(765 ILCS 530/6) (from Ch. 96 1/2, par. 9656)
Sec. 6. Compensation of surface owners for drilling and producing
operations and duties after cessation of production.
(A) The surface owner shall be entitled to reasonable compensation from
the operator for damages as follows: (1) To growing crops, trees, shrubs, fences, roads, structures, improvements, personal |
(2) To growing crops, trees, shrubs, fences, roads, structures, improvements, personal
|
(A-5) The operator shall not utilize any more of the
surface estate than is reasonably necessary for the exploration, production
and development of the mineral estate.
(B) The compensation required pursuant to paragraph (A) above shall be
paid in any manner mutually agreed upon by the operator and the surface
owner, but the failure to agree upon, or make the compensation required,
shall not prevent the operator from commencement of drilling operations;
provided, however, that operator shall tender to the surface owner payment by
check or draft in accordance with the provisions herein no later than 90 days
after completion of the well. The surface owner's remedy shall be an
action for compensation in the circuit court in which the lands or the
greater part thereof are located on which drilling operations were
conducted; provided, however, that if operator fails to tender payment
within the 90-day period or if the tender is not reasonable, surface owner
shall be entitled to reasonable compensation as provided herein as well as
attorney's fees.
If operator relies on a third party appraiser or fair market value, such
amount shall be conclusively deemed to be reasonable, and there shall be no
award of attorney's fees.
(C)
In conjunction with the plugging and abandonment of any well, the
operator shall restore the surface to a condition as near as practicable to
the condition of the surface prior to commencement of drilling operations;
provided, however, that the surface owner and operator may waive this
requirement in writing, subject to the approval of the Department of Natural
Resources that the waiver is in accordance with its
rules.
(D)
Where practicable and absent a written agreement to the contrary
with the surface owner, all flow lines and other underground structures
must be buried to a depth not less than 36 inches from the surface.
(Source: P.A. 95-493, eff. 1-1-08.)
|