TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE J: CLEAN CONSTRUCTION OR DEMOLITION DEBRIS
CHAPTER I: POLLUTION CONTROL BOARD
PART 1100 CLEAN CONSTRUCTION OR DEMOLITION DEBRIS FILL OPERATIONS AND UNCONTAMINATED SOIL FILL OPERATIONS


The General Assembly's Illinois Administrative Code database includes only those rulemakings that have been permanently adopted. This menu will point out the Sections on which an emergency rule (valid for a maximum of 150 days, usually until replaced by a permanent rulemaking) exists. The emergency rulemaking is linked through the notation that follows the Section heading in the menu.

View Entire Part

SUBPART A: GENERAL

SUBPART B: OPERATING STANDARDS FOR CCDD FILL OPERATIONS

SUBPART C: PERMIT APPLICATION INFORMATION FOR CCDD FILL OPERATIONS

SUBPART D: PROCEDURAL REQUIREMENTS FOR PERMITTING CCDD FILL OPERATIONS

SUBPART E: UNCONTAMINATED SOIL FILL OPERATIONS

SUBPART F: STANDARDS FOR UNCONTAMINATED SOIL USED AS FILL MATERIAL AT FILL OPERATIONS REGULATED BY THIS PART


AUTHORITY: Implementing Sections 5, 3.160, 22.51, and 22.51a and authorized by Sections 3.160, 22.51, 22.51a, and 27 of the Environmental Protection Act [415 ILCS 5/5, 22.51, 22.51a, and 27].

SOURCE: Adopted in R06-19 at 30 Ill. Reg.14534, effective August 24, 2006; amended in R12-9 at 36 Ill. Reg. 13892, effective August 27, 2012.