7 | | (Text of Section before amendment by P.A. 99-906 ) |
8 | | Sec. 16-128A. Certification of installers, maintainers, or |
9 | | repairers. |
10 | | (a) Within 18 months of the effective date of this |
11 | | amendatory Act of the 97th General Assembly, the Commission |
12 | | shall adopt rules, including emergency rules, establishing |
13 | | certification requirements ensuring that entities installing |
14 | | distributed generation facilities are in compliance with the |
15 | | requirements of subsection (a) of Section 16-128 of this Act. |
16 | | For purposes of this Section, the phrase "entities |
17 | | installing distributed generation facilities" shall include, |
18 | | but not be limited to, all entities that are exempt from the |
19 | | definition of "alternative retail electric supplier" under |
20 | | item (v) of Section 16-102 of this Act.
For purposes of this |
21 | | Section, the phrase "self-installer" means an individual who |
22 | | (i) leases or purchases a cogeneration facility for his or her |
23 | | own personal use and (ii) installs such cogeneration or |
|
| | SB0071 Enrolled | - 2 - | LRB100 05891 RJF 15917 b |
|
|
1 | | self-generation facility on his or her own premises without the |
2 | | assistance of any other person. |
3 | | (b) In addition to any authority granted to the Commission |
4 | | under this Act, the Commission is also authorized to: (1) |
5 | | determine which entities are subject to certification under |
6 | | this Section; (2) impose reasonable certification fees and |
7 | | penalties; (3) adopt disciplinary procedures; (4) investigate |
8 | | any and all activities subject to this Section, including |
9 | | violations thereof; (5) adopt procedures to issue or renew, or |
10 | | to refuse to issue or renew, a certification or to revoke, |
11 | | suspend, place on probation, reprimand, or otherwise |
12 | | discipline a certified entity under this Act or take other |
13 | | enforcement action against an entity subject to this Section; |
14 | | and (6) prescribe forms to be issued for the administration and |
15 | | enforcement of this Section. |
16 | | (c) No electric utility shall provide a retail customer |
17 | | with net metering service related to interconnection of that |
18 | | customer's distributed generation facility unless the customer |
19 | | provides the electric utility with (i) a certification that the |
20 | | customer installing the distributed generation facility was a |
21 | | self-installer or (ii) evidence that the distributed |
22 | | generation facility was installed by an entity certified under |
23 | | this Section that is also in good standing with the Commission. |
24 | | For purposes of this subsection, a retail customer includes |
25 | | that customer's employees, officers, and agents. An electric |
26 | | utility shall file a tariff or tariffs with the Commission |
|
| | SB0071 Enrolled | - 3 - | LRB100 05891 RJF 15917 b |
|
|
1 | | setting forth the documentation, as specified by Commission |
2 | | rule, that a retail customer must provide to an electric |
3 | | utility. The provisions of this subsection (c) shall apply on |
4 | | or after the effective date of the Commission's rules |
5 | | prescribed pursuant to subsection (a) of this Section. |
6 | | (d) Within 180 days after the effective date of this |
7 | | amendatory Act of the 97th General Assembly, the Commission |
8 | | shall initiate a rulemaking proceeding to establish |
9 | | certification requirements that shall be applicable to persons |
10 | | or entities that install, maintain, or repair electric vehicle |
11 | | charging stations. The notification and certification |
12 | | requirements of this Section shall only be applicable to |
13 | | individuals or entities that perform work on or within an |
14 | | electric vehicle charging station, including, but not limited |
15 | | to, connection of power to an electric vehicle charging |
16 | | station. |
17 | | For the purposes of this Section "electric vehicle charging |
18 | | station" means any facility or equipment that is used to charge |
19 | | a battery or other energy storage device of an electric |
20 | | vehicle.
|
21 | | Rules regulating the installation, maintenance, or repair |
22 | | of electric vehicle charging stations, in which the Commission |
23 | | may establish separate requirements based upon the |
24 | | characteristics of electric vehicle charging stations, so long |
25 | | as it is in accordance with the requirements of subsection (a) |
26 | | of Section 16-128 and Section 16-128A of this Act, shall: |
|
| | SB0071 Enrolled | - 4 - | LRB100 05891 RJF 15917 b |
|
|
1 | | (1) establish a certification process for persons or |
2 | | entities that install, maintain, or repair of electric |
3 | | vehicle charging stations; |
4 | | (2) require persons or entities that install, |
5 | | maintain, or repair electric vehicle stations to be |
6 | | certified to do business and to be bonded in the State; |
7 | | (3) ensure that persons or entities that install, |
8 | | maintain, or repair electric vehicle charging stations |
9 | | have the requisite knowledge, skills, training, |
10 | | experience, and competence to perform functions in a safe |
11 | | and reliable manner as required under subsection (a) of |
12 | | Section 16-128 of this Act; |
13 | | (4) impose reasonable certification fees and penalties |
14 | | on persons or entities that install, maintain, or repair of |
15 | | electric vehicle charging stations for noncompliance of |
16 | | the rules adopted under this subsection; |
17 | | (5) ensure that all persons or entities that install, |
18 | | maintain, or repair electric vehicle charging stations |
19 | | conform to applicable building and electrical codes; |
20 | | (6) ensure that all electric vehicle charging stations |
21 | | meet recognized industry standards as the Commission deems |
22 | | appropriate, such as the National Electric Code (NEC) and |
23 | | standards developed or created by the Institute of |
24 | | Electrical and Electronics Engineers (IEEE), the Electric |
25 | | Power Research Institute (EPRI), the Detroit Edison |
26 | | Institute (DTE), the Underwriters Laboratory (UL), the |
|
| | SB0071 Enrolled | - 5 - | LRB100 05891 RJF 15917 b |
|
|
1 | | Society of Automotive Engineers (SAE), and the National |
2 | | Institute of Standards and Technology (NIST); |
3 | | (7) include any additional requirements that the |
4 | | Commission deems reasonable to ensure that persons or |
5 | | entities that install, maintain, or repair electric |
6 | | vehicle charging stations meet adequate training, |
7 | | financial, and competency requirements; |
8 | | (8) ensure that the obligations required under this |
9 | | Section and subsection (a) of Section 16-128 of this Act |
10 | | are met prior to the interconnection of any electric |
11 | | vehicle charging station; |
12 | | (9) ensure electric vehicle charging stations |
13 | | installed by a self-installer are not used for any |
14 | | commercial purpose; |
15 | | (10) establish an inspection procedure for the |
16 | | conversion of electric vehicle charging stations installed |
17 | | by a self-installer if it is determined that the |
18 | | self-installed electric vehicle charging station is being |
19 | | used for commercial purposes; |
20 | | (11) establish the requirement that all persons or |
21 | | entities that install electric vehicle charging stations |
22 | | shall notify the servicing electric utility in writing of |
23 | | plans to install an electric vehicle charging station and |
24 | | shall notify the servicing electric utility in writing when |
25 | | installation is complete; |
26 | | (12) ensure that all persons or entities that install, |
|
| | SB0071 Enrolled | - 6 - | LRB100 05891 RJF 15917 b |
|
|
1 | | maintain, or repair electric vehicle charging stations |
2 | | obtain certificates of insurance in sufficient amounts and |
3 | | coverages that the Commission so determines and, if |
4 | | necessary as determined by the Commission, names the |
5 | | affected public utility as an additional insured; and |
6 | | (13) identify and determine the training or other |
7 | | programs by which persons or entities may obtain the |
8 | | requisite training, skills, or experience necessary to |
9 | | achieve and maintain compliance with the requirements set |
10 | | forth in this subsection and subsection (a) of Section |
11 | | 16-128 to install, maintain, or repair electric vehicle |
12 | | charging stations. |
13 | | Within 18 months after the effective date of this |
14 | | amendatory Act of the 97th General Assembly, the Commission |
15 | | shall adopt rules, and may, if it deems necessary, adopt |
16 | | emergency rules, for the installation, maintenance, or repair |
17 | | of electric vehicle charging stations. |
18 | | All retail customers who own, maintain, or repair an |
19 | | electric vehicle charging station shall provide the servicing |
20 | | electric utility (i) a certification that the customer |
21 | | installing the electric vehicle charging station was a |
22 | | self-installer or (ii) evidence that the electric vehicle |
23 | | charging station was installed by an entity certified under |
24 | | this subsection (d) that is also in good standing with the |
25 | | Commission. For purposes of this subsection (d), a retail |
26 | | customer includes that retail customer's employees, officers, |
|
| | SB0071 Enrolled | - 7 - | LRB100 05891 RJF 15917 b |
|
|
1 | | and agents. If the electric vehicle charging station was not |
2 | | installed by a self-installer, then the person or entity that |
3 | | plans to install the electric vehicle charging station shall |
4 | | provide notice to the servicing electric utility prior to |
5 | | installation and when installation is complete and provide any |
6 | | other information required by the Commission's rules |
7 | | established under subsection (d) of this Section. An electric |
8 | | utility shall file a tariff or tariffs with the Commission |
9 | | setting forth the documentation, as specified by Commission |
10 | | rule, that a retail customer who owns, uses, operates, or |
11 | | maintains an electric vehicle charging station must provide to |
12 | | an electric utility. |
13 | | For the purposes of this subsection, an electric vehicle |
14 | | charging station shall constitute a distribution facility or |
15 | | equipment as that term is used in subsection (a) of Section |
16 | | 16-128 of this Act. The phrase "self-installer" means an |
17 | | individual who (i) leases or purchases an electric vehicle |
18 | | charging station for his or her own personal use and (ii) |
19 | | installs an electric vehicle charging station on his or her own |
20 | | premises without the assistance of any other person. |
21 | | (e) Fees and penalties collected under this Section shall |
22 | | be deposited into the Public Utility Fund and used to fund the |
23 | | Commission's compliance with the obligations imposed by this |
24 | | Section. |
25 | | (f) The rules established under subsection (d) of this |
26 | | Section shall specify the initial dates for compliance with the |
|
| | SB0071 Enrolled | - 8 - | LRB100 05891 RJF 15917 b |
|
|
1 | | rules. |
2 | | (g) The certification of persons or entities that install, |
3 | | maintain, or repair distributed generation facilities and |
4 | | electric vehicle charging stations as set forth in this Section |
5 | | is an exclusive power and function of the State. A home rule |
6 | | unit or other units of local government authority may subject |
7 | | persons or entities that install, maintain, or repair |
8 | | distributed generation facilities or electric vehicle charging |
9 | | stations as set forth in this Section to any applicable local |
10 | | licensing, siting, and permitting requirements otherwise |
11 | | permitted under law so long as only Commission-certified |
12 | | persons or entities are authorized to install, maintain, or |
13 | | repair distributed generation facilities or electric vehicle |
14 | | charging stations. This Section is a limitation under |
15 | | subsection (h) of Section 6 of Article VII of the Illinois |
16 | | Constitution on the exercise by home rule units of powers and |
17 | | functions exclusively exercised by the State. |
18 | | (Source: P.A. 97-616, eff. 10-26-11; 97-1128, eff. 8-28-12.) |
19 | | (Text of Section after amendment by P.A. 99-906 ) |
20 | | Sec. 16-128A. Certification of installers, maintainers, or |
21 | | repairers. |
22 | | (a) Within 18 months of the effective date of this |
23 | | amendatory Act of the 97th General Assembly, the Commission |
24 | | shall adopt rules, including emergency rules, establishing |
25 | | certification requirements ensuring that entities installing |
|
| | SB0071 Enrolled | - 9 - | LRB100 05891 RJF 15917 b |
|
|
1 | | distributed generation facilities are in compliance with the |
2 | | requirements of subsection (a) of Section 16-128 of this Act. |
3 | | For purposes of this Section, the phrase "entities |
4 | | installing distributed generation facilities" shall include, |
5 | | but not be limited to, all entities that are exempt from the |
6 | | definition of "alternative retail electric supplier" under |
7 | | item (v) of Section 16-102 of this Act.
For purposes of this |
8 | | Section, the phrase "self-installer" means an individual who |
9 | | (i) leases or purchases a cogeneration facility for his or her |
10 | | own personal use and (ii) installs such cogeneration or |
11 | | self-generation facility on his or her own premises without the |
12 | | assistance of any other person. |
13 | | (b) In addition to any authority granted to the Commission |
14 | | under this Act, the Commission is also authorized to: (1) |
15 | | determine which entities are subject to certification under |
16 | | this Section; (2) impose reasonable certification fees and |
17 | | penalties; (3) adopt disciplinary procedures; (4) investigate |
18 | | any and all activities subject to this Section, including |
19 | | violations thereof; (5) adopt procedures to issue or renew, or |
20 | | to refuse to issue or renew, a certification or to revoke, |
21 | | suspend, place on probation, reprimand, or otherwise |
22 | | discipline a certified entity under this Act or take other |
23 | | enforcement action against an entity subject to this Section; |
24 | | and (6) prescribe forms to be issued for the administration and |
25 | | enforcement of this Section. |
26 | | (c) No electric utility shall provide a retail customer |
|
| | SB0071 Enrolled | - 10 - | LRB100 05891 RJF 15917 b |
|
|
1 | | with net metering service related to interconnection of that |
2 | | customer's distributed generation facility unless the customer |
3 | | provides the electric utility with (i) a certification that the |
4 | | customer installing the distributed generation facility was a |
5 | | self-installer or (ii) evidence that the distributed |
6 | | generation facility was installed by an entity certified under |
7 | | this Section that is also in good standing with the Commission. |
8 | | For purposes of this subsection, a retail customer includes |
9 | | that customer's employees, officers, and agents. An electric |
10 | | utility shall file a tariff or tariffs with the Commission |
11 | | setting forth the documentation, as specified by Commission |
12 | | rule, that a retail customer must provide to an electric |
13 | | utility. The provisions of this subsection (c) shall apply on |
14 | | or after the effective date of the Commission's rules |
15 | | prescribed pursuant to subsection (a) of this Section. |
16 | | (d) Within 180 days after the effective date of this |
17 | | amendatory Act of the 97th General Assembly, the Commission |
18 | | shall initiate a rulemaking proceeding to establish |
19 | | certification requirements that shall be applicable to persons |
20 | | or entities that install, maintain, or repair electric vehicle |
21 | | charging stations. The notification and certification |
22 | | requirements of this Section shall only be applicable to |
23 | | individuals or entities that perform work on or within an |
24 | | electric vehicle charging station, including, but not limited |
25 | | to, connection of power to an electric vehicle charging |
26 | | station. |
|
| | SB0071 Enrolled | - 11 - | LRB100 05891 RJF 15917 b |
|
|
1 | | For the purposes of this Section "electric vehicle charging |
2 | | station" means any facility or equipment that is used to charge |
3 | | a battery or other energy storage device of an electric |
4 | | vehicle.
|
5 | | Rules regulating the installation, maintenance, or repair |
6 | | of electric vehicle charging stations, in which the Commission |
7 | | may establish separate requirements based upon the |
8 | | characteristics of electric vehicle charging stations, so long |
9 | | as it is in accordance with the requirements of subsection (a) |
10 | | of Section 16-128 and Section 16-128A of this Act, shall: |
11 | | (1) establish a certification process for persons or |
12 | | entities that install, maintain, or repair of electric |
13 | | vehicle charging stations; |
14 | | (2) require persons or entities that install, |
15 | | maintain, or repair electric vehicle stations to be |
16 | | certified to do business and to be bonded in the State; |
17 | | (3) ensure that persons or entities that install, |
18 | | maintain, or repair electric vehicle charging stations |
19 | | have the requisite knowledge, skills, training, |
20 | | experience, and competence to perform functions in a safe |
21 | | and reliable manner as required under subsection (a) of |
22 | | Section 16-128 of this Act; |
23 | | (4) impose reasonable certification fees and penalties |
24 | | on persons or entities that install, maintain, or repair of |
25 | | electric vehicle charging stations for noncompliance of |
26 | | the rules adopted under this subsection; |
|
| | SB0071 Enrolled | - 12 - | LRB100 05891 RJF 15917 b |
|
|
1 | | (5) ensure that all persons or entities that install, |
2 | | maintain, or repair electric vehicle charging stations |
3 | | conform to applicable building and electrical codes; |
4 | | (6) ensure that all electric vehicle charging stations |
5 | | meet recognized industry standards as the Commission deems |
6 | | appropriate, such as the National Electric Code (NEC) and |
7 | | standards developed or created by the Institute of |
8 | | Electrical and Electronics Engineers (IEEE), the Electric |
9 | | Power Research Institute (EPRI), the Detroit Edison |
10 | | Institute (DTE), the Underwriters Laboratory (UL), the |
11 | | Society of Automotive Engineers (SAE), and the National |
12 | | Institute of Standards and Technology (NIST); |
13 | | (7) include any additional requirements that the |
14 | | Commission deems reasonable to ensure that persons or |
15 | | entities that install, maintain, or repair electric |
16 | | vehicle charging stations meet adequate training, |
17 | | financial, and competency requirements; |
18 | | (8) ensure that the obligations required under this |
19 | | Section and subsection (a) of Section 16-128 of this Act |
20 | | are met prior to the interconnection of any electric |
21 | | vehicle charging station; |
22 | | (9) ensure electric vehicle charging stations |
23 | | installed by a self-installer are not used for any |
24 | | commercial purpose; |
25 | | (10) establish an inspection procedure for the |
26 | | conversion of electric vehicle charging stations installed |
|
| | SB0071 Enrolled | - 13 - | LRB100 05891 RJF 15917 b |
|
|
1 | | by a self-installer if it is determined that the |
2 | | self-installed electric vehicle charging station is being |
3 | | used for commercial purposes; |
4 | | (11) establish the requirement that all persons or |
5 | | entities that install electric vehicle charging stations |
6 | | shall notify the servicing electric utility in writing of |
7 | | plans to install an electric vehicle charging station and |
8 | | shall notify the servicing electric utility in writing when |
9 | | installation is complete; |
10 | | (12) ensure that all persons or entities that install, |
11 | | maintain, or repair electric vehicle charging stations |
12 | | obtain certificates of insurance in sufficient amounts and |
13 | | coverages that the Commission so determines and, if |
14 | | necessary as determined by the Commission, names the |
15 | | affected public utility as an additional insured; and |
16 | | (13) identify and determine the training or other |
17 | | programs by which persons or entities may obtain the |
18 | | requisite training, skills, or experience necessary to |
19 | | achieve and maintain compliance with the requirements set |
20 | | forth in this subsection and subsection (a) of Section |
21 | | 16-128 to install, maintain, or repair electric vehicle |
22 | | charging stations. |
23 | | Within 18 months after the effective date of this |
24 | | amendatory Act of the 97th General Assembly, the Commission |
25 | | shall adopt rules, and may, if it deems necessary, adopt |
26 | | emergency rules, for the installation, maintenance, or repair |
|
| | SB0071 Enrolled | - 14 - | LRB100 05891 RJF 15917 b |
|
|
1 | | of electric vehicle charging stations. |
2 | | All retail customers who own, maintain, or repair an |
3 | | electric vehicle charging station shall provide the servicing |
4 | | electric utility (i) a certification that the customer |
5 | | installing the electric vehicle charging station was a |
6 | | self-installer or (ii) evidence that the electric vehicle |
7 | | charging station was installed by an entity certified under |
8 | | this subsection (d) that is also in good standing with the |
9 | | Commission. For purposes of this subsection (d), a retail |
10 | | customer includes that retail customer's employees, officers, |
11 | | and agents. If the electric vehicle charging station was not |
12 | | installed by a self-installer, then the person or entity that |
13 | | plans to install the electric vehicle charging station shall |
14 | | provide notice to the servicing electric utility prior to |
15 | | installation and when installation is complete and provide any |
16 | | other information required by the Commission's rules |
17 | | established under subsection (d) of this Section. An electric |
18 | | utility shall file a tariff or tariffs with the Commission |
19 | | setting forth the documentation, as specified by Commission |
20 | | rule, that a retail customer who owns, uses, operates, or |
21 | | maintains an electric vehicle charging station must provide to |
22 | | an electric utility. |
23 | | For the purposes of this subsection, an electric vehicle |
24 | | charging station shall constitute a distribution facility or |
25 | | equipment as that term is used in subsection (a) of Section |
26 | | 16-128 of this Act. The phrase "self-installer" means an |
|
| | SB0071 Enrolled | - 15 - | LRB100 05891 RJF 15917 b |
|
|
1 | | individual who (i) leases or purchases an electric vehicle |
2 | | charging station for his or her own personal use and (ii) |
3 | | installs an electric vehicle charging station on his or her own |
4 | | premises without the assistance of any other person. |
5 | | (e) Fees and penalties collected under this Section shall |
6 | | be deposited into the Public Utility Fund and used to fund the |
7 | | Commission's compliance with the obligations imposed by this |
8 | | Section. |
9 | | (f) The rules established under subsection (d) of this |
10 | | Section shall specify the initial dates for compliance with the |
11 | | rules. |
12 | | (g) Within 18 months of the effective date of this |
13 | | amendatory Act of the 99th General Assembly, the Commission |
14 | | shall adopt rules, including emergency rules, establishing a |
15 | | process for entities installing a new utility-scale wind |
16 | | project or a new utility-scale solar project to certify |
17 | | compliance with the requirements of this Section. For purposes |
18 | | of this Section, the phrase "entities installing a new |
19 | | utility-scale wind project or a new utility-scale solar |
20 | | project" shall include, but is not limited to, any entity |
21 | | installing new wind projects or new photovoltaic projects as |
22 | | such terms are defined in subsection (c) of Section 1-75 of the |
23 | | Illinois Power Agency Act. |
24 | | The process shall include an option to complete the |
25 | | certification electronically by completing forms on-line. An |
26 | | entity installing a new utility-scale wind project or a new |
|
| | SB0071 Enrolled | - 16 - | LRB100 05891 RJF 15917 b |
|
|
1 | | utility-scale solar project shall be permitted to complete |
2 | | certification after the subject work has been completed. The |
3 | | Commission shall maintain on its website a list of entities |
4 | | installing new utility-scale wind projects or new |
5 | | utility-scale solar projects measures that have successfully |
6 | | completed the certification process. |
7 | | (h) In addition to any authority granted to the Commission |
8 | | under this Act, the Commission is also authorized to: (1) |
9 | | determine which entities are subject to certification under |
10 | | subsection (g) of this Section; (2) impose reasonable |
11 | | certification fees and penalties; (3) adopt disciplinary |
12 | | procedures; (4) investigate any and all activities subject to |
13 | | subsection (g) or this subsection (h) of this Section, |
14 | | including violations thereof; (5) adopt procedures to issue or |
15 | | renew, or to refuse to issue or renew, a certification or to |
16 | | revoke, suspend, place on probation, reprimand, or otherwise |
17 | | discipline a certified entity under subsection (g) of this |
18 | | Section or take other enforcement action against an entity |
19 | | subject to subsection (g) or this subsection (h) of this |
20 | | Section; (6) prescribe forms to be issued for the |
21 | | administration and enforcement of subsection (g) and this |
22 | | subsection (h) of this Section; and (7) establish requirements |
23 | | to ensure that entities installing a new wind project or a new |
24 | | photovoltaic project have the requisite knowledge, skills, |
25 | | training, experience, and competence to perform in a safe and |
26 | | reliable manner as required by subsection (a) of Section 16-128 |
|
| | SB0071 Enrolled | - 17 - | LRB100 05891 RJF 15917 b |
|
|
1 | | of this Act. |
2 | | (i) The certification of persons or entities that install, |
3 | | maintain, or repair new wind projects, new photovoltaic |
4 | | projects, distributed generation facilities, and electric |
5 | | vehicle charging stations as set forth in this Section is an |
6 | | exclusive power and function of the State. A home rule unit or |
7 | | other units of local government authority may subject persons |
8 | | or entities that install, maintain, or repair new wind |
9 | | projects, new photovoltaic projects, distributed generation |
10 | | facilities, or electric vehicle charging stations as set forth |
11 | | in this Section to any applicable local licensing, siting, and |
12 | | permitting requirements otherwise permitted under law so long |
13 | | as only Commission-certified persons or entities are |
14 | | authorized to install, maintain, or repair new wind projects, |
15 | | new photovoltaic projects, distributed generation facilities, |
16 | | or electric vehicle charging stations. This Section is a |
17 | | limitation under subsection (h) of Section 6 of Article VII of |
18 | | the Illinois Constitution on the exercise by home rule units of |
19 | | powers and functions exclusively exercised by the State. |
20 | | (Source: P.A. 99-906, eff. 6-1-17.) |
21 | | Section 95. No acceleration or delay. Where this Act makes |
22 | | changes in a statute that is represented in this Act by text |
23 | | that is not yet or no longer in effect (for example, a Section |
24 | | represented by multiple versions), the use of that text does |
25 | | not accelerate or delay the taking effect of (i) the changes |