period in each year thereafter except as provided |
8 | | in item (6) of this subsection (a). |
9 | | (3) Through May 31, 2017, the quantity of renewable |
10 | | energy resources shall be in amounts at least equal to the |
11 | | annual percentages set forth in item (1) of subsection (c) |
12 | | of Section 1-75 of the Illinois Power Agency Act. At least |
13 | | 60% of the renewable energy resources procured pursuant to |
14 | | items (1) and (3) of subsection (b) of this Section shall |
15 | | come from wind generation and, starting June 1, 2015, at |
16 | | least 6% of the renewable energy resources procured |
17 | | pursuant to items (1) and (3) of subsection (b) of this |
18 | | Section shall come from solar photovoltaics. If, in any |
19 | | given year, an alternative retail electric supplier does |
20 | | not purchase at least these levels of renewable energy |
21 | | resources, then the alternative retail electric supplier |
22 | | shall make alternative compliance payments, as described |
23 | | in subsection (d) of this Section. |
24 | | (3.5) For the delivery year commencing June 1, 2017, |
25 | | the quantity of renewable energy resources shall be at |
26 | | least 13.0% of the uncovered amount of metered electricity |
|
| | SB1617 | - 15 - | LRB100 06842 RJF 16891 b |
|
|
1 | | (megawatt-hours) delivered by the alternative retail |
2 | | electric supplier to Illinois retail customers during the |
3 | | delivery year, which uncovered amount shall equal 50% of |
4 | | such metered electricity delivered by the alternative |
5 | | retail electric supplier. For the delivery year commencing |
6 | | June 1, 2018, the quantity of renewable energy resources |
7 | | shall be at least 14.5% of the uncovered amount of metered |
8 | | electricity (megawatt-hours) delivered by the alternative |
9 | | retail electric supplier to Illinois retail customers |
10 | | during the delivery year, which uncovered amount shall |
11 | | equal 25% of such metered electricity delivered by the |
12 | | alternative retail electric supplier. At least 32% of the |
13 | | renewable energy resources procured by the alternative |
14 | | retail electric supplier for its uncovered portion under |
15 | | this paragraph (3.5) shall come from wind or photovoltaic |
16 | | generation. The renewable energy resources procured under |
17 | | this paragraph (3.5) shall not include any resources from a |
18 | | facility whose costs were being recovered through rates |
19 | | regulated by any state or states on or after January 1, |
20 | | 2017. |
21 | | (4) The quantity and source of renewable energy |
22 | | resources shall be independently verified through the PJM |
23 | | Environmental Information System Generation Attribute |
24 | | Tracking System (PJM-GATS) or the Midwest Renewable Energy |
25 | | Tracking System (M-RETS), which shall document the |
26 | | location of generation, resource type, month, and year of |
|
| | SB1617 | - 16 - | LRB100 06842 RJF 16891 b |
|
|
1 | | generation for all qualifying renewable energy resources |
2 | | that an alternative retail electric supplier uses to comply |
3 | | with this Section. No later than June 1, 2009, the Illinois |
4 | | Power Agency shall provide PJM-GATS, M-RETS, and |
5 | | alternative retail electric suppliers with all information |
6 | | necessary to identify resources located in Illinois, |
7 | | within states that adjoin Illinois or within portions of |
8 | | the PJM and MISO footprint in the United States that |
9 | | qualify under the definition of renewable energy resources |
10 | | in Section 1-10 of the Illinois Power Agency Act for |
11 | | compliance with this Section 16-115D. Alternative retail |
12 | | electric suppliers shall not be subject to the requirements |
13 | | in item (3) of subsection (c) of Section 1-75 of the |
14 | | Illinois Power Agency Act. |
15 | | (5) All renewable energy credits used to comply with |
16 | | this Section shall be permanently retired. |
17 | | (6) The required procurement of renewable energy |
18 | | resources by an alternative retail electric supplier shall |
19 | | apply to all metered electricity delivered to Illinois |
20 | | retail customers by the alternative retail electric |
21 | | supplier pursuant to contracts executed or extended after |
22 | | March 15, 2009. |
23 | | (b) Compliance obligations. |
24 | | (1) Through May 31, 2017, an alternative retail |
25 | | electric supplier shall comply with the renewable energy |
26 | | portfolio standards by making an alternative compliance |
|
| | SB1617 | - 17 - | LRB100 06842 RJF 16891 b |
|
|
1 | | payment, as described in subsection (d) of this Section, to |
2 | | cover at least one-half of the alternative retail electric |
3 | | supplier's compliance obligation for the period prior to |
4 | | June 1, 2017. |
5 | | (2) For the delivery years beginning June 1, 2017 and |
6 | | June 1, 2018, an alternative retail electric supplier need |
7 | | not make any alternative compliance payment to meet any |
8 | | portion of its compliance obligation, as set forth in |
9 | | paragraph (3.5) of subsection (a) of this Section. |
10 | | (3) An alternative retail electric supplier shall use |
11 | | any one or combination of the following means to cover the |
12 | | remainder of the alternative retail electric supplier's |
13 | | compliance obligation, as set forth in paragraphs (3) and |
14 | | (3.5) of subsection (a) of this Section, not covered by an |
15 | | alternative compliance payment made under paragraphs (1) |
16 | | and (2) of this subsection (b) of this Section: |
17 | | (A) Generating electricity using renewable energy |
18 | | resources identified pursuant to item (4) of |
19 | | subsection (a) of this Section. |
20 | | (B) Purchasing electricity generated using |
21 | | renewable energy resources identified pursuant to item |
22 | | (4) of subsection (a) of this Section through an energy |
23 | | contract. |
24 | | (C) Purchasing renewable energy credits from |
25 | | renewable energy resources identified pursuant to item |
26 | | (4) of subsection (a) of this Section. |
|
| | SB1617 | - 18 - | LRB100 06842 RJF 16891 b |
|
|
1 | | (D) Making an alternative compliance payment as |
2 | | described in subsection (d) of this Section. |
3 | | (c) Use of renewable energy credits. |
4 | | (1) Renewable energy credits that are not used by an |
5 | | alternative retail electric supplier to comply with a |
6 | | renewable portfolio standard in a compliance year may be |
7 | | banked and carried forward up to 2 12-month compliance |
8 | | periods after the compliance period in which the credit was |
9 | | generated for the purpose of complying with a renewable |
10 | | portfolio standard in those 2 subsequent compliance |
11 | | periods. For the 2009-2010 and 2010-2011 compliance |
12 | | periods, an alternative retail electric supplier may use |
13 | | renewable credits generated after December 31, 2008 and |
14 | | before June 1, 2009 to comply with this Section. |
15 | | (2) An alternative retail electric supplier is |
16 | | responsible for demonstrating that a renewable energy |
17 | | credit used to comply with a renewable portfolio standard |
18 | | is derived from a renewable energy resource and that the |
19 | | alternative retail electric supplier has not used, traded, |
20 | | sold, or otherwise transferred the credit. |
21 | | (3) The same renewable energy credit may be used by an |
22 | | alternative retail electric supplier to comply with a |
23 | | federal renewable portfolio standard and a renewable |
24 | | portfolio standard established under this Act. An |
25 | | alternative retail electric supplier that uses a renewable |
26 | | energy credit to comply with a renewable portfolio standard |
|
| | SB1617 | - 19 - | LRB100 06842 RJF 16891 b |
|
|
1 | | imposed by any other state may not use the same credit to |
2 | | comply with a renewable portfolio standard established |
3 | | under this Act. |
4 | | (d) Alternative compliance payments. |
5 | | (1) The Commission shall establish and post on its |
6 | | website, within 5 business days after entering an order |
7 | | approving a procurement plan pursuant to Section 1-75 of |
8 | | the Illinois Power Agency Act, maximum alternative |
9 | | compliance payment rates, expressed on a per kilowatt-hour |
10 | | basis, that will be applicable in the first compliance |
11 | | period following the plan approval. A separate maximum |
12 | | alternative compliance payment rate shall be established |
13 | | for the service territory of each electric utility that is |
14 | | subject to subsection (c) of Section 1-75 of the Illinois |
15 | | Power Agency Act. Each maximum alternative compliance |
16 | | payment rate shall be equal to the maximum allowable annual |
17 | | estimated average net increase due to the costs of the |
18 | | utility's purchase of renewable energy resources included |
19 | | in the amounts paid by eligible retail customers in |
20 | | connection with electric service, as described in item (2) |
21 | | of subsection (c) of Section 1-75 of the Illinois Power |
22 | | Agency Act for the compliance period, and as established in |
23 | | the approved procurement plan. Following each procurement |
24 | | event through which renewable energy resources are |
25 | | purchased for one or more of these utilities for the |
26 | | compliance period, the Commission shall establish and post |
|
| | SB1617 | - 20 - | LRB100 06842 RJF 16891 b |
|
|
1 | | on its website estimates of the alternative compliance |
2 | | payment rates, expressed on a per kilowatt-hour basis, that |
3 | | shall apply for that compliance period. Posting of the |
4 | | estimates shall occur no later than 10 business days |
5 | | following the procurement event, however, the Commission |
6 | | shall not be required to establish and post such estimates |
7 | | more often than once per calendar month. By July 1 of each |
8 | | year, the Commission shall establish and post on its |
9 | | website the actual alternative compliance payment rates |
10 | | for the preceding compliance year. For compliance years |
11 | | beginning prior to June 1, 2014, each alternative |
12 | | compliance payment rate shall be equal to the total amount |
13 | | of dollars that the utility contracted to spend on |
14 | | renewable resources, excepting the additional incremental |
15 | | cost attributable to solar resources, for the compliance |
16 | | period divided by the forecasted load of eligible retail |
17 | | customers, at the customers' meters, as previously |
18 | | established in the Commission-approved procurement plan |
19 | | for that compliance year. For compliance years commencing |
20 | | on or after June 1, 2014, each alternative compliance |
21 | | payment rate shall be equal to the total amount of dollars |
22 | | that the utility contracted to spend on all renewable |
23 | | resources for the compliance period divided by the |
24 | | forecasted load of retail customers for which the utility |
25 | | is procuring renewable energy resources in a given delivery |
26 | | year, at the customers' meters, as previously established |
|
| | SB1617 | - 21 - | LRB100 06842 RJF 16891 b |
|
|
1 | | in the Commission-approved procurement plan for that |
2 | | compliance year. The actual alternative compliance payment |
3 | | rates may not exceed the maximum alternative compliance |
4 | | payment rates established for the compliance period. For |
5 | | purposes of this subsection (d), the term "eligible retail |
6 | | customers" has the same meaning as found in Section |
7 | | 16-111.5 of this Act. |
8 | | (2) In any given compliance year, an alternative retail |
9 | | electric supplier may elect to use alternative compliance |
10 | | payments to comply with all or a part of the applicable |
11 | | renewable portfolio standard. In the event that an |
12 | | alternative retail electric supplier elects to make |
13 | | alternative compliance payments to comply with all or a |
14 | | part of the applicable renewable portfolio standard, such |
15 | | payments shall be made by September 1, 2010 for the period |
16 | | of June 1, 2009 to May 1, 2010 and by September 1 of each |
17 | | year thereafter for the subsequent compliance period, in |
18 | | the manner and form as determined by the Commission. Any |
19 | | election by an alternative retail electric supplier to use |
20 | | alternative compliance payments is subject to review by the |
21 | | Commission under subsection (e) of this Section. |
22 | | (3) An alternative retail electric supplier's |
23 | | alternative compliance payments shall be computed |
24 | | separately for each electric utility's service territory |
25 | | within which the alternative retail electric supplier |
26 | | provided retail service during the compliance period, |
|
| | SB1617 | - 22 - | LRB100 06842 RJF 16891 b |
|
|
1 | | provided that the electric utility was subject to |
2 | | subsection (c) of Section 1-75 of the Illinois Power Agency |
3 | | Act. For each service territory, the alternative retail |
4 | | electric supplier's alternative compliance payment shall |
5 | | be equal to (i) the actual alternative compliance payment |
6 | | rate established in item (1) of this subsection (d), |
7 | | multiplied by (ii) the actual amount of metered electricity |
8 | | delivered by the alternative retail electric supplier to |
9 | | retail customers for which the supplier has a compliance |
10 | | obligation within the service territory during the |
11 | | compliance period, multiplied by (iii) the result of one |
12 | | minus the ratios of the quantity of renewable energy |
13 | | resources used by the alternative retail electric supplier |
14 | | to comply with the requirements of this Section within the |
15 | | service territory to the product of the percentage of |
16 | | renewable energy resources required under item (3) or (3.5) |
17 | | of subsection (a) of this Section and the actual amount of |
18 | | metered electricity delivered by the alternative retail |
19 | | electrical supplier to retail customers for which the |
20 | | supplier has a compliance obligation within the service |
21 | | territory during the compliance period. |
22 | | (4) Through May 31, 2017, all alternative compliance |
23 | | payments by alternative retail electric suppliers shall be |
24 | | deposited in the Illinois Power Agency Renewable Energy |
25 | | Resources Fund and used to purchase renewable energy |
26 | | credits, in accordance with Section 1-56 of the Illinois |
|
| | SB1617 | - 23 - | LRB100 06842 RJF 16891 b |
|
|
1 | | Power Agency Act. Beginning April 1, 2012 and by April 1 of |
2 | | each year thereafter, the Illinois Power Agency shall |
3 | | submit an annual report to the General Assembly, the |
4 | | Commission, and alternative retail electric suppliers that |
5 | | shall include, but not be limited to: |
6 | | (A) the total amount of alternative compliance |
7 | | payments received in aggregate from alternative retail |
8 | | electric suppliers by planning year for all previous |
9 | | planning years in which the alternative compliance |
10 | | payment was in effect; |
11 | | (B) the amount of those payments utilized to |
12 | | purchased renewable energy credits itemized by the |
13 | | date of each procurement in which the payments were |
14 | | utilized; and |
15 | | (C) the unused and remaining balance in the Agency |
16 | | Renewable Energy Resources Fund attributable to those |
17 | | payments. |
18 | | (4.5) Beginning with the delivery year commencing June |
19 | | 1, 2017, all alternative compliance payments by |
20 | | alternative retail electric suppliers shall be remitted to |
21 | | the applicable electric utility. To facilitate this |
22 | | remittance, each electric utility shall file a tariff with |
23 | | the Commission no later than 30 days following the |
24 | | effective date of this amendatory Act of the 99th General |
25 | | Assembly, which the Commission shall approve, after notice |
26 | | and hearing, no later than 45 days after its filing. The |
|
| | SB1617 | - 24 - | LRB100 06842 RJF 16891 b |
|
|
1 | | Illinois Power Agency shall use such payments to increase |
2 | | the amount of renewable energy resources otherwise to be |
3 | | procured under subsection (c) of Section 1-75 of the |
4 | | Illinois Power Agency Act. |
5 | | (5) The Commission, in consultation with the Illinois |
6 | | Power Agency, shall establish a process or proceeding to |
7 | | consider the impact of a federal renewable portfolio |
8 | | standard, if enacted, on the operation of the alternative |
9 | | compliance mechanism, which shall include, but not be |
10 | | limited to, developing, to the extent permitted by the |
11 | | applicable federal statute, an appropriate methodology to |
12 | | apportion renewable energy credits retired as a result of |
13 | | alternative compliance payments made in accordance with |
14 | | this Section. The Commission shall commence any such |
15 | | process or proceeding within 35 days after enactment of a |
16 | | federal renewable portfolio standard. |
17 | | (e) Each alternative retail electric supplier shall, by |
18 | | September 1, 2010 and by September 1 of each year thereafter, |
19 | | prepare and submit to the Commission a report, in a format to |
20 | | be specified by the Commission, that provides information |
21 | | certifying compliance by the alternative retail electric |
22 | | supplier with this Section, including copies of all PJM-GATS |
23 | | and M-RETS reports, and documentation relating to banking, |
24 | | retiring renewable energy credits, and any other information |
25 | | that the Commission determines necessary to ensure compliance |
26 | | with this Section. |
|
| | SB1617 | - 25 - | LRB100 06842 RJF 16891 b |
|
|
1 | | An alternative retail electric supplier may file |
2 | | commercially or financially sensitive information or trade |
3 | | secrets with the Commission as provided under the rules of the |
4 | | Commission. To be filed confidentially, the information shall |
5 | | be accompanied by an affidavit that sets forth both the reasons |
6 | | for the confidentiality and a public synopsis of the |
7 | | information. |
8 | | (f) The Commission may initiate a contested case to review |
9 | | allegations that the alternative retail electric supplier has |
10 | | violated this Section, including an order issued or rule |
11 | | promulgated under this Section. In any such proceeding, the |
12 | | alternative retail electric supplier shall have the burden of |
13 | | proof. If the Commission finds, after notice and hearing, that |
14 | | an alternative retail electric supplier has violated this |
15 | | Section, then the Commission shall issue an order requiring the |
16 | | alternative retail electric supplier to: |
17 | | (1) immediately comply with this Section; and |
18 | | (2) if the violation involves a failure to procure the |
19 | | requisite quantity of renewable energy resources or pay the |
20 | | applicable alternative compliance payment by the annual |
21 | | deadline, the Commission shall require the alternative |
22 | | retail electric supplier to double the applicable |
23 | | alternative compliance payment that would otherwise be |
24 | | required to bring the alternative retail electric supplier |
25 | | into compliance with this Section. |
26 | | If an alternative retail electric supplier fails to comply |
|
| | SB1617 | - 26 - | LRB100 06842 RJF 16891 b |
|
|
1 | | with the renewable energy resource portfolio requirement in |
2 | | this Section more than once in a 5-year period, then the |
3 | | Commission shall revoke the alternative electric supplier's |
4 | | certificate of service authority. The Commission shall not |
5 | | accept an application for a certificate of service authority |
6 | | from an alternative retail electric supplier that has lost |
7 | | certification under this subsection (f), or any corporate |
8 | | affiliate thereof, for at least one year after the date of |
9 | | revocation. |
10 | | (g) All of the provisions of this Section apply to electric |
11 | | utilities operating outside their service area except under |
12 | | item (2) of subsection (a) of this Section the quantity of |
13 | | renewable energy resources shall be measured as a percentage of |
14 | | the actual amount of electricity (megawatt-hours) supplied in |
15 | | the State outside of the utility's service territory during the |
16 | | 12-month period June 1 through May 31, commencing June 1, 2009, |
17 | | and the comparable 12-month period in each year thereafter |
18 | | except as provided in item (6) of subsection (a) of this |
19 | | Section. |
20 | | If any such utility fails to procure the requisite quantity |
21 | | of renewable energy resources by the annual deadline, then the |
22 | | Commission shall require the utility to double the alternative |
23 | | compliance payment that would otherwise be required to bring |
24 | | the utility into compliance with this Section. |
25 | | If any such utility fails to comply with the renewable |
26 | | energy resource portfolio requirement in this Section more than |
|
| | SB1617 | - 27 - | LRB100 06842 RJF 16891 b |
|
|
1 | | once in a 5-year period, then the Commission shall order the |
2 | | utility to cease all sales outside of the utility's service |
3 | | territory for a period of at least one year. |
4 | | (h) The provisions of this Section and the provisions of |
5 | | subsection (d) of Section 16-115 of this Act relating to |
6 | | procurement of renewable energy resources shall not apply to an |
7 | | alternative retail electric supplier that operates a combined |
8 | | heat and power system in this State or that has a corporate |
9 | | affiliate that operates such a combined heat and power system |
10 | | in this State that supplies electricity primarily to or for the |
11 | | benefit of: (i) facilities owned by the supplier, its |
12 | | subsidiary, or other corporate affiliate; (ii) facilities |
13 | | electrically integrated with the electrical system of |
14 | | facilities owned by the supplier, its subsidiary, or other |
15 | | corporate affiliate; or (iii) facilities that are adjacent to |
16 | | the site on which the combined heat and power system is |
17 | | located.
|
18 | | (i) Except as otherwise provided in this subsection (i), |
19 | | the The obligations of alternative retail electric suppliers |
20 | | and electric utilities operating outside their service |
21 | | territories to procure renewable energy resources, make |
22 | | alternative compliance payments, and file annual reports, and |
23 | | the obligations of the Commission to determine and post |
24 | | alternative compliance payment rates, shall terminate after |
25 | | May 31, 2019 , provided that alternative retail electric |
26 | | suppliers and electric utilities operating outside their |
|
| | SB1617 | - 28 - | LRB100 06842 RJF 16891 b |
|
|
1 | | service territories shall be obligated to make all alternative |
2 | | compliance payments that they were obligated to pay for periods |
3 | | through and including May 31, 2019, but were not paid as of |
4 | | that date . No later than September 1, 2020, each alternative |
5 | | retail electric supplier and electric utility operating |
6 | | outside their service territory shall submit a report as |
7 | | required by subsection (e) of this Section for the compliance |
8 | | period beginning January 1, 2019 and ending May 31, 2019. The |
9 | | Commission shall continue to enforce the payment of unpaid |
10 | | alternative compliance payments in accordance with subsections |
11 | | (f) and (g) of this Section. All alternative compliance |
12 | | payments made after May 31, 2016 shall be remitted to the |
13 | | applicable electric utility and used to purchase renewable |
14 | | energy credits, in accordance with Section 1-75 of the Illinois |
15 | | Power Agency Act. |
16 | | This subsection (i) is intended to accommodate the |
17 | | transition to the procurement of renewable energy resources for |
18 | | all retail customers in the amounts specified under subsection |
19 | | (c) of Section 1-75 of the Illinois Power Agency Act and |
20 | | Section 16-111.5 of this Act, including but not limited to the |
21 | | transition to a single charge applicable to all retail |
22 | | customers to recover the costs of these resources. Each |
23 | | alternative retail electric supplier shall certify in its |
24 | | annual reports filed pursuant to subsection (e) of this Section |
25 | | after May 31, 2019, that its retail customers are not paying |
26 | | the costs of alternative compliance payments or renewable |
|
| | SB1617 | - 29 - | LRB100 06842 RJF 16891 b |
|
|
1 | | energy resources that the alternative retail electric supplier |
2 | | is not required to remit or purchase under this Section. The |
3 | | Commission shall have the authority to initiate an emergency |
4 | | rulemaking to adopt rules regarding such certification. |
5 | | (Source: P.A. 99-906, eff. 6-1-17.) |
6 | | Section 95. No acceleration or delay. Where this Act makes |
7 | | changes in a statute that is represented in this Act by text |
8 | | that is not yet or no longer in effect (for example, a Section |
9 | | represented by multiple versions), the use of that text does |
10 | | not accelerate or delay the taking effect of (i) the changes |
11 | | made by this Act or (ii) provisions derived from any other |
12 | | Public Act.
|
13 | | Section 99. Effective date. This Act takes effect upon |
14 | | becoming law or on the date the provisions of Public Act 99-906 |
15 | | that amend Section 16-115D of the Public Utilities Act take |
16 | | effect, whichever is later.
|