TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE G: WASTE DISPOSAL
CHAPTER I: POLLUTION CONTROL BOARD
SUBCHAPTER f: RISK BASED CLEANUP OBJECTIVES
PART 742 TIERED APPROACH TO CORRECTIVE ACTION OBJECTIVES
SECTION 742.APPENDIX C TIER 2 TABLES


 

Section 742.APPENDIX C   Tier 2 Tables

 

Section 742.TABLE L   J&E Equationsa

 

Indoor air remediation objectives (mg/m3)

 

For carcinogenic contaminants

 

J&E1

For noncarcinogenic contaminants

 

J&E2

To convert mg/m3 from parts per million volume

 

 

Note:  24.45 equals the molar volume of air in liters at normal temperature (25°C) and pressure (760 mmHg).

J&E3

Soil gas remediation objective (mg/m3)

 

 

J&E4

Soil Vapor Saturation Limit

(mg/m3-air)

 

J&E5

Groundwater remediation objectives

 

 

J&E6

Attenuation factor

 

Attenuation factor when the mode of contaminant transport is both diffusion and advection

 

Qsoil = 83.33 cm3/sec

 

J&E7

Attenuation factor when the mode of contaminant transport is diffusion only

 

Qsoil= 0 cm3/sec

 

J&E8

Total overall effective diffusion coefficient for vapor transport in porous media for multiple soil layers (cm2/s)

 

J&E9a

In Equation J&E9a, the following condition must be satisfied:

J&E9b

 

Source to building separation (cm)

 

J&E10

Effective diffusion coefficient for each soil layer (cm2/s)

 

J&E11

 

Surface area of enclosed space at or below grade (cm2)

 

For a building with a full concrete slab-on-grade

J&E12a

Surface area of enclosed space at or below grade (cm2)

For a building with a full concrete basement floor and walls

J&E12b

Building ventilation rate (cm3/s) 

 

 

J&E13

 

Area of total cracks (cm2)

 

 

J&E14

Effective diffusion coefficient through the cracks (cm2/s)

 

 

 

J&E15

Total porosity

 

J&E16

Water-filled soil porosity

 

J&E17

Air-filled soil porosity

 

J&E18

 

a  This table contains equations based on the assumption that the existing or potential building has a full concrete slab-on-grade or a full concrete basement floor and walls.  This table applies only when the existing or potential building has a full concrete slab-on-grade or a full concrete basement floor and walls.  Institutional controls under Subpart J are required to develop remediation objectives pursuant to this table.  This table does not apply when the existing or potential building has neither a full concrete slab-on-grade nor a full concrete basement floor and walls, such as a building with an earthen crawl space, an earthen floor, a stone foundation, a partial concrete floor, or a sump.  In such cases, site evaluators have the option of excluding the indoor inhalation exposure route under Section 742.312, meeting the building control technology requirements under Subpart L, or proposing an alternative approach under Tier 3.

 

(Source:  Added at 37 Ill. Reg. 7506, effective May 15, 2013)