Public Act 095-0288 |
||||
| ||||
| ||||
AN ACT concerning safety.
| ||||
Be it enacted by the People of the State of Illinois,
| ||||
represented in the General Assembly:
| ||||
Section 5. The Environmental Protection Act is amended by | ||||
changing Sections 39 and 39.2 as follows:
| ||||
(415 ILCS 5/39) (from Ch. 111 1/2, par. 1039)
| ||||
Sec. 39. Issuance of permits; procedures.
| ||||
(a) When the Board has by regulation required a permit for
| ||||
the construction, installation, or operation of any type of | ||||
facility,
equipment, vehicle, vessel, or aircraft, the | ||||
applicant shall apply to
the Agency for such permit and it | ||||
shall be the duty of the Agency to
issue such a permit upon | ||||
proof by the applicant that the facility,
equipment, vehicle, | ||||
vessel, or aircraft will not cause a violation of
this Act or | ||||
of regulations hereunder. The Agency shall adopt such
| ||||
procedures as are necessary to carry out its duties under this | ||||
Section.
In making its determinations on permit applications | ||||
under this Section the Agency may consider prior adjudications | ||||
of
noncompliance with this Act by the applicant that involved a | ||||
release of a
contaminant into the environment. In granting | ||||
permits, the Agency
may impose reasonable conditions | ||||
specifically related to the applicant's past
compliance | ||||
history with this Act as necessary to correct, detect, or
|
prevent noncompliance. The Agency may impose such other | ||
conditions
as may be necessary to accomplish the purposes of | ||
this Act, and as are not
inconsistent with the regulations | ||
promulgated by the Board hereunder. Except as
otherwise | ||
provided in this Act, a bond or other security shall not be | ||
required
as a condition for the issuance of a permit. If the | ||
Agency denies any permit
under this Section, the Agency shall | ||
transmit to the applicant within the time
limitations of this | ||
Section specific, detailed statements as to the reasons the
| ||
permit application was denied. Such statements shall include, | ||
but not be
limited to the following:
| ||
(i) the Sections of this Act which may be violated if | ||
the permit
were granted;
| ||
(ii) the provision of the regulations, promulgated | ||
under this Act,
which may be violated if the permit were | ||
granted;
| ||
(iii) the specific type of information, if any, which | ||
the Agency
deems the applicant did not provide the Agency; | ||
and
| ||
(iv) a statement of specific reasons why the Act and | ||
the regulations
might not be met if the permit were | ||
granted.
| ||
If there is no final action by the Agency within 90 days | ||
after the
filing of the application for permit, the applicant | ||
may deem the permit
issued; except that this time period shall | ||
be extended to 180 days when
(1) notice and opportunity for |
public hearing are required by State or
federal law or | ||
regulation, (2) the application which was filed is for
any | ||
permit to develop a landfill subject to issuance pursuant to | ||
this
subsection, or (3) the application that was filed is for a | ||
MSWLF unit
required to issue public notice under subsection (p) | ||
of Section 39. The
90-day and 180-day time periods for the | ||
Agency to take final action do not
apply to NPDES permit | ||
applications under subsection (b) of this Section,
to RCRA | ||
permit applications under subsection (d) of this Section, or
to | ||
UIC permit applications under subsection (e) of this Section.
| ||
The Agency shall publish notice of all final permit | ||
determinations for
development permits for MSWLF units and for | ||
significant permit modifications
for lateral expansions for | ||
existing MSWLF units one time in a newspaper of
general | ||
circulation in the county in which the unit is or is proposed | ||
to be
located.
| ||
After January 1, 1994 and until July 1, 1998, operating | ||
permits issued under
this Section by the
Agency for sources of | ||
air pollution permitted to emit less than 25 tons
per year of | ||
any combination of regulated air pollutants, as defined in
| ||
Section 39.5 of this Act, shall be required to be renewed only | ||
upon written
request by the Agency consistent with applicable | ||
provisions of this Act and
regulations promulgated hereunder. | ||
Such operating permits shall expire
180 days after the date of | ||
such a request. The Board shall revise its
regulations for the | ||
existing State air pollution operating permit program
|
consistent with this provision by January 1, 1994.
| ||
After June 30, 1998, operating permits issued under this | ||
Section by the
Agency for sources of air pollution that are not | ||
subject to Section 39.5 of
this Act and are not required to | ||
have a federally enforceable State operating
permit shall be | ||
required to be renewed only upon written request by the Agency
| ||
consistent with applicable provisions of this Act and its | ||
rules. Such
operating permits shall expire 180 days after the | ||
date of such a request.
Before July 1, 1998, the Board shall | ||
revise its rules for the existing State
air pollution operating | ||
permit program consistent with this paragraph and shall
adopt | ||
rules that require a source to demonstrate that it qualifies | ||
for a permit
under this paragraph.
| ||
(b) The Agency may issue NPDES permits exclusively under | ||
this
subsection for the discharge of contaminants from point | ||
sources into
navigable waters, all as defined in the Federal | ||
Water Pollution Control
Act, as now or hereafter amended, | ||
within the jurisdiction of the
State, or into any well.
| ||
All NPDES permits shall contain those terms and conditions, | ||
including
but not limited to schedules of compliance, which may | ||
be required to
accomplish the purposes and provisions of this | ||
Act.
| ||
The Agency may issue general NPDES permits for discharges | ||
from categories
of point sources which are subject to the same | ||
permit limitations and
conditions. Such general permits may be | ||
issued without individual
applications and shall conform to |
regulations promulgated under Section 402
of the Federal Water | ||
Pollution Control Act, as now or hereafter amended.
| ||
The Agency may include, among such conditions, effluent | ||
limitations
and other requirements established under this Act, | ||
Board regulations,
the Federal Water Pollution Control Act, as | ||
now or hereafter amended, and
regulations pursuant thereto, and | ||
schedules for achieving compliance
therewith at the earliest | ||
reasonable date.
| ||
The Agency shall adopt filing requirements and procedures | ||
which are
necessary and appropriate for the issuance of NPDES | ||
permits, and which
are consistent with the Act or regulations | ||
adopted by the Board, and
with the Federal Water Pollution | ||
Control Act, as now or hereafter
amended, and regulations | ||
pursuant thereto.
| ||
The Agency, subject to any conditions which may be | ||
prescribed by
Board regulations, may issue NPDES permits to | ||
allow discharges beyond
deadlines established by this Act or by | ||
regulations of the Board without
the requirement of a variance, | ||
subject to the Federal Water Pollution
Control Act, as now or | ||
hereafter amended, and regulations pursuant thereto.
| ||
(c) Except for those facilities owned or operated by | ||
sanitary districts
organized under the Metropolitan Water | ||
Reclamation District Act, no
permit for the development or | ||
construction of a new pollution control
facility may be granted | ||
by the Agency unless the applicant submits proof to the
Agency | ||
that the location of the facility has been approved by the |
County Board
of the county if in an unincorporated area, or the | ||
governing body of the
municipality when in an incorporated | ||
area, in which the facility is to be
located in accordance with | ||
Section 39.2 of this Act. For purposes of this subsection (c), | ||
and for purposes of Section 39.2 of this Act, the appropriate | ||
county board or governing body of the municipality shall be the | ||
county board of the county or the governing body of the | ||
municipality in which the facility is to be located as of the | ||
date when the application for siting approval is filed.
| ||
In the event that siting approval granted pursuant to | ||
Section 39.2 has
been transferred to a subsequent owner or | ||
operator, that subsequent owner or
operator may apply to the | ||
Agency for, and the Agency may grant, a development
or | ||
construction permit for the facility for which local siting | ||
approval was
granted. Upon application to the Agency for a | ||
development or
construction permit by that subsequent owner or | ||
operator,
the permit applicant shall cause written notice of | ||
the permit application
to be served upon the appropriate county | ||
board or governing body of the
municipality that granted siting | ||
approval for that facility and upon any party
to the siting | ||
proceeding pursuant to which siting approval was granted. In
| ||
that event, the Agency shall conduct an evaluation of the | ||
subsequent owner or
operator's prior experience in waste | ||
management operations in the manner
conducted under subsection | ||
(i) of Section 39 of this Act.
| ||
Beginning August 20, 1993, if the pollution control |
facility consists of a
hazardous or solid waste disposal | ||
facility for which the proposed site is
located in an | ||
unincorporated area of a county with a population of less than
| ||
100,000 and includes all or a portion of a parcel of land that | ||
was, on April 1,
1993, adjacent to a municipality having a | ||
population of less than 5,000, then
the local siting review | ||
required under this subsection (c) in conjunction with
any | ||
permit applied for after that date shall be performed by the | ||
governing body
of that adjacent municipality rather than the | ||
county board of the county in
which the proposed site is | ||
located; and for the purposes of that local siting
review, any | ||
references in this Act to the county board shall be deemed to | ||
mean
the governing body of that adjacent municipality; | ||
provided, however, that the
provisions of this paragraph shall | ||
not apply to any proposed site which was, on
April 1, 1993, | ||
owned in whole or in part by another municipality.
| ||
In the case of a pollution control facility for which a
| ||
development permit was issued before November 12, 1981, if an | ||
operating
permit has not been issued by the Agency prior to | ||
August 31, 1989 for
any portion of the facility, then the | ||
Agency may not issue or renew any
development permit nor issue | ||
an original operating permit for any portion of
such facility | ||
unless the applicant has submitted proof to the Agency that the
| ||
location of the facility has been approved by the appropriate | ||
county board or
municipal governing body pursuant to Section | ||
39.2 of this Act.
|
After January 1, 1994, if a solid waste
disposal facility, | ||
any portion for which an operating permit has been issued by
| ||
the Agency, has not accepted waste disposal for 5 or more | ||
consecutive calendars
years, before that facility may accept | ||
any new or additional waste for
disposal, the owner and | ||
operator must obtain a new operating permit under this
Act for | ||
that facility unless the owner and operator have applied to the | ||
Agency
for a permit authorizing the temporary suspension of | ||
waste acceptance. The
Agency may not issue a new operation | ||
permit under this Act for the facility
unless the applicant has | ||
submitted proof to the Agency that the location of the
facility | ||
has been approved or re-approved by the appropriate county | ||
board or
municipal governing body under Section 39.2 of this | ||
Act after the facility
ceased accepting waste.
| ||
Except for those facilities owned or operated by sanitary | ||
districts
organized under the Metropolitan Water Reclamation | ||
District Act, and
except for new pollution control facilities | ||
governed by Section 39.2,
and except for fossil fuel mining | ||
facilities, the granting of a permit under
this Act shall not | ||
relieve the applicant from meeting and securing all
necessary | ||
zoning approvals from the unit of government having zoning
| ||
jurisdiction over the proposed facility.
| ||
Before beginning construction on any new sewage treatment | ||
plant or sludge
drying site to be owned or operated by a | ||
sanitary district organized under
the Metropolitan Water | ||
Reclamation District Act for which a new
permit (rather than |
the renewal or amendment of an existing permit) is
required, | ||
such sanitary district shall hold a public hearing within the
| ||
municipality within which the proposed facility is to be | ||
located, or within the
nearest community if the proposed | ||
facility is to be located within an
unincorporated area, at | ||
which information concerning the proposed facility
shall be | ||
made available to the public, and members of the public shall | ||
be given
the opportunity to express their views concerning the | ||
proposed facility.
| ||
The Agency may issue a permit for a municipal waste | ||
transfer station
without requiring approval pursuant to | ||
Section 39.2 provided that the following
demonstration is made:
| ||
(1) the municipal waste transfer station was in | ||
existence on or before
January 1, 1979 and was in | ||
continuous operation from January 1, 1979 to January
1, | ||
1993;
| ||
(2) the operator submitted a permit application to the | ||
Agency to develop
and operate the municipal waste transfer | ||
station during April of 1994;
| ||
(3) the operator can demonstrate that the county board | ||
of the county, if
the municipal waste transfer station is | ||
in an unincorporated area, or the
governing body of the | ||
municipality, if the station is in an incorporated area,
| ||
does not object to resumption of the operation of the | ||
station; and
| ||
(4) the site has local zoning approval.
|
(d) The Agency may issue RCRA permits exclusively under | ||
this
subsection to persons owning or operating a facility for | ||
the treatment,
storage, or disposal of hazardous waste as | ||
defined under this Act.
| ||
All RCRA permits shall contain those terms and conditions, | ||
including but
not limited to schedules of compliance, which may | ||
be required to accomplish
the purposes and provisions of this | ||
Act. The Agency may include among such
conditions standards and | ||
other requirements established under this Act,
Board | ||
regulations, the Resource Conservation and Recovery Act of 1976 | ||
(P.L.
94-580), as amended, and regulations pursuant thereto, | ||
and may include
schedules for achieving compliance therewith as | ||
soon as possible. The
Agency shall require that a performance | ||
bond or other security be provided
as a condition for the | ||
issuance of a RCRA permit.
| ||
In the case of a permit to operate a hazardous waste or PCB | ||
incinerator
as defined in subsection (k) of Section 44, the | ||
Agency shall require, as a
condition of the permit, that the | ||
operator of the facility perform such
analyses of the waste to | ||
be incinerated as may be necessary and appropriate
to ensure | ||
the safe operation of the incinerator.
| ||
The Agency shall adopt filing requirements and procedures | ||
which
are necessary and appropriate for the issuance of RCRA | ||
permits, and which
are consistent with the Act or regulations | ||
adopted by the Board, and with
the Resource Conservation and | ||
Recovery Act of 1976 (P.L. 94-580), as
amended, and regulations |
pursuant thereto.
| ||
The applicant shall make available to the public for | ||
inspection all
documents submitted by the applicant to the | ||
Agency in furtherance
of an application, with the exception of | ||
trade secrets, at the office of
the county board or governing | ||
body of the municipality. Such documents
may be copied upon | ||
payment of the actual cost of reproduction during regular
| ||
business hours of the local office. The Agency shall issue a | ||
written statement
concurrent with its grant or denial of the | ||
permit explaining the basis for its
decision.
| ||
(e) The Agency may issue UIC permits exclusively under this
| ||
subsection to persons owning or operating a facility for the | ||
underground
injection of contaminants as defined under this | ||
Act.
| ||
All UIC permits shall contain those terms and conditions, | ||
including but
not limited to schedules of compliance, which may | ||
be required to accomplish
the purposes and provisions of this | ||
Act. The Agency may include among such
conditions standards and | ||
other requirements established under this Act,
Board | ||
regulations, the Safe Drinking Water Act (P.L. 93-523), as | ||
amended,
and regulations pursuant thereto, and may include | ||
schedules for achieving
compliance therewith. The Agency shall | ||
require that a performance bond or
other security be provided | ||
as a condition for the issuance of a UIC permit.
| ||
The Agency shall adopt filing requirements and procedures | ||
which
are necessary and appropriate for the issuance of UIC |
permits, and which
are consistent with the Act or regulations | ||
adopted by the Board, and with
the Safe Drinking Water Act | ||
(P.L. 93-523), as amended, and regulations
pursuant thereto.
| ||
The applicant shall make available to the public for | ||
inspection, all
documents submitted by the applicant to the | ||
Agency in furtherance of an
application, with the exception of | ||
trade secrets, at the office of the county
board or governing | ||
body of the municipality. Such documents may be copied upon
| ||
payment of the actual cost of reproduction during regular | ||
business hours of the
local office. The Agency shall issue a | ||
written statement concurrent with its
grant or denial of the | ||
permit explaining the basis for its decision.
| ||
(f) In making any determination pursuant to Section 9.1 of | ||
this Act:
| ||
(1) The Agency shall have authority to make the | ||
determination of any
question required to be determined by | ||
the Clean Air Act, as now or
hereafter amended, this Act, | ||
or the regulations of the Board, including the
| ||
determination of the Lowest Achievable Emission Rate, | ||
Maximum Achievable
Control Technology, or Best Available | ||
Control Technology, consistent with the
Board's | ||
regulations, if any.
| ||
(2) The Agency shall, after conferring with the | ||
applicant, give written
notice to the applicant of its | ||
proposed decision on the application including
the terms | ||
and conditions of the permit to be issued and the facts, |
conduct
or other basis upon which the Agency will rely to | ||
support its proposed action.
| ||
(3) Following such notice, the Agency shall give the | ||
applicant an
opportunity for a hearing in accordance with | ||
the provisions of Sections
10-25 through 10-60 of the | ||
Illinois Administrative Procedure Act.
| ||
(g) The Agency shall include as conditions upon all permits | ||
issued for
hazardous waste disposal sites such restrictions | ||
upon the future use
of such sites as are reasonably necessary | ||
to protect public health and
the environment, including | ||
permanent prohibition of the use of such
sites for purposes | ||
which may create an unreasonable risk of injury to human
health | ||
or to the environment. After administrative and judicial | ||
challenges
to such restrictions have been exhausted, the Agency | ||
shall file such
restrictions of record in the Office of the | ||
Recorder of the county in which
the hazardous waste disposal | ||
site is located.
| ||
(h) A hazardous waste stream may not be deposited in a | ||
permitted hazardous
waste site unless specific authorization | ||
is obtained from the Agency by the
generator and disposal site | ||
owner and operator for the deposit of that specific
hazardous | ||
waste stream. The Agency may grant specific authorization for
| ||
disposal of hazardous waste streams only after the generator | ||
has reasonably
demonstrated that, considering
technological | ||
feasibility and economic reasonableness, the hazardous waste
| ||
cannot be reasonably recycled for reuse, nor incinerated or |
chemically,
physically or biologically treated so as to | ||
neutralize the hazardous waste
and render it nonhazardous. In | ||
granting authorization under this Section,
the Agency may | ||
impose such conditions as may be necessary to accomplish
the | ||
purposes of the Act and are consistent with this Act and | ||
regulations
promulgated by the Board hereunder. If the Agency | ||
refuses to grant
authorization under this Section, the | ||
applicant may appeal as if the Agency
refused to grant a | ||
permit, pursuant to the provisions of subsection (a) of
Section | ||
40 of this Act. For purposes of this subsection (h), the term
| ||
"generator" has the meaning given in Section 3.205 of this Act,
| ||
unless: (1) the hazardous waste is treated, incinerated, or | ||
partially recycled
for reuse prior to disposal, in which case | ||
the last person who treats,
incinerates, or partially recycles | ||
the hazardous waste prior to disposal is the
generator; or (2) | ||
the hazardous waste is from a response action, in which case
| ||
the person performing the response action is the generator. | ||
This subsection
(h) does not apply to any hazardous waste that | ||
is restricted from land disposal
under 35 Ill. Adm. Code 728.
| ||
(i) Before issuing any RCRA permit, any permit for a waste | ||
storage site,
sanitary landfill, waste disposal site, waste | ||
transfer station, waste treatment
facility, waste incinerator, | ||
or any waste-transportation operation, or any permit or interim | ||
authorization for a clean construction or demolition debris | ||
fill operation, the Agency
shall conduct an evaluation of the | ||
prospective owner's or operator's prior
experience in waste |
management operations and clean construction or demolition | ||
debris fill operations. The Agency may deny such a permit, or | ||
deny or revoke interim authorization,
if the prospective owner | ||
or operator or any employee or officer of the
prospective owner | ||
or operator has a history of:
| ||
(1) repeated violations of federal, State, or local | ||
laws, regulations,
standards, or ordinances in the | ||
operation of waste management facilities or
sites or clean | ||
construction or demolition debris fill operation | ||
facilities or sites; or
| ||
(2) conviction in this or another State of any crime | ||
which is a felony
under the laws of this State, or | ||
conviction of a felony in a federal court; or conviction in | ||
this or another state or federal court of any of the | ||
following crimes: forgery, official misconduct, bribery, | ||
perjury, or knowingly submitting false information under | ||
any environmental law, regulation, or permit term or | ||
condition; or
| ||
(3) proof of gross carelessness or incompetence in | ||
handling, storing,
processing, transporting or disposing | ||
of waste or clean construction or demolition debris, or | ||
proof of gross carelessness or incompetence in using clean | ||
construction or demolition debris as fill.
| ||
(i-5) Before issuing any permit or approving any interim | ||
authorization for a clean construction or demolition debris | ||
fill operation in which any ownership interest is transferred |
between January 1, 2005, and the effective date of the | ||
prohibition set forth in Section 22.52 of this Act, the Agency | ||
shall conduct an evaluation of the operation if any previous | ||
activities at the site or facility may have caused or allowed | ||
contamination of the site. It shall be the responsibility of | ||
the owner or operator seeking the permit or interim | ||
authorization to provide to the Agency all of the information | ||
necessary for the Agency to conduct its evaluation. The Agency | ||
may deny a permit or interim authorization if previous | ||
activities at the site may have caused or allowed contamination | ||
at the site, unless such contamination is authorized under any | ||
permit issued by the Agency.
| ||
(j) The issuance under this Act of a permit to engage in | ||
the surface mining
of any resources other than fossil fuels | ||
shall not relieve
the permittee from its duty to comply with | ||
any applicable local law regulating
the commencement, location | ||
or operation of surface mining facilities.
| ||
(k) A development permit issued under subsection (a) of | ||
Section 39 for any
facility or site which is required to have a | ||
permit under subsection (d) of
Section 21 shall expire at the | ||
end of 2 calendar years from the date upon which
it was issued, | ||
unless within that period the applicant has taken action to
| ||
develop the facility or the site. In the event that review of | ||
the
conditions of the development permit is sought pursuant to | ||
Section 40 or
41, or permittee is prevented from commencing | ||
development of the facility
or site by any other litigation |
beyond the permittee's control, such
two-year period shall be | ||
deemed to begin on the date upon which such review
process or | ||
litigation is concluded.
| ||
(l) No permit shall be issued by the Agency under this Act | ||
for
construction or operation of any facility or site located | ||
within the
boundaries of any setback zone established pursuant | ||
to this Act, where such
construction or operation is | ||
prohibited.
| ||
(m) The Agency may issue permits to persons owning or | ||
operating
a facility for composting landscape waste. In | ||
granting such permits, the Agency
may impose such conditions as | ||
may be necessary to accomplish the purposes of
this Act, and as | ||
are not inconsistent with applicable regulations promulgated
| ||
by the Board. Except as otherwise provided in this Act, a bond | ||
or other
security shall not be required as a condition for the | ||
issuance of a permit. If
the Agency denies any permit pursuant | ||
to this subsection, the Agency shall
transmit to the applicant | ||
within the time limitations of this subsection
specific, | ||
detailed statements as to the reasons the permit application | ||
was
denied. Such statements shall include but not be limited to | ||
the following:
| ||
(1) the Sections of this Act that may be violated if | ||
the permit
were granted;
| ||
(2) the specific regulations promulgated pursuant to | ||
this
Act that may be violated if the permit were granted;
| ||
(3) the specific information, if any, the Agency deems |
the
applicant did not provide in its application to the | ||
Agency; and
| ||
(4) a statement of specific reasons why the Act and the | ||
regulations
might be violated if the permit were granted.
| ||
If no final action is taken by the Agency within 90 days | ||
after the filing
of the application for permit, the applicant | ||
may deem the permit issued.
Any applicant for a permit may | ||
waive the 90 day limitation by filing a
written statement with | ||
the Agency.
| ||
The Agency shall issue permits for such facilities upon | ||
receipt of an
application that includes a legal description of | ||
the site, a topographic
map of the site drawn to the scale of | ||
200 feet to the inch or larger, a
description of the operation, | ||
including the area served, an estimate of
the volume of | ||
materials to be processed, and documentation that:
| ||
(1) the facility includes a setback of at
least 200 | ||
feet from the nearest potable water supply well;
| ||
(2) the facility is located outside the boundary
of the | ||
10-year floodplain or the site will be floodproofed;
| ||
(3) the facility is located so as to minimize
| ||
incompatibility with the character of the surrounding | ||
area, including at
least a 200 foot setback from any | ||
residence, and in the case of a
facility that is developed | ||
or the permitted composting area of which is
expanded after | ||
November 17, 1991, the composting area is located at least | ||
1/8
mile from the nearest residence (other than a residence |
located on the same
property as the facility);
| ||
(4) the design of the facility will prevent any compost | ||
material from
being placed within 5 feet of the water | ||
table, will adequately control runoff
from the site, and | ||
will collect and manage any leachate that is generated on
| ||
the site;
| ||
(5) the operation of the facility will include | ||
appropriate dust
and odor control measures, limitations on | ||
operating hours, appropriate
noise control measures for | ||
shredding, chipping and similar equipment,
management | ||
procedures for composting, containment and disposal of
| ||
non-compostable wastes, procedures to be used for
| ||
terminating operations at the site, and recordkeeping | ||
sufficient to
document the amount of materials received, | ||
composted and otherwise
disposed of; and
| ||
(6) the operation will be conducted in accordance with | ||
any applicable
rules adopted by the Board.
| ||
The Agency shall issue renewable permits of not longer than | ||
10 years
in duration for the composting of landscape wastes, as | ||
defined in Section
3.155 of this Act, based on the above | ||
requirements.
| ||
The operator of any facility permitted under this | ||
subsection (m) must
submit a written annual statement to the | ||
Agency on or before April 1 of
each year that includes an | ||
estimate of the amount of material, in tons,
received for | ||
composting.
|
(n) The Agency shall issue permits jointly with the | ||
Department of
Transportation for the dredging or deposit of | ||
material in Lake Michigan in
accordance with Section 18 of the | ||
Rivers, Lakes, and Streams Act.
| ||
(o) (Blank.)
| ||
(p) (1) Any person submitting an application for a permit | ||
for a new MSWLF
unit or for a lateral expansion under | ||
subsection (t) of Section 21 of this Act
for an existing MSWLF | ||
unit that has not received and is not subject to local
siting | ||
approval under Section 39.2 of this Act shall publish notice of | ||
the
application in a newspaper of general circulation in the | ||
county in which the
MSWLF unit is or is proposed to be located. | ||
The notice must be published at
least 15 days before submission | ||
of the permit application to the Agency. The
notice shall state | ||
the name and address of the applicant, the location of the
| ||
MSWLF unit or proposed MSWLF unit, the nature and size of the | ||
MSWLF unit or
proposed MSWLF unit, the nature of the activity | ||
proposed, the probable life of
the proposed activity, the date | ||
the permit application will be submitted, and a
statement that | ||
persons may file written comments with the Agency concerning | ||
the
permit application within 30 days after the filing of the | ||
permit application
unless the time period to submit comments is | ||
extended by the Agency.
| ||
When a permit applicant submits information to the Agency | ||
to supplement a
permit application being reviewed by the | ||
Agency, the applicant shall not be
required to reissue the |
notice under this subsection.
| ||
(2) The Agency shall accept written comments concerning the | ||
permit
application that are postmarked no later than 30 days | ||
after the
filing of the permit application, unless the time | ||
period to accept comments is
extended by the Agency.
| ||
(3) Each applicant for a permit described in part (1) of | ||
this subsection
shall file a
copy of the permit application | ||
with the county board or governing body of the
municipality in | ||
which the MSWLF unit is or is proposed to be located at the
| ||
same time the application is submitted to the Agency. The | ||
permit application
filed with the county board or governing | ||
body of the municipality shall include
all documents submitted | ||
to or to be submitted to the Agency, except trade
secrets as | ||
determined under Section 7.1 of this Act. The permit | ||
application
and other documents on file with the county board | ||
or governing body of the
municipality shall be made available | ||
for public inspection during regular
business hours at the | ||
office of the county board or the governing body of the
| ||
municipality and may be copied upon payment of the actual cost | ||
of
reproduction.
| ||
(Source: P.A. 93-575, eff. 1-1-04; 94-272, eff. 7-19-05; | ||
94-725, eff. 6-1-06 .)
| ||
(415 ILCS 5/39.2) (from Ch. 111 1/2, par. 1039.2)
| ||
Sec. 39.2. Local siting review.
| ||
(a) The county board of the county or the governing body of |
the
municipality, as determined by paragraph (c) of Section 39 | ||
of this Act, shall
approve or disapprove the request for local | ||
siting approval for each pollution
control facility which is | ||
subject to such review. An applicant for local
siting approval | ||
shall submit sufficient details describing the proposed
| ||
facility to demonstrate compliance, and local siting approval | ||
shall be granted
only if the proposed facility meets the | ||
following criteria:
| ||
(i) the facility is necessary to accommodate the waste | ||
needs of the area
it is intended to serve;
| ||
(ii) the facility is so designed, located and proposed | ||
to be operated
that the public health, safety and welfare | ||
will be protected;
| ||
(iii) the facility is located so as to minimize | ||
incompatibility with the
character of the surrounding area | ||
and to minimize the effect on the value of
the surrounding | ||
property;
| ||
(iv) (A) for a facility other than a sanitary landfill | ||
or waste disposal
site, the facility is located outside the | ||
boundary of the 100 year flood plain
or the site is | ||
flood-proofed; (B) for a facility that is a sanitary | ||
landfill
or waste disposal site, the facility is located | ||
outside the boundary of the
100-year floodplain, or if the | ||
facility is a facility described in subsection
(b)(3) of | ||
Section 22.19a, the site is flood-proofed;
| ||
(v) the plan of operations for the facility is designed |
to minimize
the danger to the surrounding area from fire, | ||
spills, or other operational
accidents;
| ||
(vi) the traffic patterns to or from the facility are | ||
so designed as to
minimize the impact on existing traffic | ||
flows;
| ||
(vii) if the facility will be treating, storing or | ||
disposing of
hazardous waste, an emergency response plan | ||
exists for the facility which
includes notification, | ||
containment and evacuation procedures to be used in
case of | ||
an accidental release;
| ||
(viii) if the facility is to be located in a county | ||
where the county
board has adopted a solid waste management | ||
plan consistent with the planning
requirements of the Local | ||
Solid Waste Disposal Act or the Solid Waste Planning
and | ||
Recycling Act, the facility is
consistent with that plan; | ||
for purposes of this criterion (viii), the "solid waste | ||
management plan" means the plan that is in effect as of the | ||
date the application for siting approval is filed; and
| ||
(ix) if the facility will be located within a regulated | ||
recharge area,
any applicable requirements specified by | ||
the Board for such areas have been
met.
| ||
The county board or the governing body of the municipality | ||
may also
consider as evidence the previous operating experience | ||
and past record of
convictions or admissions of violations of | ||
the applicant (and any subsidiary
or parent corporation) in the | ||
field of solid waste management when
considering criteria (ii) |
and (v) under this Section. | ||
If the facility is subject to the location restrictions in | ||
Section 22.14 of this Act, compliance with that Section shall | ||
be determined as of the date the application for siting | ||
approval is filed.
| ||
(b) No later than 14 days before the date on which the | ||
county board or
governing body of the municipality receives a | ||
request for
site approval, the applicant shall cause written | ||
notice
of such request to be served either in person or by | ||
registered mail, return
receipt requested, on the owners of all | ||
property within the subject area not
solely owned by the | ||
applicant, and on the owners of all property within 250
feet in | ||
each direction of the lot line of the subject property, said | ||
owners
being such persons or entities which appear from the | ||
authentic tax records of
the County in which such facility is | ||
to be located; provided, that the number
of all feet occupied | ||
by all public roads, streets, alleys and other public ways
| ||
shall be excluded in computing the 250 feet requirement; | ||
provided further, that
in no event shall this requirement | ||
exceed 400 feet, including public streets,
alleys and other | ||
public ways.
| ||
Such written notice shall also be served upon members of | ||
the General Assembly
from the legislative district in which the | ||
proposed facility is located
and shall be published in a | ||
newspaper of general circulation published in
the county in | ||
which the site is located.
|
Such notice shall state the name and address of the | ||
applicant, the location
of the proposed site, the nature and | ||
size of the development, the nature of the
activity proposed, | ||
the probable life of the proposed activity, the date when
the | ||
request for site approval will be submitted, and a description | ||
of the right
of persons to comment on such request as hereafter | ||
provided.
| ||
(c) An applicant shall file a copy of its request with the | ||
county board
of the county or the governing body of the | ||
municipality in which the proposed
site is located. The request | ||
shall include (i) the substance of the
applicant's proposal and | ||
(ii) all documents, if any, submitted as of that date
to the | ||
Agency pertaining to the proposed facility, except trade | ||
secrets as
determined under Section 7.1 of this Act. All such | ||
documents or other
materials on file with the county board or | ||
governing body of the municipality
shall be made available for | ||
public inspection at the office of the county board
or the | ||
governing body of the municipality and may be copied upon | ||
payment of the
actual cost of reproduction.
| ||
Any person may file written comment with the county board | ||
or governing
body of the municipality concerning the | ||
appropriateness of the proposed
site for its intended purpose. | ||
The county board or governing body of the
municipality shall | ||
consider any comment received or postmarked not later
than 30 | ||
days after the date of the last public hearing.
| ||
(d) At least one public hearing is to be held by the county |
board or
governing body of the municipality no sooner than 90 | ||
days but no later than
120 days after the date on which it | ||
received the
request for site approval. No later than 14 days | ||
prior to such hearing,
notice shall be published in a newspaper | ||
of general circulation published in
the county of the proposed | ||
site, and delivered by certified mail to all members
of the | ||
General Assembly from the district in which the proposed site | ||
is
located, to the governing authority of every municipality | ||
contiguous to the
proposed site or contiguous to the | ||
municipality in which the proposed site is
to be located, to | ||
the county board of the county where the proposed site is to
be | ||
located, if the proposed site is located within the boundaries | ||
of a
municipality, and to the Agency. Members or | ||
representatives of the governing
authority of a municipality | ||
contiguous to the proposed site or contiguous to
the | ||
municipality in which the proposed site is to be located and, | ||
if the
proposed site is located in a municipality, members or | ||
representatives of the
county board of a county in which the | ||
proposed site is to be located may appear
at and participate in | ||
public hearings held pursuant to this Section. The
public | ||
hearing shall develop a record sufficient to form the basis of | ||
appeal
of the decision in accordance with Section 40.1 of this | ||
Act. The fact that a
member of the county board or governing | ||
body of the municipality has publicly
expressed an opinion on | ||
an issue related to a site review proceeding shall not
preclude | ||
the member from taking part in the proceeding and voting on the |
issue.
| ||
(e) Decisions of the county board or governing body of the | ||
municipality
are to be in writing, specifying the reasons for | ||
the decision, such reasons
to be in conformance with subsection | ||
(a) of this Section. In granting approval
for a site the county | ||
board or governing body of the municipality may impose
such | ||
conditions as may be reasonable and necessary to accomplish the | ||
purposes
of this Section and as are not inconsistent with | ||
regulations promulgated
by the Board. Such decision shall be | ||
available for public inspection at
the office of the county | ||
board or governing body of the municipality and
may be copied | ||
upon payment of the actual cost of reproduction. If there is
no | ||
final action by the county board or governing body of the | ||
municipality
within 180 days after the date on which it | ||
received the
request for site approval, the applicant may deem | ||
the request approved.
| ||
At any time prior to completion by the applicant of the | ||
presentation of
the applicant's factual evidence and an | ||
opportunity for cross-questioning
by the county board or | ||
governing body of the municipality and any participants,
the | ||
applicant may file not more than one amended application upon | ||
payment
of additional fees pursuant to subsection (k); in which | ||
case the time
limitation for final action set forth in this | ||
subsection (e) shall
be extended for an additional period of 90 | ||
days.
| ||
If, prior to making a final local siting decision, a county |
board or
governing body of a municipality has negotiated and | ||
entered into a host
agreement with the local siting applicant, | ||
the terms and conditions of
the host agreement, whether written | ||
or oral, shall be disclosed and made
a part of the hearing | ||
record for that local siting proceeding.
In the case of an oral | ||
agreement, the disclosure shall be made in the form
of a | ||
written summary jointly prepared and submitted by the county | ||
board or
governing body of the municipality and the siting | ||
applicant and shall describe
the terms and conditions of the | ||
oral agreement.
| ||
(e-5) Siting approval obtained pursuant to this Section is | ||
transferable
and may be transferred to a subsequent owner or | ||
operator. In the event that
siting approval has been | ||
transferred to a subsequent owner or operator, that
subsequent | ||
owner or operator assumes and takes subject to any and all
| ||
conditions imposed upon the prior owner or operator by the | ||
county board of
the county or governing body of the | ||
municipality pursuant to subsection (e).
However, any such | ||
conditions imposed pursuant to this Section may be modified
by | ||
agreement between the subsequent owner or operator and the | ||
appropriate
county board or governing body. Further, in the | ||
event that siting approval
obtained pursuant to this Section | ||
has been transferred to a subsequent owner or
operator, that | ||
subsequent owner or operator assumes all rights and obligations
| ||
and takes the facility subject to any and all terms and | ||
conditions of any
existing host agreement between the prior |
owner or operator and the appropriate
county board or governing | ||
body.
| ||
(f) A local siting approval granted under this Section | ||
shall expire at
the end of 2 calendar years from the date upon | ||
which it was granted, unless
the local siting approval granted | ||
under this Section is for a sanitary landfill
operation, in | ||
which case the approval shall expire at the end of 3 calendar
| ||
years from the date upon which it was granted, and unless | ||
within that period
the applicant has made application to the | ||
Agency for a
permit to develop the site. In the event that the | ||
local siting decision has
been appealed, such expiration period | ||
shall be deemed to begin on the date
upon which the appeal | ||
process is concluded.
| ||
Except as otherwise provided in this subsection, upon the | ||
expiration
of a development permit under subsection (k) of | ||
Section 39, any associated
local siting approval granted for | ||
the facility under this Section shall also
expire.
| ||
If a first development permit for a municipal waste | ||
incineration
facility expires under subsection (k) of Section | ||
39 after September 30,
1989 due to circumstances beyond the | ||
control of the applicant, any
associated local siting approval | ||
granted for the facility under this
Section may be used to | ||
fulfill the local siting approval requirement upon
application | ||
for a second development permit for the same site, provided
| ||
that the proposal in the new application is materially the | ||
same, with respect
to the criteria in subsection (a) of this |
Section, as the proposal that
received the original siting | ||
approval, and application for the second
development permit is | ||
made before January 1, 1990.
| ||
(g) The siting approval procedures, criteria and appeal | ||
procedures
provided for in this Act for new pollution control | ||
facilities
shall be the exclusive siting procedures and rules | ||
and appeal procedures
for facilities subject to such | ||
procedures. Local zoning or other local land
use requirements | ||
shall not be applicable to such siting decisions.
| ||
(h) Nothing in this Section shall apply to any existing or | ||
new
pollution control facility located within the corporate | ||
limits of
a municipality with a population of over 1,000,000.
| ||
(i) (Blank.)
| ||
The Board shall adopt regulations establishing the | ||
geologic and
hydrologic siting criteria necessary to protect | ||
usable groundwater
resources which are to be followed by the | ||
Agency in its review of permit
applications for new pollution | ||
control facilities. Such
regulations, insofar as they apply to | ||
new pollution control
facilities authorized to store, treat or | ||
dispose of any hazardous waste,
shall be at least as stringent | ||
as the requirements of the Resource
Conservation and Recovery | ||
Act and any State or federal regulations adopted
pursuant | ||
thereto.
| ||
(j) Any new pollution control facility which has never | ||
obtained local
siting approval under the provisions of this | ||
Section shall be required to
obtain such approval after a final |
decision on an appeal of a permit denial.
| ||
(k) A county board or governing body of a municipality may | ||
charge
applicants for siting review under this Section a | ||
reasonable fee to cover
the reasonable and necessary costs | ||
incurred by such county or municipality
in the siting review | ||
process.
| ||
(l) The governing Authority as determined by subsection (c) | ||
of Section
39 of this Act may request the Department of | ||
Transportation to perform
traffic impact studies of proposed or | ||
potential locations for required
pollution control facilities.
| ||
(m) An applicant may not file a request for local siting | ||
approval which is
substantially the same as a request which was | ||
disapproved pursuant to a
finding against the applicant under | ||
any of criteria (i) through (ix) of
subsection (a) of this | ||
Section within the preceding 2 years.
| ||
(n) In any review proceeding of a decision of the county | ||
board or
governing body of a municipality made pursuant to the | ||
local
siting review process, the petitioner in the review | ||
proceeding shall pay to
the county or municipality the cost of | ||
preparing and certifying the record
of proceedings. Should the | ||
petitioner in the review proceeding fail to make
payment, the | ||
provisions of Section 3-109 of the Code of Civil
Procedure | ||
shall apply.
| ||
In the event the petitioner is a citizens' group that | ||
participated in the
siting proceeding and is so located as to | ||
be affected by the proposed
facility, such petitioner shall be |
exempt from paying the costs of
preparing and certifying the | ||
record.
| ||
(o) Notwithstanding any other provision of this Section, a | ||
transfer
station used exclusively for landscape waste, where | ||
landscape waste is held
no longer than 24 hours from the time | ||
it was received, is not subject to the
requirements of local | ||
siting approval under this Section, but is subject only
to | ||
local zoning approval.
| ||
(Source: P.A. 94-591, eff. 8-15-05.)
| ||
(415 ILCS 115/Act rep.)
| ||
Section 10. The Illinois Pollution Prevention Act is | ||
repealed. | ||
Section 97. Applicability. The changes made by Section 5 of | ||
this amendatory Act of the 95th General Assembly apply only to | ||
siting applications filed on or after the effective date of | ||
this amendatory Act.
| ||
Section 99. Effective date. This Act takes effect upon | ||
becoming law.
|