TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL CHAPTER I: POLLUTION CONTROL BOARD SUBCHAPTER i: SOLID WASTE AND SPECIAL WASTE HAULING PART 817 REQUIREMENTS FOR NEW STEEL AND FOUNDRY INDUSTRY WASTES LANDFILLS SECTION 817.405 FOUNDATION CONSTRUCTION
Section 817.405 Foundation Construction
a) If the in situ material provides insufficient strength to meet the requirements of Section 817.404, then the insufficient material shall be removed and replaced with clean materials sufficient to meet the requirements of Section 817.404.
b) All trees, stumps, roots, boulders and debris shall be removed.
c) All material shall be compacted to achieve the strength and density properties necessary to demonstrate compliance with this Part in conformance with a construction quality assurance plan pursuant to 35 Ill. Adm. Code 811.Subpart E.
d) Placement of frozen soil or soil onto frozen ground is prohibited.
e) The foundation shall be constructed and graded to provide a smooth, workable surface on which to construct the liner. |