TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL
CHAPTER I: POLLUTION CONTROL BOARD
SUBCHAPTER i: SOLID WASTE AND SPECIAL WASTE HAULING
PART 812 INFORMATION TO BE SUBMITTED IN A PERMIT APPLICATION
SECTION 812.305 FOUNDATION ANALYSIS AND DESIGN


 

Section 812.305  Foundation Analysis and Design

 

a)         The permit application shall contain a foundation study and analysis showing that the unit demonstrates compliance with 35 Ill. Adm. Code 811.304 and 811.305.

 

b)         The study shall be performed by or under the supervision of a registered professional engineer.

 

c)         The following information shall be included in the permit application:

 

1)         Results of tests performed on foundation materials;

 

2)         Estimated settlement of the unit;

 

3)         Diagrams and cross sections of any proposed sub-base or foundation construction;

 

4)         Specifications for soil to be used for foundation construction shall include, but not be limited to, soil classification, permeability, moisture content, moisture-density relationship, plasticity and strength; and

 

5)         A construction quality assurance program for proper implementation of the foundation pursuant to 35 Ill. Adm. Code 811.Subpart E.