TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL CHAPTER I: POLLUTION CONTROL BOARD SUBCHAPTER f: RISK BASED CLEANUP OBJECTIVES PART 742 TIERED APPROACH TO CORRECTIVE ACTION OBJECTIVES SECTION 742.APPENDIX C TIER 2 TABLES
Section 742.APPENDIX C Tier 2 Tables
Section 742.TABLE L J&E Equationsa
a This table contains equations based on the assumption that the existing or potential building has a full concrete slab-on-grade or a full concrete basement floor and walls. This table applies only when the existing or potential building has a full concrete slab-on-grade or a full concrete basement floor and walls. Institutional controls under Subpart J are required to develop remediation objectives pursuant to this table. This table does not apply when the existing or potential building has neither a full concrete slab-on-grade nor a full concrete basement floor and walls, such as a building with an earthen crawl space, an earthen floor, a stone foundation, a partial concrete floor, or a sump. In such cases, site evaluators have the option of excluding the indoor inhalation exposure route under Section 742.312, meeting the building control technology requirements under Subpart L, or proposing an alternative approach under Tier 3.
(Source: Added at 37 Ill. Reg. 7506, effective May 15, 2013) |