| ||||
Public Act 097-0491 | ||||
| ||||
| ||||
AN ACT concerning State government.
| ||||
Be it enacted by the People of the State of Illinois,
| ||||
represented in the General Assembly:
| ||||
Section 5. The Illinois Power Agency Act is amended by | ||||
changing Section 1-10 as follows:
| ||||
(20 ILCS 3855/1-10)
| ||||
Sec. 1-10. Definitions. | ||||
"Agency" means the Illinois Power Agency. | ||||
"Agency loan agreement" means any agreement pursuant to | ||||
which the Illinois Finance Authority agrees to loan the | ||||
proceeds of revenue bonds issued with respect to a project to | ||||
the Agency upon terms providing for loan repayment installments | ||||
at least sufficient to pay when due all principal of, interest | ||||
and premium, if any, on those revenue bonds, and providing for | ||||
maintenance, insurance, and other matters in respect of the | ||||
project. | ||||
"Authority" means the Illinois Finance Authority. | ||||
"Clean coal facility" means an electric generating | ||||
facility that uses primarily coal as a feedstock and that | ||||
captures and sequesters carbon emissions at the following | ||||
levels: at least 50% of the total carbon emissions that the | ||||
facility would otherwise emit if, at the time construction | ||||
commences, the facility is scheduled to commence operation |
before 2016, at least 70% of the total carbon emissions that | ||
the facility would otherwise emit if, at the time construction | ||
commences, the facility is scheduled to commence operation | ||
during 2016 or 2017, and at least 90% of the total carbon | ||
emissions that the facility would otherwise emit if, at the | ||
time construction commences, the facility is scheduled to | ||
commence operation after 2017. The power block of the clean | ||
coal facility shall not exceed allowable emission rates for | ||
sulfur dioxide, nitrogen oxides, carbon monoxide, particulates | ||
and mercury for a natural gas-fired combined-cycle facility the | ||
same size as and in the same location as the clean coal | ||
facility at the time the clean coal facility obtains an | ||
approved air permit. All coal used by a clean coal facility | ||
shall have high volatile bituminous rank and greater than 1.7 | ||
pounds of sulfur per million btu content, unless the clean coal | ||
facility does not use gasification technology and was operating | ||
as a conventional coal-fired electric generating facility on | ||
June 1, 2009 (the effective date of Public Act 95-1027). | ||
"Clean coal SNG facility" means a facility that uses a | ||
gasification process to produce substitute natural gas, that | ||
sequesters at least 90% of the total carbon emissions that the | ||
facility would otherwise emit and that uses petroleum coke or | ||
coal as a feedstock, with all such coal having a high | ||
bituminous rank and greater than 1.7 pounds of sulfur per | ||
million btu content. | ||
"Commission" means the Illinois Commerce Commission. |
"Costs incurred in connection with the development and | ||
construction of a facility" means: | ||
(1) the cost of acquisition of all real property and | ||
improvements in connection therewith and equipment and | ||
other property, rights, and easements acquired that are | ||
deemed necessary for the operation and maintenance of the | ||
facility; | ||
(2) financing costs with respect to bonds, notes, and | ||
other evidences of indebtedness of the Agency; | ||
(3) all origination, commitment, utilization, | ||
facility, placement, underwriting, syndication, credit | ||
enhancement, and rating agency fees; | ||
(4) engineering, design, procurement, consulting, | ||
legal, accounting, title insurance, survey, appraisal, | ||
escrow, trustee, collateral agency, interest rate hedging, | ||
interest rate swap, capitalized interest and other | ||
financing costs, and other expenses for professional | ||
services; and | ||
(5) the costs of plans, specifications, site study and | ||
investigation, installation, surveys, other Agency costs | ||
and estimates of costs, and other expenses necessary or | ||
incidental to determining the feasibility of any project, | ||
together with such other expenses as may be necessary or | ||
incidental to the financing, insuring, acquisition, and | ||
construction of a specific project and placing that project | ||
in operation. |
"Department" means the Department of Commerce and Economic | ||
Opportunity. | ||
"Director" means the Director of the Illinois Power Agency. | ||
"Demand-response" means measures that decrease peak | ||
electricity demand or shift demand from peak to off-peak | ||
periods. | ||
"Energy efficiency" means measures that reduce the amount | ||
of electricity or natural gas required to achieve a given end | ||
use. | ||
"Electric utility" has the same definition as found in | ||
Section 16-102 of the Public Utilities Act. | ||
"Facility" means an electric generating unit or a | ||
co-generating unit that produces electricity along with | ||
related equipment necessary to connect the facility to an | ||
electric transmission or distribution system. | ||
"Governmental aggregator" means one or more units of local | ||
government that individually or collectively procure | ||
electricity to serve residential retail electrical loads | ||
located within its or their jurisdiction. | ||
"Local government" means a unit of local government as | ||
defined in Article VII of Section 1 of the Illinois | ||
Constitution. | ||
"Municipality" means a city, village, or incorporated | ||
town. | ||
"Person" means any natural person, firm, partnership, | ||
corporation, either domestic or foreign, company, association, |
limited liability company, joint stock company, or association | ||
and includes any trustee, receiver, assignee, or personal | ||
representative thereof. | ||
"Project" means the planning, bidding, and construction of | ||
a facility. | ||
"Public utility" has the same definition as found in | ||
Section 3-105 of the Public Utilities Act. | ||
"Real property" means any interest in land together with | ||
all structures, fixtures, and improvements thereon, including | ||
lands under water and riparian rights, any easements, | ||
covenants, licenses, leases, rights-of-way, uses, and other | ||
interests, together with any liens, judgments, mortgages, or | ||
other claims or security interests related to real property. | ||
"Renewable energy credit" means a tradable credit that | ||
represents the environmental attributes of a certain amount of | ||
energy produced from a renewable energy resource. | ||
"Renewable energy resources" includes energy and its | ||
associated renewable energy credit or renewable energy credits | ||
from wind, solar thermal energy, photovoltaic cells and panels, | ||
biodiesel, anaerobic digestion, crops and untreated and | ||
unadulterated organic waste biomass, tree waste, hydropower | ||
that does not involve new construction or significant expansion | ||
of hydropower dams, and other alternative sources of | ||
environmentally preferable energy. For purposes of this Act, | ||
landfill gas produced in the State is considered a renewable | ||
energy resource. "Renewable energy resources" does not include |
the incineration or burning of tires, garbage, general | ||
household, institutional, and commercial waste, industrial | ||
lunchroom or office waste, landscape waste other than tree | ||
waste, railroad crossties, utility poles, or construction or | ||
demolition debris, other than untreated and unadulterated | ||
waste wood. | ||
"Revenue bond" means any bond, note, or other evidence of | ||
indebtedness issued by the Authority, the principal and | ||
interest of which is payable solely from revenues or income | ||
derived from any project or activity of the Agency. | ||
"Sequester" means permanent storage of carbon dioxide by | ||
injecting it into a saline aquifer, a depleted gas reservoir, | ||
or an oil reservoir, directly or through an enhanced oil | ||
recovery process that may involve intermediate storage in a | ||
salt dome. | ||
"Servicing agreement" means (i) in the case of an electric | ||
utility, an agreement between the owner of a clean coal | ||
facility and such electric utility, which agreement shall have | ||
terms and conditions meeting the requirements of paragraph (3) | ||
of subsection (d) of Section 1-75, and (ii) in the case of an | ||
alternative retail electric supplier, an agreement between the | ||
owner of a clean coal facility and such alternative retail | ||
electric supplier, which agreement shall have terms and | ||
conditions meeting the requirements of Section 16-115(d)(5) of | ||
the Public Utilities Act. | ||
"Substitute natural gas" or "SNG" means a gas manufactured |
by gasification of hydrocarbon feedstock, which is | ||
substantially interchangeable in use and distribution with | ||
conventional natural gas. | ||
"Total resource cost test" or "TRC test" means a standard | ||
that is met if, for an investment in energy efficiency or | ||
demand-response measures, the benefit-cost ratio is greater | ||
than one. The benefit-cost ratio is the ratio of the net | ||
present value of the total benefits of the program to the net | ||
present value of the total costs as calculated over the | ||
lifetime of the measures. A total resource cost test compares | ||
the sum of avoided electric utility costs, representing the | ||
benefits that accrue to the system and the participant in the | ||
delivery of those efficiency measures, as well as other | ||
quantifiable societal benefits, including avoided natural gas | ||
utility costs, to the sum of all incremental costs of end-use | ||
measures that are implemented due to the program (including | ||
both utility and participant contributions), plus costs to | ||
administer, deliver, and evaluate each demand-side program, to | ||
quantify the net savings obtained by substituting the | ||
demand-side program for supply resources. In calculating | ||
avoided costs of power and energy that an electric utility | ||
would otherwise have had to acquire, reasonable estimates shall | ||
be included of financial costs likely to be imposed by future | ||
regulations and legislation on emissions of greenhouse gases.
| ||
(Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09; | ||
95-1027, eff. 6-1-09; 96-33, eff. 7-10-09; 96-159, eff. |
8-10-09; 96-784, eff. 8-28-09; 96-1000, eff. 7-2-10.)
| ||
Section 99. Effective date. This Act takes effect upon | ||
becoming law.
|