Section 905.APPENDIX A Illustrations and Exhibits
Section 905.ILLUSTRATION H Subsurface Seepage System
Size Determination
Section 905.EXHIBIT A Gravel System
Time (minutes) required for last 6 inches of water to fall
|
FOR RESIDENTIAL USE Required Absorption Area (sq
ft)/bedroom)
|
FOR INSTITUTIONAL OR COMMERCIAL
USE Allowable application rate (GPD/sq ft) (5)
|
Recommended depth
from bottom of the trench to the limiting layer
|
18
- 60
|
200
|
1.0
|
|
90
|
210
|
.95
|
3 feet
|
120
|
235
|
.85
|
|
150
|
265
|
.75
|
|
180
|
290
|
.69
|
|
240
|
320
|
.62
|
|
300
|
350
|
.57
|
2 feet
|
360
|
385
|
.52
|
|
NOTE:
|
1.
|
Absorption area is figured as trench bottom area in
absorption trenches and bottom area in seepage beds.
|
2.
|
Seepage beds require 1½ times the seepage field absorption
area specified.
|
3.
|
Over 360 is unsuitable for subsurface seepage systems.
|
4.
|
Under 18 is unsuitable for subsurface seepage systems.
|
5.
|
Divide the required total gallons per day by this number
to get the number of square feet required
|
|
|
|
|
|
(Source: Amended at 20 Ill. Reg.
2431, effective March 15, 1996)
Section 905.APPENDIX A Illustrations and Exhibits
Section 905.ILLUSTRATION H Subsurface Seepage System
Size Determination
Section 905.EXHIBIT B Gravelless System
Time (minutes) required for last 6 inches of water to fall
|
FOR RESIDENTIAL USE Required Absorption Area (sq
ft)/bedroom)
|
FOR INSTITUTIONAL OR COMMERCIAL
USE Allowable application rate (GPD/sq ft) (5)
|
Recommended depth
from bottom of the trench to the limiting layer
|
|
8 inch
|
10 inch
|
8 inch
|
10
inch
|
|
18 – 60
|
100
|
70
|
2.00
|
3.00
|
|
90
|
105
|
70
|
1.90
|
2.86
|
3 feet
|
120
|
120
|
80
|
1.66
|
2.50
|
|
150
|
135
|
90
|
1.48
|
2.22
|
|
180
|
145
|
100
|
1.38
|
2.00
|
|
240
|
160
|
110
|
1.25
|
1.82
|
|
300
|
175
|
120
|
1.14
|
1.66
|
2 feet
|
360
|
195
|
130
|
1.0
|
1.54
|
|
NOTE:
|
1.
|
Over 360 is unsuitable for subsurface seepage systems.
|
2.
|
Under 18 is unsuitable for subsurface seepage systems.
|
3.
|
Divide the required total gallons per day by this number
to get the number of lineal feet required.
|
|
|
|
|
|
|
|
(Source: Amended at 20 Ill. Reg.
2431, effective March 15, 1996)