Public Act 096-0781 |
||||
| ||||
| ||||
AN ACT concerning finance.
| ||||
Be it enacted by the People of the State of Illinois,
| ||||
represented in the General Assembly:
| ||||
Section 5. If and only if Senate Bill 658 of the 96th | ||||
General Assembly (as amended by House Amendment No. 3) becomes | ||||
law, the Illinois Power Agency Act is amended by changing | ||||
Section 1-56 as follows: | ||||
(20 ILCS 3855/1-56 as added by 09600SB0658eng with ham003)
| ||||
Sec. 1-56. Clean coal SNG facility construction. | ||||
(a) It is the intention of the General Assembly to provide | ||||
additional long-term natural gas price stability to the State | ||||
and consumers by promoting the development of a clean coal SNG | ||||
facility that would produce a minimum annual output of 30 Bcf | ||||
of SNG and commence construction no later than June 1, 2013 on | ||||
a brownfield site in a municipality with at least one million | ||||
residents. The costs associated with preparing a facility cost | ||||
report for such a facility, which contains all of the | ||||
information required by subsection (b) of this Section, may be | ||||
paid or reimbursed pursuant to subsection (c) of this Section. | ||||
(b) The facility cost report for a facility that meets the | ||||
criteria set forth in subsection (a) of this Section shall be | ||||
prepared by a duly licensed engineering firm that details the | ||||
estimated capital costs payable to one or more contractors or |
suppliers for the engineering, procurement, and construction | ||
of the components comprising the facility and the estimated | ||
costs of operation and maintenance of the facility. The report | ||
must be provided to the General Assembly and the Agency on or | ||
before April 30, 2010. The facility cost report shall include | ||
all off the following: | ||
(1) An estimate of the capital cost of the core plant | ||
based on a front-end engineering and design study. The core | ||
plant shall include all civil, structural, mechanical, | ||
electrical, control, and safety systems. The quoted | ||
construction costs shall be expressed in nominal dollars as | ||
of the date that the quote is prepared and shall include: | ||
(A) capitalized financing costs during | ||
construction; | ||
(B) taxes, insurance, and other owner's costs; and | ||
(C) any assumed escalation in materials and labor | ||
beyond the date as of which the construction cost quote | ||
is expressed; | ||
(2) An estimate of the capital cost of the balance of | ||
the plant, including any capital costs associated with site | ||
preparation and remediation, sequestration of carbon | ||
dioxide emissions, and all interconnects and interfaces | ||
required to operate the facility, such as construction or | ||
backfeed power supply, pipelines to transport substitute | ||
natural gas or carbon dioxide, potable water supply, | ||
natural gas supply, water supply, water discharge, |
landfill, access roads, and coal delivery. The front-end | ||
engineering and design study and the cost study for the | ||
balance of the plant shall include sufficient design work | ||
to permit quantification of major categories of materials, | ||
commodities and labor hours, and receipt of quotes from | ||
vendors of major equipment required to construct and | ||
operate the facility. | ||
(3) An operating and maintenance cost quote that will | ||
provide the estimated cost of delivered fuel, personnel, | ||
maintenance contracts, chemicals, catalysts, consumables, | ||
spares, and other fixed and variable operating and | ||
maintenance costs. This quote is subject to the following | ||
requirements: | ||
(A) The delivered fuel cost estimate shall be | ||
provided by a recognized third party expert or experts | ||
in the fuel and transportation industries. | ||
(B) The balance of the operating and maintenance | ||
cost quote, excluding delivered fuel costs shall be | ||
developed based on the inputs provided by a duly | ||
licensed engineering firm performing the construction | ||
cost quote, potential vendors under long-term service | ||
agreements and plant operating agreements, or | ||
recognized third-party plant operator or operators. | ||
The operating and maintenance cost quote shall be | ||
expressed in nominal dollars as of the date that the quote | ||
is prepared and shall include (i) taxes, insurance, and |
other owner's costs and (ii) any assumed escalation in | ||
materials and labor beyond the date as of which the | ||
operating and maintenance cost quote is expressed. | ||
(c) Reasonable amounts paid or due to be paid by the owner | ||
or owners of the clean coal SNG facility to third parties | ||
unrelated to the owner or owners to prepare the facility cost | ||
report will may be reimbursed or paid up to $10 million through | ||
Coal Development Bonds , through funding authorized pursuant to | ||
20 ILCS 3501/825-65 . | ||
(d) The Agency shall review the facility report and based | ||
on that report, consider whether to enter into long term | ||
contracts to purchase SNG from the facility pursuant to Section | ||
1-20 of this Act. To assist with its evaluation of the report, | ||
the Agency may hire one or more experts or consultants, the | ||
reasonable costs of which, not to exceed $250,000, shall be | ||
paid for by the owner or owners of the clean coal SNG facility | ||
submitting the facility cost report. The Agency may begin the | ||
process of selecting such experts or consultants prior to | ||
receipt of the facility cost report.
| ||
(Source: 09600SB0658eng with ham003.) | ||
Section 10. If and only if Senate Bill 658 of the 96th | ||
General Assembly (as amended by House Amendment No. 3) becomes | ||
law, the General Obligation Bond Act is amended by changing | ||
Section 7 as follows:
|
(30 ILCS 330/7) (from Ch. 127, par. 657)
| ||
Sec. 7. Coal and Energy Development. The amount of | ||
$698,200,000 is
authorized to be used by the Department of | ||
Commerce and Economic Opportunity (formerly Department of | ||
Commerce and Community Affairs) for
coal and energy development | ||
purposes, pursuant to Sections 2, 3 and 3.1 of the
Illinois | ||
Coal and Energy Development Bond Act, for the purposes
| ||
specified
in Section 8.1 of the Energy Conservation and Coal | ||
Development Act, for
the purposes specified in Section 605-332 | ||
of the Department of Commerce and
Economic Opportunity Law of | ||
the Civil Administrative Code of Illinois, and for the purpose | ||
of facility cost reports prepared pursuant to Sections 1-56 or | ||
Section 1-75(d)(4) of the Illinois Power Agency Act and for the | ||
purpose of development costs pursuant to Section 8.1 of the | ||
Energy Conservation and Coal Development Act . Of this
amount:
| ||
(a) $115,000,000 is
for the specific purposes of | ||
acquisition,
development, construction, reconstruction, | ||
improvement, financing,
architectural and technical planning | ||
and installation of capital facilities
consisting of | ||
buildings, structures, durable equipment, and land for the
| ||
purpose of capital development of coal resources within the | ||
State and for the
purposes specified in Section 8.1 of the | ||
Energy Conservation and Coal
Development Act;
| ||
(b) $35,000,000 is for the purposes specified in Section | ||
8.1 of the
Energy
Conservation and Coal Development Act and | ||
making a grant to the owner of a
generating station
located in |
Illinois and having at least three coal-fired generating units
| ||
with accredited summer capability greater than 500 megawatts | ||
each at such
generating station as provided in Section 6 of | ||
that Bond Act;
| ||
(c) $13,200,000 is for research, development and | ||
demonstration
of forms of energy
other than that derived from | ||
coal, either on or off State property;
| ||
(d) $500,000,000 is for the purpose of providing financial | ||
assistance to
new
electric generating facilities as provided in | ||
Section 605-332 of the Department
of Commerce and Economic | ||
Opportunity Law of the Civil Administrative Code of
Illinois; | ||
and
| ||
(e) $35,000,000 is for the purpose of facility cost reports | ||
prepared for not more than one facility pursuant to Section | ||
1-75(d)(4) of the Illinois Power Agency Act and not more than | ||
one facility pursuant to Section 1-56 of the Illinois Power | ||
Agency Act and for the purpose of up to $6,000,000 of | ||
development costs pursuant to Section 8.1 of the Energy | ||
Conservation and Coal Development Act . | ||
(Source: P.A. 94-793, eff. 5-19-06; 95-1026, eff. 1-12-09.)
| ||
Section 99. Effective date. This Act takes effect upon | ||
becoming law.
|