Public Act 1008 103RD GENERAL ASSEMBLY

 


 
Public Act 103-1008
 
SB3506 EnrolledLRB103 37497 JAG 67620 b

    AN ACT concerning safety.
 
    Be it enacted by the People of the State of Illinois,
represented in the General Assembly:
 
    Section 5. The Environmental Protection Act is amended by
changing Section 39.5 as follows:
 
    (415 ILCS 5/39.5)  (from Ch. 111 1/2, par. 1039.5)
    Sec. 39.5. Clean Air Act Permit Program.
    1. Definitions. For purposes of this Section:
    "Administrative permit amendment" means a permit revision
subject to subsection 13 of this Section.
    "Affected source for acid deposition" means a source that
includes one or more affected units under Title IV of the Clean
Air Act.
    "Affected States" for purposes of formal distribution of a
draft CAAPP permit to other States for comments prior to
issuance, means all States:
        (1) Whose air quality may be affected by the source
    covered by the draft permit and that are contiguous to
    Illinois; or
        (2) That are within 50 miles of the source.
    "Affected unit for acid deposition" shall have the meaning
given to the term "affected unit" in the regulations
promulgated under Title IV of the Clean Air Act.
    "Applicable Clean Air Act requirement" means all of the
following as they apply to emissions units in a source
(including regulations that have been promulgated or approved
by USEPA pursuant to the Clean Air Act which directly impose
requirements upon a source and other such federal requirements
which have been adopted by the Board. These may include
requirements and regulations which have future effective
compliance dates. Requirements and regulations will be exempt
if USEPA determines that such requirements need not be
contained in a Title V permit):
        (1) Any standard or other requirement provided for in
    the applicable state implementation plan approved or
    promulgated by USEPA under Title I of the Clean Air Act
    that implements the relevant requirements of the Clean Air
    Act, including any revisions to the state Implementation
    Plan promulgated in 40 CFR Part 52, Subparts A and O and
    other subparts applicable to Illinois. For purposes of
    this paragraph (1) of this definition, "any standard or
    other requirement" means only such standards or
    requirements directly enforceable against an individual
    source under the Clean Air Act.
        (2)(i) Any term or condition of any preconstruction
        permits issued pursuant to regulations approved or
        promulgated by USEPA under Title I of the Clean Air
        Act, including Part C or D of the Clean Air Act.
            (ii) Any term or condition as required pursuant to
        Section 39.5 of any federally enforceable State
        operating permit issued pursuant to regulations
        approved or promulgated by USEPA under Title I of the
        Clean Air Act, including Part C or D of the Clean Air
        Act.
        (3) Any standard or other requirement under Section
    111 of the Clean Air Act, including Section 111(d).
        (4) Any standard or other requirement under Section
    112 of the Clean Air Act, including any requirement
    concerning accident prevention under Section 112(r)(7) of
    the Clean Air Act.
        (5) Any standard or other requirement of the acid rain
    program under Title IV of the Clean Air Act or the
    regulations promulgated thereunder.
        (6) Any requirements established pursuant to Section
    504(b) or Section 114(a)(3) of the Clean Air Act.
        (7) Any standard or other requirement governing solid
    waste incineration, under Section 129 of the Clean Air
    Act.
        (8) Any standard or other requirement for consumer and
    commercial products, under Section 183(e) of the Clean Air
    Act.
        (9) Any standard or other requirement for tank
    vessels, under Section 183(f) of the Clean Air Act.
        (10) Any standard or other requirement of the program
    to control air pollution from Outer Continental Shelf
    sources, under Section 328 of the Clean Air Act.
        (11) Any standard or other requirement of the
    regulations promulgated to protect stratospheric ozone
    under Title VI of the Clean Air Act, unless USEPA has
    determined that such requirements need not be contained in
    a Title V permit.
        (12) Any national ambient air quality standard or
    increment or visibility requirement under Part C of Title
    I of the Clean Air Act, but only as it would apply to
    temporary sources permitted pursuant to Section 504(e) of
    the Clean Air Act.
    "Applicable requirement" means all applicable Clean Air
Act requirements and any other standard, limitation, or other
requirement contained in this Act or regulations promulgated
under this Act as applicable to sources of air contaminants
(including requirements that have future effective compliance
dates).
    "CAAPP" means the Clean Air Act Permit Program, developed
pursuant to Title V of the Clean Air Act.
    "CAAPP application" means an application for a CAAPP
permit.
    "CAAPP Permit" or "permit" (unless the context suggests
otherwise) means any permit issued, renewed, amended, modified
or revised pursuant to Title V of the Clean Air Act.
    "CAAPP source" means any source for which the owner or
operator is required to obtain a CAAPP permit pursuant to
subsection 2 of this Section.
    "Clean Air Act" means the Clean Air Act, as now and
hereafter amended, 42 U.S.C. 7401, et seq.
    "Designated representative" has the meaning given to it in
Section 402(26) of the Clean Air Act and the regulations
promulgated thereunder, which state that the term "designated
representative" means a responsible person or official
authorized by the owner or operator of a unit to represent the
owner or operator in all matters pertaining to the holding,
transfer, or disposition of allowances allocated to a unit,
and the submission of and compliance with permits, permit
applications, and compliance plans for the unit.
    "Draft CAAPP permit" means the version of a CAAPP permit
for which public notice and an opportunity for public comment
and hearing is offered by the Agency.
    "Effective date of the CAAPP" means the date that USEPA
approves Illinois' CAAPP.
    "Emission unit" means any part or activity of a stationary
source that emits or has the potential to emit any air
pollutant. This term is not meant to alter or affect the
definition of the term "unit" for purposes of Title IV of the
Clean Air Act.
    "Federally enforceable" means enforceable by USEPA.
    "Final permit action" means the Agency's granting with
conditions, refusal to grant, renewal of, or revision of a
CAAPP permit, the Agency's determination of incompleteness of
a submitted CAAPP application, or the Agency's failure to act
on an application for a permit, permit renewal, or permit
revision within the time specified in subsection 13,
subsection 14, or paragraph (j) of subsection 5 of this
Section.
    "General permit" means a permit issued to cover numerous
similar sources in accordance with subsection 11 of this
Section.
    "Major source" means a source for which emissions of one
or more air pollutants meet the criteria for major status
pursuant to paragraph (c) of subsection 2 of this Section.
    "Maximum achievable control technology" or "MACT" means
the maximum degree of reductions in emissions deemed
achievable under Section 112 of the Clean Air Act.
    "Owner or operator" means any person who owns, leases,
operates, controls, or supervises a stationary source.
    "Permit modification" means a revision to a CAAPP permit
that cannot be accomplished under the provisions for
administrative permit amendments under subsection 13 of this
Section.
    "Permit revision" means a permit modification or
administrative permit amendment.
    "Phase II" means the period of the national acid rain
program, established under Title IV of the Clean Air Act,
beginning January 1, 2000, and continuing thereafter.
    "Phase II acid rain permit" means the portion of a CAAPP
permit issued, renewed, modified, or revised by the Agency
during Phase II for an affected source for acid deposition.
    "Potential to emit" means the maximum capacity of a
stationary source to emit any air pollutant under its physical
and operational design. Any physical or operational limitation
on the capacity of a source to emit an air pollutant, including
air pollution control equipment and restrictions on hours of
operation or on the type or amount of material combusted,
stored, or processed, shall be treated as part of its design if
the limitation is enforceable by USEPA. This definition does
not alter or affect the use of this term for any other purposes
under the Clean Air Act, or the term "capacity factor" as used
in Title IV of the Clean Air Act or the regulations promulgated
thereunder.
    "Preconstruction Permit" or "Construction Permit" means a
permit which is to be obtained prior to commencing or
beginning actual construction or modification of a source or
emissions unit.
    "Proposed CAAPP permit" means the version of a CAAPP
permit that the Agency proposes to issue and forwards to USEPA
for review in compliance with applicable requirements of the
Act and regulations promulgated thereunder.
    "Regulated air pollutant" means the following:
        (1) Nitrogen oxides (NOx) or any volatile organic
    compound.
        (2) Any pollutant for which a national ambient air
    quality standard has been promulgated.
        (3) Any pollutant that is subject to any standard
    promulgated under Section 111 of the Clean Air Act.
        (4) Any Class I or II substance subject to a standard
    promulgated under or established by Title VI of the Clean
    Air Act.
        (5) Any pollutant subject to a standard promulgated
    under Section 112 or other requirements established under
    Section 112 of the Clean Air Act, including Sections
    112(g), (j) and (r).
            (i) Any pollutant subject to requirements under
        Section 112(j) of the Clean Air Act. Any pollutant
        listed under Section 112(b) for which the subject
        source would be major shall be considered to be
        regulated 18 months after the date on which USEPA was
        required to promulgate an applicable standard pursuant
        to Section 112(e) of the Clean Air Act, if USEPA fails
        to promulgate such standard.
            (ii) Any pollutant for which the requirements of
        Section 112(g)(2) of the Clean Air Act have been met,
        but only with respect to the individual source subject
        to Section 112(g)(2) requirement.
        (6) Greenhouse gases.
    "Renewal" means the process by which a permit is reissued
at the end of its term.
    "Responsible official" means one of the following:
        (1) For a corporation: a president, secretary,
    treasurer, or vice-president of the corporation in charge
    of a principal business function, or any other person who
    performs similar policy or decision-making functions for
    the corporation, or a duly authorized representative of
    such person if the representative is responsible for the
    overall operation of one or more manufacturing,
    production, or operating facilities applying for or
    subject to a permit and either (i) the facilities employ
    more than 250 persons or have gross annual sales or
    expenditures exceeding $25 million (in second quarter 1980
    dollars), or (ii) the delegation of authority to such
    representative is approved in advance by the Agency.
        (2) For a partnership or sole proprietorship: a
    general partner or the proprietor, respectively, or in the
    case of a partnership in which all of the partners are
    corporations, a duly authorized representative of the
    partnership if the representative is responsible for the
    overall operation of one or more manufacturing,
    production, or operating facilities applying for or
    subject to a permit and either (i) the facilities employ
    more than 250 persons or have gross annual sales or
    expenditures exceeding $25 million (in second quarter 1980
    dollars), or (ii) the delegation of authority to such
    representative is approved in advance by the Agency.
        (3) For a municipality, State, Federal, or other
    public agency: either a principal executive officer or
    ranking elected official. For the purposes of this part, a
    principal executive officer of a Federal agency includes
    the chief executive officer having responsibility for the
    overall operations of a principal geographic unit of the
    agency (e.g., a Regional Administrator of USEPA).
        (4) For affected sources for acid deposition:
            (i) The designated representative shall be the
        "responsible official" in so far as actions,
        standards, requirements, or prohibitions under Title
        IV of the Clean Air Act or the regulations promulgated
        thereunder are concerned.
            (ii) The designated representative may also be the
        "responsible official" for any other purposes with
        respect to air pollution control.
    "Section 502(b)(10) changes" means changes that contravene
express permit terms. "Section 502(b)(10) changes" do not
include changes that would violate applicable requirements or
contravene federally enforceable permit terms or conditions
that are monitoring (including test methods), recordkeeping,
reporting, or compliance certification requirements.
    "Solid waste incineration unit" means a distinct operating
unit of any facility which combusts any solid waste material
from commercial or industrial establishments or the general
public (including single and multiple residences, hotels, and
motels). The term does not include incinerators or other units
required to have a permit under Section 3005 of the Solid Waste
Disposal Act. The term also does not include (A) materials
recovery facilities (including primary or secondary smelters)
which combust waste for the primary purpose of recovering
metals, (B) qualifying small power production facilities, as
defined in Section 3(17)(C) of the Federal Power Act (16
U.S.C. 769(17)(C)), or qualifying cogeneration facilities, as
defined in Section 3(18)(B) of the Federal Power Act (16
U.S.C. 796(18)(B)), which burn homogeneous waste (such as
units which burn tires or used oil, but not including
refuse-derived fuel) for the production of electric energy or
in the case of qualifying cogeneration facilities which burn
homogeneous waste for the production of electric energy and
steam or forms of useful energy (such as heat) which are used
for industrial, commercial, heating or cooling purposes, or
(C) air curtain incinerators provided that such incinerators
only burn wood wastes, yard waste and clean lumber and that
such air curtain incinerators comply with opacity limitations
to be established by the USEPA by rule.
    "Source" means any stationary source (or any group of
stationary sources) that is located on one or more contiguous
or adjacent properties that are under common control of the
same person (or persons under common control) and that belongs
to a single major industrial grouping. For the purposes of
defining "source," a stationary source or group of stationary
sources shall be considered part of a single major industrial
grouping if all of the pollutant emitting activities at such
source or group of sources located on contiguous or adjacent
properties and under common control belong to the same Major
Group (i.e., all have the same two-digit code) as described in
the Standard Industrial Classification Manual, 1987, or such
pollutant emitting activities at a stationary source (or group
of stationary sources) located on contiguous or adjacent
properties and under common control constitute a support
facility. The determination as to whether any group of
stationary sources is located on contiguous or adjacent
properties, and/or is under common control, and/or whether the
pollutant emitting activities at such group of stationary
sources constitute a support facility shall be made on a case
by case basis.
    "Stationary source" means any building, structure,
facility, or installation that emits or may emit any regulated
air pollutant or any pollutant listed under Section 112(b) of
the Clean Air Act, except those emissions resulting directly
from an internal combustion engine for transportation purposes
or from a nonroad engine or nonroad vehicle as defined in
Section 216 of the Clean Air Act.
    "Subject to regulation" has the meaning given to it in 40
CFR 70.2, as now or hereafter amended.
    "Support facility" means any stationary source (or group
of stationary sources) that conveys, stores, or otherwise
assists to a significant extent in the production of a
principal product at another stationary source (or group of
stationary sources). A support facility shall be considered to
be part of the same source as the stationary source (or group
of stationary sources) that it supports regardless of the
2-digit Standard Industrial Classification code for the
support facility.
    "USEPA" means the Administrator of the United States
Environmental Protection Agency (USEPA) or a person designated
by the Administrator.
 
    1.1. Exclusion From the CAAPP.
        a. An owner or operator of a source which determines
    that the source could be excluded from the CAAPP may seek
    such exclusion prior to the date that the CAAPP
    application for the source is due but in no case later than
    9 months after the effective date of the CAAPP through the
    imposition of federally enforceable conditions limiting
    the "potential to emit" of the source to a level below the
    major source threshold for that source as described in
    paragraph (c) of subsection 2 of this Section, within a
    State operating permit issued pursuant to subsection (a)
    of Section 39 of this Act. After such date, an exclusion
    from the CAAPP may be sought under paragraph (c) of
    subsection 3 of this Section.
        b. An owner or operator of a source seeking exclusion
    from the CAAPP pursuant to paragraph (a) of this
    subsection must submit a permit application consistent
    with the existing State permit program which specifically
    requests such exclusion through the imposition of such
    federally enforceable conditions.
        c. Upon such request, if the Agency determines that
    the owner or operator of a source has met the requirements
    for exclusion pursuant to paragraph (a) of this subsection
    and other applicable requirements for permit issuance
    under subsection (a) of Section 39 of this Act, the Agency
    shall issue a State operating permit for such source under
    subsection (a) of Section 39 of this Act, as amended, and
    regulations promulgated thereunder with federally
    enforceable conditions limiting the "potential to emit" of
    the source to a level below the major source threshold for
    that source as described in paragraph (c) of subsection 2
    of this Section.
        d. The Agency shall provide an owner or operator of a
    source which may be excluded from the CAAPP pursuant to
    this subsection with reasonable notice that the owner or
    operator may seek such exclusion.
        e. The Agency shall provide such sources with the
    necessary permit application forms.
 
    2. Applicability.
        a. Sources subject to this Section shall include:
            i. Any major source as defined in paragraph (c) of
        this subsection.
            ii. Any source subject to a standard or other
        requirements promulgated under Section 111 (New Source
        Performance Standards) or Section 112 (Hazardous Air
        Pollutants) of the Clean Air Act, except that a source
        is not required to obtain a permit solely because it is
        subject to regulations or requirements under Section
        112(r) of the Clean Air Act.
            iii. Any affected source for acid deposition, as
        defined in subsection 1 of this Section.
            iv. Any other source subject to this Section under
        the Clean Air Act or regulations promulgated
        thereunder, or applicable Board regulations.
        b. Sources exempted from this Section shall include:
            i. All sources listed in paragraph (a) of this
        subsection that are not major sources, affected
        sources for acid deposition or solid waste
        incineration units required to obtain a permit
        pursuant to Section 129(e) of the Clean Air Act, until
        the source is required to obtain a CAAPP permit
        pursuant to the Clean Air Act or regulations
        promulgated thereunder.
            ii. Nonmajor sources subject to a standard or
        other requirements subsequently promulgated by USEPA
        under Section 111 or 112 of the Clean Air Act that are
        determined by USEPA to be exempt at the time a new
        standard is promulgated.
            iii. All sources and source categories that would
        be required to obtain a permit solely because they are
        subject to Part 60, Subpart AAA - Standards of
        Performance for New Residential Wood Heaters (40 CFR
        Part 60).
            iv. All sources and source categories that would
        be required to obtain a permit solely because they are
        subject to Part 61, Subpart M - National Emission
        Standard for Hazardous Air Pollutants for Asbestos,
        Section 61.145 (40 CFR Part 61).
            v. Any other source categories exempted by USEPA
        regulations pursuant to Section 502(a) of the Clean
        Air Act.
            vi. Major sources of greenhouse gas emissions
        required to obtain a CAAPP permit under this Section
        if any of the following occurs:
                (A) enactment of federal legislation depriving
            the Administrator of the USEPA of authority to
            regulate greenhouse gases under the Clean Air Act;
                (B) the issuance of any opinion, ruling,
            judgment, order, or decree by a federal court
            depriving the Administrator of the USEPA of
            authority to regulate greenhouse gases under the
            Clean Air Act; or
                (C) action by the President of the United
            States or the President's authorized agent,
            including the Administrator of the USEPA, to
            repeal or withdraw the Greenhouse Gas Tailoring
            Rule (75 Fed. Reg. 31514, June 3, 2010).
            If any event listed in this subparagraph (vi)
        occurs, CAAPP permits issued after such event shall
        not impose permit terms or conditions addressing
        greenhouse gases during the effectiveness of any event
        listed in subparagraph (vi). If any event listed in
        this subparagraph (vi) occurs, any owner or operator
        with a CAAPP permit that includes terms or conditions
        addressing greenhouse gases may elect to submit an
        application to the Agency to address a revision or
        repeal of such terms or conditions. If any owner or
        operator submits such an application, the Agency shall
        expeditiously process the permit application in
        accordance with applicable laws and regulations.
        Nothing in this subparagraph (vi) shall relieve an
        owner or operator of a source from the requirement to
        obtain a CAAPP permit for its emissions of regulated
        air pollutants other than greenhouse gases, as
        required by this Section.
        c. For purposes of this Section the term "major
    source" means any source that is:
            i. A major source under Section 112 of the Clean
        Air Act, which is defined as:
                A. For pollutants other than radionuclides,
            any stationary source or group of stationary
            sources located within a contiguous area and under
            common control that emits or has the potential to
            emit, in the aggregate, 10 tons per year (tpy) or
            more of any hazardous air pollutant which has been
            listed pursuant to Section 112(b) of the Clean Air
            Act, 25 tpy or more of any combination of such
            hazardous air pollutants, or such lesser quantity
            as USEPA may establish by rule. Notwithstanding
            the preceding sentence, emissions from any oil or
            gas exploration or production well (with its
            associated equipment) and emissions from any
            pipeline compressor or pump station shall not be
            aggregated with emissions from other similar
            units, whether or not such units are in a
            contiguous area or under common control, to
            determine whether such stations are major sources.
                B. For radionuclides, "major source" shall
            have the meaning specified by the USEPA by rule.
            ii. A major stationary source of air pollutants,
        as defined in Section 302 of the Clean Air Act, that
        directly emits or has the potential to emit, 100 tpy or
        more of any air pollutant subject to regulation
        (including any major source of fugitive emissions of
        any such pollutant, as determined by rule by USEPA).
        For purposes of this subsection, "fugitive emissions"
        means those emissions which could not reasonably pass
        through a stack, chimney, vent, or other
        functionally-equivalent opening. The fugitive
        emissions of a stationary source shall not be
        considered in determining whether it is a major
        stationary source for the purposes of Section 302(j)
        of the Clean Air Act, unless the source belongs to one
        of the following categories of stationary source:
                A. Coal cleaning plants (with thermal dryers).
                B. Kraft pulp mills.
                C. Portland cement plants.
                D. Primary zinc smelters.
                E. Iron and steel mills.
                F. Primary aluminum ore reduction plants.
                G. Primary copper smelters.
                H. Municipal incinerators capable of charging
            more than 250 tons of refuse per day.
                I. Hydrofluoric, sulfuric, or nitric acid
            plants.
                J. Petroleum refineries.
                K. Lime plants.
                L. Phosphate rock processing plants.
                M. Coke oven batteries.
                N. Sulfur recovery plants.
                O. Carbon black plants (furnace process).
                P. Primary lead smelters.
                Q. Fuel conversion plants.
                R. Sintering plants.
                S. Secondary metal production plants.
                T. Chemical process plants.
                U. Fossil-fuel boilers (or combination
            thereof) totaling more than 250 million British
            thermal units per hour heat input.
                V. Petroleum storage and transfer units with a
            total storage capacity exceeding 300,000 barrels.
                W. Taconite ore processing plants.
                X. Glass fiber processing plants.
                Y. Charcoal production plants.
                Z. Fossil fuel-fired steam electric plants of
            more than 250 million British thermal units per
            hour heat input.
                AA. All other stationary source categories,
            which as of August 7, 1980 are being regulated by a
            standard promulgated under Section 111 or 112 of
            the Clean Air Act.
                BB. Any other stationary source category
            designated by USEPA by rule.
            iii. A major stationary source as defined in part
        D of Title I of the Clean Air Act including:
                A. For ozone nonattainment areas, sources with
            the potential to emit 100 tons or more per year of
            volatile organic compounds or oxides of nitrogen
            in areas classified as "marginal" or "moderate",
            50 tons or more per year in areas classified as
            "serious", 25 tons or more per year in areas
            classified as "severe", and 10 tons or more per
            year in areas classified as "extreme"; except that
            the references in this clause to 100, 50, 25, and
            10 tons per year of nitrogen oxides shall not
            apply with respect to any source for which USEPA
            has made a finding, under Section 182(f)(1) or (2)
            of the Clean Air Act, that requirements otherwise
            applicable to such source under Section 182(f) of
            the Clean Air Act do not apply. Such sources shall
            remain subject to the major source criteria of
            subparagraph (ii) of paragraph (c) of this
            subsection.
                B. For ozone transport regions established
            pursuant to Section 184 of the Clean Air Act,
            sources with the potential to emit 50 tons or more
            per year of volatile organic compounds (VOCs).
                C. For carbon monoxide nonattainment areas (1)
            that are classified as "serious", and (2) in which
            stationary sources contribute significantly to
            carbon monoxide levels as determined under rules
            issued by USEPA, sources with the potential to
            emit 50 tons or more per year of carbon monoxide.
                D. For particulate matter (PM-10)
            nonattainment areas classified as "serious",
            sources with the potential to emit 70 tons or more
            per year of PM-10.
 
    3. Agency Authority To Issue CAAPP Permits and Federally
Enforceable State Operating Permits.
        a. The Agency shall issue CAAPP permits under this
    Section consistent with the Clean Air Act and regulations
    promulgated thereunder and this Act and regulations
    promulgated thereunder.
        b. The Agency shall issue CAAPP permits for fixed
    terms of 5 years, except CAAPP permits issued for solid
    waste incineration units combusting municipal waste which
    shall be issued for fixed terms of 12 years and except
    CAAPP permits for affected sources for acid deposition
    which shall be issued for initial terms to expire on
    December 31, 1999, and for fixed terms of 5 years
    thereafter.
        c. The Agency shall have the authority to issue a
    State operating permit for a source under subsection (a)
    of Section 39 of this Act, as amended, and regulations
    promulgated thereunder, which includes federally
    enforceable conditions limiting the "potential to emit" of
    the source to a level below the major source threshold for
    that source as described in paragraph (c) of subsection 2
    of this Section, thereby excluding the source from the
    CAAPP, when requested by the applicant pursuant to
    paragraph (u) of subsection 5 of this Section. The public
    notice requirements of this Section applicable to CAAPP
    permits shall also apply to the initial issuance of
    permits under this paragraph.
        d. For purposes of this Act, a permit issued by USEPA
    under Section 505 of the Clean Air Act, as now and
    hereafter amended, shall be deemed to be a permit issued
    by the Agency pursuant to Section 39.5 of this Act.
 
    4. Transition.
        a. An owner or operator of a CAAPP source shall not be
    required to renew an existing State operating permit for
    any emission unit at such CAAPP source once a CAAPP
    application timely submitted prior to expiration of the
    State operating permit has been deemed complete. For
    purposes other than permit renewal, the obligation upon
    the owner or operator of a CAAPP source to obtain a State
    operating permit is not removed upon submittal of the
    complete CAAPP permit application. An owner or operator of
    a CAAPP source seeking to make a modification to a source
    prior to the issuance of its CAAPP permit shall be
    required to obtain a construction permit, operating
    permit, or both as required for such modification in
    accordance with the State permit program under subsection
    (a) of Section 39 of this Act, as amended, and regulations
    promulgated thereunder. The application for such
    construction permit, operating permit, or both shall be
    considered an amendment to the CAAPP application submitted
    for such source.
        b. An owner or operator of a CAAPP source shall
    continue to operate in accordance with the terms and
    conditions of its applicable State operating permit
    notwithstanding the expiration of the State operating
    permit until the source's CAAPP permit has been issued.
        c. An owner or operator of a CAAPP source shall submit
    its initial CAAPP application to the Agency no later than
    12 months after the effective date of the CAAPP. The
    Agency may request submittal of initial CAAPP applications
    during this 12-month period according to a schedule set
    forth within Agency procedures, however, in no event shall
    the Agency require such submittal earlier than 3 months
    after such effective date of the CAAPP. An owner or
    operator may voluntarily submit its initial CAAPP
    application prior to the date required within this
    paragraph or applicable procedures, if any, subsequent to
    the date the Agency submits the CAAPP to USEPA for
    approval.
        d. The Agency shall act on initial CAAPP applications
    in accordance with paragraph (j) of subsection 5 of this
    Section.
        e. For purposes of this Section, the term "initial
    CAAPP application" shall mean the first CAAPP application
    submitted for a source existing as of the effective date
    of the CAAPP.
        f. The Agency shall provide owners or operators of
    CAAPP sources with at least 3 months advance notice of the
    date on which their applications are required to be
    submitted. In determining which sources shall be subject
    to early submittal, the Agency shall include among its
    considerations the complexity of the permit application,
    and the burden that such early submittal will have on the
    source.
        g. The CAAPP permit shall upon becoming effective
    supersede the State operating permit.
        h. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    5. Applications and Completeness.
        a. An owner or operator of a CAAPP source shall submit
    its complete CAAPP application consistent with the Act and
    applicable regulations.
        b. An owner or operator of a CAAPP source shall submit
    a single complete CAAPP application covering all emission
    units at that source.
        c. To be deemed complete, a CAAPP application must
    provide all information, as requested in Agency
    application forms, sufficient to evaluate the subject
    source and its application and to determine all applicable
    requirements, pursuant to the Clean Air Act, and
    regulations thereunder, this Act and regulations
    thereunder. Such Agency application forms shall be
    finalized and made available prior to the date on which
    any CAAPP application is required.
        d. An owner or operator of a CAAPP source shall
    submit, as part of its complete CAAPP application, a
    compliance plan, including a schedule of compliance,
    describing how each emission unit will comply with all
    applicable requirements. Any such schedule of compliance
    shall be supplemental to, and shall not sanction
    noncompliance with, the applicable requirements on which
    it is based.
        e. Each submitted CAAPP application shall be certified
    for truth, accuracy, and completeness by a responsible
    official in accordance with applicable regulations.
        f. The Agency shall provide notice to a CAAPP
    applicant as to whether a submitted CAAPP application is
    complete. Unless the Agency notifies the applicant of
    incompleteness, within 60 days after receipt of the CAAPP
    application, the application shall be deemed complete. The
    Agency may request additional information as needed to
    make the completeness determination. The Agency may to the
    extent practicable provide the applicant with a reasonable
    opportunity to correct deficiencies prior to a final
    determination of completeness.
        g. If after the determination of completeness the
    Agency finds that additional information is necessary to
    evaluate or take final action on the CAAPP application,
    the Agency may request in writing such information from
    the source with a reasonable deadline for response.
        h. If the owner or operator of a CAAPP source submits a
    timely and complete CAAPP application, the source's
    failure to have a CAAPP permit shall not be a violation of
    this Section until the Agency takes final action on the
    submitted CAAPP application, provided, however, where the
    applicant fails to submit the requested information under
    paragraph (g) of this subsection 5 within the time frame
    specified by the Agency, this protection shall cease to
    apply.
        i. Any applicant who fails to submit any relevant
    facts necessary to evaluate the subject source and its
    CAAPP application or who has submitted incorrect
    information in a CAAPP application shall, upon becoming
    aware of such failure or incorrect submittal, submit
    supplementary facts or correct information to the Agency.
    In addition, an applicant shall provide to the Agency
    additional information as necessary to address any
    requirements which become applicable to the source
    subsequent to the date the applicant submitted its
    complete CAAPP application but prior to release of the
    draft CAAPP permit.
        j. The Agency shall issue or deny the CAAPP permit
    within 18 months after the date of receipt of the complete
    CAAPP application, with the following exceptions: (i)
    permits for affected sources for acid deposition shall be
    issued or denied within 6 months after receipt of a
    complete application in accordance with subsection 17 of
    this Section; (ii) the Agency shall act on initial CAAPP
    applications within 24 months after the date of receipt of
    the complete CAAPP application; (iii) the Agency shall act
    on complete applications containing early reduction
    demonstrations under Section 112(i)(5) of the Clean Air
    Act within 9 months of receipt of the complete CAAPP
    application.
        Where the Agency does not take final action on the
    permit within the required time period, the permit shall
    not be deemed issued; rather, the failure to act shall be
    treated as a final permit action for purposes of judicial
    review pursuant to Sections 40.2 and 41 of this Act.
        k. The submittal of a complete CAAPP application shall
    not affect the requirement that any source have a
    preconstruction permit under Title I of the Clean Air Act.
        l. Unless a timely and complete renewal application
    has been submitted consistent with this subsection, a
    CAAPP source operating upon the expiration of its CAAPP
    permit shall be deemed to be operating without a CAAPP
    permit. Such operation is prohibited under this Act.
        m. Permits being renewed shall be subject to the same
    procedural requirements, including those for public
    participation and federal review and objection, that apply
    to original permit issuance.
        n. For purposes of permit renewal, a timely
    application is one that is submitted no less than 9 months
    prior to the date of permit expiration.
        o. The terms and conditions of a CAAPP permit shall
    remain in effect until the issuance of a CAAPP renewal
    permit provided a timely and complete CAAPP application
    has been submitted.
        p. The owner or operator of a CAAPP source seeking a
    permit shield pursuant to paragraph (j) of subsection 7 of
    this Section shall request such permit shield in the CAAPP
    application regarding that source.
        q. The Agency shall make available to the public all
    documents submitted by the applicant to the Agency,
    including each CAAPP application, compliance plan
    (including the schedule of compliance), and emissions or
    compliance monitoring report, with the exception of
    information entitled to confidential treatment pursuant to
    Section 7 of this Act.
        r. The Agency shall use the standardized forms
    required under Title IV of the Clean Air Act and
    regulations promulgated thereunder for affected sources
    for acid deposition.
        s. An owner or operator of a CAAPP source may include
    within its CAAPP application a request for permission to
    operate during a startup, malfunction, or breakdown
    consistent with applicable Board regulations.
        t. An owner or operator of a CAAPP source, in order to
    utilize the operational flexibility provided under
    paragraph (l) of subsection 7 of this Section, must
    request such use and provide the necessary information
    within its CAAPP application.
        u. An owner or operator of a CAAPP source which seeks
    exclusion from the CAAPP through the imposition of
    federally enforceable conditions, pursuant to paragraph
    (c) of subsection 3 of this Section, must request such
    exclusion within a CAAPP application submitted consistent
    with this subsection on or after the date that the CAAPP
    application for the source is due. Prior to such date, but
    in no case later than 9 months after the effective date of
    the CAAPP, such owner or operator may request the
    imposition of federally enforceable conditions pursuant to
    paragraph (b) of subsection 1.1 of this Section.
        v. CAAPP applications shall contain accurate
    information on allowable emissions to implement the fee
    provisions of subsection 18 of this Section.
        w. An owner or operator of a CAAPP source shall submit
    within its CAAPP application emissions information
    regarding all regulated air pollutants emitted at that
    source consistent with applicable Agency procedures.
    Emissions information regarding insignificant activities
    or emission levels, as determined by the Agency pursuant
    to Board regulations, may be submitted as a list within
    the CAAPP application. The Agency shall propose
    regulations to the Board defining insignificant activities
    or emission levels, consistent with federal regulations,
    if any, no later than 18 months after the effective date of
    this amendatory Act of 1992, consistent with Section
    112(n)(1) of the Clean Air Act. The Board shall adopt
    final regulations defining insignificant activities or
    emission levels no later than 9 months after the date of
    the Agency's proposal.
        x. The owner or operator of a new CAAPP source shall
    submit its complete CAAPP application consistent with this
    subsection within 12 months after commencing operation of
    such source. The owner or operator of an existing source
    that has been excluded from the provisions of this Section
    under subsection 1.1 or paragraph (c) of subsection 3 of
    this Section and that becomes subject to the CAAPP solely
    due to a change in operation at the source shall submit its
    complete CAAPP application consistent with this subsection
    at least 180 days before commencing operation in
    accordance with the change in operation.
        y. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary to implement this subsection.
 
    6. Prohibitions.
        a. It shall be unlawful for any person to violate any
    terms or conditions of a permit issued under this Section,
    to operate any CAAPP source except in compliance with a
    permit issued by the Agency under this Section or to
    violate any other applicable requirements. All terms and
    conditions of a permit issued under this Section are
    enforceable by USEPA and citizens under the Clean Air Act,
    except those, if any, that are specifically designated as
    not being federally enforceable in the permit pursuant to
    paragraph (m) of subsection 7 of this Section.
        b. After the applicable CAAPP permit or renewal
    application submittal date, as specified in subsection 5
    of this Section, no person shall operate a CAAPP source
    without a CAAPP permit unless the complete CAAPP permit or
    renewal application for such source has been timely
    submitted to the Agency.
        c. No owner or operator of a CAAPP source shall cause
    or threaten or allow the continued operation of an
    emission source during malfunction or breakdown of the
    emission source or related air pollution control equipment
    if such operation would cause a violation of the standards
    or limitations applicable to the source, unless the CAAPP
    permit granted to the source provides for such operation
    consistent with this Act and applicable Board regulations.
 
    7. Permit Content.
        a. All CAAPP permits shall contain emission
    limitations and standards and other enforceable terms and
    conditions, including but not limited to operational
    requirements, and schedules for achieving compliance at
    the earliest reasonable date, which are or will be
    required to accomplish the purposes and provisions of this
    Act and to assure compliance with all applicable
    requirements.
        b. The Agency shall include among such conditions
    applicable monitoring, reporting, record keeping and
    compliance certification requirements, as authorized by
    paragraphs (d), (e), and (f) of this subsection, that the
    Agency deems necessary to assure compliance with the Clean
    Air Act, the regulations promulgated thereunder, this Act,
    and applicable Board regulations. When monitoring,
    reporting, record keeping, and compliance certification
    requirements are specified within the Clean Air Act,
    regulations promulgated thereunder, this Act, or
    applicable regulations, such requirements shall be
    included within the CAAPP permit. The Board shall have
    authority to promulgate additional regulations where
    necessary to accomplish the purposes of the Clean Air Act,
    this Act, and regulations promulgated thereunder.
        c. The Agency shall assure, within such conditions,
    the use of terms, test methods, units, averaging periods,
    and other statistical conventions consistent with the
    applicable emission limitations, standards, and other
    requirements contained in the permit.
        d. To meet the requirements of this subsection with
    respect to monitoring, the permit shall:
            i. Incorporate and identify all applicable
        emissions monitoring and analysis procedures or test
        methods required under the Clean Air Act, regulations
        promulgated thereunder, this Act, and applicable Board
        regulations, including any procedures and methods
        promulgated by USEPA pursuant to Section 504(b) or
        Section 114 (a)(3) of the Clean Air Act.
            ii. Where the applicable requirement does not
        require periodic testing or instrumental or
        noninstrumental monitoring (which may consist of
        recordkeeping designed to serve as monitoring),
        require periodic monitoring sufficient to yield
        reliable data from the relevant time period that is
        representative of the source's compliance with the
        permit, as reported pursuant to paragraph (f) of this
        subsection. The Agency may determine that
        recordkeeping requirements are sufficient to meet the
        requirements of this subparagraph.
            iii. As necessary, specify requirements concerning
        the use, maintenance, and when appropriate,
        installation of monitoring equipment or methods.
        e. To meet the requirements of this subsection with
    respect to record keeping, the permit shall incorporate
    and identify all applicable recordkeeping requirements and
    require, where applicable, the following:
            i. Records of required monitoring information that
        include the following:
                A. The date, place and time of sampling or
            measurements.
                B. The date(s) analyses were performed.
                C. The company or entity that performed the
            analyses.
                D. The analytical techniques or methods used.
                E. The results of such analyses.
                F. The operating conditions as existing at the
            time of sampling or measurement.
            ii. Retention of records of all monitoring data
        and support information for a period of at least 5
        years from the date of the monitoring sample,
        measurement, report, or application. Support
        information includes all calibration and maintenance
        records, original strip-chart recordings for
        continuous monitoring instrumentation, and copies of
        all reports required by the permit.
        f. To meet the requirements of this subsection with
    respect to reporting, the permit shall incorporate and
    identify all applicable reporting requirements and require
    the following:
            i. Submittal of reports of any required monitoring
        every 6 months. More frequent submittals may be
        requested by the Agency if such submittals are
        necessary to assure compliance with this Act or
        regulations promulgated by the Board thereunder. All
        instances of deviations from permit requirements must
        be clearly identified in such reports. All required
        reports must be certified by a responsible official
        consistent with subsection 5 of this Section.
            ii. Prompt reporting of deviations from permit
        requirements, including those attributable to upset
        conditions as defined in the permit, the probable
        cause of such deviations, and any corrective actions
        or preventive measures taken.
        g. Each CAAPP permit issued under subsection 10 of
    this Section shall include a condition prohibiting
    emissions exceeding any allowances that the source
    lawfully holds under Title IV of the Clean Air Act or the
    regulations promulgated thereunder, consistent with
    subsection 17 of this Section and applicable regulations,
    if any.
        h. All CAAPP permits shall state that, where another
    applicable requirement of the Clean Air Act is more
    stringent than any applicable requirement of regulations
    promulgated under Title IV of the Clean Air Act, both
    provisions shall be incorporated into the permit and shall
    be State and federally enforceable.
        i. Each CAAPP permit issued under subsection 10 of
    this Section shall include a severability clause to ensure
    the continued validity of the various permit requirements
    in the event of a challenge to any portions of the permit.
        j. The following shall apply with respect to owners or
    operators requesting a permit shield:
            i. The Agency shall include in a CAAPP permit,
        when requested by an applicant pursuant to paragraph
        (p) of subsection 5 of this Section, a provision
        stating that compliance with the conditions of the
        permit shall be deemed compliance with applicable
        requirements which are applicable as of the date of
        release of the proposed permit, provided that:
                A. The applicable requirement is specifically
            identified within the permit; or
                B. The Agency in acting on the CAAPP
            application or revision determines in writing that
            other requirements specifically identified are not
            applicable to the source, and the permit includes
            that determination or a concise summary thereof.
            ii. The permit shall identify the requirements for
        which the source is shielded. The shield shall not
        extend to applicable requirements which are
        promulgated after the date of release of the proposed
        permit unless the permit has been modified to reflect
        such new requirements.
            iii. A CAAPP permit which does not expressly
        indicate the existence of a permit shield shall not
        provide such a shield.
            iv. Nothing in this paragraph or in a CAAPP permit
        shall alter or affect the following:
                A. The provisions of Section 303 (emergency
            powers) of the Clean Air Act, including USEPA's
            authority under that section.
                B. The liability of an owner or operator of a
            source for any violation of applicable
            requirements prior to or at the time of permit
            issuance.
                C. The applicable requirements of the acid
            rain program consistent with Section 408(a) of the
            Clean Air Act.
                D. The ability of USEPA to obtain information
            from a source pursuant to Section 114
            (inspections, monitoring, and entry) of the Clean
            Air Act.
        k. (Blank). Each CAAPP permit shall include an
    emergency provision providing an affirmative defense of
    emergency to an action brought for noncompliance with
    technology-based emission limitations under a CAAPP permit
    if the following conditions are met through properly
    signed, contemporaneous operating logs, or other relevant
    evidence:
            i. An emergency occurred and the permittee can
        identify the cause(s) of the emergency.
            ii. The permitted facility was at the time being
        properly operated.
            iii. The permittee submitted notice of the
        emergency to the Agency within 2 working days after
        the time when emission limitations were exceeded due
        to the emergency. This notice must contain a detailed
        description of the emergency, any steps taken to
        mitigate emissions, and corrective actions taken.
            iv. During the period of the emergency the
        permittee took all reasonable steps to minimize levels
        of emissions that exceeded the emission limitations,
        standards, or requirements in the permit.
        For purposes of this subsection, "emergency" means any
    situation arising from sudden and reasonably unforeseeable
    events beyond the control of the source, such as an act of
    God, that requires immediate corrective action to restore
    normal operation, and that causes the source to exceed a
    technology-based emission limitation under the permit, due
    to unavoidable increases in emissions attributable to the
    emergency. An emergency shall not include noncompliance to
    the extent caused by improperly designed equipment, lack
    of preventative maintenance, careless or improper
    operation, or operation error.
        In any enforcement proceeding, the permittee seeking
    to establish the occurrence of an emergency has the burden
    of proof. This provision is in addition to any emergency
    or upset provision contained in any applicable
    requirement. This provision does not relieve a permittee
    of any reporting obligations under existing federal or
    state laws or regulations.
        l. The Agency shall include in each permit issued
    under subsection 10 of this Section:
            i. Terms and conditions for reasonably anticipated
        operating scenarios identified by the source in its
        application. The permit terms and conditions for each
        such operating scenario shall meet all applicable
        requirements and the requirements of this Section.
                A. Under this subparagraph, the source must
            record in a log at the permitted facility a record
            of the scenario under which it is operating
            contemporaneously with making a change from one
            operating scenario to another.
                B. The permit shield described in paragraph
            (j) of subsection 7 of this Section shall extend
            to all terms and conditions under each such
            operating scenario.
            ii. Where requested by an applicant, all terms and
        conditions allowing for trading of emissions increases
        and decreases between different emission units at the
        CAAPP source, to the extent that the applicable
        requirements provide for trading of such emissions
        increases and decreases without a case-by-case
        approval of each emissions trade. Such terms and
        conditions:
                A. Shall include all terms required under this
            subsection to determine compliance;
                B. Must meet all applicable requirements;
                C. Shall extend the permit shield described in
            paragraph (j) of subsection 7 of this Section to
            all terms and conditions that allow such increases
            and decreases in emissions.
        m. The Agency shall specifically designate as not
    being federally enforceable under the Clean Air Act any
    terms and conditions included in the permit that are not
    specifically required under the Clean Air Act or federal
    regulations promulgated thereunder. Terms or conditions so
    designated shall be subject to all applicable State
    requirements, except the requirements of subsection 7
    (other than this paragraph, paragraph q of subsection 7,
    subsections 8 through 11, and subsections 13 through 16 of
    this Section. The Agency shall, however, include such
    terms and conditions in the CAAPP permit issued to the
    source.
        n. Each CAAPP permit issued under subsection 10 of
    this Section shall specify and reference the origin of and
    authority for each term or condition, and identify any
    difference in form as compared to the applicable
    requirement upon which the term or condition is based.
        o. Each CAAPP permit issued under subsection 10 of
    this Section shall include provisions stating the
    following:
            i. Duty to comply. The permittee must comply with
        all terms and conditions of the CAAPP permit. Any
        permit noncompliance constitutes a violation of the
        Clean Air Act and the Act, and is grounds for any or
        all of the following: enforcement action; permit
        termination, revocation and reissuance, or
        modification; or denial of a permit renewal
        application.
            ii. Need to halt or reduce activity not a defense.
        It shall not be a defense for a permittee in an
        enforcement action that it would have been necessary
        to halt or reduce the permitted activity in order to
        maintain compliance with the conditions of this
        permit.
            iii. Permit actions. The permit may be modified,
        revoked, reopened, and reissued, or terminated for
        cause in accordance with the applicable subsections of
        Section 39.5 of this Act. The filing of a request by
        the permittee for a permit modification, revocation
        and reissuance, or termination, or of a notification
        of planned changes or anticipated noncompliance does
        not stay any permit condition.
            iv. Property rights. The permit does not convey
        any property rights of any sort, or any exclusive
        privilege.
            v. Duty to provide information. The permittee
        shall furnish to the Agency within a reasonable time
        specified by the Agency any information that the
        Agency may request in writing to determine whether
        cause exists for modifying, revoking and reissuing, or
        terminating the permit or to determine compliance with
        the permit. Upon request, the permittee shall also
        furnish to the Agency copies of records required to be
        kept by the permit or, for information claimed to be
        confidential, the permittee may furnish such records
        directly to USEPA along with a claim of
        confidentiality.
            vi. Duty to pay fees. The permittee must pay fees
        to the Agency consistent with the fee schedule
        approved pursuant to subsection 18 of this Section,
        and submit any information relevant thereto.
            vii. Emissions trading. No permit revision shall
        be required for increases in emissions allowed under
        any approved economic incentives, marketable permits,
        emissions trading, and other similar programs or
        processes for changes that are provided for in the
        permit and that are authorized by the applicable
        requirement.
        p. Each CAAPP permit issued under subsection 10 of
    this Section shall contain the following elements with
    respect to compliance:
            i. Compliance certification, testing, monitoring,
        reporting, and record keeping requirements sufficient
        to assure compliance with the terms and conditions of
        the permit. Any document (including reports) required
        by a CAAPP permit shall contain a certification by a
        responsible official that meets the requirements of
        subsection 5 of this Section and applicable
        regulations.
            ii. Inspection and entry requirements that
        necessitate that, upon presentation of credentials and
        other documents as may be required by law and in
        accordance with constitutional limitations, the
        permittee shall allow the Agency, or an authorized
        representative to perform the following:
                A. Enter upon the permittee's premises where a
            CAAPP source is located or emissions-related
            activity is conducted, or where records must be
            kept under the conditions of the permit.
                B. Have access to and copy, at reasonable
            times, any records that must be kept under the
            conditions of the permit.
                C. Inspect at reasonable times any facilities,
            equipment (including monitoring and air pollution
            control equipment), practices, or operations
            regulated or required under the permit.
                D. Sample or monitor any substances or
            parameters at any location:
                    1. As authorized by the Clean Air Act, at
                reasonable times, for the purposes of assuring
                compliance with the CAAPP permit or applicable
                requirements; or
                    2. As otherwise authorized by this Act.
            iii. A schedule of compliance consistent with
        subsection 5 of this Section and applicable
        regulations.
            iv. Progress reports consistent with an applicable
        schedule of compliance pursuant to paragraph (d) of
        subsection 5 of this Section and applicable
        regulations to be submitted semiannually, or more
        frequently if the Agency determines that such more
        frequent submittals are necessary for compliance with
        the Act or regulations promulgated by the Board
        thereunder. Such progress reports shall contain the
        following:
                A. Required dates for achieving the
            activities, milestones, or compliance required by
            the schedule of compliance and dates when such
            activities, milestones or compliance were
            achieved.
                B. An explanation of why any dates in the
            schedule of compliance were not or will not be
            met, and any preventive or corrective measures
            adopted.
            v. Requirements for compliance certification with
        terms and conditions contained in the permit,
        including emission limitations, standards, or work
        practices. Permits shall include each of the
        following:
                A. The frequency (annually or more frequently
            as specified in any applicable requirement or by
            the Agency pursuant to written procedures) of
            submissions of compliance certifications.
                B. A means for assessing or monitoring the
            compliance of the source with its emissions
            limitations, standards, and work practices.
                C. A requirement that the compliance
            certification include the following:
                    1. The identification of each term or
                condition contained in the permit that is the
                basis of the certification.
                    2. The compliance status.
                    3. Whether compliance was continuous or
                intermittent.
                    4. The method(s) used for determining the
                compliance status of the source, both
                currently and over the reporting period
                consistent with subsection 7 of this Section.
                D. A requirement that all compliance
            certifications be submitted to the Agency.
                E. Additional requirements as may be specified
            pursuant to Sections 114(a)(3) and 504(b) of the
            Clean Air Act.
                F. Other provisions as the Agency may require.
        q. If the owner or operator of CAAPP source can
    demonstrate in its CAAPP application, including an
    application for a significant modification, that an
    alternative emission limit would be equivalent to that
    contained in the applicable Board regulations, the Agency
    shall include the alternative emission limit in the CAAPP
    permit, which shall supersede the emission limit set forth
    in the applicable Board regulations, and shall include
    conditions that insure that the resulting emission limit
    is quantifiable, accountable, enforceable, and based on
    replicable procedures.
 
    8. Public Notice; Affected State Review.
        a. The Agency shall provide notice to the public,
    including an opportunity for public comment and a hearing,
    on each draft CAAPP permit for issuance, renewal or
    significant modification, subject to Section 7.1 and
    subsection (a) of Section 7 of this Act.
        b. The Agency shall prepare a draft CAAPP permit and a
    statement that sets forth the legal and factual basis for
    the draft CAAPP permit conditions, including references to
    the applicable statutory or regulatory provisions. The
    Agency shall provide this statement to any person who
    requests it.
        c. The Agency shall give notice of each draft CAAPP
    permit to the applicant and to any affected State on or
    before the time that the Agency has provided notice to the
    public, except as otherwise provided in this Act.
        d. The Agency, as part of its submittal of a proposed
    permit to USEPA (or as soon as possible after the
    submittal for minor permit modification procedures allowed
    under subsection 14 of this Section), shall notify USEPA
    and any affected State in writing of any refusal of the
    Agency to accept all of the recommendations for the
    proposed permit that an affected State submitted during
    the public or affected State review period. The notice
    shall include the Agency's reasons for not accepting the
    recommendations. The Agency is not required to accept
    recommendations that are not based on applicable
    requirements or the requirements of this Section.
        e. The Agency shall make available to the public any
    CAAPP permit application, compliance plan (including the
    schedule of compliance), CAAPP permit, and emissions or
    compliance monitoring report. If an owner or operator of a
    CAAPP source is required to submit information entitled to
    protection from disclosure under Section 7.1 and
    subsection (a) of Section 7 of this Act, the owner or
    operator shall submit such information separately. The
    requirements of Section 7.1 and subsection (a) of Section
    7 of this Act shall apply to such information, which shall
    not be included in a CAAPP permit unless required by law.
    The contents of a CAAPP permit shall not be entitled to
    protection under Section 7.1 and subsection (a) of Section
    7 of this Act.
        f. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
        g. If requested by the permit applicant, the Agency
    shall provide the permit applicant with a copy of the
    draft CAAPP permit prior to any public review period. If
    requested by the permit applicant, the Agency shall
    provide the permit applicant with a copy of the final
    CAAPP permit prior to issuance of the CAAPP permit.
 
    9. USEPA Notice and Objection.
        a. The Agency shall provide to USEPA for its review a
    copy of each CAAPP application (including any application
    for permit modification), statement of basis as provided
    in paragraph (b) of subsection 8 of this Section, proposed
    CAAPP permit, CAAPP permit, and, if the Agency does not
    incorporate any affected State's recommendations on a
    proposed CAAPP permit, a written statement of this
    decision and its reasons for not accepting the
    recommendations, except as otherwise provided in this Act
    or by agreement with USEPA. To the extent practicable, the
    preceding information shall be provided in computer
    readable format compatible with USEPA's national database
    management system.
        b. The Agency shall not issue the proposed CAAPP
    permit if USEPA objects in writing within 45 days after
    receipt of the proposed CAAPP permit and all necessary
    supporting information.
        c. If USEPA objects in writing to the issuance of the
    proposed CAAPP permit within the 45-day period, the Agency
    shall respond in writing and may revise and resubmit the
    proposed CAAPP permit in response to the stated objection,
    to the extent supported by the record, within 90 days
    after the date of the objection. Prior to submitting a
    revised permit to USEPA, the Agency shall provide the
    applicant and any person who participated in the public
    comment process, pursuant to subsection 8 of this Section,
    with a 10-day period to comment on any revision which the
    Agency is proposing to make to the permit in response to
    USEPA's objection in accordance with Agency procedures.
        d. Any USEPA objection under this subsection,
    according to the Clean Air Act, will include a statement
    of reasons for the objection and a description of the
    terms and conditions that must be in the permit, in order
    to adequately respond to the objections. Grounds for a
    USEPA objection include the failure of the Agency to: (1)
    submit the items and notices required under this
    subsection; (2) submit any other information necessary to
    adequately review the proposed CAAPP permit; or (3)
    process the permit under subsection 8 of this Section
    except for minor permit modifications.
        e. If USEPA does not object in writing to issuance of a
    permit under this subsection, any person may petition
    USEPA within 60 days after expiration of the 45-day review
    period to make such objection.
        f. If the permit has not yet been issued and USEPA
    objects to the permit as a result of a petition, the Agency
    shall not issue the permit until USEPA's objection has
    been resolved. The Agency shall provide a 10-day comment
    period in accordance with paragraph c of this subsection.
    A petition does not, however, stay the effectiveness of a
    permit or its requirements if the permit was issued after
    expiration of the 45-day review period and prior to a
    USEPA objection.
        g. If the Agency has issued a permit after expiration
    of the 45-day review period and prior to receipt of a USEPA
    objection under this subsection in response to a petition
    submitted pursuant to paragraph e of this subsection, the
    Agency may, upon receipt of an objection from USEPA,
    revise and resubmit the permit to USEPA pursuant to this
    subsection after providing a 10-day comment period in
    accordance with paragraph c of this subsection. If the
    Agency fails to submit a revised permit in response to the
    objection, USEPA shall modify, terminate or revoke the
    permit. In any case, the source will not be in violation of
    the requirement to have submitted a timely and complete
    application.
        h. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    10. Final Agency Action.
        a. The Agency shall issue a CAAPP permit, permit
    modification, or permit renewal if all of the following
    conditions are met:
            i. The applicant has submitted a complete and
        certified application for a permit, permit
        modification, or permit renewal consistent with
        subsections 5 and 14 of this Section, as applicable,
        and applicable regulations.
            ii. The applicant has submitted with its complete
        application an approvable compliance plan, including a
        schedule for achieving compliance, consistent with
        subsection 5 of this Section and applicable
        regulations.
            iii. The applicant has timely paid the fees
        required pursuant to subsection 18 of this Section and
        applicable regulations.
            iv. The Agency has received a complete CAAPP
        application and, if necessary, has requested and
        received additional information from the applicant
        consistent with subsection 5 of this Section and
        applicable regulations.
            v. The Agency has complied with all applicable
        provisions regarding public notice and affected State
        review consistent with subsection 8 of this Section
        and applicable regulations.
            vi. The Agency has provided a copy of each CAAPP
        application, or summary thereof, pursuant to agreement
        with USEPA and proposed CAAPP permit required under
        subsection 9 of this Section to USEPA, and USEPA has
        not objected to the issuance of the permit in
        accordance with the Clean Air Act and 40 CFR Part 70.
        b. The Agency shall have the authority to deny a CAAPP
    permit, permit modification, or permit renewal if the
    applicant has not complied with the requirements of
    subparagraphs (i) through (iv) of paragraph (a) of this
    subsection or if USEPA objects to its issuance.
        c. i. Prior to denial of a CAAPP permit, permit
        modification, or permit renewal under this Section,
        the Agency shall notify the applicant of the possible
        denial and the reasons for the denial.
            ii. Within such notice, the Agency shall specify
        an appropriate date by which the applicant shall
        adequately respond to the Agency's notice. Such date
        shall not exceed 15 days from the date the
        notification is received by the applicant. The Agency
        may grant a reasonable extension for good cause shown.
            iii. Failure by the applicant to adequately
        respond by the date specified in the notification or
        by any granted extension date shall be grounds for
        denial of the permit.
            For purposes of obtaining judicial review under
        Sections 40.2 and 41 of this Act, the Agency shall
        provide to USEPA and each applicant, and, upon
        request, to affected States, any person who
        participated in the public comment process, and any
        other person who could obtain judicial review under
        Sections 40.2 and 41 of this Act, a copy of each CAAPP
        permit or notification of denial pertaining to that
        party.
        d. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    11. General Permits.
        a. The Agency may issue a general permit covering
    numerous similar sources, except for affected sources for
    acid deposition unless otherwise provided in regulations
    promulgated under Title IV of the Clean Air Act.
        b. The Agency shall identify, in any general permit,
    criteria by which sources may qualify for the general
    permit.
        c. CAAPP sources that would qualify for a general
    permit must apply for coverage under the terms of the
    general permit or must apply for a CAAPP permit consistent
    with subsection 5 of this Section and applicable
    regulations.
        d. The Agency shall comply with the public comment and
    hearing provisions of this Section as well as the USEPA
    and affected State review procedures prior to issuance of
    a general permit.
        e. When granting a subsequent request by a qualifying
    CAAPP source for coverage under the terms of a general
    permit, the Agency shall not be required to repeat the
    public notice and comment procedures. The granting of such
    request shall not be considered a final permit action for
    purposes of judicial review.
        f. The Agency may not issue a general permit to cover
    any discrete emission unit at a CAAPP source if another
    CAAPP permit covers emission units at the source.
        g. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    12. Operational Flexibility.
        a. An owner or operator of a CAAPP source may make
    changes at the CAAPP source without requiring a prior
    permit revision, consistent with subparagraphs (i) through
    (iii) of paragraph (a) of this subsection, so long as the
    changes are not modifications under any provision of Title
    I of the Clean Air Act and they do not exceed the emissions
    allowable under the permit (whether expressed therein as a
    rate of emissions or in terms of total emissions),
    provided that the owner or operator of the CAAPP source
    provides USEPA and the Agency with written notification as
    required below in advance of the proposed changes, which
    shall be a minimum of 7 days, unless otherwise provided by
    the Agency in applicable regulations regarding
    emergencies. The owner or operator of a CAAPP source and
    the Agency shall each attach such notice to their copy of
    the relevant permit.
            i. An owner or operator of a CAAPP source may make
        Section 502 (b) (10) changes without a permit
        revision, if the changes are not modifications under
        any provision of Title I of the Clean Air Act and the
        changes do not exceed the emissions allowable under
        the permit (whether expressed therein as a rate of
        emissions or in terms of total emissions).
                A. For each such change, the written
            notification required above shall include a brief
            description of the change within the source, the
            date on which the change will occur, any change in
            emissions, and any permit term or condition that
            is no longer applicable as a result of the change.
                B. The permit shield described in paragraph
            (j) of subsection 7 of this Section shall not
            apply to any change made pursuant to this
            subparagraph.
            ii. An owner or operator of a CAAPP source may
        trade increases and decreases in emissions in the
        CAAPP source, where the applicable implementation plan
        provides for such emission trades without requiring a
        permit revision. This provision is available in those
        cases where the permit does not already provide for
        such emissions trading.
                A. Under this subparagraph (ii) of paragraph
            (a) of this subsection, the written notification
            required above shall include such information as
            may be required by the provision in the applicable
            implementation plan authorizing the emissions
            trade, including at a minimum, when the proposed
            changes will occur, a description of each such
            change, any change in emissions, the permit
            requirements with which the source will comply
            using the emissions trading provisions of the
            applicable implementation plan, and the pollutants
            emitted subject to the emissions trade. The notice
            shall also refer to the provisions in the
            applicable implementation plan with which the
            source will comply and provide for the emissions
            trade.
                B. The permit shield described in paragraph
            (j) of subsection 7 of this Section shall not
            apply to any change made pursuant to subparagraph
            (ii) of paragraph (a) of this subsection.
            Compliance with the permit requirements that the
            source will meet using the emissions trade shall
            be determined according to the requirements of the
            applicable implementation plan authorizing the
            emissions trade.
            iii. If requested within a CAAPP application, the
        Agency shall issue a CAAPP permit which contains terms
        and conditions, including all terms required under
        subsection 7 of this Section to determine compliance,
        allowing for the trading of emissions increases and
        decreases at the CAAPP source solely for the purpose
        of complying with a federally-enforceable emissions
        cap that is established in the permit independent of
        otherwise applicable requirements. The owner or
        operator of a CAAPP source shall include in its CAAPP
        application proposed replicable procedures and permit
        terms that ensure the emissions trades are
        quantifiable and enforceable. The permit shall also
        require compliance with all applicable requirements.
                A. Under this subparagraph (iii) of paragraph
            (a), the written notification required above shall
            state when the change will occur and shall
            describe the changes in emissions that will result
            and how these increases and decreases in emissions
            will comply with the terms and conditions of the
            permit.
                B. The permit shield described in paragraph
            (j) of subsection 7 of this Section shall extend
            to terms and conditions that allow such increases
            and decreases in emissions.
        b. An owner or operator of a CAAPP source may make
    changes that are not addressed or prohibited by the
    permit, other than those which are subject to any
    requirements under Title IV of the Clean Air Act or are
    modifications under any provisions of Title I of the Clean
    Air Act, without a permit revision, in accordance with the
    following requirements:
            (i) Each such change shall meet all applicable
        requirements and shall not violate any existing permit
        term or condition;
            (ii) Sources must provide contemporaneous written
        notice to the Agency and USEPA of each such change,
        except for changes that qualify as insignificant under
        provisions adopted by the Agency or the Board. Such
        written notice shall describe each such change,
        including the date, any change in emissions,
        pollutants emitted, and any applicable requirement
        that would apply as a result of the change;
            (iii) The change shall not qualify for the shield
        described in paragraph (j) of subsection 7 of this
        Section; and
            (iv) The permittee shall keep a record describing
        changes made at the source that result in emissions of
        a regulated air pollutant subject to an applicable
        Clean Air Act requirement, but not otherwise regulated
        under the permit, and the emissions resulting from
        those changes.
        c. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary to implement this subsection.
 
    13. Administrative Permit Amendments.
        a. The Agency shall take final action on a request for
    an administrative permit amendment within 60 days after
    receipt of the request. Neither notice nor an opportunity
    for public and affected State comment shall be required
    for the Agency to incorporate such revisions, provided it
    designates the permit revisions as having been made
    pursuant to this subsection.
        b. The Agency shall submit a copy of the revised
    permit to USEPA.
        c. For purposes of this Section the term
    "administrative permit amendment" shall be defined as a
    permit revision that can accomplish one or more of the
    changes described below:
            i. Corrects typographical errors;
            ii. Identifies a change in the name, address, or
        phone number of any person identified in the permit,
        or provides a similar minor administrative change at
        the source;
            iii. Requires more frequent monitoring or
        reporting by the permittee;
            iv. Allows for a change in ownership or
        operational control of a source where the Agency
        determines that no other change in the permit is
        necessary, provided that a written agreement
        containing a specific date for transfer of permit
        responsibility, coverage, and liability between the
        current and new permittees has been submitted to the
        Agency;
            v. Incorporates into the CAAPP permit the
        requirements from preconstruction review permits
        authorized under a USEPA-approved program, provided
        the program meets procedural and compliance
        requirements substantially equivalent to those
        contained in this Section;
            vi. (Blank); or
            vii. Any other type of change which USEPA has
        determined as part of the approved CAAPP permit
        program to be similar to those included in this
        subsection.
        d. The Agency shall, upon taking final action granting
    a request for an administrative permit amendment, allow
    coverage by the permit shield in paragraph (j) of
    subsection 7 of this Section for administrative permit
    amendments made pursuant to subparagraph (v) of paragraph
    (c) of this subsection which meet the relevant
    requirements for significant permit modifications.
        e. Permit revisions and modifications, including
    administrative amendments and automatic amendments
    (pursuant to Sections 408(b) and 403(d) of the Clean Air
    Act or regulations promulgated thereunder), for purposes
    of the acid rain portion of the permit shall be governed by
    the regulations promulgated under Title IV of the Clean
    Air Act. Owners or operators of affected sources for acid
    deposition shall have the flexibility to amend their
    compliance plans as provided in the regulations
    promulgated under Title IV of the Clean Air Act.
        f. The CAAPP source may implement the changes
    addressed in the request for an administrative permit
    amendment immediately upon submittal of the request.
        g. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    14. Permit Modifications.
        a. Minor permit modification procedures.
            i. The Agency shall review a permit modification
        using the "minor permit" modification procedures only
        for those permit modifications that:
                A. Do not violate any applicable requirement;
                B. Do not involve significant changes to
            existing monitoring, reporting, or recordkeeping
            requirements in the permit;
                C. Do not require a case-by-case determination
            of an emission limitation or other standard, or a
            source-specific determination of ambient impacts,
            or a visibility or increment analysis;
                D. Do not seek to establish or change a permit
            term or condition for which there is no
            corresponding underlying requirement and which
            avoids an applicable requirement to which the
            source would otherwise be subject. Such terms and
            conditions include:
                    1. A federally enforceable emissions cap
                assumed to avoid classification as a
                modification under any provision of Title I of
                the Clean Air Act; and
                    2. An alternative emissions limit approved
                pursuant to regulations promulgated under
                Section 112(i)(5) of the Clean Air Act;
                E. Are not modifications under any provision
            of Title I of the Clean Air Act; and
                F. Are not required to be processed as a
            significant modification.
            ii. Notwithstanding subparagraph (i) of paragraph
        (a) and subparagraph (ii) of paragraph (b) of this
        subsection, minor permit modification procedures may
        be used for permit modifications involving the use of
        economic incentives, marketable permits, emissions
        trading, and other similar approaches, to the extent
        that such minor permit modification procedures are
        explicitly provided for in an applicable
        implementation plan or in applicable requirements
        promulgated by USEPA.
            iii. An applicant requesting the use of minor
        permit modification procedures shall meet the
        requirements of subsection 5 of this Section and shall
        include the following in its application:
                A. A description of the change, the emissions
            resulting from the change, and any new applicable
            requirements that will apply if the change occurs;
                B. The source's suggested draft permit;
                C. Certification by a responsible official,
            consistent with paragraph (e) of subsection 5 of
            this Section and applicable regulations, that the
            proposed modification meets the criteria for use
            of minor permit modification procedures and a
            request that such procedures be used; and
                D. Completed forms for the Agency to use to
            notify USEPA and affected States as required under
            subsections 8 and 9 of this Section.
            iv. Within 5 working days after receipt of a
        complete permit modification application, the Agency
        shall notify USEPA and affected States of the
        requested permit modification in accordance with
        subsections 8 and 9 of this Section. The Agency
        promptly shall send any notice required under
        paragraph (d) of subsection 8 of this Section to
        USEPA.
            v. The Agency may not issue a final permit
        modification until after the 45-day review period for
        USEPA or until USEPA has notified the Agency that
        USEPA will not object to the issuance of the permit
        modification, whichever comes first, although the
        Agency can approve the permit modification prior to
        that time. Within 90 days after the Agency's receipt
        of an application under the minor permit modification
        procedures or 15 days after the end of USEPA's 45-day
        review period under subsection 9 of this Section,
        whichever is later, the Agency shall:
                A. Issue the permit modification as proposed;
                B. Deny the permit modification application;
                C. Determine that the requested modification
            does not meet the minor permit modification
            criteria and should be reviewed under the
            significant modification procedures; or
                D. Revise the draft permit modification and
            transmit to USEPA the new proposed permit
            modification as required by subsection 9 of this
            Section.
            vi. Any CAAPP source may make the change proposed
        in its minor permit modification application
        immediately after it files such application. After the
        CAAPP source makes the change allowed by the preceding
        sentence, and until the Agency takes any of the
        actions specified in items (A) through (C) of
        subparagraph (v) of paragraph (a) of this subsection,
        the source must comply with both the applicable
        requirements governing the change and the proposed
        permit terms and conditions. During this time period,
        the source need not comply with the existing permit
        terms and conditions it seeks to modify. If the source
        fails to comply with its proposed permit terms and
        conditions during this time period, the existing
        permit terms and conditions which it seeks to modify
        may be enforced against it.
            vii. The permit shield under paragraph (j) of
        subsection 7 of this Section may not extend to minor
        permit modifications.
            viii. If a construction permit is required,
        pursuant to subsection (a) of Section 39 of this Act
        and regulations thereunder, for a change for which the
        minor permit modification procedures are applicable,
        the source may request that the processing of the
        construction permit application be consolidated with
        the processing of the application for the minor permit
        modification. In such cases, the provisions of this
        Section, including those within subsections 5, 8, and
        9, shall apply and the Agency shall act on such
        applications pursuant to subparagraph (v) of paragraph
        (a) of subsection 14 of this Section. The source may
        make the proposed change immediately after filing its
        application for the minor permit modification. Nothing
        in this subparagraph shall otherwise affect the
        requirements and procedures applicable to construction
        permits.
        b. Group Processing of Minor Permit Modifications.
            i. Where requested by an applicant within its
        application, the Agency shall process groups of a
        source's applications for certain modifications
        eligible for minor permit modification processing in
        accordance with the provisions of this paragraph (b).
            ii. Permit modifications may be processed in
        accordance with the procedures for group processing,
        for those modifications:
                A. Which meet the criteria for minor permit
            modification procedures under subparagraph (i) of
            paragraph (a) of subsection 14 of this Section;
            and
                B. That collectively are below 10 percent of
            the emissions allowed by the permit for the
            emissions unit for which change is requested, 20
            percent of the applicable definition of major
            source set forth in subsection 2 of this Section,
            or 5 tons per year, whichever is least.
            iii. An applicant requesting the use of group
        processing procedures shall meet the requirements of
        subsection 5 of this Section and shall include the
        following in its application:
                A. A description of the change, the emissions
            resulting from the change, and any new applicable
            requirements that will apply if the change occurs.
                B. The source's suggested draft permit.
                C. Certification by a responsible official
            consistent with paragraph (e) of subsection 5 of
            this Section, that the proposed modification meets
            the criteria for use of group processing
            procedures and a request that such procedures be
            used.
                D. A list of the source's other pending
            applications awaiting group processing, and a
            determination of whether the requested
            modification, aggregated with these other
            applications, equals or exceeds the threshold set
            under item (B) of subparagraph (ii) of paragraph
            (b) of this subsection.
                E. Certification, consistent with paragraph
            (e) of subsection 5 of this Section, that the
            source has notified USEPA of the proposed
            modification. Such notification need only contain
            a brief description of the requested modification.
                F. Completed forms for the Agency to use to
            notify USEPA and affected states as required under
            subsections 8 and 9 of this Section.
            iv. On a quarterly basis or within 5 business days
        after receipt of an application demonstrating that the
        aggregate of a source's pending applications equals or
        exceeds the threshold level set forth within item (B)
        of subparagraph (ii) of paragraph (b) of this
        subsection, whichever is earlier, the Agency shall
        promptly notify USEPA and affected States of the
        requested permit modifications in accordance with
        subsections 8 and 9 of this Section. The Agency shall
        send any notice required under paragraph (d) of
        subsection 8 of this Section to USEPA.
            v. The provisions of subparagraph (v) of paragraph
        (a) of this subsection shall apply to modifications
        eligible for group processing, except that the Agency
        shall take one of the actions specified in items (A)
        through (D) of subparagraph (v) of paragraph (a) of
        this subsection within 180 days after receipt of the
        application or 15 days after the end of USEPA's 45-day
        review period under subsection 9 of this Section,
        whichever is later.
            vi. The provisions of subparagraph (vi) of
        paragraph (a) of this subsection shall apply to
        modifications for group processing.
            vii. The provisions of paragraph (j) of subsection
        7 of this Section shall not apply to modifications
        eligible for group processing.
        c. Significant Permit Modifications.
            i. Significant modification procedures shall be
        used for applications requesting significant permit
        modifications and for those applications that do not
        qualify as either minor permit modifications or as
        administrative permit amendments.
            ii. Every significant change in existing
        monitoring permit terms or conditions and every
        relaxation of reporting or recordkeeping requirements
        shall be considered significant. A modification shall
        also be considered significant if in the judgment of
        the Agency action on an application for modification
        would require decisions to be made on technically
        complex issues. Nothing herein shall be construed to
        preclude the permittee from making changes consistent
        with this Section that would render existing permit
        compliance terms and conditions irrelevant.
            iii. Significant permit modifications must meet
        all the requirements of this Section, including those
        for applications (including completeness review),
        public participation, review by affected States, and
        review by USEPA applicable to initial permit issuance
        and permit renewal. The Agency shall take final action
        on significant permit modifications within 9 months
        after receipt of a complete application.
        d. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    15. Reopenings for Cause by the Agency.
        a. Each issued CAAPP permit shall include provisions
    specifying the conditions under which the permit will be
    reopened prior to the expiration of the permit. Such
    revisions shall be made as expeditiously as practicable. A
    CAAPP permit shall be reopened and revised under any of
    the following circumstances, in accordance with procedures
    adopted by the Agency:
            i. Additional requirements under the Clean Air Act
        become applicable to a major CAAPP source for which 3
        or more years remain on the original term of the
        permit. Such a reopening shall be completed not later
        than 18 months after the promulgation of the
        applicable requirement. No such revision is required
        if the effective date of the requirement is later than
        the date on which the permit is due to expire.
            ii. Additional requirements (including excess
        emissions requirements) become applicable to an
        affected source for acid deposition under the acid
        rain program. Excess emissions offset plans shall be
        deemed to be incorporated into the permit upon
        approval by USEPA.
            iii. The Agency or USEPA determines that the
        permit contains a material mistake or that inaccurate
        statements were made in establishing the emissions
        standards, limitations, or other terms or conditions
        of the permit.
            iv. The Agency or USEPA determines that the permit
        must be revised or revoked to assure compliance with
        the applicable requirements.
        b. In the event that the Agency determines that there
    are grounds for revoking a CAAPP permit, for cause,
    consistent with paragraph a of this subsection, it shall
    file a petition before the Board setting forth the basis
    for such revocation. In any such proceeding, the Agency
    shall have the burden of establishing that the permit
    should be revoked under the standards set forth in this
    Act and the Clean Air Act. Any such proceeding shall be
    conducted pursuant to the Board's procedures for
    adjudicatory hearings and the Board shall render its
    decision within 120 days of the filing of the petition.
    The Agency shall take final action to revoke and reissue a
    CAAPP permit consistent with the Board's order.
        c. Proceedings regarding a reopened CAAPP permit shall
    follow the same procedures as apply to initial permit
    issuance and shall affect only those parts of the permit
    for which cause to reopen exists.
        d. Reopenings under paragraph (a) of this subsection
    shall not be initiated before a notice of such intent is
    provided to the CAAPP source by the Agency at least 30 days
    in advance of the date that the permit is to be reopened,
    except that the Agency may provide a shorter time period
    in the case of an emergency.
        e. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    16. Reopenings for Cause by USEPA.
        a. When USEPA finds that cause exists to terminate,
    modify, or revoke and reissue a CAAPP permit pursuant to
    subsection 15 of this Section, and thereafter notifies the
    Agency and the permittee of such finding in writing, the
    Agency shall forward to USEPA and the permittee a proposed
    determination of termination, modification, or revocation
    and reissuance as appropriate, in accordance with
    paragraph (b) of this subsection. The Agency's proposed
    determination shall be in accordance with the record, the
    Clean Air Act, regulations promulgated thereunder, this
    Act and regulations promulgated thereunder. Such proposed
    determination shall not affect the permit or constitute a
    final permit action for purposes of this Act or the
    Administrative Review Law. The Agency shall forward to
    USEPA such proposed determination within 90 days after
    receipt of the notification from USEPA. If additional time
    is necessary to submit the proposed determination, the
    Agency shall request a 90-day extension from USEPA and
    shall submit the proposed determination within 180 days
    after receipt of notification from USEPA.
            b. i. Prior to the Agency's submittal to USEPA of a
        proposed determination to terminate or revoke and
        reissue the permit, the Agency shall file a petition
        before the Board setting forth USEPA's objection, the
        permit record, the Agency's proposed determination,
        and the justification for its proposed determination.
        The Board shall conduct a hearing pursuant to the
        rules prescribed by Section 32 of this Act, and the
        burden of proof shall be on the Agency.
            ii. After due consideration of the written and
        oral statements, the testimony and arguments that
        shall be submitted at hearing, the Board shall issue
        and enter an interim order for the proposed
        determination, which shall set forth all changes, if
        any, required in the Agency's proposed determination.
        The interim order shall comply with the requirements
        for final orders as set forth in Section 33 of this
        Act. Issuance of an interim order by the Board under
        this paragraph, however, shall not affect the permit
        status and does not constitute a final action for
        purposes of this Act or the Administrative Review Law.
            iii. The Board shall cause a copy of its interim
        order to be served upon all parties to the proceeding
        as well as upon USEPA. The Agency shall submit the
        proposed determination to USEPA in accordance with the
        Board's Interim Order within 180 days after receipt of
        the notification from USEPA.
        c. USEPA shall review the proposed determination to
    terminate, modify, or revoke and reissue the permit within
    90 days after receipt.
            i. When USEPA reviews the proposed determination
        to terminate or revoke and reissue and does not
        object, the Board shall, within 7 days after receipt
        of USEPA's final approval, enter the interim order as
        a final order. The final order may be appealed as
        provided by Title XI of this Act. The Agency shall take
        final action in accordance with the Board's final
        order.
            ii. When USEPA reviews such proposed determination
        to terminate or revoke and reissue and objects, the
        Agency shall submit USEPA's objection and the Agency's
        comments and recommendation on the objection to the
        Board and permittee. The Board shall review its
        interim order in response to USEPA's objection and the
        Agency's comments and recommendation and issue a final
        order in accordance with Sections 32 and 33 of this
        Act. The Agency shall, within 90 days after receipt of
        such objection, respond to USEPA's objection in
        accordance with the Board's final order.
            iii. When USEPA reviews such proposed
        determination to modify and objects, the Agency shall,
        within 90 days after receipt of the objection, resolve
        the objection and modify the permit in accordance with
        USEPA's objection, based upon the record, the Clean
        Air Act, regulations promulgated thereunder, this Act,
        and regulations promulgated thereunder.
        d. If the Agency fails to submit the proposed
    determination pursuant to paragraph a of this subsection
    or fails to resolve any USEPA objection pursuant to
    paragraph c of this subsection, USEPA will terminate,
    modify, or revoke and reissue the permit.
        e. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
 
    17. Title IV; Acid Rain Provisions.
        a. The Agency shall act on initial CAAPP applications
    for affected sources for acid deposition in accordance
    with this Section and Title V of the Clean Air Act and
    regulations promulgated thereunder, except as modified by
    Title IV of the Clean Air Act and regulations promulgated
    thereunder. The Agency shall issue initial CAAPP permits
    to the affected sources for acid deposition which shall
    become effective no earlier than January 1, 1995, and
    which shall terminate on December 31, 1999, in accordance
    with this Section. Subsequent CAAPP permits issued to
    affected sources for acid deposition shall be issued for a
    fixed term of 5 years. Title IV of the Clean Air Act and
    regulations promulgated thereunder, including but not
    limited to 40 C.F.R. Part 72, as now or hereafter amended,
    are applicable to and enforceable under this Act.
        b. A designated representative of an affected source
    for acid deposition shall submit a timely and complete
    Phase II acid rain permit application and compliance plan
    to the Agency, not later than January 1, 1996, that meets
    the requirements of Titles IV and V of the Clean Air Act
    and regulations. The Agency shall act on the Phase II acid
    rain permit application and compliance plan in accordance
    with this Section and Title V of the Clean Air Act and
    regulations promulgated thereunder, except as modified by
    Title IV of the Clean Air Act and regulations promulgated
    thereunder. The Agency shall issue the Phase II acid rain
    permit to an affected source for acid deposition no later
    than December 31, 1997, which shall become effective on
    January 1, 2000, in accordance with this Section, except
    as modified by Title IV and regulations promulgated
    thereunder; provided that the designated representative of
    the source submitted a timely and complete Phase II permit
    application and compliance plan to the Agency that meets
    the requirements of Title IV and V of the Clean Air Act and
    regulations.
        c. Each Phase II acid rain permit issued in accordance
    with this subsection shall have a fixed term of 5 years.
    Except as provided in paragraph b above, the Agency shall
    issue or deny a Phase II acid rain permit within 18 months
    of receiving a complete Phase II permit application and
    compliance plan.
        d. A designated representative of a new unit, as
    defined in Section 402 of the Clean Air Act, shall submit a
    timely and complete Phase II acid rain permit application
    and compliance plan that meets the requirements of Titles
    IV and V of the Clean Air Act and its regulations. The
    Agency shall act on the new unit's Phase II acid rain
    permit application and compliance plan in accordance with
    this Section and Title V of the Clean Air Act and its
    regulations, except as modified by Title IV of the Clean
    Air Act and its regulations. The Agency shall reopen the
    new unit's CAAPP permit for cause to incorporate the
    approved Phase II acid rain permit in accordance with this
    Section. The Phase II acid rain permit for the new unit
    shall become effective no later than the date required
    under Title IV of the Clean Air Act and its regulations.
        e. A designated representative of an affected source
    for acid deposition shall submit a timely and complete
    Title IV NOx permit application to the Agency, not later
    than January 1, 1998, that meets the requirements of
    Titles IV and V of the Clean Air Act and its regulations.
    The Agency shall reopen the Phase II acid rain permit for
    cause and incorporate the approved NOx provisions into the
    Phase II acid rain permit not later than January 1, 1999,
    in accordance with this Section, except as modified by
    Title IV of the Clean Air Act and regulations promulgated
    thereunder. Such reopening shall not affect the term of
    the Phase II acid rain permit.
        f. The designated representative of the affected
    source for acid deposition shall renew the initial CAAPP
    permit and Phase II acid rain permit in accordance with
    this Section and Title V of the Clean Air Act and
    regulations promulgated thereunder, except as modified by
    Title IV of the Clean Air Act and regulations promulgated
    thereunder.
        g. In the case of an affected source for acid
    deposition for which a complete Phase II acid rain permit
    application and compliance plan are timely received under
    this subsection, the complete permit application and
    compliance plan, including amendments thereto, shall be
    binding on the owner, operator and designated
    representative, all affected units for acid deposition at
    the affected source, and any other unit, as defined in
    Section 402 of the Clean Air Act, governed by the Phase II
    acid rain permit application and shall be enforceable as
    an acid rain permit for purposes of Titles IV and V of the
    Clean Air Act, from the date of submission of the acid rain
    permit application until a Phase II acid rain permit is
    issued or denied by the Agency.
        h. The Agency shall not include or implement any
    measure which would interfere with or modify the
    requirements of Title IV of the Clean Air Act or
    regulations promulgated thereunder.
        i. Nothing in this Section shall be construed as
    affecting allowances or USEPA's decision regarding an
    excess emissions offset plan, as set forth in Title IV of
    the Clean Air Act or regulations promulgated thereunder.
            i. No permit revision shall be required for
        increases in emissions that are authorized by
        allowances acquired pursuant to the acid rain program,
        provided that such increases do not require a permit
        revision under any other applicable requirement.
            ii. No limit shall be placed on the number of
        allowances held by the source. The source may not,
        however, use allowances as a defense to noncompliance
        with any other applicable requirement.
            iii. Any such allowance shall be accounted for
        according to the procedures established in regulations
        promulgated under Title IV of the Clean Air Act.
        j. To the extent that the federal regulations
    promulgated under Title IV, including but not limited to
    40 C.F.R. Part 72, as now or hereafter amended, are
    inconsistent with the federal regulations promulgated
    under Title V, the federal regulations promulgated under
    Title IV shall take precedence.
        k. The USEPA may intervene as a matter of right in any
    permit appeal involving a Phase II acid rain permit
    provision or denial of a Phase II acid rain permit.
        l. It is unlawful for any owner or operator to violate
    any terms or conditions of a Phase II acid rain permit
    issued under this subsection, to operate any affected
    source for acid deposition except in compliance with a
    Phase II acid rain permit issued by the Agency under this
    subsection, or to violate any other applicable
    requirements.
        m. The designated representative of an affected source
    for acid deposition shall submit to the Agency the data
    and information submitted quarterly to USEPA, pursuant to
    40 CFR 75.64, concurrently with the submission to USEPA.
    The submission shall be in the same electronic format as
    specified by USEPA.
        n. The Agency shall act on any petition for exemption
    of a new unit or retired unit, as those terms are defined
    in Section 402 of the Clean Air Act, from the requirements
    of the acid rain program in accordance with Title IV of the
    Clean Air Act and its regulations.
        o. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary to implement this subsection.
 
    18. Fee Provisions.
        a. A source subject to this Section or excluded under
    subsection 1.1 or paragraph (c) of subsection 3 of this
    Section, shall pay a fee as provided in this paragraph (a)
    of subsection 18. However, a source that has been excluded
    from the provisions of this Section under subsection 1.1
    or under paragraph (c) of subsection 3 of this Section
    because the source emits less than 25 tons per year of any
    combination of regulated air pollutants, except greenhouse
    gases, shall pay fees in accordance with paragraph (1) of
    subsection (b) of Section 9.6.
            i. The fee for a source allowed to emit less than
        100 tons per year of any combination of regulated air
        pollutants, except greenhouse gases, shall be $1,800
        per year, and that fee shall increase, beginning
        January 1, 2012, to $2,150 per year.
            ii. The fee for a source allowed to emit 100 tons
        or more per year of any combination of regulated air
        pollutants, except greenhouse gases and those
        regulated air pollutants excluded in paragraph (f) of
        this subsection 18, shall be as follows:
                A. The Agency shall assess a fee of $18 per
            ton, per year for the allowable emissions of
            regulated air pollutants subject to this
            subparagraph (ii) of paragraph (a) of subsection
            18, and that fee shall increase, beginning January
            1, 2012, to $21.50 per ton, per year. These fees
            shall be used by the Agency and the Board to fund
            the activities required by Title V of the Clean
            Air Act including such activities as may be
            carried out by other State or local agencies
            pursuant to paragraph (d) of this subsection. The
            amount of such fee shall be based on the
            information supplied by the applicant in its
            complete CAAPP permit application or in the CAAPP
            permit if the permit has been granted and shall be
            determined by the amount of emissions that the
            source is allowed to emit annually, provided
            however, that the maximum fee for a CAAPP permit
            under this subparagraph (ii) of paragraph (a) of
            subsection 18 is $250,000, and increases,
            beginning January 1, 2012, to $294,000. Beginning
            January 1, 2012, the maximum fee under this
            subparagraph (ii) of paragraph (a) of subsection
            18 for a source that has been excluded under
            subsection 1.1 of this Section or under paragraph
            (c) of subsection 3 of this Section is $4,112. The
            Agency shall provide as part of the permit
            application form required under subsection 5 of
            this Section a separate fee calculation form which
            will allow the applicant to identify the allowable
            emissions and calculate the fee. In no event shall
            the Agency raise the amount of allowable emissions
            requested by the applicant unless such increases
            are required to demonstrate compliance with terms
            of a CAAPP permit.
                Notwithstanding the above, any applicant may
            seek a change in its permit which would result in
            increases in allowable emissions due to an
            increase in the hours of operation or production
            rates of an emission unit or units and such a
            change shall be consistent with the construction
            permit requirements of the existing State permit
            program, under subsection (a) of Section 39 of
            this Act and applicable provisions of this
            Section. Where a construction permit is required,
            the Agency shall expeditiously grant such
            construction permit and shall, if necessary,
            modify the CAAPP permit based on the same
            application.
                B. The applicant or permittee may pay the fee
            annually or semiannually for those fees greater
            than $5,000. However, any applicant paying a fee
            equal to or greater than $100,000 shall pay the
            full amount on July 1, for the subsequent fiscal
            year, or pay 50% of the fee on July 1 and the
            remaining 50% by the next January 1. The Agency
            may change any annual billing date upon reasonable
            notice, but shall prorate the new bill so that the
            permittee or applicant does not pay more than its
            required fees for the fee period for which payment
            is made.
        b. (Blank).
        c. (Blank).
        d. There is hereby created in the State Treasury a
    special fund to be known as the Clean Air Act Permit Fund
    (formerly known as the CAA Permit Fund). All Funds
    collected by the Agency pursuant to this subsection shall
    be deposited into the Fund. The General Assembly shall
    appropriate monies from this Fund to the Agency and to the
    Board to carry out their obligations under this Section.
    The General Assembly may also authorize monies to be
    granted by the Agency from this Fund to other State and
    local agencies which perform duties related to the CAAPP.
    Interest generated on the monies deposited in this Fund
    shall be returned to the Fund.
        e. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary to implement this subsection.
        f. For purposes of this subsection, the term
    "regulated air pollutant" shall have the meaning given to
    it under subsection 1 of this Section but shall exclude
    the following:
            i. carbon monoxide;
            ii. any Class I or II substance which is a
        regulated air pollutant solely because it is listed
        pursuant to Section 602 of the Clean Air Act; and
            iii. any pollutant that is a regulated air
        pollutant solely because it is subject to a standard
        or regulation under Section 112(r) of the Clean Air
        Act based on the emissions allowed in the permit
        effective in that calendar year, at the time the
        applicable bill is generated.
 
    19. Air Toxics Provisions.
        a. In the event that the USEPA fails to promulgate in a
    timely manner a standard pursuant to Section 112(d) of the
    Clean Air Act, the Agency shall have the authority to
    issue permits, pursuant to Section 112(j) of the Clean Air
    Act and regulations promulgated thereunder, which contain
    emission limitations which are equivalent to the emission
    limitations that would apply to a source if an emission
    standard had been promulgated in a timely manner by USEPA
    pursuant to Section 112(d). Provided, however, that the
    owner or operator of a source shall have the opportunity
    to submit to the Agency a proposed emission limitation
    which it determines to be equivalent to the emission
    limitations that would apply to such source if an emission
    standard had been promulgated in a timely manner by USEPA.
    If the Agency refuses to include the emission limitation
    proposed by the owner or operator in a CAAPP permit, the
    owner or operator may petition the Board to establish
    whether the emission limitation proposal submitted by the
    owner or operator provides for emission limitations which
    are equivalent to the emission limitations that would
    apply to the source if the emission standard had been
    promulgated by USEPA in a timely manner. The Board shall
    determine whether the emission limitation proposed by the
    owner or operator or an alternative emission limitation
    proposed by the Agency provides for the level of control
    required under Section 112 of the Clean Air Act, or shall
    otherwise establish an appropriate emission limitation,
    pursuant to Section 112 of the Clean Air Act.
        b. Any Board proceeding brought under paragraph (a) or
    (e) of this subsection shall be conducted according to the
    Board's procedures for adjudicatory hearings and the Board
    shall render its decision within 120 days of the filing of
    the petition. Any such decision shall be subject to review
    pursuant to Section 41 of this Act. Where USEPA
    promulgates an applicable emission standard prior to the
    issuance of the CAAPP permit, the Agency shall include in
    the permit the promulgated standard, provided that the
    source shall have the compliance period provided under
    Section 112(i) of the Clean Air Act. Where USEPA
    promulgates an applicable standard subsequent to the
    issuance of the CAAPP permit, the Agency shall revise such
    permit upon the next renewal to reflect the promulgated
    standard, providing a reasonable time for the applicable
    source to comply with the standard, but no longer than 8
    years after the date on which the source is first required
    to comply with the emissions limitation established under
    this subsection.
        c. The Agency shall have the authority to implement
    and enforce complete or partial emission standards
    promulgated by USEPA pursuant to Section 112(d), and
    standards promulgated by USEPA pursuant to Sections
    112(f), 112(h), 112(m), and 112(n), and may accept
    delegation of authority from USEPA to implement and
    enforce Section 112(l) and requirements for the prevention
    and detection of accidental releases pursuant to Section
    112(r) of the Clean Air Act.
        d. The Agency shall have the authority to issue
    permits pursuant to Section 112(i)(5) of the Clean Air
    Act.
        e. The Agency has the authority to implement Section
    112(g) of the Clean Air Act consistent with the Clean Air
    Act and federal regulations promulgated thereunder. If the
    Agency refuses to include the emission limitations
    proposed in an application submitted by an owner or
    operator for a case-by-case maximum achievable control
    technology (MACT) determination, the owner or operator may
    petition the Board to determine whether the emission
    limitation proposed by the owner or operator or an
    alternative emission limitation proposed by the Agency
    provides for a level of control required by Section 112 of
    the Clean Air Act, or to otherwise establish an
    appropriate emission limitation under Section 112 of the
    Clean Air Act.
 
    20. Small Business.
        a. For purposes of this subsection:
        "Program" is the Small Business Stationary Source
    Technical and Environmental Compliance Assistance Program
    created within this State pursuant to Section 507 of the
    Clean Air Act and guidance promulgated thereunder, to
    provide technical assistance and compliance information to
    small business stationary sources;
        "Small Business Assistance Program" is a component of
    the Program responsible for providing sufficient
    communications with small businesses through the
    collection and dissemination of information to small
    business stationary sources; and
        "Small Business Stationary Source" means a stationary
    source that:
            1. is owned or operated by a person that employs
        100 or fewer individuals;
            2. is a small business concern as defined in the
        "Small Business Act";
            3. is not a major source as that term is defined in
        subsection 2 of this Section;
            4. does not emit 50 tons or more per year of any
        regulated air pollutant, except greenhouse gases; and
            5. emits less than 75 tons per year of all
        regulated pollutants, except greenhouse gases.
        b. The Agency shall adopt and submit to USEPA, after
    reasonable notice and opportunity for public comment, as a
    revision to the Illinois state implementation plan, plans
    for establishing the Program.
        c. The Agency shall have the authority to enter into
    such contracts and agreements as the Agency deems
    necessary to carry out the purposes of this subsection.
        d. The Agency may establish such procedures as it may
    deem necessary for the purposes of implementing and
    executing its responsibilities under this subsection.
        e. There shall be appointed a Small Business Ombudsman
    (hereinafter in this subsection referred to as
    "Ombudsman") to monitor the Small Business Assistance
    Program. The Ombudsman shall be a nonpartisan designated
    official, with the ability to independently assess whether
    the goals of the Program are being met.
        f. The State Ombudsman Office shall be located in an
    existing Ombudsman office within the State or in any State
    Department.
        g. There is hereby created a State Compliance Advisory
    Panel (hereinafter in this subsection referred to as
    "Panel") for determining the overall effectiveness of the
    Small Business Assistance Program within this State.
        h. The selection of Panel members shall be by the
    following method:
            1. The Governor shall select two members who are
        not owners or representatives of owners of small
        business stationary sources to represent the general
        public;
            2. The Director of the Agency shall select one
        member to represent the Agency; and
            3. The State Legislature shall select four members
        who are owners or representatives of owners of small
        business stationary sources. Both the majority and
        minority leadership in both Houses of the Legislature
        shall appoint one member of the panel.
        i. Panel members should serve without compensation but
    will receive full reimbursement for expenses including
    travel and per diem as authorized within this State.
        j. The Panel shall select its own Chair by a majority
    vote. The Chair may meet and consult with the Ombudsman
    and the head of the Small Business Assistance Program in
    planning the activities for the Panel.
 
    21. Temporary Sources.
        a. The Agency may issue a single permit authorizing
    emissions from similar operations by the same source owner
    or operator at multiple temporary locations, except for
    sources which are affected sources for acid deposition
    under Title IV of the Clean Air Act.
        b. The applicant must demonstrate that the operation
    is temporary and will involve at least one change of
    location during the term of the permit.
        c. Any such permit shall meet all applicable
    requirements of this Section and applicable regulations,
    and include conditions assuring compliance with all
    applicable requirements at all authorized locations and
    requirements that the owner or operator notify the Agency
    at least 10 days in advance of each change in location.
 
    22. Solid Waste Incineration Units.
        a. A CAAPP permit for a solid waste incineration unit
    combusting municipal waste subject to standards
    promulgated under Section 129(e) of the Clean Air Act
    shall be issued for a period of 12 years and shall be
    reviewed every 5 years, unless the Agency requires more
    frequent review through Agency procedures.
        b. During the review in paragraph (a) of this
    subsection, the Agency shall fully review the previously
    submitted CAAPP permit application and corresponding
    reports subsequently submitted to determine whether the
    source is in compliance with all applicable requirements.
        c. If the Agency determines that the source is not in
    compliance with all applicable requirements it shall
    revise the CAAPP permit as appropriate.
        d. The Agency shall have the authority to adopt
    procedural rules, in accordance with the Illinois
    Administrative Procedure Act, as the Agency deems
    necessary, to implement this subsection.
(Source: P.A. 99-380, eff. 8-17-15; 99-933, eff. 1-27-17;
100-103, eff. 8-11-17.)
 
    Section 99. Effective date. This Act takes effect upon
becoming law.